MONTHYEARML18152B6571999-04-28028 April 1999 Application for Amends to Licenses DPR-32 & DPR-37,revising TSs Re Refueling Water Chemical Addition Tank Min Vol ML18152B5431999-02-16016 February 1999 Application for Amends to Licenses DPR-32 & DPR-37,revising TS Re Augmented Insp Requirements for Reactor Coolant Pump Flywheels ML18152B5501999-02-16016 February 1999 Application for Amends to Licenses DPR-32 & DPR-37,proposing Administrative Change That Will Consolidate AFW cross-connect Requirements by Relocation of Electrical Power Requirements from TS 3.16 to TS 3.6 ML18152B6131998-11-0404 November 1998 Application for Amends to Licenses DPR-32 & DPR-37,revising EDG Start & Load Time Testing Requirements in TS 4.6.A.1.b ML18153A3291998-09-24024 September 1998 Application for Amends to Licenses DPR-32 & DPR-37,modifying Testing Requirements for Reactor Trip Bypass Breaker ML18151A6801998-06-19019 June 1998 Application for Amends to Licenses DPR-32 & DPR-37, Establishing Requirements for Use of Temporary Supply Line (Jumper) to Provide Svc Water to Component Cooling Heat Exchangers.Application Revised 971105 Submittal ML18153A2891998-03-25025 March 1998 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,revising Station Mgt Titles to Reflect New Positions Approved by Vepc Power Board of Directors on 980220 ML18153A3451997-12-18018 December 1997 Application for Amends to Licenses DPR-32 & DPR-37, Clarifying Terminology Used for Describing Equipment Surveillances Conducted in Refueling Interval Frequency. Amend Consistent W/Info Provided in Rev 1 of NUREG-1431 ML18151A9791997-11-0505 November 1997 Application for Amends to Licenses DPR-32 & DPR-37, Respectively.Amends Will Revise TS to Increase Maximum Allowable Fuel Enrichment from 4.1 to 4.3 Weight Percent U-235.Description of Change Encl ML18152A0761997-11-0505 November 1997 Application for Amends to Licenses DPR-32 & DPR-37, Establishing Requirements for Use of Temporary Supply Line (Jumper) to Provide Svc Water to Component Cooling Heat Exchangers ML18153A6331996-11-26026 November 1996 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,respectively,eliminating Records Retention Requirements Section of Ts,Per GL 95-06 & Adminstrative Ltr 95-06 ML18153A6881996-04-15015 April 1996 Application for Amends to Licenses DPR-32 & DPR-37, Clarifying Applicability of Quadrant Power Tilt Ratio Requirements ML18153A5371996-03-21021 March 1996 Application for Amends to Licenses DPR-32 & DPR-37, Clarifying Requirements for Testing Charcoal Adsorbent in Auxiliary Ventilation & Control Room Air Filtration Sys as Outlined in Tech Specs 4.12 & 4.20,respectively ML18153A5781996-01-30030 January 1996 Application for Amends to Licenses DPR-32 & DPR-37, Eliminating Surveillance Requirement for Certain Reactor Coolant Liquid Samples ML18153A6741995-11-20020 November 1995 Application for Amends to Licenses DPR-32 & DPR-37,permiting Use of 10CFR50 App J,Option B Performance-Based Containment Leakage Rate Testing. ML18153A7121995-07-20020 July 1995 Application for Amends to Licenses DPR-32 & DPR-37,proposing Changes to Ts,By Establishing New Setpoint Limit for Steam Generator high-high Level & Provides More Restrictive Setting Limits for Certain Rps/Esfas Setpoints ML18153A6971995-07-14014 July 1995 Application for Amends to Licenses DPR-32 & DPR-37,providing Two H Allowed Outage Time for One RHR Pump to Accommodate Plant Safety,Emergency Power Sys Surveillance Testing & Permit Depressurizing Su Accumulators in Lieu of Isolation ML18152A1841995-02-14014 February 1995 Application for Amends to Licenses DPR-32 & DPR-37,revising TS 4.4.D to Permit Approved Exemptions to ILRT Frequency Requirements,Including one-time Exemption Request from Section III.D.1(a) of 10CFR50,App J for Surry Unit 2 ML18153B2111995-01-24024 January 1995 Application for Amends to Licenses DPR-32 & DPR-37,modifying as-found Test Acceptance Criterion for Pressurizer Safety Valves ML18153B1601994-11-29029 November 1994 Application for Amends to Licenses DPR-32 & DPR-37,revising TSs to Implement Zirlo Fuel Cladding ML18153B1561994-11-22022 November 1994 Application for Amends to Licenses DPR-32 & DPR-37,deleting Unnecessary Descriptive Phrases Re Number of Cells in Station & EDG Batteries ML18153B1481994-11-10010 November 1994 Application for Amends to Licenses DPR-32 & DPR-37 to TS Re Changes to TS to Clarify SR for Reactor Protection & Engineered Safeguard Sys Instrumentation & Actuation Logic ML18153B0921994-10-11011 