ML18030A375

From kanterella
Jump to navigation Jump to search
Suppls 910429 Response to Weaknesses Noted in Maint Team Insp Repts 50-387/90-81 & 50-388/90-81.Estimated Completion Date for I&C Planning Guideline & I&C Procedure Writers Guide Revised to 911231
ML18030A375
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 12/12/1991
From: Keiser H
PENNSYLVANIA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
PLA-3701, NUDOCS 9112170368
Download: ML18030A375 (2)


Text

ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ESSION NBR: 9112170368 DOC. DATE: 91/12/12 NOTARIZED: NO DOCKET CIL:50-387 Susquehanna Steam Electric Station, Unit 1, Pennsylva'5000387 50-388 Susquehanna Steam Electric Station, Unit 2, Pennsylva 05000388 AUTH. NAME AUTHOR AFFILIATION KEISER,H.W. Pennsylvania Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Suppls 910429 response to weaknesses noted in Maint Team Insp Repts 50-387/90-81 & 50-388/90-81.Estimated completion date for I&C planning guideline & I&C procedure writers D guide revised to 911231.

DISTRIBUTION CODE: IEOID TITLE: General (50 COPIES RECEIVED:LTR 3 ENCL L7 Dkt)-Insp Rept/Notice of Violation Response SIZE

/

NOTES:LPDR 1 cy Transcripts. 05000387 A LPDR 1 cy Transcripts. 05000388 D

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD1-2 PD RALEIGH,J.

INTERNAL: ACRS AEOD AEOD/DEIIB AEOD/DSP/TPAB DEDRO NRR HARBUCK,C.

NRR MORISSEAU,D NRR/DLPQ/LHFBPT

~

NRR/DLPQ/LPEB10 NRR/DOEA/OEAB NRR/DREP/PEPB9H NRR/DST/DIR 8E2 NRR/PMAS/ILRB12 NUDOCS-ABSTRACT OE DI OGC/HDS2 02 RGN1 FILE 01 EXTERNAL: EG&G/BRYCE,J.H. NRC PDR NSIC NOTES:

D A

D D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION a- LISTS FOR DOCUMENTS YOU DON'T NEED!

TAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL

'ennsylvania Power 8 Light Company

~ Two North Ninth Street ~ Allentown, PA 18101-1179 ~ 215i774-5151 Harold W. Keiser Senior Vice President-Nuclear 215/77441 94 OEC JZ1991 U.S. Nuclear Regulatory Commission Attn.: Document Control Desk Mail Station Pl-137 Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION REPLY TO WEAKNESSES INSPECTION REPORT NOS. 50-387/90-81 AND 50-388/90-81 PLA- 3701 FILE R41-2, R31 Docket Nos. 50-387 and 50-388 PLA-3573, dated Ap ril 29. 1991 was provided to respond to weaknesses listed in Appendix 2 to Inspection Report Nos. 50-387/90-81 and 50-388/90-81, the Susquehanna SES Special Maintenance Team inspection. In our response to Section 5.9, Pages 53 and 54, we committed to having our I&C group develop a Writer's Guide to standardize procedure writing by the end of the second quarter of 1991 and to the development of an I&C Planning Guideline for issuance during September, 1991. The schedule for completion of these items has been revised.

The estimated completion" date for the I&C Planning Guideline and the I&C Procedure Writer's Guide is December 31, 1991.

If you have any questions, please contact Mr. W.W. Williams at (215)774-7910.

Very truly yours, H. eiser cc: NRC Region I Regional Administrator Mr. J. J. Raleigh, NRC Project Manager (OWFN)

Mr. G. S. Barber, NRC Sr. Resident Inspector (SSES)

Qp0 91 1"'1703&V F'Dn AQOCK

~ 1 12 l'.

0"=000387 r'

g PDR