Similar Documents at Surry |
---|
Category:SAFETY EVALUATION REPORT--LICENSING & RELATED ISSUES
MONTHYEARML18152B3371999-09-24024 September 1999 SER Accepting Third 10-year Interval Inservice Insp Plan Request for Relief SR-026 for Surry Power Station Unit 2 ML18152B3631999-08-23023 August 1999 Safety Evaluation Supporting Eddy Current Techniques Used by VEPCO to Determine Depth of Degradation Evident in Units SG Tubing & VEPCO Approach for Dispositioning Tubes with Avb Wear Indications ML18152B3831999-08-23023 August 1999 Safety Evaluation Granting Relief Request from ASME Section XI Requirements for Containment Insp ML18152B3841999-08-23023 August 1999 Safety Evaluation Granting Relief Request from ASME Section Xa Requirements for Containment Insp ML20196J4781999-07-0101 July 1999 Safety Evaluation Supporting Amends 221 & 221 to Licenses DPR-32 & DPR-37,respectively ML20195D3571999-06-0707 June 1999 Safety Evaluation Supporting Amends 220 & 220 to Licenses DPR-32 & DPR-37,respectively ML18152B6481999-04-14014 April 1999 Safety Evaluation Supporting Relief Requests IWE-2,4.5.6 & IWL-2 to Licenses DPR-32 & DPR-37 Respectively ML18152B6451999-04-13013 April 1999 SER Accepting Util Reactor Pressure Vessel Fluence Methodology for Surry Power Stations,Units 1 & 2 & North Anna Power Station,Units 1 & 2 Subject to Listed Limitations ML20207L8081999-03-12012 March 1999 Safety Evaluation Supporting Amends 219 & 219 to Licenses DPR-32 & DPR-37 ML18152B5381999-02-16016 February 1999 SER Accepting Third 10-year Interval Inservice Insp Request for Relief for Surry Power Station,Unit 1.Staff Concludes That Licensee Proposed Alternative Will Provide Acceptable Level of Quality & Safety.Technical Ltr Rept Also Encl ML18152B5861998-12-18018 December 1998 SER Approving Request Relief Related to Inservice Testing Program at Surry Power Station Unit 1 ML18152B5901998-12-16016 December 1998 Safety Evaluation Authorizing Request to Use Code Case N-577 as Alternative to Requirements of ASME Code Section XI for Surry Power Station,Unit 1 ML20198F9221998-12-16016 December 1998 Safety Evaluation Supporting Amends 217 & 217 to Licenses DPR-32 & DPR-37,respectively ML20151U7261998-09-0303 September 1998 Safety Evaluation Approving Exemption from Certain 10CFR20 Requirements Re Use of self-contained Breathing Apparatus with Enriched Oxygen in Subatmospheric Containments at SPS ML20237E9721998-08-26026 August 1998 Safety Evaluation Supporting Amends 216 & 216 to Licenses DPR-32 & DPR-37,respectively ML20236R2111998-07-15015 July 1998 SER Related to Request for Revised Exemption from 10CFR70.24(a) for Surry Power Station,Units 1 & 2 ML20249B8191998-06-19019 June 1998 Safety Evaluation Supporting Amends 215 & 215 to Licenses DPR-32 & DPR-37,respectively ML20249B8261998-06-19019 June 1998 Safety Evaluation Supporting Amends 214 & 214 to Licenses DPR-32 & DPR-37,respectively ML20248M0911998-06-11011 June 1998 Safety Evaluation Supporting Amends 213 & 213 to Licenses DPR-32 & DPR-37,respectively ML18152B8011998-05-0404 May 1998 Safety Evaluation Granting Third 10-year Interval Inservice Insp Plan Request for Relief SR-19 for Surry Power Station, Unit 1 ML18152B7881998-04-28028 April 1998 SER Accepting Request for Relief from ASME Code Requirements - Deferral of Repair to RHR Sys Piping ML18153A3011998-04-20020 April 1998 Safety Evaluation Denying Licensee Assessment of Reactor Vessel Structural Integrity ML20217P9941998-04-0707 April 1998 Safety Evaluation Granting Licensee Third 10-yr Inservice Insp Program Relief Requests SR-018 - Sr-024 ML18153A3841997-12-0303 December 1997 Safety Evaluation Accepting Licensee Structural Integrity & Operability Assessments ML20202B8751997-11-24024 November 1997 Safety Evaluation Denying Licensee Request for Exemption from Section III.G.2.f of App R to 10CFR50.Staff Concluded That Use of Combustible Radiant Energy Heat Shields