LER 87-009-04:on 870910,svc Water Sys Cabling App R Separation Criteria Inadequacy Identified.Caused by Inadequate Design Review.Design Change Correcting Deficiency Will Be made.W/871006 Ltr
ML18093A431
Person / Time
Site: Salem PSEG icon.png
Issue date: 10/06/1987
From: Mel Gray, Zupko J
Public Service Enterprise Group
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
LER-87-009, LER-87-9, NUDOCS 8710140071
Download: ML18093A431 (10)


Text

. NlllC For111 JN 19-831 I .- U.I. NUCLEAlll lllEQULATOlllY A""ROVEO OMI NO. 311111~104 EXPIRES 8/3111&

C~llllON LICENSEE EVENT REPORT (LERI FACILITY NAME 111 'DOCKET NUMIElll 121 . I P'AU~ "'

Salem Generating Station - Unit 2 o 1s101010131 11 l 1 loF 019 TITLE 141 Appendix R Criteria Non-Conformance EVEN')' DATE Ill LEA NUMBER 1.11 RE ..ORT DATE 171 OTHER FACILITIEI INVOLVED Ill MONTH QAY *YEAR YEAR  ::::::::::

SEQUENTIAL.

NUMBE" }) REVISK>N NUMBER MONTH DAY YEAR FACIL.ITV NAMES DOCKET NUMllERISI Salem - Unit 1 0 I 5 Io I o I o 12 I 712 I7 - I ol9 -

ol 9 ilo 8 7 8 0 ol4 i i 0 ol6 sl 1 0 15 IO Io I o I I I OPEl'lATINQ THll REl'ORT II IUIMITTED PURIUANT TO THE REOUIREMENTI OF 10 CFlll §: ICl><<k OM or ml>'W of tho followin1) 1111 l'OWl!ll MOOE Ill I

N I/A 20.402(bl 20.411111*1111111 20.-lcl 80.*1*1111 --x I0.731811211M I0.731oll21M 73.71(bl 731.71(*1 LEVEL 1101 I I

  • l*lil:l.lllli'l.l:lil*ll"lll:111:11::111.111*111*1*1.11111:111:1111.

i--

20.-11Jl111NI 20.-11111111111 20.-loll1lllvl llO.alcll21 80.73(11121111 80.731811211111 80.7311o112llwMI ll0.731oll211w111JIAI ll0.731oll2Jlw1Hllll

- OTHER (Sp<</fy in Ab111Wt

/>>low ontl In To*t. NRC Form 366A)

-:*:*:*:*:*:*:*:*:*:*:*:.:*:*:*:***:*:*:*:*:*:*:*:*:*:*:*:*:*:*:*::* 20.at111111w1 ll0.7311112111111 ll0.731111211*1 LICENSEE CONTACT FOR THll LEA 1121 NAME TELEPHONE NUMBER AREA CODE M. K. Gray - Licensing Engineer 6 0 9 1 1 31319 I -14 13. I 1,0 COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRllED IN THll REl'ORT 1131
.*.;.;.;.; i*
-:*:*::: :-:*:* :*:*-:*:* *:*:-:*:*:*:*:*: CAUSE
: : : : [: : : : ~:1:1:1:1 1:1:1:1: 1: : 1: : : :

MANUFAC* REPORTABLE MANUFAC* ~EPORTAllLE CAUSE SYSTEM COMPONENT TO NPRDS ,;.;.;.;:  :*:*:*:;*.*: *:-:::*:*: SYSTEM COMPONENT TUR ER TUR ER TO NPRDS

/\? \:;:::::::;}/

I I I I I I I

.;.;::.; :* .;.; *.*.* .*:**:*. I I I I I I I li i i]![*:i:i : i!i : i i:;:i i i i[i!i i ~!i!i: :

I I I I I I I  ;::::ttJ  :*:**:*:*:*:-:*.:*:

?2

)\ I I I I I I I

!: 1:,:*j.,: i: : : : : =.1 .: 1: : : :!:*~.: =1=!

IU~LEMENTAL REPORT EXPECTED (141 MONTH DAY Y&;AR EXPECTED

~

SUBMISSION j YES (If rn. comptoro EXPECTEO SUIMISSION ()ATE/ NO DATE 1151 I I I AUTAACT (Limit ro 1.fOO q>>en, i.*.. *PPfOxim*r.ly fiftHn 1ingl**11>>c1 ry,,.wrirt1n hn11J (111 The following system/component conditions were identified by a PSE&G task force reviewing/evaluating Salem Station's compliance with the requirements of 10CFR 50 Appendix R.

