MONTHYEARPLA-5120, Forwards Change J to SSES Security Training & Qualification Plan.Without Encl1999-10-22022 October 1999 Forwards Change J to SSES Security Training & Qualification Plan.Without Encl ML18040B2951999-09-0808 September 1999 Requests Info Re Any NRC or Susquehanna Documented Concerns with MSIV Reliability Prior to Plant Trip & Assurance to Public That NRC Able to Detect Mgt Problems Early PLA-5094, Forwards,For Review,Change 00 to SSES Physical Security Plan.Without Encl1999-08-24024 August 1999 Forwards,For Review,Change 00 to SSES Physical Security Plan.Without Encl ML18040A9741999-07-0808 July 1999 Forwards Rev 30 to SSES Emergency Plan, Adding EAL to Account for Potential Conditions Associated with Dry Cask Storage Sys Being Installed at Plant ML20207G5051999-06-0707 June 1999 Informs That NRC Office of NRR Reorganized Effective 990328.As Part of Reorganization,Divison of Licensing Project Management Created PLA-5072, Forwards Change Nn to SSES Physical Security Plan.Util Determined That Changes Do Not Decrease Safeguards Effectiveness of Plan,Per 10CFR50.54(p).Encl Withheld from Public Disclosure,Per 10CFR73.211999-06-0404 June 1999 Forwards Change Nn to SSES Physical Security Plan.Util Determined That Changes Do Not Decrease Safeguards Effectiveness of Plan,Per 10CFR50.54(p).Encl Withheld from Public Disclosure,Per 10CFR73.21 ML18040A9731999-05-24024 May 1999 Submits Response to RAI Re Exemption from Biennial Exercise Schedule.Changing of Drill Date Will Not Reduce Level of Emergency Preparedness at Plant ML20195B2181999-05-20020 May 1999 Forwards Proprietary Decommissioning Status Rept for 10% Interest in Sses,Units 1 & 2.Proprietary Info Withheld,Per 10CFR2.790 ML18040B2901999-04-30030 April 1999 Forwards Summary Rept of Safety Evaluations Approved During Period from 961024-981029,per 10CFR50.59(b).Format of Rept, Listed PLA-5041, Forwards Proprietary & Redacted Decommissioning Rept of Financial Assurance for Util 90% Interest in Sses,Units 1 & 2,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per 10CFR2.7901999-03-29029 March 1999 Forwards Proprietary & Redacted Decommissioning Rept of Financial Assurance for Util 90% Interest in Sses,Units 1 & 2,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per 10CFR2.790 ML17164A9891999-03-12012 March 1999 Informs That Util 990312 Ltr (PLA-5040) Submitted to NRC, Missing Encl C.Requests to Replace Package in Entirety with Encl ML18040A9691999-03-12012 March 1999 Forwards Revised Proposed Amend 227 to License NPF-14, Proposing Changes to ANFB-10 Critical Power Correlation & MCPR Safety Limits ML18040A9721999-03-11011 March 1999 Requests That Date for full-participation SSES Exercise, Scheduled for Week of 991115,be Changed Due to FEMA Region III Scheduling Conflicts.Fema Requests That Exercise Date Be Changed to Week of 001031 PLA-4852, Forwards non-redacted Version of Pp&L,Inc Corporate Auditing Rept 739459-2-98,dated 980210.Informs That Document Contains Info to Be Withheld IAW 10CFR2.7901999-02-18018 February 1999 Forwards non-redacted Version of Pp&L,Inc Corporate Auditing Rept 739459-2-98,dated 980210.Informs That Document Contains Info to Be Withheld IAW 10CFR2.790 ML20203G5821999-02-17017 February 1999 Second Final Response to FOIA Request for Documents. Documents Listed in App C Being Released in Entirety. Documents Listed in App D Being Withheld in Part (Ref FOIA Exemption 5) ML20202F4761999-01-29029 January 1999 First Partial Response to FOIA Request for Documents.Records in App a Encl & Being Released in Entirety.App B Records Being Withheld in Part (Ref FOIA Exemption 7C) ML18040A9671999-01-29029 January 1999 Notifies That Util Implemented Severe Accident Mgt Strategy in Accordance with Ltr Dtd 950327.Emegency Plan Revs Which Were Required to Implement Strategy Were Submitted by Ltr Dtd 981125 ML18040A9681999-01-29029 January 1999 Requests Exemption from Requirements of 10CFR50 App E,Items IVF.2.b & C,To Allowed to Reschedule Federally Observed Full Participation Emergency Exercise for SSES from Wk of 991115 to Wk of 001031 ML18040A9651999-01-12012 January 1999 Submits Addl Info Re Proposed Amend 184 to License NPF-22 for ANFB-10 Critical Power Correlation & MCPR Safety Limits ML18030A1021998-12-16016 December 1998 Forwards Tables as Requested During 981202 Telcon Re Proposed Amend 184,dtd 980804,re ANFB-10 Critical Power Correlation & MCPR Safety Limits.Tables Provide Roadmap Identifying Applicability of References to TSs ML18030A4331998-11-25025 November 1998 Forwards Rev 29 to SSES Emergecny Plan.Changes Has Been Made Without Commission Approval as It Does Not Decrease Effectiveness of Plan & Plan as Changed Continues to Satisfy Applicable Requirements of App E to 10CFR50 ML20195J9101998-11-18018 November 