Similar Documents at Surry |
---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML18152B6571999-04-28028 April 1999 Application for Amends to Licenses DPR-32 & DPR-37,revising TSs Re Refueling Water Chemical Addition Tank Min Vol ML18152B5431999-02-16016 February 1999 Application for Amends to Licenses DPR-32 & DPR-37,revising TS Re Augmented Insp Requirements for Reactor Coolant Pump Flywheels ML18152B5501999-02-16016 February 1999 Application for Amends to Licenses DPR-32 & DPR-37,proposing Administrative Change That Will Consolidate AFW cross-connect Requirements by Relocation of Electrical Power Requirements from TS 3.16 to TS 3.6 ML18152B6131998-11-0404 November 1998 Application for Amends to Licenses DPR-32 & DPR-37,revising EDG Start & Load Time Testing Requirements in TS 4.6.A.1.b ML18153A3291998-09-24024 September 1998 Application for Amends to Licenses DPR-32 & DPR-37,modifying Testing Requirements for Reactor Trip Bypass Breaker ML18151A6801998-06-19019 June 1998 Application for Amends to Licenses DPR-32 & DPR-37, Establishing Requirements for Use of Temporary Supply Line (Jumper) to Provide Svc Water to Component Cooling Heat Exchangers.Application Revised 971105 Submittal ML18153A2891998-03-25025 March 1998 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,revising Station Mgt Titles to Reflect New Positions Approved by Vepc Power Board of Directors on 980220 ML18153A3451997-12-18018 December 1997 Application for Amends to Licenses DPR-32 & DPR-37, Clarifying Terminology Used for Describing Equipment Surveillances Conducted in Refueling Interval Frequency. Amend Consistent W/Info Provided in Rev 1 of NUREG-1431 ML18151A9791997-11-0505 November 1997 Application for Amends to Licenses DPR-32 & DPR-37, Respectively.Amends Will Revise TS to Increase Maximum Allowable Fuel Enrichment from 4.1 to 4.3 Weight Percent U-235.Description of Change Encl ML18152A0761997-11-0505 November 1997 Application for Amends to Licenses DPR-32 & DPR-37, Establishing Requirements for Use of Temporary Supply Line (Jumper) to Provide Svc Water to Component Cooling Heat Exchangers ML18153A6331996-11-26026 November 1996 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,respectively,eliminating Records Retention Requirements Section of Ts,Per GL 95-06 & Adminstrative Ltr 95-06 ML18153A6881996-04-15015 April 1996 Application for Amends to Licenses DPR-32 & DPR-37, Clarifying Applicability of Quadrant Power Tilt Ratio Requirements ML18153A5371996-03-21021 March 1996 Application for Amends to Licenses DPR-32 & DPR-37, Clarifying Requirements for Testing Charcoal Adsorbent in Auxiliary Ventilation & Control Room Air Filtration Sys as Outlined in Tech Specs 4.12 & 4.20,respectively ML18153A5781996-01-30030 January 1996 Application for Amends to Licenses DPR-32 & DPR-37, Eliminating Surveillance Requirement for Certain Reactor Coolant Liquid Samples ML18153A6741995-11-20020 November 1995 Application for Amends to Licenses DPR-32 & DPR-37,permiting Use of 10CFR50 App J,Option B Performance-Based Containment Leakage Rate Testing. ML18153A7121995-07-20020 July 1995 Application for Amends to Licenses DPR-32 & DPR-37,proposing Changes to Ts,By Establishing New Setpoint Limit for Steam Generator high-high Level & Provides More Restrictive Setting Limits for Certain Rps/Esfas Setpoints ML18153A6971995-07-14014 July 1995 Application for Amends to Licenses DPR-32 & DPR-37,providing Two H Allowed Outage Time for One RHR Pump to Accommodate Plant Safety,Emergency Power Sys Surveillance Testing & Permit Depressurizing Su Accumulators in Lieu of Isolation ML18152A1841995-02-14014 February 1995 Application for Amends to Licenses DPR-32 & DPR-37,revising TS 4.4.D to Permit Approved Exemptions to ILRT Frequency Requirements,Including one-time Exemption Request from Section III.D.1(a) of 10CFR50,App J for Surry Unit 2 ML18153B2111995-01-24024 January 1995 Application for Amends to Licenses DPR-32 & DPR-37,modifying as-found Test Acceptance Criterion for Pressurizer Safety Valves ML18153B1601994-11-29029 November 1994 Application for Amends to Licenses DPR-32 & DPR-37,revising TSs to Implement Zirlo Fuel Cladding ML18153B1561994-11-22022 November 1994 Application for Amends to Licenses DPR-32 & DPR-37,deleting Unnecessary Descriptive Phrases Re Number of Cells in Station & EDG Batteries ML18153B1481994-11-10010 November 1994 Application for Amends to Licenses DPR-32 & DPR-37 to TS Re Changes to TS to Clarify SR for Reactor Protection & Engineered Safeguard Sys Instrumentation & Actuation Logic ML18153B0921994-10-11011 October 1994 Application for Amends to Licenses DPR-32 & DPR-37,modifying Surveillance Frequencies of Hydrogen Analyzers in Accordance W/Generic Ltr 93-05 ML18153B0491994-08-30030 August 1994 Application for Amends to Licenses DPR-32 & DPR-37,revising TS to Accomodate Core Uprating,In Accordance w/WCAP-10263, Review Plan for Uprating Licensed Power of PWR Power Plant. ML18153B0041994-07-14014 July 1994 Application for Amends to Licenses DPR-32 & DPR-37, Requesting Amendments in Form of Changes to TS to Eliminate Remaining References to cycle-specific Parameters in Surry TS ML18153A9651994-06-0909 June 1994 Application for Amends to Licenses DPR-32 & DPR-37,modifying in Part,Chemical & Vol Control Sys Specs & Safety Injection Sys Specs in Accordance w/NUREG-0452,Rev 4,NUREG-1431 & Generic Ltr 93-05 ML18153A8801994-02-25025 February 1994 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,modifying Surveillance Frequency of Nozzles in Containment & Recirculation Spray Sys in Accordance W/Gl 93-05, Line-Item TS Improvements to Reduced Srs.... ML18153B4301993-12-27027 December 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,changing TS to Revise Review Responsibilities of Station Nuclear Safety & Operating Committee & Mgt Safety Review Committee ML18153B3481993-10-19019 October 1993 Application for Amends to Licenses DPR-32 & DPR-37,adding Operability & Action Statements for RSHX Service Water Outlet Radiation Monitors to TS Table 3.7-6 & SRs for Monitors to TS Table 4.1-2 ML18153B3301993-09-29029 September 1993 Application for Amends to Licenses DPR-32 & DPR-37,modifying TS to Require Insp Frequency of Low Pressure Turbine Blades to Permit Blade Insp to Perform Concurrent W/Disk & Hub Insp ML18153D3951993-07-20020 July 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7 Proposing Changes of Deletion of Requirement for Station Nuclear Safety & Operating Committee & Audit Frequencies ML18153D3901993-07-16016 July 1993 Application for Amends to Licenses DPR-32 & DPR-37,proposing Changes to TS to Permit Operation W/Three Degree Increase in Svc Water Temp Limit for Containment Air Partial Pressures of 9.1,9.2 & 9.35 Psia ML18153D3931993-07-16016 July 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7 to Implement Revised 10CFR20,revise Frequency of Radiological Effluent Release Repts from Semiannual to Annual & Clarify Site Maps ML18153D3791993-07-0202 July 1993 Application for Amends to Licenses DPR-32 & DPR-37,updating Augmented Insp Program for Sensitized Stainless Steel to Incorporate Newer Code Requirements While Maintaining Increased Insp Philosophy of ASLB ML18153D3781993-07-0202 July 1993 Application for Amends to Licenses DPR-32 & DPR-37 Modifying TS to Include COLR Which Presents reload-specific Limits for Key Core Operating Parameters ML18152A4471993-05-0606 May 1993 Application for Amend to License DPR-37,modifying TS to Support Operation of Unit 2 w/100 Psi Reduction in RCS Nominal Operating Pressure Through End of Operating Cycle 12,per Enforcement Discretion Granted by NRC on 930504 ML18153D3141993-04-21021 April 1993 Application for Amends to Licenses DPR-32 & DPR-37,providing Clarification of Design Response Time of Containment Hydrogen Analyzers & Deleting Unnecessary Channel Check for Analyzers ML18153D3111993-04-21021 April 1993 Suppl to 930315 Application for Amends to Licenses DPR-32 & DPR-37,modifying LCO & Action Statements for Main Control Room & Emergency Switchgear Room Air Conditioning Sys ML18153D2771993-03-19019 March 1993 Application for Amends to Licenses DPR-32 & DPR-37,revising TS to Address Operation W/Control Rod Urgent Failure Condition ML18153D2691993-03-15015 March 1993 Application for Amends to Licenses DPR-32 & DPR-37,changing TS to Permit Use of Two New Main Control Room & Emergency Switchgear Room Air Conditioning Sys Chillers,When Fully Operational,To Meet LCO ML18153D2281993-01-26026 January 1993 Application for Amends to Licenses DPR-32 & DPR-37,adding NRC Std Fire Protection License Condition to Each OL & Relocating Fire Protection Requirements from TS to Updated Fsar,Per GL 86-10 & GL 88-12 ML18153D1971992-12-11011 December 1992 Application for Amends to Licenses DPR-32 & DPR-37, Eliminating Operability Requirements for RCS Loop Stop Interlocks & Establishing Requirements for Operation of Loop Stop Valves ML18153D1681992-11-10010 November 1992 Application for Amends to Licenses DPR-32 & DPR-37, Specifying Action Statement for Operable Svc Water Flow Paths to Main