ML22040A352
| ML22040A352 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 02/15/2022 |
| From: | Jonathan Evans Office of Nuclear Reactor Regulation, Division of Nuclear Materials Safety IV |
| To: | |
| Antonangeli D | |
| References | |
| EA-21-170 | |
| Download: ML22040A352 (5) | |
Text
February 15, 2022 NOTICE OF PUBLIC MEETING Licensee:
Energy Northwest Facility:
Columbia Generating Station Docket No:
05000397 Licensee No:
EA-21-170 Date and Time:
Tuesday, March 1, 2022 9:00 AM CST Location:
U.S. Nuclear Regulatory Commission Region IV (RIV)
Conference Rooms 1 and 2 1600 East Lamar Blvd Arlington, TX 76011 (Due to COVID-19 conditions, public participation will be via WebEx and teleconference only. The public attendees will be able to view the presentations via WebEx but will only be able to listen in and engage via the provided bridge line. The WebEx registration link is available below.)
Purpose:
The purpose of this regulatory conference is to discuss the safety significance of a preliminary finding of low to moderate safety significance and associated apparent violations of NRC requirements in regard to the reactor water cleanup (RWCU) radioactive material uptake event that occurred at Columbia Generating Station (CGS) before the agency makes a final determination. These findings and apparent violations are discussed in NRC Inspection Report 05000397/2021-090, dated January 13, 2022 (NRC's Agencywide Documents Access and Management System [ADAMS] Accession No. ML21347A988).
NRC Attendees:
Scott Morris, Regional Administrator, RIV John Monninger, Deputy Regional Administrator, RIV Mary Muessle, Director, Division of Radiological Safety and Security, RIV Jeremy Groom, Allegation Coordinator and Enforcement, RIV Greg Warnick, Chief, Decommissioning, ISFSI, and Operating Reactors Branch, RIV (DIORB)
Jonathan Evans, Acting Chief, DIORB David Cylkowski, Regional Counsel, RIV Natasha Greene, PhD, Senior Health Physicist, DIORB, RIV Dominic Antonangeli, Health Physicist, DIORB, RIV Others, as designated
Licensee Attendees:
Grover Hettel, Vice President, Nuclear Generation / Chief Nuclear Officer Dave Brown, Site Vice President Randy Prewett, Plant General Manager Tony Hedges, Manager, Chemistry/Radiological Services Sam Nappi, Assistant Manager, Chemistry/Radiological Services Desirée Wolfgramm, Manager, Regulatory Affairs Rick Wynegar, Supervisor, Regulatory Compliance Others, as designated Public Participation:
This conference is open to public observation and questions following the formal portion of the meeting via teleconference only due to COVID-19 pandemic restrictions.
Bridge Line Phone Number: (800) 857-5003, Passcode: 5204033 REGISTRATION LINK This is the WebEx Attendee Registration link. Everyone must register to get the actual link to join the meeting and to receive the reminder email.
https://usnrc.webex.com/usnrc/onstage/g.php?MTID=e5a24e6a1e2fef72cd2b7391d6bf9f0de
PUBLIC MEETING AGENDA
REGULATORY CONFERENCE Columbia Generating Station Tuesday, March 1, 2022 9:00 AM to 12:00 PM (CST)
Online Guests via WebEx Topic Participants NRC Opening Remarks and Introductions Scott Morris Licensee Opening Remarks and
Introductions
Columbia Generating Station Regulatory Conference Process Mary Muessle Summary of the Event, White Finding, and Violations Jonathan Evans NRCs Dispositioning Process & Outcomes Natasha Greene, PhD Possible Outcomes and Licensee Appeal Rights Jeremy Groom Summary of Apparent Violations Dominic Antonangeli Licensee Presentation Columbia Generating Station Questions and Discussion NRC and Licensee Participants Break and NRC Caucus NRC and Licensee Participants Questions and Discussion NRC and Licensee Participants Licensee Closing Remarks Columbia Generating Station NRC Closing Remarks Scott Morris Public Question and Answer Session Public Attendees
Meeting
Contact:
Jonathan Evans, Acting Branch Chief Decommissioning, ISFSI, and Reactor Operations Branch (DIORB)
Division of Radiological Safety and Security (DRSS)
(301) 415-4024 Jonathan.Evans@nrc.gov Approved by:
Jonathan Evans Acting Branch Chief, DRSS/DIORB Signed by:
Mary Muessle Director, DRSS, RIV Signed by Evans, Jonathan on 02/10/22 Signed by Muessle, Mary on 02/15/22
SUBJECT:
NOTICE OF PUBLIC MEETING-DATED FEBRUARY 15, 2022 DISTRIBUTION:
SMorris, RA JMonninger, DRA MMuessle, RIV/D GMiller, RIV/DD MHay, DRP NTaylor, DRP RLantz, DRS JDixon, DRS DCylkowski, RC LHowell, RIV/OEDO VDricks, ORA LWilkins, OCA MChawla, NRR AMoreno, RIV/OCA RAlexander, RSLO JJosey, DRP HFreeman, DRP SSchwind, DRP SLichvar, DRP HMarchlewski, DRP PNiebaum, DRP ADonley DRP MBennett, DRP BCorrell, IPAT LFlores, IPAT FRamirez, IPAT GWarnick, RIB NGreene, RIB DAntonangeli, RIB R4Enforcement Resource RIV Guards EClay, DRMA PHall, DRMA AMattila, DRMA LGomez, DRMA JMurray, ORA ADAMS Accession Number: ML22040A352 Publicly Available Non-Publicly Available Sensitive Non-Sensitive OFFICE RIV/DRSS RIV/DIORB RIV/OPA RIV/ACES NAME Dir:MMuessle ABC:JEvans SPAO: VDricks TL: JGroom DATE 02/15/22 02/10/22 02/10/22 02/10/22 OFFICIAL RECORD COPY