Inside Containment at Surry & North Anna Unacceptable ML18153A4011997-11-24024 November 1997 Safety Evaluation Accepting Licensee Proposed Alternative to Perform Visual Exam of Reactor Vessel Closure Head Nuts in Lieu of Surface Exam ML18153A4471997-10-0101 October 1997 Safety Evaluation Re Relief from Implementation of 10CFR50.55a Requirements for Surry Power Station,Units 1 & 2 & North Anna Power Station,Units 1 & 2 ML20217P0951997-08-21021 August 1997 Safety Evaluation Accepting Licensee ,As Suppl by 970324 Request for Exemption from Requirements of 10CFR70.24(a) Re Criticality Monitors as Pertaining to Unirradiated Fuel & Other Forms of Special Nuclear Matls ML20149D8361997-07-15015 July 1997 Safety Evaluation Supporting Amends 211 & 211 to Licenses DPR-32 & DPR-37,respectively ML18153A1271997-04-11011 April 1997 Safety Evaluation Accepting Third 10-yr ISI Interval Requests for Relief Sr-14 - SR-17 for Plant,Unit 2 ML18153A0511996-08-30030 August 1996 SE Granting Third 10-yr Interval ISI Program Plan Requests for Relief SR-009 Through SR-017,subj to Requirement for Relief Request SR-014 ML20117M4281996-06-0707 June 1996 Safety Evaluation Supporting Amends 210 & 210 to Licenses DPR-32 & DPR-37 ML20108B3661996-04-29029 April 1996 Safety Evaluation Supporting Amends 209 & 209 to Licenses DPR-32 & DPR-37,respectively ML20107K0081996-04-18018 April 1996 Safety Evaluation Supporting Amends 208 & 208 to Licenses DPR-32 & DPR-37,respectively ML18153A6091996-04-16016 April 1996 Safety Evaluation Authorizing Third 10-yr Interval ISI Program Plan Requests for Relief to Use Code Cases N-522 & N-535 at Plant,Per 10CFR50.55a(a)(3)(i) ML20099M0071995-12-28028 December 1995 Safety Evaluation Supporting Amends 207 & 207 to Licenses DPR-32 & DPR-37,respectively ML18153A5631995-12-19019 December 1995 SER Recommending That Relief Requests SR-22 Through SR-26, Be Granted,Per 10CFR50.55a(g)(6)(i) ML18153A5541995-12-13013 December 1995 Safety Evaluation Accepting Change to Emergency Plan Augmentation Goals of Selected Responders from 30 Minutes to 45 Minutes for Plant ML20092G7381995-09-14014 September 1995 Safety Evaluation Supporting Amends 205 & 205 to Licenses DPR-32 & DPR-37 ML20092A3131995-09-0101 September 1995 Safety Evaluation Supporting Amend 204 to Licenses DPR-32 & DPR-37 ML18153A7511995-08-30030 August 1995 Safety Evaluation Granting Third 10-yr Interval Inservice Insp Program Plan,Rev 0 & Associated Requests for Relief ML20087B5731995-08-0303 August 1995 Safety Evaluation Supporting Amends 203 & 203 to Licenses DPR-32 & DPR-37,respectively ML20087A1791995-07-27027 July 1995 Safety Evaluation Supporting Amends 202 & 202 to Licenses DPR-32 & DPR-37,respectively ML18153A7261995-07-19019 July 1995 Safety Evaluation Re Third 10-yr Interval Inservice Insp Program Update & Associated Requests for Relief ML18153A7101995-07-19019 July 1995 Safety Evaluation Granting Requests for Relief RR-2,RR-6, RR-7,RR-8,RR-11,SR-002,SR-003,SR-004 & SR-006 ML20086J7611995-07-11011 July 1995 Safety Evaluation Supporting Amends 201 & 201 to Licenses DPR-32 & DPR-37,respectively ML18153A6951995-07-0606 July 1995 SER Denying Proposed Revisions to Decrease Effectiveness of Currently Approved Emergency Plan for Each Site ML20086E3221995-06-29029 June 1995 Safety Evaluation Supporting Amends 200 & 200 to Licenses DPR-32 & DPR-37,respectively ML18153A8511995-06-0808 June 1995 Safety Evaluation Granting Third Interval Inservice Insp Program Relief Requests from ASME Code Section XI for Plant, Unit 1 & 2 ML20091R3121995-05-31031 May 1995 Safety Evaluation Supporting Amend 199 to Licenses DPR-32 & DPR-37,respectively 1999-09-24
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML18152A2811999-10-12012 October 1999 Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619 05000281/LER-1999-004-02, :on 981109,EDG Was Inoperable Longer than Allowed by TS Due to Governor Compensation Valve.Root Cause Evaluation Being Performed to Determine How Compensation Valve Became Closed1999-10-0101 October 1999