Control & Emergency Switchgear Room Air Conditioning Condensers Governed by TS 3.14.C ML18153D1611992-10-26026 October 1992 Application for Amends to Licenses DPR-32 & DPR-37 to Increase Limit for Intermediate Range High Flux Reactor Trip Setpoint & to Eliminate Redundant Stipulation That Predicted Critical Rod Position Be Above Zero Power Insertion Limit ML18153D1171992-09-0404 September 1992 Suppl to 911230 Amend Applications 165 & 164 to Licenses DPR-32 & DPR-37,respectively,reinstating Allowed Outage Time for Surveillance Testing of Nonessential Svc Water Isolation Actuation Logic & Reformatting Logic ML18153D1141992-09-0404 September 1992 Application for Amends to Licenses DPR-32 & DPR-37,changing TS to Modify Acceptance Criteria for Functional Testing of Anchor/Darling Mechanical Snubbers to Reflect Replacement of Pacific Scientific Snubbers W/Anchor/Darling Snubbers ML18153D0871992-08-0707 August 1992 Application for Amends to Licenses DPR-32 & DPR-37, Establishing Operating Requirements for Recirculation Mode Transfer (Rmt) Function,Including LCO Action Statement & SR for Rmt & Deleting RWST Max Vol Requirements ML18153D0861992-08-0404 August 1992 Suppl to 911008 Application for Amends to Licenses DPR-32 & DPR-37,upgrading Portions of Section 3.0 & 4.0,per Generic Ltr 87-09 to Restrict Changes of Operational Conditions While in LCO & Delaying Entry Into Action Statement ML18153D0701992-07-28028 July 1992 Application for Amends to Licenses DPR-32 & DPR-37,deleting Operability & SRs of Hydrogen Monitor from Explosive Gas Monitoring Instrumentation Requirements for Waste Gas Holdup Sys & Including Requirements to Submit Special Rept to NRC ML18153D0301992-06-0101 June 1992 Application for Amends to Licenses DPR-32 & DPR-37,modifying Definition of Containment Integrity & Establishing LCOs & Operation & Action Statements for Containment Isolation Sys, Per Generic Ltr 91-08 & NUREG-0452 1999-04-28
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML18152B6571999-04-28028 April 1999 Application for Amends to Licenses DPR-32 & DPR-37,revising TSs Re Refueling Water Chemical Addition Tank Min Vol ML18152B5431999-02-16016 February 1999 Application for Amends to Licenses DPR-32 & DPR-37,revising TS Re Augmented Insp Requirements for Reactor Coolant Pump Flywheels ML18152B5501999-02-16016 February 1999 Application for Amends to Licenses DPR-32 & DPR-37,proposing Administrative Change That Will Consolidate AFW cross-connect Requirements by Relocation of Electrical Power Requirements from TS 3.16 to TS 3.6 ML18152B6131998-11-0404 November 1998 Application for Amends to Licenses DPR-32 & DPR-37,revising EDG Start & Load Time Testing Requirements in TS 4.6.A.1.b ML18153A3291998-09-24024 September 1998 Application for Amends to Licenses DPR-32 & DPR-37,modifying Testing Requirements for Reactor Trip Bypass Breaker ML18151A6801998-06-19019 June 1998 Application for Amends to Licenses DPR-32 & DPR-37, Establishing Requirements for Use of Temporary Supply Line (Jumper) to Provide Svc Water to Component Cooling Heat Exchangers.Application Revised 971105 Submittal ML18153A2891998-03-25025 March 1998 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,revising Station Mgt Titles to Reflect New Positions Approved by Vepc Power Board of Directors on 980220 ML18153A3451997-12-18018 December 1997 Application for Amends to Licenses DPR-32 & DPR-37, Clarifying Terminology Used for Describing Equipment Surveillances Conducted in Refueling Interval Frequency. Amend Consistent W/Info Provided in Rev 1 of NUREG-1431 ML18151A9791997-11-0505 November 1997 Application for Amends to Licenses DPR-32 & DPR-37, Respectively.Amends Will Revise TS to Increase Maximum Allowable Fuel Enrichment from 4.1 to 4.3 Weight Percent U-235.Description of Change Encl ML18152A0761997-11-0505 November 1997 Application for Amends to Licenses DPR-32 & DPR-37, Establishing Requirements for Use of Temporary Supply Line (Jumper) to Provide Svc Water to Component Cooling Heat Exchangers ML18153A6331996-11-26026 November 1996 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,respectively,eliminating Records Retention Requirements Section of Ts,Per GL 95-06 & Adminstrative Ltr 95-06 ML18153A6881996-04-15015 April 1996 Application for Amends to Licenses DPR-32 & DPR-37, Clarifying Applicability of Quadrant Power Tilt Ratio Requirements ML18153A5371996-03-21021 March 1996 Application for Amends to Licenses DPR-32 & DPR-37, Clarifying Requirements for Testing Charcoal Adsorbent in Auxiliary Ventilation & Control Room Air Filtration Sys as Outlined in Tech Specs 4.12 & 4.20,respectively ML18153A5781996-01-30030 January 1996 Application for Amends to Licenses DPR-32 & DPR-37, Eliminating Surveillance Requirement for Certain Reactor Coolant Liquid Samples ML18153A6741995-11-20020 November 1995 Application for Amends to Licenses DPR-32 & DPR-37,permiting Use of 10CFR50 App J,Option B Performance-Based Containment Leakage Rate Testing. ML18153A7121995-07-20020 July 1995 Application for Amends to Licenses DPR-32 & DPR-37,proposing Changes to Ts,By Establishing New Setpoint Limit for Steam Generator high-high Level & Provides More Restrictive Setting Limits for Certain Rps/Esfas Setpoints ML18153A6971995-07-14014 July 1995 Application for Amends to Licenses DPR-32 & DPR-37,providing Two H Allowed Outage Time for One RHR Pump to Accommodate Plant Safety,Emergency Power Sys Surveillance Testing & Permit Depressurizing Su Accumulators in Lieu of Isolation ML18152A1841995-02-14014 February 1995 Application for Amends to Licenses DPR-32 & DPR-37,revising TS 4.4.D to Permit Approved Exemptions to ILRT Frequency Requirements,Including one-time Exemption Request from Section III.D.1(a) of 10CFR50,App J for Surry Unit 2 ML18153B2111995-01-24024 January 1995 Application for Amends to Licenses DPR-32 & DPR-37,modifying as-found Test Acceptance Criterion for Pressurizer Safety Valves ML18153B1601994-11-29029 November 1994 Application for Amends to Licenses DPR-32 & DPR-37,revising TSs to Implement Zirlo Fuel Cladding ML18153B1561994-11-22022 November 1994 Application for Amends to Licenses DPR-32 & DPR-37,deleting Unnecessary Descriptive Phrases Re Number of Cells in Station & EDG Batteries ML18153B1481994-11-10010 November 1994 Application for Amends to Licenses DPR-32 & DPR-37 to TS Re Changes to TS to Clarify SR for Reactor Protection & Engineered Safeguard Sys Instrumentation & Actuation Logic ML18153B0921994-10-11011 October 1994 Application for Amends to Licenses DPR-32 & DPR-37,modifying Surveillance Frequencies of Hydrogen Analyzers in Accordance W/Generic Ltr 93-05 ML18153B0491994-08-30030 August 1994 Application for Amends to Licenses DPR-32 & DPR-37,revising TS to Accomodate Core Uprating,In Accordance w/WCAP-10263, Review Plan for Uprating Licensed Power of PWR Power Plant. ML18153B0041994-07-14014 July 1994 Application for Amends to Licenses DPR-32 & DPR-37, Requesting Amendments in Form of Changes to TS to Eliminate Remaining References to cycle-specific Parameters in Surry TS ML18153A9651994-06-0909 June 1994 Application for Amends to Licenses DPR-32 & DPR-37,modifying in Part,Chemical & Vol Control Sys Specs & Safety Injection Sys Specs in Accordance w/NUREG-0452,Rev 4,NUREG-1431 & Generic Ltr 93-05 ML18153A8801994-02-25025 February 1994 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,modifying Surveillance Frequency of Nozzles in Containment & Recirculation Spray Sys in Accordance W/Gl 93-05, Line-Item TS Improvements to Reduced Srs.... ML18153B4301993-12-27027 December 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,changing TS to Revise Review Responsibilities of Station Nuclear Safety & Operating Committee & Mgt Safety Review Committee ML18153B3481993-10-19019 October 1993 Application for Amends to Licenses DPR-32 & DPR-37,adding Operability & Action Statements for RSHX Service Water Outlet Radiation Monitors to TS Table 3.7-6 & SRs for Monitors to TS Table 4.1-2 ML18153B3301993-09-29029 September 1993 Application for Amends to Licenses DPR-32 & DPR-37,modifying TS to Require Insp Frequency of Low Pressure Turbine Blades to Permit Blade Insp to Perform Concurrent W/Disk & Hub Insp ML18153D3951993-07-20020 July 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7 Proposing Changes of Deletion of Requirement for Station Nuclear Safety & Operating Committee & Audit Frequencies ML18153D3901993-07-16016 July 1993 Application for Amends to Licenses DPR-32 & DPR-37,proposing Changes to TS to Permit Operation W/Three Degree Increase in Svc Water Temp Limit for Containment Air Partial Pressures of 9.1,9.2 & 9.35 Psia ML18153D3931993-07-16016 July 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7 to Implement Revised 10CFR20,revise Frequency of Radiological Effluent Release Repts from Semiannual to Annual & Clarify Site Maps ML18153D3791993-07-0202 July 1993 Application for Amends to Licenses DPR-32 & DPR-37,updating Augmented Insp Program for Sensitized Stainless Steel to Incorporate Newer Code Requirements While Maintaining Increased Insp