LER 87-009-00 addressed a SW System cabling Appendix R separation criteria inadequacy. The root cause was inadequate design review. The current design meets the original electrical separation criteria, but not the Appendix R criteria.

PSE&G is reviewing design change options. LER 87-009-01 addressed non-seismically qualified Marinite walls located in Salem Units i & 2 460V Switchgear Room. The walls have been reinforced to seismic criteria. A sample of design changes installed before implementation of current design control procedures is being conducted. LER 87-009-02 addresses RHR Room Coolers IVFI cabling Appendix R inadequacies and control cabling Appendix R inadequacies for RHR Room Coolers, Charging* Pump Room Coolers IVFI and Diesel Generator Fuel Oil Transfer Pumps IDCI.

The root cause of these Appendix R inadequacies is inadequate design review. In both cases, an hourly roving fire watch patrol was established for the respective areas. A design change correcting these deficiencies will be made. LER 87-009-03 addressed a D/G power cabling Appendix R separation criteria deficiency. The root cause was inadequate design review. Design change options are being reviewed.

This LER Supplement addresses cabling defic;iencies located in both Units C02 Equipment Rooms, identified on 9/10/87e The root cause was inadequate design/

review. A design change correcting this deficiency will be made.

J2/

8710140071 B710CD6 y~~-,.:v PDR ADOCK 05000272 NlllCF--

19-631 s PDR

LICENSEE EVENT REPORT CLER) TEXT CONTINUATION Salem Generating Station DOCKET NUMBER LER NUMBER PAGE Unit 2 5000311 87-009-04 2 of 9 PLANT AND SYSTEM IDENTIFICATION:

Westinghouse - Pressurized Water Reactor Energy Industry Identification System (EIIS) codes are identified in the text as {xx}

IDENTIFICATION OF OCCURRENCE:

Appendix R Criteria Non-Conformance Discovery Date: 09/10/87 Report Date: 10/06/87 This report was initiated by Incident Report Nos.87-241, 87-256, 278, 279, 301, & 343 CONDITIONS, PRIOR TO OCCURRENCE:

N/A DESCRIPTION OF OCCURRENCE:

The following plant system/component conditions were identified by a Public Service Electric & Gas (PSE&G) task force established to review and evaluate Salem Station's compliance with the requirements of 10CFR 50 Appendix R. The original LER (paragraphs designated "A")

dealt with a design configuration problem associated with Salem Unit 2's Service Water System electrical cabling. The first supplement (paragraphs designated "B") addresses a wall constructed to act as a fire barrier but its design did not fully address seismic criteria concerns. The second supplement addresses Residual Heat Removal (RHR) Room Coolers {VF} cabling concerns (paragraphs designated "C")

and control cabling concerns for RHR Room Coolers, Charging Pump Room Coolers {VF} and Diesel Generator (D/G) Fuel Oil Transfer Pumps {DC}

(paragraphs designated "D"). The third supplement addressed inadequate separation of D/G power cabling (paragraphs designated "E"). This ~upplement addresses inadequate separation of cabling located in the C02 Equipment Room (paragraphs designated "F").

On June 19, 1987 at 1515 hours0.0175 days <br />0.421 hours <br />0.0025 weeks <br />5.764575e-4 months <br />, it was discovered that the cabling for the three (3) electrical trains of the Unit 2 Service Water (SW)

System {BI} did not meet the separation requirements of the Code of Federal Regula-tions, 10CFR 50 Appendix R. These cables are located in the SW Pipe Tunnel located between the Auxiliary Building and the "A" SW Intake Structure. Upon discovery, a continuous fire watch was established at the entrance to the SW Pipe Tunnel. The fire watch periodically walks down the length of the tunnel. This discovery was reported to the Nuclear Regulatory Commission by telephone on June 19, 1987 at 1530 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.82165e-4 months <br /> in accordance with the requirements of 10CFR

50. 72 (b) (2) (iii) (D).