October 1994 Application for Amends to Licenses DPR-32 & DPR-37,modifying Surveillance Frequencies of Hydrogen Analyzers in Accordance W/Generic Ltr 93-05 ML18153B0491994-08-30030 August 1994 Application for Amends to Licenses DPR-32 & DPR-37,revising TS to Accomodate Core Uprating,In Accordance w/WCAP-10263, Review Plan for Uprating Licensed Power of PWR Power Plant. ML18153B0041994-07-14014 July 1994 Application for Amends to Licenses DPR-32 & DPR-37, Requesting Amendments in Form of Changes to TS to Eliminate Remaining References to cycle-specific Parameters in Surry TS ML18153A9651994-06-0909 June 1994 Application for Amends to Licenses DPR-32 & DPR-37,modifying in Part,Chemical & Vol Control Sys Specs & Safety Injection Sys Specs in Accordance w/NUREG-0452,Rev 4,NUREG-1431 & Generic Ltr 93-05 ML18153A8801994-02-25025 February 1994 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,modifying Surveillance Frequency of Nozzles in Containment & Recirculation Spray Sys in Accordance W/Gl 93-05, Line-Item TS Improvements to Reduced Srs.... ML18153B4301993-12-27027 December 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,changing TS to Revise Review Responsibilities of Station Nuclear Safety & Operating Committee & Mgt Safety Review Committee ML18153B3481993-10-19019 October 1993 Application for Amends to Licenses DPR-32 & DPR-37,adding Operability & Action Statements for RSHX Service Water Outlet Radiation Monitors to TS Table 3.7-6 & SRs for Monitors to TS Table 4.1-2 ML18153B3301993-09-29029 September 1993 Application for Amends to Licenses DPR-32 & DPR-37,modifying TS to Require Insp Frequency of Low Pressure Turbine Blades to Permit Blade Insp to Perform Concurrent W/Disk & Hub Insp ML18153D3951993-07-20020 July 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7 Proposing Changes of Deletion of Requirement for Station Nuclear Safety & Operating Committee & Audit Frequencies ML18153D3901993-07-16016 July 1993 Application for Amends to Licenses DPR-32 & DPR-37,proposing Changes to TS to Permit Operation W/Three Degree Increase in Svc Water Temp Limit for Containment Air Partial Pressures of 9.1,9.2 & 9.35 Psia ML18153D3931993-07-16016 July 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7 to Implement Revised 10CFR20,revise Frequency of Radiological Effluent Release Repts from Semiannual to Annual & Clarify Site Maps ML18153D3791993-07-0202 July 1993 Application for Amends to Licenses DPR-32 & DPR-37,updating Augmented Insp Program for Sensitized Stainless Steel to Incorporate Newer Code Requirements While Maintaining Increased Insp Philosophy of ASLB ML18153D3781993-07-0202 July 1993 Application for Amends to Licenses DPR-32 & DPR-37 Modifying TS to Include COLR Which Presents reload-specific Limits for Key Core Operating Parameters ML18152A4471993-05-0606 May 1993 Application for Amend to License DPR-37,modifying TS to Support Operation of Unit 2 w/100 Psi Reduction in RCS Nominal Operating Pressure Through End of Operating Cycle 12,per Enforcement Discretion Granted by NRC on 930504 ML18153D3141993-04-21021 April 1993 Application for Amends to Licenses DPR-32 & DPR-37,providing Clarification of Design Response Time of Containment Hydrogen Analyzers & Deleting Unnecessary Channel Check for Analyzers ML18153D3111993-04-21021 April 1993 Suppl to 930315 Application for Amends to Licenses DPR-32 & DPR-37,modifying LCO & Action Statements for Main Control Room & Emergency Switchgear Room Air Conditioning Sys ML18153D2771993-03-19019 March 1993 Application for Amends to Licenses DPR-32 & DPR-37,revising TS to Address Operation W/Control Rod Urgent Failure Condition ML18153D2691993-03-15015 March 1993 Application for Amends to Licenses DPR-32 & DPR-37,changing TS to Permit Use of Two New Main Control Room & Emergency Switchgear Room Air Conditioning Sys Chillers,When Fully Operational,To Meet LCO ML18153D2281993-01-26026 January 1993 Application for Amends to Licenses DPR-32 & DPR-37,adding NRC Std Fire Protection License Condition to Each OL & Relocating Fire Protection Requirements from TS to Updated Fsar,Per GL 86-10 & GL 88-12 ML18153D1971992-12-11011 December 1992 Application for Amends to Licenses DPR-32 & DPR-37, Eliminating Operability Requirements for RCS Loop Stop Interlocks & Establishing Requirements for Operation of Loop Stop Valves ML18153D1681992-11-10010 November 1992 Application for Amends to Licenses DPR-32 & DPR-37, Specifying Action Statement for Operable Svc