Philosophy of ASLB ML18153D3781993-07-0202 July 1993 Application for Amends to Licenses DPR-32 & DPR-37 Modifying TS to Include COLR Which Presents reload-specific Limits for Key Core Operating Parameters ML18152A4471993-05-0606 May 1993 Application for Amend to License DPR-37,modifying TS to Support Operation of Unit 2 w/100 Psi Reduction in RCS Nominal Operating Pressure Through End of Operating Cycle 12,per Enforcement Discretion Granted by NRC on 930504 ML18153D3141993-04-21021 April 1993 Application for Amends to Licenses DPR-32 & DPR-37,providing Clarification of Design Response Time of Containment Hydrogen Analyzers & Deleting Unnecessary Channel Check for Analyzers ML18153D3111993-04-21021 April 1993 Suppl to 930315 Application for Amends to Licenses DPR-32 & DPR-37,modifying LCO & Action Statements for Main Control Room & Emergency Switchgear Room Air Conditioning Sys ML18153D2771993-03-19019 March 1993 Application for Amends to Licenses DPR-32 & DPR-37,revising TS to Address Operation W/Control Rod Urgent Failure Condition ML18153D2691993-03-15015 March 1993 Application for Amends to Licenses DPR-32 & DPR-37,changing TS to Permit Use of Two New Main Control Room & Emergency Switchgear Room Air Conditioning Sys Chillers,When Fully Operational,To Meet LCO ML18153D2281993-01-26026 January 1993 Application for Amends to Licenses DPR-32 & DPR-37,adding NRC Std Fire Protection License Condition to Each OL & Relocating Fire Protection Requirements from TS to Updated Fsar,Per GL 86-10 & GL 88-12 ML20128A5221993-01-22022 January 1993 Amends 173 & 172 to Licenses DPR-32 & DPR-37,respectively, Revising TS to Modify Acceptance Criteria for Functional Testing of Anchor Darling Mechanical Snubbers ML18153D1971992-12-11011 December 1992 Application for Amends to Licenses DPR-32 & DPR-37, Eliminating Operability Requirements for RCS Loop Stop Interlocks & Establishing Requirements for Operation of Loop Stop Valves ML18153D1681992-11-10010 November 1992 Application for Amends to Licenses DPR-32 & DPR-37, Specifying Action Statement for Operable Svc Water Flow Paths to Main Control & Emergency Switchgear Room Air Conditioning Condensers Governed by TS 3.14.C ML18153D1611992-10-26026 October 1992 Application for Amends to Licenses DPR-32 & DPR-37 to Increase Limit for Intermediate Range High Flux Reactor Trip Setpoint & to Eliminate Redundant Stipulation That Predicted Critical Rod Position Be Above Zero Power Insertion Limit ML18153D1171992-09-0404 September 1992 Suppl to 911230 Amend Applications 165 & 164 to Licenses DPR-32 & DPR-37,respectively,reinstating Allowed Outage Time for Surveillance Testing of Nonessential Svc Water Isolation Actuation Logic & Reformatting Logic ML18153D1141992-09-0404 September 1992 Application for Amends to Licenses DPR-32 & DPR-37,changing TS to Modify Acceptance Criteria for Functional Testing of Anchor/Darling Mechanical Snubbers to Reflect Replacement of Pacific Scientific Snubbers W/Anchor/Darling Snubbers ML18153D0871992-08-0707 August 1992 Application for Amends to Licenses DPR-32 & DPR-37, Establishing Operating Requirements for Recirculation Mode Transfer (Rmt) Function,Including LCO Action Statement & SR for Rmt & Deleting RWST Max Vol Requirements ML18153D0861992-08-0404 August 1992 Suppl to 911008 Application for Amends to Licenses DPR-32 & DPR-37,upgrading Portions of Section 3.0 & 4.0,per Generic Ltr 87-09 to Restrict Changes of Operational Conditions While in LCO & Delaying Entry Into Action Statement ML18153D0701992-07-28028 July 1992 Application for Amends to Licenses DPR-32 & DPR-37,deleting Operability & SRs of Hydrogen Monitor from Explosive Gas Monitoring Instrumentation Requirements for Waste Gas Holdup Sys & Including Requirements to Submit Special Rept to NRC 1999-04-28
[Table view] |
Text
e e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 January 24, 1995 U.S. Nuclear Regulatory Commission Serial No.95-016 Attention: Document Control Desk NL&P/ETS: RO Washington, DC. 20555 Docket Nos. 50-280 50-281 license Nos. DPR-32 DPR-37 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 PROPOSED TECHNICAL SPECIFICATIONS CHANGES PRESSUIRZER SAFETY VALVE ACCEPTANCE CRITERIA Pursuant to 1o CFR 50.90, the Virginia Electric and Power Company requests amendments, in the form of changes to the Technical Specifications, to Facility Operating License Nos. DPR-32 and DPR-37 for Surry Power Station Units 1 and 2.
The proposed changes will modify the "as-found" test acceptance criterion for the pressurizer safety valves.