- on 981109,EDG Was Inoperable Longer than Allowed by TS Due to Governor Compensation Valve.Root Cause Evaluation Being Performed to Determine How Compensation Valve Became Closed
ML18152B3531999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Surry Power Station,Units 1 & 2.With ML18152B3371999-09-24024 September 1999 SER Accepting Third 10-year Interval Inservice Insp Plan Request for Relief SR-026 for Surry Power Station Unit 2 ML18152B6651999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Surry Power Station Units 1 & 2.With 05000280/LER-1999-006, :on 990802,determined That Plant Was Outside of App R Design Basis Due to Fire Barrier Deficiencies. Caused by Original Plant Design Deficiencies.Fire Watches Were Established & Mods Have Been Completed.With1999-08-27027 August 1999
- on 990802,determined That Plant Was Outside of App R Design Basis Due to Fire Barrier Deficiencies. Caused by Original Plant Design Deficiencies.Fire Watches Were Established & Mods Have Been Completed.With
05000280/LER-1999-005-01, :on 990731,effluent Radiation Monitors Were Declared Inoperable.Caused by Degraded Heat Trace Circuits for Monitors Sample Suction Line.Degraded Heat Trace Circuit Was Replaced & Addl Heat Trace Is Being Installed1999-08-27027 August 1999
- on 990731,effluent Radiation Monitors Were Declared Inoperable.Caused by Degraded Heat Trace Circuits for Monitors Sample Suction Line.Degraded Heat Trace Circuit Was Replaced & Addl Heat Trace Is Being Installed
ML18152B3841999-08-23023 August 1999 Safety Evaluation Granting Relief Request from ASME Section Xa Requirements for Containment Insp ML18152B3631999-08-23023 August 1999 Safety Evaluation Supporting Eddy Current Techniques Used by VEPCO to Determine Depth of Degradation Evident in Units SG Tubing & VEPCO Approach for Dispositioning Tubes with Avb Wear Indications ML18152B3831999-08-23023 August 1999 Safety Evaluation Granting Relief Request from ASME Section XI Requirements for Containment Insp 05000280/LER-1999-004-01, :on 990714,TS Violation Due to non-safety Related Fans Effect on CR Boundary Was Noted.Cause of Event Has Not Yet Been Determined.Cable Spreading Room Doors Were Operned to Reduce Pressure in Rooms1999-08-13013 August 1999
- on 990714,TS Violation Due to non-safety Related Fans Effect on CR Boundary Was Noted.Cause of Event Has Not Yet Been Determined.Cable Spreading Room Doors Were Operned to Reduce Pressure in Rooms
ML18151A3981999-08-13013 August 1999 SPS Unit 2 ISI Summary Rept for 1999 Refueling Outage ML18152B3791999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Surry Power Station,Units 1 & 2.With 05000281/LER-1999-003-02, :on 990705,auto Reactor Trip on Low Coolant Flow,Occurred.Caused by Loop Stop Valve Failure.Approved RCE Recommendations,Designed to Prevent Recurrence of Similar Event Will Be Implemented Through CAP1999-07-30030 July 1999
- on 990705,auto Reactor Trip on Low Coolant Flow,Occurred.Caused by Loop Stop Valve Failure.Approved RCE Recommendations,Designed to Prevent Recurrence of Similar Event Will Be Implemented Through CAP
ML20196J4781999-07-0101 July 1999 Safety Evaluation Supporting Amends 221 & 221 to Licenses DPR-32 & DPR-37,respectively ML18152B3911999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Surry Power Station,Units 1 & 2.With ML20195D3571999-06-0707 June 1999 Safety Evaluation Supporting Amends 220 & 220 to Licenses DPR-32 & DPR-37,respectively ML20195E2401999-05-31031 May 1999 Rev 2 to COLR for SPS Unit 2 Cycle 16 Pattern Ag ML18152B4341999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Surry Power Station,Units 1 & 2.With 05000281/LER-1999-002-02, :on 990425,MSSVs Tested Out of Tolerance for as Found Setpoint.Caused by Minor Setpoint Drift.No Immediate Action Required.Deviation Rept Submitted for Each Valve.With1999-05-18018 May 1999
