ML20010D141
| ML20010D141 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 11/26/2019 |
| From: | Greg Werner Operations Branch IV |
| To: | Entergy Operations |
| References | |
| Download: ML20010D141 (1) | |
Text
Attachment 6 OBDI 202 - IOLE Process Rev 3 PROPOSED OUTLINE COMMENTS Facility:
River Bend First Exam Date:
November 18, 2019 Written Exam Outline Comment Resolution 1 NRC Generated 2 No additional comments Administrative JPM Outline Comment Resolution 1
Ensure that A7 meets the requirement for SRO only level of knowledge. The title seems to indicate RO task.
The applicant will have to determine the operability of the broken equipment and determine the entry requirements into the EOOS computer program. At RBS this function is normally performed by the CRS or STA on shift. ROs do not use the EOOS computer.
Control Room / In-Plant System JPM Outline Comment Resolution 1
Most of the bank and modified JPMs indicate when the bank was last used or what JPM it was modified for. Please provide that for f, g, and j.
- f. Original JPM was to Parallel and load not secure.
- g. Original is noted.
- j. Alternate path was used in Dec 2010.
2 In counting your attributes, you are assigning an (E) to four simulator JPMs.
The (E) designation is only used for in-plant JPMs. (See ES-301-D.4.b, page 14).
ES-301-2 updated.
3 Are d, e, I, j, and k the JPMs for the SRO-U?
Yes. Added additional line in table to designate JPMs.
Simulator Scenario Outline Comments Comment Resolution 1 No Comments