A discussion of the proposed Technical Specifications changes is provided in . The proposed Technical Specifications changes are provided in . It has been determined that the proposed Technical Specifications changes do not involve an unreviewed safety question as defined in 10 CFR 50.59 or a significant hazards consideration as defined in 10 CFR 50.92. The basis for our determination that these changes do not involve a significant hazards consideration is provided in Attachment 3. The proposed Technical Specifications changes have been reviewed and approved by the Station Nuclear Safety and Operating Committees and the Management Safety Review Committee.
Should you have any questions or require additional information, please contact us.
Very truly yours,
~{?Orf~
James P. O'Hanlon Senior Vice President - Nuclear Attachments
,--- 95020102-46 950 i 24 ---- \
PDR ADOCK 05000280 .
P PDR
cc: U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, N.W.
Suite 2900 Atlanta, Georgia 30323 Mr. M. W. Branch NRC Senior Resident Inspector Surry Power Station Commissioner Department of Health Room 400 109 Governor Street Richmond, Virginia 23219
COMMONWEALTH OF VIRGINIA )
)
COUNTY OF HENRICO )
The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by J. P. O'Hanlon, who is Senior Vice President -
Nuclear, of Virginia Electric and Power Company. He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.
Acknowledged before me this _li!~ay of , 1gqS:
My Commission Expires: vJt~ 31 (SEAL) -
l Attachment 1 Discussion of Changes Surry Power Station
DISCUSSION OF PROPOSED CHANGES INTRODUCTION In order to eliminate unnecessary Technical Specification violations when testing the pressurizer safety valves, a change to the "as-found" acceptance criterion is being proposed. Since the "as-left" acceptance criterion remains unchanged, this change does not result in any reduction of operating or safety analysis margin. An evaluation of the affected accidents/transients has been performed which supports increasing the current Technical Specification 3.1.A.3.b pressurizer safety valve lift setpoint "as-tound" acceptance criterion from +/-1 % to +/-3%, while maintaining the "as-left" acceptance criterion at +/-1 %. As discussed below, analyses of the Loss of Load, Locked Rotor, and Rod Withdrawal transients demonstrate that increasing the as-found pressurizer safety valve lift setpoint acceptance criterion to +/-3% does not result in transient pressures in excess of the overpressure safety limits for the primary or secondary coolant systems. These transient analyses were performed assuming an uprated core power level consistent with Virginia Electric and Power Company's Core Uprate License request (6). A Departure from Nucleate Boiling (DNB) assessment demonstrates that the increased "as-found" pressurizer safety valve lift setpoint acceptance criterion does not adversely impact the DNB results of any Surry UFSAR Chapter 14 transient analyses. The proposed TS change does not pose a significant safety hazard and does not represent an unreviewed safety question. The specific Technical Specification changes and a discussion detailing the analysis and associated results are provided.
BACKGROUND Surry Technical Specification 3.1.A.3.b currently establishes a +/-1 % "as-found" and a
+/-1 % "as-left" lift setpoint acceptance criterion for the pressurizer safety valves.
Industry and Virginia Electric and Power Company experience indicates that operating effects coupled with the sensitivity of test results to variations in the test conditions have led to "as-found" test results being outside the current Technical Specification
+/-1 % acceptance criterion. These results are considered a Technical Specification violation even though the accident analyses support actual operation at +/-3% without
e aAy ~afety* impact. However, to maintain operational margin the "as-left" acceptance criterion remains at +/-1 % for the safety valves.
An "as-found" pressurizer safety valve lift setpoint acceptance criterion of +/-3% is supported by the ANSI-OM-1 inservice performance testing standard. The proposed setpoint acceptance criterion increase does not change the nominal setpoint of the pressurizer safety valves. Only the allowable tolerance about the existing setpoint is to be changed.
SPECIFIC CHANGES The Technical Specification 3.1.A.3.b pressurizer safety valve lift setpoint acceptance criterion for the "as-found" condition is being changed from +/-1 % to +/-3%. This is the only Technical Specification affected by the proposed change to the pressurizer safety valve lift setpoint acceptance criterion.
SAFETY SIGNIFICANCE An increase in the pressurizer safety valve lift setpoint tolerance affects the maximum pressure that will be attained in a system transient. Evaluation of the overall effect of changing the pressurizer safety valve setpoint acceptance criterion was accomplished by examining the effect of the changes on those transients which experience the most limiting pressure increases. These transients are the Complete Loss of External Electrical Load, the Locked Reactor Coolant Pump Rotor, and Rod Withdrawal events initiated from low power.
