e e
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 August 4, 1992 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 PROPOSED TECHNICAL SPECIFICATION CHANGE 3.0/4.0 LCO AND SURVEILLANCE REQUIREMENTS Serial No.
91-572A NURPC Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Pursuant to 1 O CFR 50.90 in a letter (Serial No.91-572) dated October 8, 1991, Virginia Electric and Power Company requested an amendment, in the form of changes to the Technical Specifications, to Operating License Nos. DPR-32 and DPR-37 for Surry Power Station Units 1 and 2. This augmented submittal supercedes that previous request and should replace it in its entirety.
The proposed Technical Specification change will upgrade portions of Sections 3.0 and 4.0 of the Surry Power Station Technical Specifications by incorporating conclusions reached in Generic Letter 87-09. The proposed change restricts the changing of operational conditions while in Limiting Conditions for Operation (LCO),
allows the entry into an action statement due to a missed surveillance to be delayed for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and requires the completion of the surveillance requirements of an LCO prior to changing operational conditions.* Exceptions to certain requirements of Sections 3.0 and 4.0 are proposed where justified. identifies the proposed changes including subsections 3.0 and 4.0 in their entirety. Paragraphs unaffected by this change have been relocated in some cases. The actual proposed changes are indicated by revision bars in the right margin.
The proposed change has been reviewed and approved by the Station Nuclear Safety and Operating Committee and the Management Safety Review Committee. It has been determined that this change does not involve an unreviewed safety question as defined in 1 O CFR 50.59 and, as shown in Attachment 2, involves no significant hazards considerations according to 1 O CFR 50.92.
Very truly yours,
,Jl~
W. L. Stewart Senior Vice President - Nuclear Attachments
- 1. Proposed Technical Specification Changes
- 2. Discussion and Significant Hazards Consideration Evaluation
/'------
- ... **:. 92081_10291 92. 0804~0,'
PDR *. *ADOCK _05000280
- p.
PDR, *.
cc:
U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W.
Suite 2900 Atlanta, Georgia 30323 Mr. M. W. Branch NRC Senior Resident Inspector Surry Power Station Commissioner Department of Health.
Room 400 1 09 Governor Street Richmond, Virginia 23219
e COMMONWEAL TH OF VIRGINIA )
)
COUNTY OF HENRICO
)
The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by W. L. Stewart who is Senior Vice President -
Nuclear, of Virginia Electric and Power Company. He is duly authorized to execute
- and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.
Acknowledged before me this tj/"!! day of, ~t, 19 !lZ_.
My Commission Expires: !~ 3/
, 19~-