Water Flow Paths to Main Control & Emergency Switchgear Room Air Conditioning Condensers Governed by TS 3.14.C ML18153D1611992-10-26026 October 1992 Application for Amends to Licenses DPR-32 & DPR-37 to Increase Limit for Intermediate Range High Flux Reactor Trip Setpoint & to Eliminate Redundant Stipulation That Predicted Critical Rod Position Be Above Zero Power Insertion Limit ML18153D1171992-09-0404 September 1992 Suppl to 911230 Amend Applications 165 & 164 to Licenses DPR-32 & DPR-37,respectively,reinstating Allowed Outage Time for Surveillance Testing of Nonessential Svc Water Isolation Actuation Logic & Reformatting Logic ML18153D1141992-09-0404 September 1992 Application for Amends to Licenses DPR-32 & DPR-37,changing TS to Modify Acceptance Criteria for Functional Testing of Anchor/Darling Mechanical Snubbers to Reflect Replacement of Pacific Scientific Snubbers W/Anchor/Darling Snubbers ML18153D0871992-08-0707 August 1992 Application for Amends to Licenses DPR-32 & DPR-37, Establishing Operating Requirements for Recirculation Mode Transfer (Rmt) Function,Including LCO Action Statement & SR for Rmt & Deleting RWST Max Vol Requirements ML18153D0861992-08-0404 August 1992 Suppl to 911008 Application for Amends to Licenses DPR-32 & DPR-37,upgrading Portions of Section 3.0 & 4.0,per Generic Ltr 87-09 to Restrict Changes of Operational Conditions While in LCO & Delaying Entry Into Action Statement ML18153D0701992-07-28028 July 1992 Application for Amends to Licenses DPR-32 & DPR-37,deleting Operability & SRs of Hydrogen Monitor from Explosive Gas Monitoring Instrumentation Requirements for Waste Gas Holdup Sys & Including Requirements to Submit Special Rept to NRC ML18153D0301992-06-0101 June 1992 Application for Amends to Licenses DPR-32 & DPR-37,modifying Definition of Containment Integrity & Establishing LCOs & Operation & Action Statements for Containment Isolation Sys, Per Generic Ltr 91-08 & NUREG-0452 1999-04-28
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML18152B6571999-04-28028 April 1999 Application for Amends to Licenses DPR-32 & DPR-37,revising TSs Re Refueling Water Chemical Addition Tank Min Vol ML18152B5431999-02-16016 February 1999 Application for Amends to Licenses DPR-32 & DPR-37,revising TS Re Augmented Insp Requirements for Reactor Coolant Pump Flywheels ML18152B5501999-02-16016 February 1999 Application for Amends to Licenses DPR-32 & DPR-37,proposing Administrative Change That Will Consolidate AFW cross-connect Requirements by Relocation of Electrical Power Requirements from TS 3.16 to TS 3.6 ML18152B6131998-11-0404 November 1998 Application for Amends to Licenses DPR-32 & DPR-37,revising EDG Start & Load Time Testing Requirements in TS 4.6.A.1.b ML18153A3291998-09-24024 September 1998 Application for Amends to Licenses DPR-32 & DPR-37,modifying Testing Requirements for Reactor Trip Bypass Breaker ML18151A6801998-06-19019 June 1998 Application for Amends to Licenses DPR-32 & DPR-37, Establishing Requirements for Use of Temporary Supply Line (Jumper) to Provide Svc Water to Component Cooling Heat Exchangers.Application Revised 971105 Submittal ML18153A2891998-03-25025 March 1998 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,revising Station Mgt Titles to Reflect New Positions Approved by Vepc Power Board of Directors on 980220 ML18153A3451997-12-18018 December 1997 Application for Amends to Licenses DPR-32 & DPR-37, Clarifying Terminology Used for Describing Equipment Surveillances Conducted in Refueling Interval Frequency. Amend Consistent W/Info Provided in Rev 1 of NUREG-1431 ML18151A9791997-11-0505 November 1997 Application for Amends to Licenses DPR-32 & DPR-37, Respectively.Amends Will Revise TS to Increase Maximum Allowable Fuel Enrichment from 4.1 to 4.3 Weight Percent U-235.Description of Change Encl ML18152A0761997-11-0505 November 1997 Application for Amends to Licenses DPR-32 & DPR-37, Establishing Requirements for Use of Temporary Supply Line (Jumper) to Provide Svc Water to Component Cooling Heat Exchangers ML18153A6331996-11-26026 November 1996 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,respectively,eliminating Records Retention Requirements Section of Ts,Per GL 95-06 & Adminstrative Ltr 95-06 ML18153A6881996-04-15015 April 1996 Application for Amends to Licenses DPR-32 & DPR-37, Clarifying Applicability of Quadrant Power Tilt Ratio Requirements ML18153A5371996-03-21021 March 1996 Application for Amends to Licenses DPR-32 & DPR-37, Clarifying