LICENSEE EVENT REPORT (LER) TEXT CONTINUATION Salem Generating Station DOCKET NUMBER LER NUMBER PAGE Unit 2 5000311 87-009-04 3 of 9 DESCRIPTION OF OCCURRENCE: (cont'd)

On June 25, 1987 it was discovered that a Marinite wall located in the Salem Unit 1 460V Switchgear Room (84' Elevation) was not seismically qualified. If a seismic event occurred a possibility "B" existed that the wall could, have failed causing damage to the 460V Vital Bus Switchgear. This wall configuration also existed for Salem Unit 2.

On July 17, 1987 at 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br />, it was identified that the cabling for redundant trains of. Unit 2 RHR Room Coolers do not meet the requirements of 10CFR 50 Appendix R, Subsection III(G). These cables are located in a common panel in the Reactor Plant Auxiliary

  • Equipment Area, Elevation 64 (Fire Area 2FA-AB-64B). A postulated "C" fire in this area could d~mage these cables resulting in the loss of both RHR Room Coole~s. In addition, damage to these cables could prevent the RHR Room-Ventilation Supply and Exhaust Dampers {VF} from opening. This discovery was reported to the Nuclear Regulatory Commission on July 17, 1987 at 1615 hours0.0187 days <br />0.449 hours <br />0.00267 weeks <br />6.145075e-4 months <br /> pursuant to 10CFR
50. 72 (b) (2) (iii) (B).

On July 17, 1987 at 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br />, it was identified that the cabling located in the Unit 2 Upper Electrical Penetration Area, Elevation 100', (Fire Area 2FA-EP-100G) does not meet the separation requirements of 10CFR 50 Appendix R. These cables run from the Safeguards Equipment Cabinets (SECs) to the Vital Ventilation.Control "D" Centers. If a postulated fire occurred in the Upper Electrical Penetration Area, the possi~ility exists to damage control cabling for both RHR Room Coolers, both Charging Pump Room Coolers, and one (1) D/G Fuel Oil Transfer Pump. This equipment is necessary to achieve and maintain a safe shutdown of the plant. This discovery was reported to the Nuclear Regulatory Commission on July 17, 1987 at 1615 hours0.0187 days <br />0.449 hours <br />0.00267 weeks <br />6.145075e-4 months <br /> pursuant to 10CFR 50.72(b) (2) (iii) (A).

On August 6, 1987 at 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br />, it was identified that the power_

cabling for the "B" and "C" D/G's of both Salem Unit 1 and Unit 2 do not meet the separation criteria of 10 CFR50 Appendix R Subsection "E" III(G). These cables are located in the Diesel Fuel Oil Storage Room at elevation 84' (Fire Area 1(2) FA-AB-84D). A postulated fire in this area damaging these cables could result in the loss of both "B" and "C" D/G's.

On September 10, 1987 at 1500 hours0.0174 days <br />0.417 hours <br />0.00248 weeks <br />5.7075e-4 months <br />, the cabling located in both Salem Unit 1 and Unit 2 COz Equipment Rooms (Fire Areas 1(2)FA-DG-84F) was identified to not meet 10 CFR50 Appendix R Subsection III(G). This cabling includes the neutral ground strap and power cables for the "A" D/G, "B" and "C" SW Pump power feeds, power cabling for the "A" and "B" D/G Fuel Oil Transfer "F" Pumps, and the cabling for various "A" and "C" Train SW components.

If a postulated fire occurred in a COz Equipment Room, the potential exists to damage these cables, resulting in the loss of the applicable Unit's "A" D/G, "B"- and "C" SW Pumps, D/G Fuel Oil Transfer Pumps, various Service Water valves, and portions of the SW

\ LICENSEE EVENT REPORT (LER} TEXT CONTINUATION Salem Ge~erating Station DOCKET NUMBER LER NUMBER PAGE Unit 2 5000311 87-009-04 4 of 9 DESCRIPTION OF OCCURRENCE: {cont'd}

HVAC system. This equ_ipment is necessary to achieve and maintain post-fire safe shutdown of the plant.

APPARENT CAUSE OF OCCURRENCE:

The root cause of the SW cabling configuration deficiency is inadequate design review. The current design meets the original electrical separation requirements for Salem Station Unit 2, however, it does not meet the 10CFR 50 Appendix R requirements as published in "A" the Federal Register on September 8, 1981. The Appendix R criteria was not applied to the SW Piping Tunnel because of its restricted access and confined space. Due to this oversight, the SW Pump cabling configuration was not modified.