In the analyses described herein, the pressurizer safety valves were assumed to open in accordance with the References (4) and (5) pressurizer safety valve model, hereafter termed the Westinghouse model. To support the proposed pressurizer safety valve lift setpoint acceptance criterion increase, the pressurizer safety valves were assumed to begin opening at a pressure 3% above the nominal lift setpoint. For pressurizer safety valves installed on a loop seal, the Westinghouse model requires application of an additional 1% "medium shift" to account for the effects of setting the valves on steam while installing them on a water-filled loop seal. However, because the loop seals have been removed from Surry, it was not necessary to apply the additional 1% "medium shift". In addition, the Westinghouse model requires
appli_catiori of a 1.31 second delay to the opening of the valve to simulate purging of the loop seal. Pressurizer safety valve installation without loop seal was simulated by reducing the delay 0.2 seconds. Lastly, the time required for the pressurizer safety valve to "pop" completely open was simulated by application of an additional 0.1 % to the assumed 3% lift setpoint tolerance. The pressurizer safety valves are assumed to close at a pressure 3% below the setpoint pressure (3% blowdown}.
Accident analyses previously submitted to support an uprated core power level at Surry Units 1 and 2 (6} assumed a +/-1 % pressurizer safety valve lift setpoint acceptance criterion, and pressurizer safety valve installation on a water-filled loop seal. Because the impact on peak transient pressure of increasing the as-found pressurizer safety valve lift setpoint acceptance criterion from +/-1 % to +/-3% is more than offset by draining the pressurizer safety valve loop seals, the pressure transient results presented in the Surry core uprating package (6) remain bounding.
It is highly unlikely that each safety valve's setpoint will be simultaneously at one extreme of the tolerance band. Therefore, the safety valve operation assumed in the analyses described herein is very conservative. Because an increased low-end acceptance criterion potentially reduces the system pressure experienced at the point of minimum departure from nucleate boiling ratio (DNBR), the effect of an increased pressurizer safety valve setpoint acceptance criterion on the DNBR results of affected transients was evaluated. As well, the proposed changes were evaluated in light of their impact on operational margins. Transient analyses were performed with the RETRAN system transient analysis code (1 ), (2).
LOSS OF LOAD The Loss of Load event is characterized by a rapid reduction in steam flow from the steam generator and a resultant rapid rise in secondary pressures. Consequently, primary side temperatures and pressures increase. The transient is terminated either by a direct reactor trip or in the limiting case by the high pressurizer pressure trip. The transient has been shown to be non-limiting with respect to core thermal margins.
- The Loss of Load analysis was performed to establish that a Loss of Load event would not result in primary side pressures beyond the limit of 2750 psia nor secondary side pressures beyond the limit of 121 O psia when the pressurizer safety valve lift setpoint
e acceptance criterion is increased to +/-3%. The following assumptions were made in this analysis:
- 1. The loss of load is a 100% loss of load with no condenser dumps or power operated relief valves (PORVs) available.
- 2. The transient is initiated from 102% of an uprated core power level (2546 MWt).
- 3. Main feedwater is isolated at the time of reactor trip.
- 4. A least negative Doppler temperature coefficient is assumed.
- 5. Pressurizer sprays are disabled.
- 6. Supports a moderator temperature coefficient (MTC) core design limit of
+6.0 pcm/°F from 0% to 50% power and a linearly decreasing limit to 0.0 pcm/°F at 100% power.
- 7. No credit is taken for a direct reactor trip on turbine trip.
- 8. No credit is taken for automatic rod control.
- 9. A pressurizer safety valve lift setpoint acceptance criterion of 3% is simulated in accordance with the Reference (4) Westinghouse model.
The maximum primary side (cold leg) pressure was determined to be 2680 psia, which is well below the overpressure safety limit (110% of design pressure) of 2750 psia.
The maximum secondary side (steam generator pressure was determined to be 1187 psia, which is well below the overpressure safety limit of 121 O psia.
LOCKED ROTOR ANALYSIS This analysis was performed in order to determine if an increased pressurizer safety valve lift setpoint acceptance criterion would result in an overpressurization of either the primary or secondary side during a postulated Locked Rotor transient. The following assumptions were used in this analysis:
- 1. Initial reactor power is 102% of an uprated core power level (2545 MWt).
- 2. Initial average core temperature is nominal T(avg) + 4°F.
- 3. Initial pressurizer pressure is 2280 psia, nominal pressure + 30 psi .
- 4. Pressurizer sprays do not function.
- 5. Pressurizer power operated relief valves do not function.
- 6. Condenser steam dump PORVs never open.
- 7. Atmospheric steam dump PORVs never open.
- 8. A locked rotor is the initiating event.
- 9. Reactor trip occurs on low Reactor Coolant System flow.
i 0. Coolant flow is divided into 50% through the core and 50% bypass to maximize coolant expansion in the core region.
- 11. A least negative Doppler temperature coefficient.
- 12. Supports a moderator temperature coefficient (MTC) core design limit of
+6.0 pcm/0 f from 0% to 50% power and a linearly decreasing limit to 0.0 pcm/0 f at 100% power.
- 13. Minimum trip reactivity.
The RETRAN transient analysis of the Locked Rotor event with a +/-3% pressurizer safety valve setpoint acceptance criterion rendered a peak primary (cold leg) pressure of 2677 psia and a peak secondary (steam generator) pressure of 1164 psia. These values are below the primary and secondary pressure safety limits of 2750 psia and 121 O psi a, respectively.