Requirements for Testing Charcoal Adsorbent in Auxiliary Ventilation & Control Room Air Filtration Sys as Outlined in Tech Specs 4.12 & 4.20,respectively ML18153A5781996-01-30030 January 1996 Application for Amends to Licenses DPR-32 & DPR-37, Eliminating Surveillance Requirement for Certain Reactor Coolant Liquid Samples ML18153A6741995-11-20020 November 1995 Application for Amends to Licenses DPR-32 & DPR-37,permiting Use of 10CFR50 App J,Option B Performance-Based Containment Leakage Rate Testing. ML18153A7121995-07-20020 July 1995 Application for Amends to Licenses DPR-32 & DPR-37,proposing Changes to Ts,By Establishing New Setpoint Limit for Steam Generator high-high Level & Provides More Restrictive Setting Limits for Certain Rps/Esfas Setpoints ML18153A6971995-07-14014 July 1995 Application for Amends to Licenses DPR-32 & DPR-37,providing Two H Allowed Outage Time for One RHR Pump to Accommodate Plant Safety,Emergency Power Sys Surveillance Testing & Permit Depressurizing Su Accumulators in Lieu of Isolation ML18152A1841995-02-14014 February 1995 Application for Amends to Licenses DPR-32 & DPR-37,revising TS 4.4.D to Permit Approved Exemptions to ILRT Frequency Requirements,Including one-time Exemption Request from Section III.D.1(a) of 10CFR50,App J for Surry Unit 2 ML18153B2111995-01-24024 January 1995 Application for Amends to Licenses DPR-32 & DPR-37,modifying as-found Test Acceptance Criterion for Pressurizer Safety Valves ML18153B1601994-11-29029 November 1994 Application for Amends to Licenses DPR-32 & DPR-37,revising TSs to Implement Zirlo Fuel Cladding ML18153B1561994-11-22022 November 1994 Application for Amends to Licenses DPR-32 & DPR-37,deleting Unnecessary Descriptive Phrases Re Number of Cells in Station & EDG Batteries ML18153B1481994-11-10010 November 1994 Application for Amends to Licenses DPR-32 & DPR-37 to TS Re Changes to TS to Clarify SR for Reactor Protection & Engineered Safeguard Sys Instrumentation & Actuation Logic ML18153B0921994-10-11011 October 1994 Application for Amends to Licenses DPR-32 & DPR-37,modifying Surveillance Frequencies of Hydrogen Analyzers in Accordance W/Generic Ltr 93-05 ML18153B0491994-08-30030 August 1994 Application for Amends to Licenses DPR-32 & DPR-37,revising TS to Accomodate Core Uprating,In Accordance w/WCAP-10263, Review Plan for Uprating Licensed Power of PWR Power Plant. ML18153B0041994-07-14014 July 1994 Application for Amends to Licenses DPR-32 & DPR-37, Requesting Amendments in Form of Changes to TS to Eliminate Remaining References to cycle-specific Parameters in Surry TS ML18153A9651994-06-0909 June 1994 Application for Amends to Licenses DPR-32 & DPR-37,modifying in Part,Chemical & Vol Control Sys Specs & Safety Injection Sys Specs in Accordance w/NUREG-0452,Rev 4,NUREG-1431 & Generic Ltr 93-05 ML18153A8801994-02-25025 February 1994 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,modifying Surveillance Frequency of Nozzles in Containment & Recirculation Spray Sys in Accordance W/Gl 93-05, Line-Item TS Improvements to Reduced Srs.... ML18153B4301993-12-27027 December 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7,changing TS to Revise Review Responsibilities of Station Nuclear Safety & Operating Committee & Mgt Safety Review Committee ML18153B3481993-10-19019 October 1993 Application for Amends to Licenses DPR-32 & DPR-37,adding Operability & Action Statements for RSHX Service Water Outlet Radiation Monitors to TS Table 3.7-6 & SRs for Monitors to TS Table 4.1-2 ML18153B3301993-09-29029 September 1993 Application for Amends to Licenses DPR-32 & DPR-37,modifying TS to Require Insp Frequency of Low Pressure Turbine Blades to Permit Blade Insp to Perform Concurrent W/Disk & Hub Insp ML18153D3951993-07-20020 July 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7 Proposing Changes of Deletion of Requirement for Station Nuclear Safety & Operating Committee & Audit Frequencies ML18153D3901993-07-16016 July 1993 Application for Amends to Licenses DPR-32 & DPR-37,proposing Changes to TS to Permit Operation W/Three Degree Increase in Svc Water Temp Limit for Containment Air Partial Pressures of 9.1,9.2 & 9.35 Psia ML18153D3931993-07-16016 July 1993 Application for Amends to Licenses DPR-32,DPR-37,NPF-4 & NPF-7 to Implement Revised 10CFR20,revise Frequency of Radiological Effluent Release Repts from Semiannual to Annual & Clarify Site Maps ML18153D3791993-07-0202 July 1993 Application for Amends to Licenses DPR-32 & DPR-37,updating