10CFR 50 Appendix R, Section G(2) requires cables and equipment of redundant trains of systems necessary to achieve and maintain hot shutdown be protected by one of three (3) options to ensure that one redundant train is free from fire damage. The three (3) options are:

(1) separation of cables and equipment of redundant trains by a three (3) hour fire barrier; (2) separation of cables*and equipment of "A" redundant trains by a horizontal distance of more than twenty (20) feet with no intervening combustible or fire hazards along with fire detection and an automatic fire suppression system in the area; or (3) enclosure of cables and equipment of one redundant train in a one hour rated fire barrier along with fire detectors and an automatic fire suppression system in the area. The current design does not meet any of these options.

The root cause of the Marinite wall seismic qualification concern is inadequate design review and doclimentation. The Marinite walls were installed in January 1981 to provide a fire barrier between redundant safety related components. Although the recent walkdo'Wn of the walls, by structural engineers, revealed the walls to have "B" substantial structural support, it was not clear whether seismic requirements were fully considered in the original design and construction of the walls since documentation of the construction appeared inadequate. Subsequent engineering evaluation of the wall(s) revealed that two of the walls (one per Unit) did not meet seismic requirements since their failure could degrade safety-related equipment.

The root cause of the RHR Room Cooler cabling deficiency was inadequate design review. The current cabling configuration meets the original plant design criteria in effect prior to the issuance of "C" 10 CFR50 Appendix R. The cabling configuration was not included in the fire protection upgrade made pursuant to the issuance of 10 CFR50 Appendix R in September 1981.

10 CFR50 Appendix R, Subsection III(G} requires fire protection "C" features be provided for systems important to safe shutdown. These features should be able to limit fire damage so systems necessary to

LICENSEE EVENT REPORT (LER) TEXT CONTINUATION Salem Generating Station DOCKET NUMBER LER NUMBER PAGE Unit 2 5000311 87-009-04 5 of 9 APPARENT CAUSE OF OCCURRENCE: (cont'd) achieve and maintain cold shutdown can be repaired within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

The subject cables are located in Auxiliary Building HVAC Electrical Panel 119 in Fire Area 2FA-AB-64B. A fire in this area could cause both RHR Room Coolers to become inoperable and concurrently keep the "C" RHR Room HVAC dampers in the closed position. This would degrade the performance of the RHR Pumps, which are necessary to achieve cold shutdown. To meet these Appendix R requirements, it would be necessary to either: (1) separate the cables with appropriate fire barriers, (2) have Alternate Shutdown Instructions and dedicated materials to ensure that repairs are made within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of the fire, or (3) obtain NRC approval for an Appendix R exemption in this area. None of these requiremen.ts are currently met.

The root cause of the control cabling deficiency for Fire Area 2FA-EP-100G is inadequate design review. The current cabling configuration meets the origina_l plant design criteria in effect prior to the issuance of 10 CFR50 Appendix R. The cabling configuration was not included in the fire protection upgrade made "D" pursuant to the issuance of 10 CFR50 Appendix R. 10CFR 50 Appendix R, Subsection III(G) identifies acceptable cable separation and fire barrier options that ensure one train of systems, necessary to

  • achieve and maintain hot shutdown, remain free from fire damage during a postulated fire. The current cable design does not incorporate any of these options.

The root cause of the D/G cabling deficiency is inadequate design review. The cabling configuration was not included in the fire protection upgrade made pursuant to the issuance of 10CFR 50 Appendix R. Subsection III(G) of Appendix R identifies acceptable cable "E" separation and fire barrier options that ensure one redundant train of systems necessary to achieve and maintain hot shutdown remains free from fire damage during a postulated fire. The current cablef configuration does not completely incorporate any of these options.

The root cause of the C02 Equipment Room cabling deficiencies is inadequate design review. The cabling configuration was not included in the fire protection upgrade made pursuan~ to the issuance of 10CFR 50 Appendix R. Subsection III(G) of Appendix R identifies acceptable cable separation and fire barrier options that ensure one redundant "F" train of systems* necessary to achieve and maintain hot shutdown remains free from fire damage during a postulated fire. The current cable configuration does riot completely incorporate any of these options because (1) the cables are not protected by rated fire barriers, and ( 2) the area is not equipped with detection or' automatic suppression fire equipment.