ROD WITHDRAWAL EVENTS The Loss of Load and Locked Rotor events have historically been considered the limiting Reactor Coolant System (RCS) overpressurization events. However, recent reanalyses of the Rod Withdrawal at Power (RWAP) and Rod Withdrawal from Subcritical (RWSC) events revealed that these events may result in significant pressurization of the RCS, particularly those cases initiated from low power.
Therefore, the results of these accident analyses are reviewed here for completeness.
The limiting case was initiated from 12% power and assumed a bounding reactivity insertion rate, a 3% pressurizer safety valve lift setpoint tolerance, a drained loop seal (0.2 second opening delay), and a least negative Doppler temperature coefficient.
This case resulted in a maximum RCS pressure of 2697 psia. Similarly, a RWSC case which assumed a bounding reactivity insertion rate, a 3% pressurizer safety valve lift setpoint tolerance, a drained loop seal (0.2 second opening delay), and a least negative Doppler temperature coefficient resulted in a maximum RCS pressure of 2643 psia. Both of these results are well below 110% of the RCS design pressure and are, therefore, acceptable.
DNB CONSIDERATIONS Because an increased low end tolerance potentially reduces the system pressure experienced at the point of minimum Departure from Nucleate Boiling Ratio (DNBR),
the effect of a +/-3% pressurizer safety valve setpoint acceptance criterion on the DNBR results of affected transients was evaluated by examining the Surry UFSAR Chapter 14 safety analysis results.
Of the affected transients, only the DNBR results of the Locked Rotor event are potentially adversely affected by the increased low end tolerance. An examination of the Locked Rotor event analysis DNBR results revealed that the minimum DNBR statepoint pressure is well below the proposed low-end pressurizer safety valve lift setpoint (2500 - 75 = 2425 psia, which is the nominal setpoint minus tolerance).
Therefore, the setpoint acceptance criterion increase presents no concerns regarding the DNBR results of the Locked Rotor transient.
OPERATIONAL MARGIN CONSIDERATIONS The proposed allowable as-found lift setpoint acceptance criterion has been chosen such that an inadvertent opening of the safety valves during normal operation will not occur. (The allowable as-left setpoint acceptance criterion will remain at +/-1 %.) To illustrate, the nominal high primary pressure trip setpoint is 2400 psia with a maximum uncertainty of 16 psi. The nominal setpoint plus uncertainty is, therefore, 2416 psia.
Because the nominal pressurizer safety valve lift setpolnt minus 3% tolerance is 2425 psia, a reactor trip would occur before an inadvertent opening of the pressurizer safety valves would occur. It may be concluded that the proposed setpoint acceptance criterion change does not present any operational considerations.
SUMMARY
AND CONCLUSIONS An evaluation has been performed which justifies increasing the current Technical Specification pressurizer safety valve lift setpoint acceptance criterion from +/-1 % as-found and +/-1 % as-left to +/-3% as-found and +/-1 % as-left. The proposed Technical Specification change does not pose a significant safety hazard and does not represent an unreviewed safety question. Loss of Load, Locked Rotor, and Rod Withdrawal transient analyses demonstrate that increasing the pressurizer safety valve lift setpoint
e aec~ptance criterion to +/-3% does not result in a transient pressure in excess of the overpressure safety limits for the primary and secondary sides. Further, the increased setpoint acceptance criterion does not adversely impact the DNBR results of any Surry UFSAR Chapter 14 transient analyses. In summary, each pertinent safety criterion was evaluated for an increased safety valve setpoint acceptance criterion and all were found to be acceptable.
e REFERENCES (1) N. A. Smith: "VEPCO Reactor System Transient Analysis using the RETRAN Computer Code," VEP-FRD1-41A (May, 1985).
(2) Letter from W. L. Stewart (Virginia Power) to H. R. Denton (NRC), "Surry and North Anna Power Stations Reactor System Transient Analyses," Serial No.85-753, dated November 19, 1985 (RETRAN02 MOD003).
(3) Letter from W.L. Stewart (VA Power) to H.R. Denton (USNRC), "Additional Information Related to NUREG-0737, Item 11.D.1, Performance Testing of Relief and Safety Valves," NRC Letter No. 86094, dated February 28, 1986.
(4) "Pressurizer Safety Valve Set Pressure Shift," Westinghouse Owners Group Project MUHP2351, WCAP-12910, dated March, 1991.
(5) Letter from J. E. Richardson (USNRC) to T. E. Herrman, Chairman, Pressurizer Safety Valve Working Committee, Westinghouse Owners Group, "Acceptance For Referencing Of Licensing Topical Report WCAP-1291 O, 'Pressurizer Safety Valve Set Pressure Shift"', February 19, 1993.
(6) Letter from J. P. O'Hanlon to USNRC, "Virginia Electric and Power Company, Surry Power Station Units 1 and 2, Proposed Technical Specification Changes to Accommodate Core Uprating," Serial No. 94509, dated August 30, 1994.