Augmented Insp Program for Sensitized Stainless Steel to Incorporate Newer Code Requirements While Maintaining Increased Insp Philosophy of ASLB ML18153D3781993-07-0202 July 1993 Application for Amends to Licenses DPR-32 & DPR-37 Modifying TS to Include COLR Which Presents reload-specific Limits for Key Core Operating Parameters ML18152A4471993-05-0606 May 1993 Application for Amend to License DPR-37,modifying TS to Support Operation of Unit 2 w/100 Psi Reduction in RCS Nominal Operating Pressure Through End of Operating Cycle 12,per Enforcement Discretion Granted by NRC on 930504 ML18153D3141993-04-21021 April 1993 Application for Amends to Licenses DPR-32 & DPR-37,providing Clarification of Design Response Time of Containment Hydrogen Analyzers & Deleting Unnecessary Channel Check for Analyzers ML18153D3111993-04-21021 April 1993 Suppl to 930315 Application for Amends to Licenses DPR-32 & DPR-37,modifying LCO & Action Statements for Main Control Room & Emergency Switchgear Room Air Conditioning Sys ML18153D2771993-03-19019 March 1993 Application for Amends to Licenses DPR-32 & DPR-37,revising TS to Address Operation W/Control Rod Urgent Failure Condition ML18153D2691993-03-15015 March 1993 Application for Amends to Licenses DPR-32 & DPR-37,changing TS to Permit Use of Two New Main Control Room & Emergency Switchgear Room Air Conditioning Sys Chillers,When Fully Operational,To Meet LCO ML18153D2281993-01-26026 January 1993 Application for Amends to Licenses DPR-32 & DPR-37,adding NRC Std Fire Protection License Condition to Each OL & Relocating Fire Protection Requirements from TS to Updated Fsar,Per GL 86-10 & GL 88-12 ML20128A5221993-01-22022 January 1993 Amends 173 & 172 to Licenses DPR-32 & DPR-37,respectively, Revising TS to Modify Acceptance Criteria for Functional Testing of Anchor Darling Mechanical Snubbers ML18153D1971992-12-11011 December 1992 Application for Amends to Licenses DPR-32 & DPR-37, Eliminating Operability Requirements for RCS Loop Stop Interlocks & Establishing Requirements for Operation of Loop Stop Valves ML18153D1681992-11-10010 November 1992 Application for Amends to Licenses DPR-32 & DPR-37, Specifying Action Statement for Operable Svc Water Flow Paths to Main Control & Emergency Switchgear Room Air Conditioning Condensers Governed by TS 3.14.C ML18153D1611992-10-26026 October 1992 Application for Amends to Licenses DPR-32 & DPR-37 to Increase Limit for Intermediate Range High Flux Reactor Trip Setpoint & to Eliminate Redundant Stipulation That Predicted Critical Rod Position Be Above Zero Power Insertion Limit ML18153D1171992-09-0404 September 1992 Suppl to 911230 Amend Applications 165 & 164 to Licenses DPR-32 & DPR-37,respectively,reinstating Allowed Outage Time for Surveillance Testing of Nonessential Svc Water Isolation Actuation Logic & Reformatting Logic ML18153D1141992-09-0404 September 1992 Application for Amends to Licenses DPR-32 & DPR-37,changing TS to Modify Acceptance Criteria for Functional Testing of Anchor/Darling Mechanical Snubbers to Reflect Replacement of Pacific Scientific Snubbers W/Anchor/Darling Snubbers ML18153D0871992-08-0707 August 1992 Application for Amends to Licenses DPR-32 & DPR-37, Establishing Operating Requirements for Recirculation Mode Transfer (Rmt) Function,Including LCO Action Statement & SR for Rmt & Deleting RWST Max Vol Requirements ML18153D0861992-08-0404 August 1992 Suppl to 911008 Application for Amends to Licenses DPR-32 & DPR-37,upgrading Portions of Section 3.0 & 4.0,per Generic Ltr 87-09 to Restrict Changes of Operational Conditions While in LCO & Delaying Entry Into Action Statement ML18153D0701992-07-28028 July 1992 Application for Amends to Licenses DPR-32 & DPR-37,deleting Operability & SRs of Hydrogen Monitor from Explosive Gas Monitoring Instrumentation Requirements for Waste Gas Holdup Sys & Including Requirements to Submit Special Rept to NRC 1999-04-28
[Table view] |
Text
e e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 March 21, 1996 Document Control Desk Serial No.96-146 U. S. Nuclear Regulatory Commission NLOS/ETS: RO Washington, D. C. 20005 Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 PROPOSED TECHNICAL SPECIFICATIONS CHANGES CHARCOAL FILTER TESTING CLARIFICATION Pursuant to 10 CFR 50.90, Virginia Electric and Power Company requests amendments, in the form of changes to the Technical Specifications, to Facility Operating License Nos. DPR-32 and DPR-37 for Surry Power Station Units 1 and 2.