ANALYSIS OF OCCURRENCE:

The SW System supplies cooling water to both safety related and "A" non-safety related heat loads. The system utilizes six (6) pumps.

The 4.16 KV Vital Busses (trains A, B, and C) provide power to two

I LICENSEE EVENT REPORT (LER) TEXT CONTINUATION Salem Generating Station DOCKET NUMBER LER-NUMBER PAGE Unit.2 5000311 87-009-04 6 of 9 ANALYSIS OF OCCURRENCE: (cont'd)

(2) SW Pumps per bus. The cabling for these trains runs through the SW Pipe Tunnel to the SW Intake Structure. These cables do not meet Nuclear Regulatory Commission 10CFR 50 Appendix R separation criteria "A" (for Fire Protection). If a fire were to occur in this area a possibility exists of damaging all SW Pump electrical trains, thereby fosing all SW flow. The Unit could be maintained in Hot Standby (Mode 3), which is a subcritical mode.

While SW Pump Cabling does not meet 10CFR 50 Appendix R separation criteria for fire protection, it does meet the_ separation criteria to which Unit 2 was originally licensed. The cabling is separated by a horizontal distance of approximately five (5) feet. Also, there is an unrated partial wall between two of the three SW Pump cables. The "A" combustible loading in the area is only approximately six (6) minutes of burn time. Also, access to the SW Pipe Tunnel is restricted, thereby limiting the possibility of adding uncontrolled combustible material to the area. Therefore, it is unlikely a fire would occur that could impair all s*w Pump cabling.

The inadequate separation of the SW cabling discovery was reported in accordance with 10CFR 50.72(b) (2) (iii) (D) within four (4) hours of "A" discovery (at 1530 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.82165e-4 months <br />). Also, this discovery was reported in accordance with Nuclear Regulatory Commission 10CFR 50.73(a) (2) (v) (D) via Licensee Event Report 311/87-009-00.

The Marinite walls are located in the Units 1 & 2 460V Switchgear Rooms on 84' Elevation. The 1B(2B) 460V Vital Bus Panel parallels the Marinite wall(s) with an intervening distance of approximately four (4) feet. The eight (8) foot high walls consist of two 4' panels. During a seismic event, it is possible for the upper panel to fail, damaging the 1B(2B) 460V Vital Bus Switchgear. The Switchgear supplies power to a variety of safety related equipment including Nos. 12 ( 22) & _14 (24) Containment Fan Coil Uni ts (CFCU' s) ,

No. 12 Hydrogen Recombiner, and the No. 12.Auxiliary Building Ventilation Supply and Exhaust Fans. This equipment would become inoperable if 1B(2B) Vital Bus was rendered inoperable during a seismic event. Nos. 13(23) and 15(25) CFCU's receive power via No.

"B" 1C(2C) electrical train. Additionally, 1C(2C) electrical train supplies power to one Containment Spray (CS) Pump. The limiting case involves the postulated seismic event resulting in the loss of 1B(2B) 460V Vital Bus Switchgear concurrent with a single "active failure" of the 1C(2C) electrical train. This would result in only one (1) operable CFCU and one (1) operable CS Pump. During a design base LOCA, the minimum combination of three (3) CFCU's and one (1)' CS Pump is necessary to maintain post-accident Containment pressure below design values. This requirement would not be met *if the above scenario is assumed. However, this analysis is based upon the conservative assumption that the Marinite wall failure during a seismic event would result in the complete loss of the 1B(2B} 460V Vital Bus Switchgear. The steel cabinet housing this bus provides a significant degree of protection for the Bus. Futhermore, it is possible the damage to this Bus would not necessarily result in the loss of power to all components powered from this Bus.

I LICENSEE EVENT REPORT (LER) TEXT CONTINUATION Salem Generating Station DOCKET NUMBER LER NUMBER PAGE Unit 2 . 5000311 87-009-04 7 of 9 ANALYSIS OF OCCURRENCE: (cont'd)

Due to the low probability of the combination of events occurring consistent with the conservative assumption made above, the Marinite "B" wall seismic concern *did not adversely impact the health and safety of the general.public. However, it is being reported in accordance with 10CFR 50.73(a) (2) (vi) as a design inadequacy.