- on 990425,MSSVs Tested Out of Tolerance for as Found Setpoint.Caused by Minor Setpoint Drift.No Immediate Action Required.Deviation Rept Submitted for Each Valve.With
ML18152B4161999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Surry Power Station Units 1 & 2.With 05000280/LER-1999-003-01, :on 990331,potential Loss of Charging Pumps Was Noted.Caused by Main CR Fire.Station Deviation Was Issued on 990331.With1999-04-28028 April 1999
- on 990331,potential Loss of Charging Pumps Was Noted.Caused by Main CR Fire.Station Deviation Was Issued on 990331.With
ML18152B6481999-04-14014 April 1999 Safety Evaluation Supporting Relief Requests IWE-2,4.5.6 & IWL-2 to Licenses DPR-32 & DPR-37 Respectively ML18152B6451999-04-13013 April 1999 SER Accepting Util Reactor Pressure Vessel Fluence Methodology for Surry Power Stations,Units 1 & 2 & North Anna Power Station,Units 1 & 2 Subject to Listed Limitations 05000281/LER-1999-001-02, :on 990301,RPS Relay Not Placed in Trip Resulted in Violation of TS 3.7.Caused by Lack of Procedural Guidance.Developed New Procedure to Provide More Explicit Instructions for Placing Stop Valve in Relay Trip1999-03-31031 March 1999
- on 990301,RPS Relay Not Placed in Trip Resulted in Violation of TS 3.7.Caused by Lack of Procedural Guidance.Developed New Procedure to Provide More Explicit Instructions for Placing Stop Valve in Relay Trip
ML18152B6511999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Surry Power Station Units 1 & 2 05000280/LER-1999-002-01, :on 990301,prematurely Released Fire Watches Resulted in Violation of TS 3.21.B.7.Caused by Inadequate Procedure.Procedure for Opening & Sealing Fire Stops Was Revised on 9902121999-03-29029 March 1999
- on 990301,prematurely Released Fire Watches Resulted in Violation of TS 3.21.B.7.Caused by Inadequate Procedure.Procedure for Opening & Sealing Fire Stops Was Revised on 990212
05000280/LER-1998-013, :on 981122,turbine/reactor Tripped on High Due to Short Circuit in Summator for MSL C Loop Channel III Flow Transmitter.Replaced 1-MS-FT1494 Summator & Module Repair Procedure Revised.With 9903190 Ltr1999-03-19019 March 1999
- on 981122,turbine/reactor Tripped on High Due to Short Circuit in Summator for MSL C Loop Channel III Flow Transmitter.Replaced 1-MS-FT1494 Summator & Module Repair Procedure Revised.With 9903190 Ltr
ML20207L8081999-03-12012 March 1999 Safety Evaluation Supporting Amends 219 & 219 to Licenses DPR-32 & DPR-37 ML18152B7331999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Surry Power Station,Units 1 & 2.With ML18152B5381999-02-16016 February 1999 SER Accepting Third 10-year Interval Inservice Insp Request for Relief for Surry Power Station,Unit 1.Staff Concludes That Licensee Proposed Alternative Will Provide Acceptable Level of Quality & Safety.Technical Ltr Rept Also Encl ML18152B5421999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Surry Power Station,Units 1 & 2.With ML18151A3031999-01-29029 January 1999 ISI Summary Rept for 1998 Refueling Outage,Including Form NIS-1, Owners Rept for ISIs & Form NIS-2, Owners Rept for Repairs & Replacements 05000280/LER-1999-001, :on 981222,auxiliary Feedwater Pipe Support Missed Surveillance.Caused by Personnel Error.Station Deviation Rept Was Submitted.Two Supports in Question Received Required Code Insp & Were Found Acceptable1999-01-21021 January 1999
- on 981222,auxiliary Feedwater Pipe Support Missed Surveillance.Caused by Personnel Error.Station Deviation Rept Was Submitted.Two Supports in Question Received Required Code Insp & Were Found Acceptable
