Category:Letter
MONTHYEARGO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan IR 05000397/20230042024-01-29029 January 2024 Integrated Inspection and Independent Spent Fuel Storage Installation Report 05000397/2023004 and 07200035/2023001 GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing2024-01-29029 January 2024 Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing ML24011A1522024-01-10010 January 2024 March 2024 Emergency Preparedness Exercise Inspection-Request for Information GO2-24-005, Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-1702024-01-0808 January 2024 Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-170 GO2-23-136, Guarantee of Payment of Deferred Premium2023-12-20020 December 2023 Guarantee of Payment of Deferred Premium GO2-23-135, Notice of Readiness for Supplemental Inspection2023-12-14014 December 2023 Notice of Readiness for Supplemental Inspection GO2-23-130, Reply to a Notice of Violation; EA-23-0542023-12-14014 December 2023 Reply to a Notice of Violation; EA-23-054 GO2-23-105, Licensing Basis Document Update and Biennial Commitment Change Report2023-12-12012 December 2023 Licensing Basis Document Update and Biennial Commitment Change Report ML23288A0002023-12-0707 December 2023 Issuance of Amendment No. 272 to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position GO2-23-107, Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation2023-12-0505 December 2023 Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-23-126, Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-012023-11-28028 November 2023 Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-01 GO2-23-121, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-27027 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000397/20230122023-11-20020 November 2023 Commercial Grade Dedication Inspection Report 05000397/2023012 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000397/20230102023-11-0909 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000397/2023010 IR 05000397/20230932023-11-0101 November 2023 Final Significance Determination of a White Finding, Notice of Violation and Follow-Up Assessment Letter; NRC Inspection Report 05000397/2023093 ML23299A2072023-10-26026 October 2023 Biennial Requalification Inspection Request for Information IR 05000397/20230032023-10-25025 October 2023 Integrated Inspection Report 05000397/2023003 IR 05000397/20230112023-10-0404 October 2023 License Renewal Phase 2 Report 05000397/2023011 IR 05000397/20234012023-09-11011 September 2023 Security Baseline Inspection Report 05000397/2023401 GO2-23-097, In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26)2023-09-0606 September 2023 In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26) ML24032A2182023-09-0101 September 2023 Information Request, Security IR 2024401 GO2-23-100, Technical Specification Section 5.6.4 Post Accident Monitoring Instrumentation 14-Day Report for Inoperable Suppression Pool Level Indication2023-08-31031 August 2023 Technical Specification Section 5.6.4 Post Accident Monitoring Instrumentation 14-Day Report for Inoperable Suppression Pool Level Indication GO2-23-056, Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2023-08-29029 August 2023 Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling IR 05000397/20230052023-08-22022 August 2023 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2023005) - Mid Year Letter IR 05000397/20230022023-08-0101 August 2023 Integrated Inspection Report 05000397/2023002 GO2-23-093, Supplement to Reply to a Notice of Violation: EA-21-1702023-07-27027 July 2023 Supplement to Reply to a Notice of Violation: EA-21-170 ML23206A2442023-07-25025 July 2023 Energy Northwest Columbia Generating Station, Response to Apparent Violation in NRC Inspection Report 05000397/2023092; EA-23-054 GO2-23-068, Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation2023-07-19019 July 2023 Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation GO2-23-090, Reply to a Notice of