ML20071N661
| ML20071N661 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 08/02/1994 |
| From: | Mccree V Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20071N662 | List: |
| References | |
| NUDOCS 9408080117 | |
| Download: ML20071N661 (6) | |
Text
pac
/1 og$%
j 8
E UNITED STATES 5-NUCLEAR REGULATORY COMMISSION
%g
,/
WASHINGTON, D.C. 20555-0001 i
VIRGINIA ELECTRIC AND POWER COMPANY DOCKET NO. 50-280 l
SURRY POWER STATION. UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE i
Amendment No. 192 License No. DPR-32 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Virginia Electric and Power Company (the licensee) dated April 19, 1994, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public, and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
940B080117 940802 PDR ADDCK 05000280 P
l l
1 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Facility Operating License No. DPR-32 is hereby amended to read as follows:
(B)
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 192, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance and shall be implemented within 30 days.
FOR THE NUCLEAR REGULATORY COMMISSION 0.
Victor M. McCree, Acting Director Project Directorate 11-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: August 2, 1994
pa ** ou UNITED STATES 5g if NUCLEAR REGULATORY COMMISSION 6
W ASHINGTON, D.C. 20555M1 VIRGINIA ELECTRIC AND POWER COMPANY
@QC.KET N0. 50-281 SURRY POWER STATION. UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 192 License No. DPR-37 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Virginia Electric and Power Company (the licensee) dated April'19, 1994, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; 8.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
t
. 1 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Facility Operating License No. DPR-37 is hereby
]
amended to read as follows:
(B)
Technical Soecifications i
The Technical Specifications contained in Appendix A, as revised through Amendment No.192, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance and shall be implemented within 30 days.
FOR THE NUCLEAR REGULATORY COMMISSION
&ad C.%cie<;
Victor M. McCree, Acting Director Project Directorate 11-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation i
Attachment:
Changes to the Technical Specifications Date of Issuance: August 2, 1994
ATTACHMENT TO LICENSE AMENDMENT AMENDMENT NO. 192 TO FACILITY OPERATING LICENSE NO. DPR-32 AMENDMENT NO. 192 TO FACILITY OPERATIN9 LICENSE NO. DPR-37 DOCKET N05. 50-280 AND 50-211 Revise Appendix A as fcilows:
Remove Paae Insert Paae TS 4.1-9b TS 4.1-9b i
i l
t.
TABLE 4.1-2A MINIMUM FREQUENCY FOR EQUIPMENT TESTS FSAR SECTION DESCRIPTION TEST FREQUENCY REFERENCE 1.
Control Rod Assemblies Rod drop times of all full Prior to reactor criticairty:
7 length rods at hot conditions
- a. For a!! rods following each removat of the reactorvesselhead
- b. For specially affected individuat rods following any maintenance on or modi-fication to the control rod drive system which could affect the drop time of those specific rods, and
- c. Each refueling shutdown.
2.
ControlRod Assemblies Partial movement of all rods Quarterly 7
l 3.
Refueling Water Chemical Functional Each refueling shutdown 6
Addition Tank 4.
Pressurizer Safety Valves Setpoint Per TS 4.0.3 4
5.
Main Steam Safety Valves Setpoint Per TS 4.0.3 10 6.
Containment Isolation Trip
- Functional Each refueling shutdown 5
7.
Refueling System Interlocks
- Functional Prior to refueling 9.12 g
9 8.
Service Water System
- Functional Each refueling shutdown 9.9 5
9.
Fire Protection Pump and Functional Month!y 9.10 g
Power Supply v,
10.
Primary System Leakage
- Evaluate Daily 4
5 m
11.
Diesel FuelSupply
- Fuel inventory 5 days / week 8.5 g
12.
Boric Acid Piping Heat
- Operational Monthly 9.1 7'
Tracing Circuits
?r N
13.
Main Steam Line Trip Valves Functional Before each startup (TS 4.7) 10 (Full Closure)
The provisions of Specification 4.0.4,
are not applicable t.
..