ML18152B6011998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Surry Power Station,Units 1 & 2.With ML18152B5861998-12-18018 December 1998 SER Approving Request Relief Related to Inservice Testing Program at Surry Power Station Unit 1 ML20198F9221998-12-16016 December 1998 Safety Evaluation Supporting Amends 217 & 217 to Licenses DPR-32 & DPR-37,respectively 05000280/LER-1998-014, :on 981126,manual Reactor Trip in Response to Main Feedwater Regulating Valve Failure Occurred.Caused by Dislocation of Retaining Clip in Positioner.Control Room Operators Placed Unit in Safe,Shutdown Condition1998-12-16016 December 1998
- on 981126,manual Reactor Trip in Response to Main Feedwater Regulating Valve Failure Occurred.Caused by Dislocation of Retaining Clip in Positioner.Control Room Operators Placed Unit in Safe,Shutdown Condition
ML18152B5901998-12-16016 December 1998 Safety Evaluation Authorizing Request to Use Code Case N-577 as Alternative to Requirements of ASME Code Section XI for Surry Power Station,Unit 1 ML18152B7121998-12-0404 December 1998 LER 98-S01-00:on 981105,noted Failure to Deactivate Station Access Badge.Caused by Human Error.Licensee Will Now Deactivate Station Badges Before Clearance Is Revoked & Process for Badge Deactivations Have Been Strengthened 05000280/LER-1998-012, :on 981102,noted That EDGs Were Concurrently Inoperable.Caused by Required Testing Per TS 3.16.B.1.a.2. Redundant EDG Was Returned to Svc within Two Hour Period, Following Satisfactory Testing.With1998-12-0101 December 1998
- on 981102,noted That EDGs Were Concurrently Inoperable.Caused by Required Testing Per TS 3.16.B.1.a.2. Redundant EDG Was Returned to Svc within Two Hour Period, Following Satisfactory Testing.With
ML18152B7081998-11-30030 November 1998 Rev 0 to COLR for Surry 1 Cycle 16,Pattern Un ML18152B5721998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Surry Power Station,Units 1 & 2.With ML18152B6241998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Surry Power Station Units 1 & 2.With ML18152B6881998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Surry Power Station Units 1 & 2.With ML20151U7261998-09-0303 September 1998 Safety Evaluation Approving Exemption from Certain 10CFR20 Requirements Re Use of self-contained Breathing Apparatus with Enriched Oxygen in Subatmospheric Containments at SPS ML18153A3271998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Surry Power Station,Units 1 & 2 ML20237E9721998-08-26026 August 1998 Safety Evaluation Supporting Amends 216 & 216 to Licenses DPR-32 & DPR-37,respectively ML18153A3161998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Surry Power Station Units 1 & 2 05000280/LER-1998-010, :on 980715,low Intake Canal Level Instrument Channel I Was Declared Inoperable to Allow Testing of Intake Canal Level Probe 1-CW-LE-102.Subject Probe Was Cleaned by Diver,Tested & Channel I Was Returned to Operable Status1998-07-31031 July 1998
- on 980715,low Intake Canal Level Instrument Channel I Was Declared Inoperable to Allow Testing of Intake Canal Level Probe 1-CW-LE-102.Subject Probe Was Cleaned by Diver,Tested & Channel I Was Returned to Operable Status
1999-09-30
[Table view] |
Text
e e
UNITED STATE'3 NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555--0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION FOR RELIEF REQUEST FROM ASME SECTION XI REQUIREMENTS FOR CONTAINMENT INSPECTION VIRGINIA ELECTRIC POWER COMPANY SURRY POWER STATION, UNITS 1 AND 2 DOCKET NOS: 50-280 AND 50-281
1.0 INTRODUCTION
Surry Power Station, Units 1 and 2, are presently in the third ten-year inservice inspection interval, and examinations are conducted to the requirements of the 1989 Edition of American 6ociety of Mechanical Engineers (ASME)Section XI (Ref. 1). By Federal Register Notice 154 (Volume 61 ), dated August 8, 1996, the Nuclear Regulatory Commission amended its regulations to incorporate by reference the 1992 Edition with the 1992 Addenda of Subsections IWE and IWL, with specified modifications in Title 1 O of the Code of Federal Regulations (1 O CFR) Section 50.55a. The effective date of the amended rule was September 9, 1996.