Violation2023-07-12012 July 2023 Reply to a Notice of Violation ML23143A1202023-06-27027 June 2023 Request Number 4ISI-11 to the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Regarding Alternate Examination of Reactor Vessel Welds GO2-23-073, Notification of NPDES Permit Issuance2023-06-26026 June 2023 Notification of NPDES Permit Issuance ML23163A2502023-06-12012 June 2023 Summary of Changes and Analysis for Revision 41 of Plant Procedures Manual 13.8.1 Emergency Dose Projection System Operations GO2-23-072, Cycle 27 Core Operating Limits Report2023-06-0505 June 2023 Cycle 27 Core Operating Limits Report ML23157A2702023-06-0101 June 2023 4-2022-011 -022 Letter - OI Closure to Licensee IR 05000397/20230922023-06-0101 June 2023 NRC Inspection Report 05000397/2023092 and Preliminary White Finding IR 05000397/20230902023-06-0101 June 2023 Final Significance Determination of a White Finding, Notice of Violation and Follow-Up Assessment Letter; NRC Inspection Report 05000397/2023090 GO2-23-055, Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report IR 05000397/20230012023-05-0505 May 2023 Integrated Inspection Report 05000397/2023001 - April 26, 2023 GO2-23-006, License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications2023-05-0101 May 2023 License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications IR 05000397/20233012023-05-0101 May 2023 NRC Examination Report 05000397/2023301 GO2-23-053, 2022 Annual Environmental Operating Report2023-04-26026 April 2023 2022 Annual Environmental Operating Report GO2-23-057, 2022 Annual Radioactive Effluent Release Report2023-04-25025 April 2023 2022 Annual Radioactive Effluent Release Report ML23110A2642023-04-20020 April 2023 Request for Information License Renewal Phase 2 Inspection GO2-23-012, Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2023-03-27027 March 2023 Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position GO2-23-041, Generation Station - Level of Financial Protection - Annual Reporting Requirement2023-03-15015 March 2023 Generation Station - Level of Financial Protection - Annual Reporting Requirement GO2-23-038, Plant Decommissioning Fund Status Report2023-03-15015 March 2023 Plant Decommissioning Fund Status Report ML23013A0812023-03-15015 March 2023 Issuance of Amendment No. 270 Revision to Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times-RITSTF Initiative 4B GO2-23-034, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462023-03-13013 March 2023 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 2024-01-08
[Table view] Category:Meeting Agenda
MONTHYEARML23264A1422023-09-21021 September 2023 Presubmittal Teleconference with Energy Northwest Regarding Proposed Request for U.S. Nuclear Regulatory Commission Approval to Revise the Emergency Plan in Its Entirety for Columbia Generating Station PMNS20230360, Public Open House to Discuss the Nuclear Regulatory Commission'S (NRC) 2022 Annual Assessment of Safety Performance at Columbia Generating Station2023-04-0303 April 2023 Public Open House to Discuss the Nuclear Regulatory Commission'S (NRC) 2022 Annual Assessment of Safety Performance at Columbia Generating Station PMNS20220467, Public Webinar to Discuss the Nuclear Regulatory Commission'S 2021 Annual Assessment of Safety Performance at Region IV Plants2022-05-0303 May 2022 Public Webinar to Discuss the Nuclear Regulatory Commission'S 2021 Annual Assessment of Safety Performance at Region IV Plants ML22040A3522022-02-15015 February 2022 Notice of Public Meeting to Discuss Safety Significance of Preliminary Finding of Low to Moderate Safety Significance and Associated Apparent Violations of NRC Requirements ML21280A1332021-10-0707 October 2021 Pre-Application Teleconference with Energy Northwest to Discuss Planned License Amendment Requests for Columbia Generating Station (EPID L--2021-LRM-0102) PMNS20210563, Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek2021-04-29029 April 2021 Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek ML21084A1392021-03-25025 March 2021 Pre-Application Teleconference with Energy Northwest to Discuss a Planned License Amendment Request for Columbia Generating Station ML20276A3302020-10-0202 October 2020 Presubmittal Teleconference with Energy Northwest Regarding Proposed COVID-19 Related Biennial Emergency Preparedness Exercise Exemption Request for Columbia Generating Station ML20170B1872020-06-19019 June 2020 Public Webinar to Discuss the Nrc'S Assessment of Safety Performance at Region IV Plants for 2019 ML16132A5122016-05-16016 May 2016 Notice Of Closed Meeting With USACE, NRC And Energy Northwest To Discuss Flood Analysis Associated With Columbia Generating Station ML15153A2252015-06-0202 June 2015 Meeting Notice with Columbia Generating Station to Discuss an Apparent Violation Identified at Columbia Generating Station Concerning the Failure of Emergency Plan Implementing Procedures to Implement Requirements of the Columbia.. ML12278A1212012-10-0404 October 2012 Notice of Pre-licensing Meeting to Discuss Future License Amendment Request to Address Impacts of Remediation Activities Undertaken by Department of Energy in the Owner-Controlled Area at Columbia Generating Station ML11238A1202011-09-0707 September 2011 Notice of Forthcoming Meeting to Discuss the D-SEIS for the Lr of Columbia Generating Station ML1117305512011-06-21021 June 2011 Notice of Forthcoming Pre-Licensing Meeting with Energy Northwest to Discuss Proposed Power Range Neutron Monitoring System/Arts/Mellla License Amendment Request for Columbia Generating Station ML1100300742010-12-14014 December 2010 Correction to Forthcoming Pre-Licensing Meeting with Energy Northwest(Tac No. ME5129), to Discuss Proposed Installation of a Digital Power Range Neutron Monitoring System, Average Power Range Monitor/Rod Block Monitor/Technical Specificatio ML1026302282010-10-0101 October 2010 04/27/10 Summary of Tribal Outreach Informational Meeting Concerning Columbia Generating Station License Renewal and Hanford Low Level Waste ML1019300832010-07-12012 July 2010 Notice of Meeting with Energy Northwest, Columbia Generating Station to Discuss the Acceptance Review and Request for Supplemental Information Regarding the Licensee'S Application Dated 05/11/10 to Install a Digital Neutron Monitoring Syste ML1008104032010-03-25025 March 2010 04/06/2010 Notice of Forthcoming Meeting to Discuss the License Renewal Process and Environmental Scoping for Columbia Generating Station License Renewal Application Review ML0935700732009-12-23023 December 2009 Notice of Conference Call with Energy Northwest to Discuss Columbia Generating Station'S Planned Emergency Action Level Changes ML0928810622009-10-14014 October 2009 Presentation Slides, Energy Re 618-11 Burial Ground Project Status ML0926705872009-10-0101 October 2009 Notice of Meeting with Energy Northwest to Discuss Pre-licensing Activities Associated with Proposed Department of Energy Remediation of the 618-11 Burial Grounds for the Columbia Generating Station ML0613105062006-05-11011 May 2006 Notice of Meeting with Energy Northwest Columbia Generating Station end-of-cycle Performance Assessment ML0532504282005-11-21021 November 2005 12/6-7/05 Notice of Meeting with Energy Northwest to Conduct a Working - Level Discussion Related to the Schedule and Approach of the Alternative Source Term Amendment for Columbia Generating Station ML0532504432005-11-21021 November 2005 12/8/05 Notice of Columbia Generating Meeting with Energy Northwest to Discuss Information Related to Diesel Generating Allowed Completion Time ML0506000272005-03-0101 March 2005 Notice of Meeting with Energy Northwest (Columbia Generating Station) to Discuss RAI Questions Provided by NRC for the Proposed TS Application License Amendment for Diesel Generator Completion Time Extension at Columbia Generating Station ML0422602762004-08-12012 August 2004 Meeting Summary of the August 8, 2004 Public Workshop - Region IV Operator Licensing Feedback ML0418403962004-07-0202 July 2004 Forthcoming Meeting