The Auxiliary Building HVAC Electrical Panel 119 contains solenoid valves SV-784 and SV-785 and associated cabling controlling the operation of Nos. 21 and 22 RHR Room Coolers. These solenoid valves are de-energized when either RHR Pump is required to run. RHR Pump Room HVAC dampers 2ABV27 and 2ABV28 fail open when the solenoid valves are de-energized, thereby ensuring circulation of building ventilation air in the room when either RHR Pump is operating. If a fire occurred in this area, it is possible to hot short the cabling "C" to both RHR Room Coolers and blow the control fuses in the RHR Room Cooler control circuit. This would result in the loss of both RHR Room Coolers. The potential further exists for the solenoid valves to remain energized while the RHR Pumps are running, causing dampers 2ABV27 and 2ABV28 to remain closed thereby preventing circulation of ventilation air to the room. Procedurally, operators are instructed to declare the equipment in the RHR Rooms inoperable if the ambient temperature exceeds 125°F. These limits could be exceeded in a short time given the above scenario. Furthermore, without "Alternate Shutdown Instructions" and dedicated material on hand, it cannot be assumed that the coolers could be repaired within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after the postulated fire. -

During accident conditions coincident with a Loss of Offsite Power or 4KV Bus undervoltage signal, the SECs start and connect the Diesel Generators {D/Gs) to the vital buses and sequentially start required safeguards equipment. During the automatic SEC loading sequence, safeguards equipment not required in the short term is blocked from automatically operating to avoid overloading the D/Gs. Upon completion of the automatic loading sequence, the plant operator resets the SECs allowing control of additional equipment needed to assist in the safe shutdown of the pla~t in the long term. This equipment includes the RHR Room Coolers, the Charging Pump Room Coolers, and the D/G Fuel Oil Transfer Pumps. This equipment "D" receives signals from the SECs via _cables 2RP65-AT, 2RP129-BT, and 2RP148-CT which run from 2A, 2B, and 2C SECs to 2A, 2B, and 2C Ventilation Control Centers in Fire Area 2FA-EP-100G. A fire occurring in the Upper Electrical Penetration Area could damage these cables thereby creating the possibility of not powering up this equipment when called upon. The RHR and Charging Pump Room Coolers ensure the ambient room temperature does not exceed RHR Pump or Charging Pump design limits, however, Auxiliary Building ventilation air would still be available to limit ambient temperature. The D/G Fuel Oil Transfer Pumps transfer oil from the D/G Storage Tanks to the D/G Day Tanks. Due to the repent modification to the electrical contro.ls for the D/G Fuel Oil Transfer Pumps described in Unit 1 LER 272/87-010-00, only one D/G Fuel Oil Transfer Pump would be locked out during the SEC manual loading sequence.

I LICENSEE EVENT REPORT (LER) TEXT CONTINUATION Salem Generating Station DOCKET NUMBER LER NUMBER PAGE Unit 2 5000311 87-009-04 8 of 9 ANALYSIS OF OCCURRENCE: (cont'd)

The 4KV power cabling for the DIG's is located in the DIG Fuel Oil Storage Room. Each DIG has two (2) power cables enclosed in conduit.

The DIG "B" and "C" cables BDD-B and CDD-C run from the exciter cubicle to the 4KV Vital Bus switchgear and cables BDDA-B and CDDA-C run from the DiG to the exciter cubicle. Only the "B" DIG cable BDD-B is protected with a one hour fire wrap. Approximately 23 feet separate the B and C sets of DIG power cables. Thermal type fire detectors provide fire detection capability. The C02 flooding "E" system and water deluge system provide diverse and redundant automatic suppression capabilities. This configuration does not meet any of the three (3) 10CFR 50 Appendix R G(2) options (listed in paragraph "A" of this section). Option 1 is not met because of the cabling for DIG's "B" and "C" is not separated by a three (3) hour fire barrier. Option 2 is not met because while the DIG "B" and "C" cabling is separated by more than 20 feet, the DIG Fuel Oil Storage Tank is an intervening combustible. Option 3 is not met because cable BDDA-B is not protected with a one hour rated fire barrier.

A postulated fire occurring in the DIG Fuel Oil Storage Room could render DIG's "B" and "C" inoperable. Two out of the three DIG's are required to achieve and maintain safe shutdown during a postulated "E" fire in this area coincident with a loss of off-site power. During these conditions, only DIG "A" would remain operable. Therefore, this condition is being reported as a design inadequacy pursuant to 10CFR 50.73(a) (2) (vi).