The rule requires expedited implementation of the first period examination requirements within 5 years from the effective date of the rule, which corresponds to September 9, 2001. Pursuant to 1 O CFR 50.55a(a)(3), the licensee, Virginia Electric and Power Company (VEPCO), has requested relief from specific requirements of Subsection IWL of the 1992 Edition with the 1992 Addenda of ASME Section XI.
VEPCO states that its request for relief is based on proposed alternatives that would provide an acceptable level of quality and safety, and that the relief request has been reviewed and approved by the Station Nuclear Safety and Operating Committee (Ref. 1 ). The staff has reviewed the information provided by the licensee, and its evaluation is provided below.
2.0 EVALUATION Code Requirements:
This relief request covers ali' concrete surfaces subject to examination in accordance with Subsection IWL of the 1992 Edition, 1992 Addenda of ASME Section XI (Ref. 2). Table IWL-2500-1, Category L-A, requires a VT-3C visual examination of all areas per item L1.11 and a VT-1 C visual examination of suspect areas per item L 1-12 (Ref. 2). The examinations are performed by personnel qualified to-the requirements of IWL-2310. IWL-2310 requires that VT-3C visual examinations be conducted to determine the general structural condition of concrete surfaces of containments by identifying areas of concrete deterioration and distress (Ref. 2). VT-1C visual examinations are conducted to determine concrete deterioration and distress for suspect areas detected by VT-3C and certain other conditions described in Ref. 2.
IWL-231 O further requires that (1) the owner's written practice shall define qualification requirements for concrete examination personnel in accordance with IWA-2300, and that (2) limited certification in accordance with IWA-2350 may be used for examiners limited to concrete.
9908270081 990823 PDR ADOCK 05000280 8
PDR
- Code Requirements from which VEPCO requests relief:
e VEPCO has requested relief from the qualification requirements for methods VT-1C and VT-3C as specified in IWL-2310 (Ref. 1).
Licensee's Basis for Relief:
The required examinations (specified in IWL 2310) describe both the type of examinations to be performed and the qualifications of the personnel to perform such examinations. The VT-1C and VT-3C examinations require a certification program based upon ANSI/ASNT CP-189, 1991, to provide personnel for the examinations. The licensee proposes to use Responsible Engineers in lieu of VT-1C and VT 3-C certified personnel to perform these examinations.
In addition, IWL-2320 ("Responsible Engineer) requires that the Responsible Engineer approve, instruct, and train concrete examination personnel. The Responsible Engineer is also required to evaluate examination results. The qualification requirements of the Responsible Engineer, specified in IWL-2320, do not require the Responsible Engineer to be additionally.
certified to VT-1 C or VT-3C; neither do they exempt the Responsible Engineer from the requirements of IWL-2310. In fact, the requirements of IWL-251 O specify that the examinations shall be performed by, or under the direction of, the Responsible Engineer.
The licensee further states that, from the description of the Responsible Engineer in IWL-2320, it is apparent that the individual could adequately perform the necessary examinations, given that the appropriate visual acuity requirements are met. As such, VEPCO considers that developing a new certification program for VT-1 C and VT-3C personnel will cause unnecessary hardship. The Responsible Engineer will provide equivalent quality and safety during the examination.
Licensee's Proposed Alternative: The licensee proposes the following alternative method:
Only personnel determined to be Responsible Engineers will be used in lieu of VT-1 C and VT-3C certified personnel to perform examinations required in Category L-A of ASME Section XI. Additionally, Responsible Engineers performing examinations will have met the vision test requirements of IWA-2321 and IWA-2322 of the 1992 Addenda of ASME Section XI prior to performing examinations.
Staff Evaluation:
The staff has evaluated the licensee's basis for its request for relief, as well as its proposed alternative requirements, and finds that developing a new certification program for VT-1C and VT-3C personnel will result in an undue burden on the licensee because the Code-mandated certification program i~ to be based upon ft "ISi/ ASNT CP 189, 1991, which is intended primarily for the qualification of nondestructive testing personnel for metal components and steel structures. Therefore, requiring the development of a new certification program will not add significantly to the effectiveness of the required examinations for concrete structures, provided such examinations are performed by a Responsible Engineer whose qualifications are described in IWL-2320 as follows:
The Responsible Engineer shall be a Registered Professional Engineer experienced in evaluating the in-service condition of structural concrete. The Responsible Engineer shall have knowledge of the design and Construction Code and other criteria used in design and construction of concrete containments in nuclear power plants. In addition, the Responsible Engineer shall be responsible for (a) development of procedures for examination of concrete surfaces; (b) approval, instruction, and training of concrete examination personnel; (c) evaluation of examination results; (d) preparation of repair procedures; and (e) submittal of report to the owner documenting results of examinations and repair.
VEPCO has committed, in its letter of February 11, 1999, that it will employ only personnel determined to be Responsible Engineers in lieu of VT-1C and VT-3C certified personnel to perform examinations required in Category L-A of ASTM Section XI. VEPCO has additionally committed that Responsible Engineers will have met the vision test requirements of IWA-2321 and IWA-2322 of the 1992 Addenda of ASME Section XI prior to performing examinations. In view of these facts, the staff finds that the Responsible Engineer's qualifications are adequate for performing the required examinations and provide an acceptable level of quality and safety.
3.0 CONCLUSION
The staff has evaluated VEPCO's February 11, 1999, submittal (Ref. 1) for Surry Power Station, Units 1 and 2, and concludes that the use of personnel determined to be Responsible Engineers in lieu of VT-1C and VT-3C certified personnel to perform examinations required in Category L-A of Section XI provides an acceptable level of quality and safety. Therefore, VEPCO's request for relief is authorized pursuant to 1 O CFR 50.55a(a)(3)(i).
Principal Contributor: R. Pichumani Date:
August 23, 1999
References:
- 1.
Letter, February 11, 1999, L. N. Hartz, VEPCO, to USNRC, Virginia Electric and Power Company, Surry Power Station, Units 1 and 2, North Anna Power Station, Units 1 and 2, ASME Section XI Relief Requests
- 2.
Subsection IWL" Requirements for Class CC Concrete Components of Light-Water Cooled Plants" of the 1992 Edition, 1992 Addenda of Section XI, Division 1, of ASME Boiler and Pressure Vessel Code (ASME Code)
- i.
e J.P. O'Hanlon August 23', 1999 The staff has completed its evaluation of this matter, therefore, we are closing TAC Nos.
MA4823, MA4824, MA4857 and MA4858.
Sincerely, ORIGINAL SIGNED BY:
Richard L. Emch, Jr., Chief, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-280, 50-281, 50-338, and 50-339
Enclosures:
North Anna Safety Evaluation Surry Safety Evaluation cc w/encls: See next page Distribution CDockefE1le'--.:.-J PUBLIC PDll-1 R/F J. Zwolinski/S. Black
- H. Berkow E. Dunnington G. Edison (2)
RScholl (e-mail SEs only)
OGC G. Hill (4)
ACAS M. Tschiltz, EDO.
R. Haag, RII R. Pichumani
- See previous concurrence DOCUMENT NAME:
G:\\PDl1-1\\SURRY\\ma4857,4858,4823,4824.w d OFFICE PM:PDII/S1 LA:PDl1/S1
SC/PDII/S1 NAME EDunnin ton CMarco DATE 8/14/99 8/16/99 COPY Yes/No Yes/No Yes/No OFFICIAL RECORD COPY