with Licensees to Discuss Operator Licensing Program Policies and Recent Revisions ML0405701032004-03-0202 March 2004 Notice of Meeting with Columbia Generating Station Proposed Regulatory Guide 1.200 Pilot Application License Amendment for Diesel Generator Completion Time Extension at Columbia Gs. ML0336303852003-12-30030 December 2003 Notice of Meeting with Energy Northwest Re Columbia Generating Station - to Discuss Shutdown Cooling Reportability Issues ML0334604512003-12-18018 December 2003 Notice of Meeting with Energy Northwest Regarding Resubmittal of Alternate Source Term License Amendment for Columbia Generating Station ML0314003142003-04-18018 April 2003 Meeting Summary for End-of-Cycle Performance Assessment for Columbia Generating Station ML0307107712003-03-14014 March 2003 Meeting with Columbia Generating Station to Discuss Recent Station Performance Issues & AST Submittal Progress ML0208107562002-03-19019 March 2002 Operator Licensing Workshop Meeting Summary ML17037B8001978-03-17017 March 1978 Information Meeting on BWR Equipment Seismic Qualification ML18191A2701976-07-14014 July 1976 Wppss Nuclear Project No. 2. Main Steam Isolation Valve Leakage Control System 2023-09-21
[Table view] |
Text
NRC FORM 195 U.S. NUCLL'AR REGULATORY COM N DOCKET NUMBER I2 76)
FILE NUMOER NRC D'ATTRIBUTION FDRiPART 50 DOCKET MATERIAL PUBLIC MR D B VASSALID FROM: WASHINGTON SYSTEMS RICHLAND'ASH POWER SUPPL l-l DATE OF DOCUMENT D L RENBERGER z- ls-14 DATE RECEIVED BETTE R ONO ORIZED PROP INPUT FORM NUMBER OF COPIES RECEIVED 0% 0 G INAL NCLASSIFIED OPY I gi,'TR DESCRIPTION ENCLOSURE REF THEIR 10-21-75 LTR AND OUR 12-2-75 LTR
~ ~ ~ ~ .DISCUSSING MAIN STEAM ISOLATION VALVE LEMON.GE CONTROL SYSTEM@ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
Ziti 3.4 PLANT NA>IE: ~ q~qg +~
I-Pe
.L SAFETY FOR ACTION/INFORMATION ASSXGNED AD: ASS NED A BRANCH CHIEF:
PROJECT lfANAGER: Pll0 LIC ~ ASSTo: LC ~ C INTERNAL DISTRIBUTION El FIL SYSTEMS SAFETY SITE 5~A 1&~R HEINEMAN ENVI 0 ANA S I& E SCHROEDER BENAROYA OELD GOSSICK & STAFF ENGINEERXNG IPPOLXTO NXPC iIACCARRY KXRIQJOOD CASE KNXGHT HANAUER SIHMEIL OPERATIN GRIEVES REACTO S PAWLICKI PROJECT NA EMEN REACTOR SAFE'EY OPERATXN BOYD ROSS EISENH P COLLINS NOVAK SHAD HOUSTON ROSZTOCZY BAER PETERSON CHF.CK BUTLER S A lIELTZ HELTEMES AT&I SKOVHOLT SALTZMAN RUTBERG EXTERNAL DISTRIBUTION CONTROL NUMBER LPDR: NAT LAB: BROOKHAVEN TXC: REG, VIE ULRIKSON ORNL NST LA PDR ASLB: CONSULTANTS ACRS CYS HOLDING . EN
S
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ l
Washington Public Power Supply System A JOINT OPERATING AGENCY P. O~ BOX S68 3000 GEO. WASHINGTON WAY AIGHI.ANO, WASHINGTON 95352 PHON@(50&) 546 IS II (Docket No. 50-397)
July 14, 1976 G02-76-294 Director Of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Mr. Domenic B. Vassallo
/.">>
Light Water Reactors Project Branch 4 i++
Subject:
WPPSS NUCLEAR PROJECT NO. 2 MAIN STEAM ISOLATION VALVE LEAKAGE CONTROL SYSTEM
References:
- 1) Letter, O.D; Parr to J.J. Stein entitled, "Main Steam Isolation Valve Leakage Contvol System," dated
.November 21, 1975. (GI2-75-162)
- 2) Letter, N.O. Strand to O.D. Parr entitled, NMain Steam Isolation Valve Leakage Control System," dated December 2, 1975. (G02-75-329)
Dear Mr. Vassallo:
With regard to the referenced request .for a commitment to provide an interlock prohibiting depressurization of the main steamline inboard main steamline isolation valve fails to close, we have reviewed if the the feasibility of providing the desired interlock. It appears the present switches on the inboard main 'steamline isolation valves can be changed out for switches which can accommodate the desired interlock.
Therefore, we are proceeding on the basis the inteI"lock can be provided and are taking steps to modify the existing valves to accept tne interlock.
Very truly yours, g@ k,A~.
D. L. RENBERGER Assistant Director Generation and Technology crSIN P DLR:GLG:mb C cc: JJ Byrnes - B8R-FA MacLean - GE JJ Verderber - BSR D Roe - BPA
1 C~
I \
'0 1 I