If a fire occurred in the C02 Equipment Room resulting in damage to the subject cabling, the potential exists to degrade or prevent the operation of the "A" D/G, "A" and "B" DIG Fuel Oil Transfer Pumps, "B" Train and "C" Train SW Pumps, various SW valves, and portions of the SW HVAC system. To achieve safe shutdown, two (2) out of three "F" (3) SW trains are required, as is one DIG Fuel Oil Transfer Pump.

These requirements may not be met if the above postulated fire scenario occurred. The impact of the loss of various SW valves and portions of the SW HVAC system would be to potentially degrade the function of the SW system thus preventing timely completion of a 0safe shutdown.

A postulated fire in the C02 Equipment Room in conjunction with a Loss of Offsite Power (LOP) would require the operation of the DIG's. The "A" DIG provides power to the "A" SW Pumps. Since "B" "F" and "C" SW power feed cables are also located in the C02 Equipment Room, the operation of all three SW trains could be affected by the postulated fire.

CORRECTIVE ACTION:

Upon discovery of the SW Electrical Trains configuration in the SW Pipe Tunnel, a continuous fire watch was established at the entrance "A" to the SW Pipe Tunnel. The fire watch periodically walks down the length of the tunnel. PSE&G is reviewing design modification options to correct this deficiency.

I LICENSEE EVENT REPORT (LER) TEXT CONTINUATION Salem Generating Station DOCKET NUMBER LER NUMBER PAGE Unit 2 . 5000311 87-009-04 9 of 9 CORRECTIVE ACTION (cont'd)

The Marinite walls were reinforced prior to confirmation of their inadequate seismic design. The walls are now qualified to withstand a design base seismic event without degrading adjacent safety related equipment. Th~ Systems Analysis Group currently performs a safety/non-safety system and component interaction review of design changes. This review precludes design inadequacies of this nature.

"B" A'.lso, :the existing design control procedures incorporate multi-discipline cross checks and system interaction considerationso A sample of design changes installed prior to the implementation of these design control procedures will be conducted to confirm this discrepancy is an isolated occurrence.

Upon discovery of the RHR cabling deficiency, a roving hourly fire watch was established (both Units) for the Reactor Plant Auxiliary "C" Equipment Area. A design change, meeting the requirements of 10CFR 50 Appendix R, will be implemented based on the recommendations of the Fire Protection Task Force.

Upon discovery of the SEC deficiency, a roving hourly fire watch was established (both Units) in the Upper Electrical Penetration Area. A "D" design change, meeting the requirements of 10CFR 50 Appendix R, will be implemented based on the recommendations of the Fire Protection Task Force.

A fire watch is not required in this area since detection and redundant and diverse suppression capabilities exist in the area. A "E" *design change, meeting the requirements of 10CFR 50 Appendix R, will be implemented based on the recommendations of the Fire Protection Task Force.

Upon discovery of the cabling deficiencies in the Salem Units 1 and 2 C02 Equipment Rooms, a fire. watch was established. A design "F" change, meeting the requirements of 10CFR 50 Appendix R, will be implemented based on the recommendations of the Fire Protection Task Force.

The Fire Protection Task Force is continuing its review. If the Task Force identifies other reportable 10CFR 50 Appendix R deficiencies, in the course of its review, they will be incorporated into this Licensee Event Report as a "supplemental" report.

Gen~~f Salem Operations MJP:pc SORC Mtg.

  • 87-080

Public Service Electric and Gas Companv P.O. Box E Hancocks Bridge, New Jersey 08038 Salem Generating Station October 06, 1987

u. s. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Dear Sir:

SALEM GENERATING STATION LICENSE NO. DPR-75 DOCKET NO. 50-311 UNIT NO. 2 LICENSEE EVENT REPORT SUPPLEMENT 87-009-04 This supplemental Licensee Event Report is being submitted pursuant to the requirements of 10CFR 50.73{a) (2) (v). This report addresses an additional 10CFR 50 Appendix R inadequacy. This report has been issued within thirty (30) days of the discovery of this add{tional inadequacy.

Sincerely yours, J.<tt:!J~

General Manager-Salem Operations MJP:pc Distribution 95-2~ 89 Iii f'v':* 12-0..: