NRC FORM 195 DOCKET NUMBER I2-76) 50-335 FILE NUMBER NRC DISTRIBUTION FQR P RT 50 DOCKET MATERIAL INCIDENT REPORT H.C. Moseley 'lordia Power 5 Light Co.

OATE OF DOCUMENT 4-9-76 Miami, Flordaa OATE RECEIVED A.D. Schmidt 4-22-76 OLETTER 0 NOTOR IZ E O PROP INPUT FORM NUMBER OF COPIES RECEIVED QORIGINAL CfQNC L7hSSI F I E 0 IDCOPV 30 OESCRIPTION ENCLOSURE Ltr. trans the following...... Licensee Event Report (R.p.g 7p-5)~pn 3 ip 7p Concerning Containment, Area Radiation Monitor-ing Instr'otaentationotwo inoperable channels.-..;

(30 Carbon Cys. Received) .

'ACKNOWLEDGED .

DO NOT REMOVE PLAN NAm: 'OTE:

XF PERSONNEL EXPOSURE XS INVOLVED SEND DIRECTLY TO KREGER/J, COLLINS SAFETY FOR ACTION/INFORMATION ENVIRO SAB 4 BRANCH C1IIEF.: niemann W 3 CYS FOR ACTION LIC ~ ASST: lggs W/ CYS ACRS CYS ENT TO LA INTERNAL D ISTRI BUTION E FILE NRC PDR

& E 2 SCHROEDER/XPPOLXTO NOVAK CHECK lIES S MEN E TEDE CO I"SCCA BAER SHAD OLLHER BUN 1 KRE E 0 N EXTERNAL DISTRIBUTION CONTROL NUMBER ~

LPDR TIC NSIC 3996 NRC FORM 155 I2 70)

ng II II f

N

BOX OI3100, MIAMI, FLORIDA 33101 FLORIDA POWER 5 LIGHT COViPA'IY April 9,. 1976 P -LI-76.-73

/

Cp

>DCXTIg>

(( Nrem Mr. Norman C. Moseley, Director, Region II Office of Inspection and Enforcement 'szsv U. S. Nuclear Regulatory Commission "230 Peachtree Street, N. W;, Suite 818

'tlanta, Georgia 30303, b M>>II Rdz ~~

Dear Mr..Moseley:

REPORTABLE OCCURRENCE 335-76-5 ST. LUCIE UNIT 1 DATE OF OCCURRENCE: MARCH 10'976 CONTAINMENT AREA RADIATION MONXTORING INSTRUMENTATION-TWO INOPERABLE CHANNELS The attached Licensee Event Report is being submitted in accordance with Technical Specification- 6.9 to provide 30-. day notification of the subject occurrence.

Very truly yours, A. D. Schmidt

~ ~

.Vice President Power Resourc s MAS/cpc Attachment cco Jack R. Newman, Esauire Director, Office of Inspection and Enforcement (30)

Director, Office of Management Information and Program Cont ol (3)

,UCI Olhll Ol Ill Pl CI AOI&h

CONTROL BLOCK:

ICENSEE EVENT REPORT

~

(PLEASE PRINT AU. REQUIREO INFORMATION)

I' 6 UCENSEE UCENSE EVENT NAME UCENSE NUMBER TYPE TYPE too~j F LS LS 1 0 0 0 0 0 0 0 0 0 4 1 1 1 1 ~03

.7 89 14 15 25 26 30 31 32 REPORT AEPORT 7

~D1OONT~

8 CATEOO>>

57 58 TYP~E

~g 59 SOURCE

~Z, 60 0

61.

5 COCKET NUMBEA 0 0 3 3 5 68 69 0 3

~ EVENT OATS 1 0 7 6 74 040976 75 AEPOAT OATE EVENT OESCRIPTION Qog 7 8 9 Durincr initial core loadin , ower was lost to the Channel C containment.

60

[ODG] area radiation monitorin instrumentation. At the time ESFAS Channel A 7 89 60

~04 was out of service for im lementation of a lant chan e/modification.

7 8 9 PRIMAE 80 7 8 9 ~ 80 Jog 89 80 SYSTEM CAUSE COMPONENT COMPONENT CODE CODE COMPONENT COOt SUPPUEA MAhUFACTUAEA IOD7j ~BA ~A 3 N 3 T R U V 1 1 5 N 7 8 9 10 11 12 17 44 47 CAUSE DESCRIPTION This occurrence was caused b a loose electrical connection. The FACTORY 7 8 9 80 toOI electrical connection was loose because of im roper landing of a 7 8 9 80

,Qg89 termination. Corrective action was to land the termination correctly.

7 80 METI400 OF STA'TUS  % POWER OTIIEA STATUS OISCOVEAY OISCOVEAY OESCRIPTION Q~g ~R ~oo o NA a NA 7 8 9 10 12 13 44 45 46 80 FORM OF ACTIVITY CONTENT 7

Hl8 u RELEASEO 9

PERSONNEL EXPOSURES OF AELEASE 10 11 AMOUNT OF ACTIVITY NA 44 45 LOCATION OF AELEASE NA 80 7

~>>

8 9

~oo NUMBER 11 TYPE Lzg 12 13 OESCRIPTION NA 80 7

EQ4 89

~~

PERSONNEL INJURIES NUMBER 11 OESC IPTION 12 NA 80 PROBABLZ CONSEQUENCES 7 8 9 80 LOSS OR OAMAGE TO FACILITY TYPE OESCRIPTION z NA 7 89 10 80 PUBLICITY NA 7 8 9 ~ 80 AOOITIONAL FACTORS'g See Pa e Two for continuation of Event Descri tion and Cause 7 89 80 t1i9] Description.

7 89 80 NAME M. A. Scho man CFO II4I ~ 4eT

REPORTABLE OCCURRENCE 335-76-5 LICENSEE EVENT REPORT PAGE TNO EVENT DESCRIPTION (Continued) were not available. This is contrary to Technical Specification 3.3.3.1. The immediate action was to attempt to restore power to the Channel C instrumentation and to initiate the followup action required by Specification 3.3.3.1. Power was restored quickly, so it was not necessary to complete the followup action.

This, was the first occurrence of this type. (335-76-5).

CAUSE DESCRIPTION (Continued)

Followup .action was to check other circuits for loose terminations.