Proposed TS Section 3.7.2 Re Electrical Power Sys Availability
ML18058A558
Person / Time
Site: Palisades Entergy icon.png
Issue date: 06/12/1992
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18058A557 List:
References
NUDOCS 9206250223
Download: ML18058A558 (4)


Text

ATTACHMENT 1 Consumers Power Company Palisades Plant Docket 50-255 ELECTRICAL TECHNICAL SPECIFICATIONS CHANGE Proposed Page June 12, 1992 1 Page

( 9206250223 920612. '~\

SYSTE~

J

~.7 ELECTRICAL Applicability Applies tG the availability of electrical power for the operation of plant components.

Objective To define those conditions of electrical power availability necessary to provide for safe reactor operation and the continuing availability of engineered safety features.

3.7.1 Specifications The primary coolant system shall not be heated or maintained at temperatures above 325°F if the following electrical systems are not operable:

a. Station power transformer 1-2 (2400 V).
b. Start-up transformer 1-2 (2400 V).
c. 2400 V engineered safeguards buses lC and 10.
d. 480 V distribution buses 11 and 12.
e. MCC No 1, 2, 7 and 8.
f. 125 V d-c buses No 1 and 2.
g. Four preferred a-c buses.
h. Two station batteries and the d-c systems including at least one battery charger on each bus.
i. Both diesel generators, with a minimum of 2500 gallons of fuel in each day tank a minimum of 16,000 gallons of fuel in the underground storage tank.
j. Switchyard battery and the d-c system with one battery charger.
k. 240 V a-c power panels No 1 and 2, and their associated ACB breaker distribution systems.
1. 2400 V bus lE.

3.7.2 The requirements of Specification 3.7.1 may be modified to the extent that one of the following conditions will be allowed. If any of the provisions of those exceptions are violated, the reactor shall be placed in a hot shutdown condition within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. If the violation is not corrected within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, the reactor shall be placed in a cold shutdown condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

3-41 Amendment No.

ATTACHMENT 2 Consumers Power Company Palisades Plant Docket 50-255 ELECTRICAL TECHNICAL SPECIFICATIONS CHANGE Existing Page Marked to Show Change June 12, 1992 1 Page

,\*

3.7 ELECTRICAL SYSTEMS Applicability Applies to the availability of electrical power for the operation of plant components.

Objective To define those conditions of electrical power availability necessary to provide for safe reactor operation and the continuing availability of engineered safety features.

3.7.I Specifications The primary coolant system shall not be heated or maintained at temperatures above 325°F if the following electrical systems are not operable:

a. Station power transformer I-2 (2400 V).
b. Start-up transformer I-2 (2400 V).
c. 2400 V engineered safeguards buses IC and ID.
d. 480 V distribution buses II and I2.
e. MCC No I, 2, 7 and 8.
f. I25 V d-c buses No I and 2.
g. Four preferred a-c buses.
h. Two station batteries and the d-c systems including at least one battery charger on each bus.
i. Both diesel generators, with a minimum of 2500 gallons of fuel in each day tank a minimum of IG,000 gallons of fuel in the underground storage tank.
j. Switchyard battery and the d-c system with one battery charg~r.
k. 240 V a-c power panels No I and 2, and their associated ACB breaker distribution systems.
l. 2400 V bus IE.

3.7.2 The requirements of Specification 3.7.I may be modified to the extent that one of the following conditions will be allowed after the reacter has beeR made critical. If any of the provisions of those exceptions are violated, the reactor shall be placed in a hot shutdown condition within I2 hours. If the violation is not corrected within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, the reactor shall be placed in a c6ld shutdown condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

3-4I Amendment No.