The proposed changes clarify the requirements for testing charcoal adsorbent in the Auxiliary Ventilation and Control Room Air Filtration Systems as outlined in Technical Specifications 4.12 and 4.20, respectively. The proposed changes to the Technical Specifications for Units 1 and 2 are provided in Attachment 2.
The interpretation of these requirements and the related application of referenced industry test standards has been the subject of several recent NRG telephone conference calls regarding the charcoal adsorbent in the ventilation systems. Although no safety or technical concerns have been identified in these discussions, questions have been raised concerning interpretation of requirements and the consistency by which referenced industry standards are applied.
We continue to believe that Surry Power Station is in compliance with its Technical Specifications for testing charcoal adsorbents. However, to preclude subjective interpretations and future misinterpretations of the testing standards, Technical Specifications changes are being proposed for Surry Units 1 and 2 that explicitly specify the current test method or standard currently being used to test new and used charcoal adsorbent.
These changes have been reviewed and approved by the Station Nuclear Safety and Operating Committee and the Management Safety Review Committee. It has been determined that the proposed changes do not involve an unreviewed safety question
---~*2_6_0~0J__ll~-,---~-- - ~
9603260040 960321 ~I PDR ADOCK 05000280 P PDR , i
1---
--~. ) "*
- e as defined by 10 CFR 50.59 or a significant hazards consideration as defined in 10 CFR 50.92. A discussion of the proposed changes and the basis for our no significant hazards considerations are included in Attachment 1.
To facilitate the NRC's review of these changes, we are available to meet with the NRG staff at their earliest convenience. Should you have any questions or require additional information, please contact us.
Very truly yours,
~P.C9/~
James P. O'Hanlon Senior Vice President - Nuclear Attachments cc: United States Nuclear Regulatory Commission Regional Administrator Region II 101 Marietta Street, N. W Suite 2900 Atlanta, Georgia 30323 Mr. M. R. Branch NRC Senior Resident Inspector Surry Power Station Commissioner Bureau of Radiological Health Room 104A 1500 East Main Street Richmond, Va. 23219
e COMMONWEALTH OF VIRGINIA )
)
COUNTY OF HENRICO )
The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by J. P. O'Hanlon, who is Senior Vice President -
Nuclear, of Virginia Electric and Power Company. He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.
Acknowledged before me this 2/~'ciay of ~ , 199t:,.
My Commission Expires: c4fttg= 3/ , 199.l..
~-~ NotaryuBfic (SEAL)
e Attachment 1 Discussion of Changes and Significant Hazard Consideration Determination Proposed Technical Specifications Changes for Surry Units 1 and 2
e Discussion of Change Introduction Currently, Surry Power Station tests the charcoal adsorbent in the Auxiliary Ventilation and the Control Room Air Filtration Systems in accordance with ASTM D3803-1979 1
- This method of testing provides assurance that these ventilation systems will perform their safety function. To preclude misinterpretation of the Surry Units 1 and 2 Technical Specifications, changes are being proposed to clarify the test requirements and to explicitly identify ASTM D3803-1979 as the current test method in the Technical Specifications for charcoal adsorbent. The current testing methodology fully establishes operability of the charcoal adsorbent in the ventilation systems. Since the proposed changes only clarify and explicitly identify the current testing methodology, the proposed changes do not create an unreviewed safety question or generate a significant hazards consideration.
Background
Technical Specifications require that the charcoal adsorbent be tested in accordance with ASTM D3803, and new charcoal be qualified in accordance with Table 5.1 of ANSI 3
N509-1976
- The 1979 version of ASTM D3803 was in effect when Technical Specifications Amendments No. 92 and No. 91 were issued to Surry Units 1 and 2, respectively. ASTM D3803-1979 is the testing methodology used for new and used charcoal. For new charcoal, the manufacturer's process shall be qualified in accordance with item 5.a, Table 5.1 of ANSI N509-1976. Table 5.1- references ROT M 16-1 T2 as an acceptable qualification test method for determining iodine removal efficiencies. ANSI N509-1976 does not provide a date or revision for the ROT M 16-1 T standard. The 1973 ROT M 16-1 T standard was for in-containment applications and was superseded by the 1977 version. The 1977 ROT M16-1T standard was superseded in 1981 by U.S.D.O.E. Standard NE M16-1T which fully embraces ASTM D3803-1979.
Therefore, the 1981 NE M16-1 T standard is used for qualification of the manufacturer's process for new charcoal adsorber. However, by not specifically identifying the revision and date of the standard required for charcoal adsorbent testing, the Technical Specifications test requirements can be ambiguous and may result in potential misinterpretation.
Description of Amendment Request The proposed changes clarify Surveillance Requirements for the charcoal adsorbent in the Auxiliary Ventilation Exhaust Filter Trains (TS 4.12} and the Control Room Air Filtration System (TS 4.20) by explicitly identifying the test methods used for new and used carbon adsorbent. These changes specify ASTM D3803-1979 as the laboratory testing standard for both new and used charcoal adsorbent in the ventilation systems identified above. Laboratory testing of the carbon samples adsorbers will be performed as noted below:
NEW CHARCOAL TESTING:
Manufacturer's Process Qualification in accordance with ANSI N509-1976:
Methyl Iodide Removal Efficiency:
- Relative humidity (RH) of 95%.
- 12.2 M/min. face velocity.
- Equilibrated for 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> with flow at 25° C and 95% RH.
3
- Loading with 1.75 mg/M methyl iodide for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.
- Elution period of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
- Acceptance criteria is < 1% penetration.
Batch Tests in accordance with ASTM D3803-1979:
- The ASTM D2862 for Particle Size Distribution
- The ASTM 03802 for Hardness Number
- The ASTM 03466 for Ignition Temperature
- The ASTM 03467 for Activity.
- The ASTM 02854 method for Bulk Density
- lmpregnant Content shall not exceed 5.0% by weight.
Methyl Iodide Removal Efficiency:
- Relative humidity of 95%.
- 24.4 M/min. face velocity for Auxiliary Ventilation Exhaust Filter Trains (to match in-service conditions) and 12.2 M/min. face velocity for Control Room Air Filtration System.
- Equilibrated for 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> with flow at 30° C and 95% RH.
3
- Loading with 1.75 mg/M methyl iodide for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.
- Elution period of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
- Acceptance criteria is< 3% penetration.
Elemental Iodine Retention:
- 12.2 M/min. face velocity through a 1 inch sample for a residence time of 0.125 seconds.
3
- Loading with 75 mg/M elemental iodine with flow ambient laboratory temperature and relative humidity for 10 minutes.
- Elution period of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />; during the first 30 minutes gas temperature is raised to 180° C.
- Acceptance criteria is> 99.5% retention.
e USEDCHARCOAL TESTING IN ACCORDANCE WITH ASTM D3803-1979'.
The testing of Surry used charcoal is performed in accordance with ASTM D3803-1979 and at the test conditions specified in Technical Specifications 4.12.B.7 for the Auxiliary Ventilation Exhaust Banks. The charcoal in the Control Room banks is replaced with new charcoal, versus being tested. To summarize, the used charcoal testing is performed as follows:
- Relative humidity of 95% since no heaters are installed.
- 24.4 M/min. face velocity (to match in-service conditions).
- Temperature equilibrated to 30° C without flow.
3
- Loading with 1.75 MG/M methyl iodide for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
- Elution period of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
- Acceptance criteria is< 4% penetration.
Specific Changes The Unit 1 and 2 Technical Specifications are identical. The specific changes identified below are for both units:
- Auxiliary Ventilation Exhaust Filter Trains The original requirements of Technical Specification 4.12.A.8 have been retained, although the items have been reordered and the new charcoal conditions removed. The section has been changed to clarify the applicable year of ASTM D3803-1979. Some of the specific technical requirements (i.e., residence time and 31 day availability of laboratory results) have been relocated from Technical Specification 4.12.B.7 to 4.12.A.8.
Section 4.12.A.8 is being clarified to require testing after 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> of train" operation rather than "system" operation.
A new Technical Specification 4.12.A.9 has been added to clarify the testing requirements for new charcoal. The requirements to test new charcoal were relocated from Technical Specification 4.12.A.8.a to 4.12.A.9. The qualification testing requirements have been relocated from Technical Specification 4.12.B. 7 to 4.12.A.9.
The old Technical Specification 4.12.A.9 has been renumbered 4.12.A.10.
The Basis section of Technical Specification 4.12 is being changed to clarify the statement concerning the iodine removal efficiencies assumed in the dose calculations and to make the section consistent with the dose analysis approved by the NRC.
Sections 4.12.A.6.c and 4.12.A. 7 .c are clarified by adding "while it is in service" following painting, fire, or chemical release in any ventilation zone communicating with the system to be consistent throughout the specifications.
e Sections 4.12.A.6.e and 4.12.A.7;e are clarified by adding that could affect the operation of the system" following any structural maintenance on the filter housing.
The new Technical Specification 4.20.A.8 has been added to clarify the testing requirements for new charcoal. The requirements to test new charcoal was relocated from Technical Specification 4.20.A.7.a to 4.20.A.8. The qualification testing requirements of ANSI N509-1976 have been relocated from Technical Specification 4.20.B.4 to 4.20.A.8.
Testing and laboratory analysis on used charcoal is not performed on the control room air filtration system, since the charcoal adsorber is replaced when sampling is required by Technical Specifications. The technical laboratory analysis requirements were deleted from Technical Specification 4.20.B.4.
Sections 4.20.A.1.e, 4.20.A.3.e, and 4.20.A.5.e are clarified by adding "that could affect the operation of the system" following any structural maintenance on the filter housing.
Safety Significance The test methodology, included in the proposed Technical Specifications changes represents current testing practices, accurately determines the iodine removal efficiencies, and fully establishes operability of the charcoal adsorbent in the Auxiliary Ventilation Exhaust Filter Trains and the Control Room Air Filtration System. Therefore, there is no degradation in the ability of the charcoal adsorbent to perform its safety function based on the current testing of charcoal adsorbent in the ventilation systems noted above.
The proposed Technical Specifications changes explicitly identify the current charcoal testing methodology and therefore do not affect system operation or performance, nor do they affect the probability of any event initiators. These changes do not affect any Engineered Safety Features actuation setpoints or accident mitigation capabilities. As a clarification, the proposed changes do not increase the consequences of an accident or malfunction of equipment important to safety previously evaluated in the UFSAR.
The proposed Technical Specifications changes to the charcoal sample testing methodology do not affect the method of operation of the system. The proposed changes only clarify the Technical Specifications by explicitly identifying the actual
testing methodology currently being used for the charcoal samples. No new or different accident scenarios, transient precursors, failure mechanisms, or limiting single failures will be introduced as a result of these changes. Therefore, no new accident or malfunction of a different kind is created by the proposed changes.
The new charcoal adsorber sample laboratory testing accurately demonstrates the required performance of the adsorbers following a design basis LOCA or Fuel Handling Accident. Changing the Technical Specifications to clarify the actual test methodology for charcoal sample testing does not affect system performance or operation.
Therefore, these changes do not result in a reduction in any margin of safety.
References:
- 1. ASTM D3803-1979, Standard Test Methods for Radioiodine Testing of Nuclear-Grade Gas-Phase Adsorbents
- 2. ROT M1-1T-1977, Gas-Phase Adsorbent for Trapping Radioactive Iodine and Iodine Compounds.
- 3. ANSI/ASME N509-1976, Nuclear Power Plant Air Cleaning Units and Components
Basis for No Significant Hazards Consideration Determination The proposed changes clarify Surveillance Requirements for the charcoal adsorbent in the Auxiliary Ventilation Exhaust Filter Trains (4.12) and the Control Room Air Filtration System (TS 4.20) and explicitly identify the testing methodology for new and used carbon adsorbent. These changes specify ASTM 03803-1979 as the laboratory testing standard for both new and used charcoal adsorbent used in the ventilation systems identified above.
Virginia Electric and Power Company has evaluated the proposed changes to the Surry Units 1 and 2 Technical Specifications described above against the Significant Hazards Criteria of 10 CFR 50.92 and determined that the changes do not involve any significant hazard for the following reasons:
- 1. The probability or consequences of an accident previously evaluated is not significantly increased.
The charcoal testing clarifications and explict reference to the testing currently conducted do not affect system operation or performance, nor do they affect the probability of any event initiators. These changes do not affect any Engineered Safety Features actuation setpoints or accident mitigation capabilities.
Therefore, the proposed changes do not significantly increase the consequences of an accident or malfunction of equipment important to safety previously evaluated in the UFSAR.
- 2. The possibility of an accident or a malfunction of a different type than any previously evaluated is not created.
The clarification to the charcoal sample testing protocol does not affect the method of operation of the system. The proposed changes clarify and explicitly identify the testing methodology for the charcoal samples. No new or different accident scenarios, transient precursors, failure mechanisms, or limiting single failures are introduced as a result of these changes. Therefore, the possibility of a new or different kind of accident other than those already evaluated is not created by this change.
- 3. The margin of safety has not been significantly reduced.
The charcoal adsorber sample laboratory testing accurately demonstrates the required performance of the adsorbers following a design basis LOCA or Fuel Handling Accident. Changing the Technical Specifications to clarify the actual test methodology and explicitly reference the charcoal testing actually performed does not affect system performance or operation. Therefore, these changes do not result in a significant reduction in any margin of safety.
Based on the above discussions, it has been determined that the proposed Technical Specification changes do not *involve a significant increase in the probability or consequences of an* accident or other adverse condition over previous evaluations; or create the possibility of a new or different kind of accident or condition over previous evaluations; or involve a significant reduction in a margin of safety. Therefore, the proposed license amendment does not involve a significant haza_rds consideration.
e Attachment 2 Surry Units 1 and 2 Proposed Technical Specifications Changes