1998 Forwards Notice of Withdrawal of Application for Amends to Facility Operating Licenses (Notice).Notice Has Been Filed with Ofc of Fr.Amends Would Have Revised TS to Eliminate HPCI Pump auto-transfer on High Suppression Pool Level ML20155F7201998-11-0303 November 1998 Final Response to FOIA Request for Documents.Documents Listed in App B Being Encl & Being Released in Entirety. Documents Listed in App C Being Withheld in Part (Ref Exemption 7C) ML18026A2941998-10-19019 October 1998 Forwards SSES ISI Outage Summary Rept for Unit 1 Tenth Refueling & Insp Outage PLA-4993, Forwards Change Mm to SSES Physical Security Plan.Encl Withheld,Per 10CFR73.211998-10-12012 October 1998 Forwards Change Mm to SSES Physical Security Plan.Encl Withheld,Per 10CFR73.21 ML18030A1001998-10-12012 October 1998 Forwards Rev 27 to SSES Emergency Plan. Changes Become Effective Upon Implementation of Improved Tech Specs ML18030A4321998-10-12012 October 1998 Forwards Rev 28 to SSES Emergency Plan, IAW Requirements of 10CFR50.54q.Change Is Summarized ML18030A4311998-09-29029 September 1998 Forwards Rev 27 & 28 to SSES Emergency Plan ML20151W4951998-09-10010 September 1998 Informs That as Part of NRC Probabilistic Risk Assessment Implementation Plan,Commission Assigned Two Senior Reactor Analysts (Sras) to Each Regional Ofc.T Shedlosky & J Trapp Has Been Assigned SRAs for Region I IR 05000387/19980081998-09-0808 September 1998 Provides Response to Violations Noted in Insp Repts 50-387/98-08 & 50-388/98-08.Corrective Actions:Current Administrative Controls on Fuel Level in EDG Day Tanks Will Remain in Effect Until TS Change is Approved ML18030A0991998-09-0808 September 1998 Provides Response to Violations Noted in Insp Repts 50-387/98-08 & 50-388/98-08.Corrective Actions:Current Administrative Controls on Fuel Level in EDG Day Tanks Will Remain in Effect Until TS Change Is Approved ML18026A4961998-08-31031 August 1998 Responds to NRC 980731 Ltr Re Violations Noted in Insp Repts 50-387/98-03 & 50-388/98-03.Corrective Actions:Procurement & Affected User Group Personnel Visited EDG Vendor Facilities to Appraise Vendor Work Practices & Discuss Expectations IR 05000387/19980031998-08-31031 August 1998 Responds to NRC 980731 Ltr Re Violations Noted in Insp Repts 50-387/98-03 & 50-388/98-03.Corrective Actions:Procurement & Affected User Group Personnel Visited EDG Vendor Facilities to Appraise Vendor Work Practices & Discuss Expectations ML20202F5501998-07-17017 July 1998 Responds to PP&L Corp Auditing Repts 739459-97,739459-1-97 & 739459-2-98 Re SSES Investigations Into Missed Alarm Tests ML20236P9451998-07-15015 July 1998 Forwards Emergency Response Data Sys Implementation Documents Including Data Point Library Updates for Oconee (Number 255),Dresden (Number 257) & Susquehanna (Number 258) ML18030A4291998-07-0808 July 1998 Forwards Final Version of SSES TS Implementing Improved TS of NUREG-1433.Implementation of Proposed Amend Is Predicted on NRC Issuance of Amends & Proposed to Not Exceed 90 Days from Date of Amend Issue ML18017A2181998-07-0808 July 1998 Forwards Final Version of SSES TS Implementing Improved Tech Specs of NUREG 1433.Implementation of Proposed Amend Is Predicated on NRC Issuance of Amends & Is Proposed to Not Exceed 90 Days from Date of Amend Issuance ML18026A2901998-06-0909 June 1998 Forwards Rev 26 to Emergency Plan IAW 10CFR50.54q.Summary of Changes Listed ML18026A2891998-05-22022 May 1998 Submits Withdrawal of Expedited Review/Approval of Tech Specs/Bases 3/4.3.7.11 & 3/4.11.2.6 & Response to Request for Addl Info Re Offgas Sys Mods ML18026A4941998-05-12012 May 1998 Responds to NRC Request to Resubmit Proposal to Change TS for Plant,Units 1 & 2,to Support Implementation of Improved TS & to Implement Provisions of GL 86-10 Re Relocation of Plant'S Fire Protection Program from TS to Another Document ML20202H1331998-04-16016 April 1998 Partially Deleted Ltr Re Concerns Raised to NRC Concerning PP&L Susquehanna Facility NUREG-0619, Informs That Staff Finds PP&L 980330 Request for Relief from Requirements of Section 4.3 of NUREG-0619,exams of Feedwater Nozzle Bore & Inner Radius for Another Operating Cycle to Be Acceptable1998-04-15015 April 1998 Informs That Staff Finds PP&L 980330 Request for Relief from Requirements of Section 4.3 of NUREG-0619,exams of Feedwater Nozzle Bore & Inner Radius for Another Operating Cycle to Be Acceptable ML20216B6811998-04-0101 April 1998 First Partial Response to FOIA Request for Documents. Forwards Documents Listed in App a Being Released in Entirety ML17159A2341998-03-30030 March 1998 Forwards LER 97-007-01,per 10CFR50.73(a)(2)(i)(B).Revised LER Submitted to Modify Previous Position W/Regards to Entry Into TS 3.0.3 for Event PLA-4865, Forwards Listed non-redacted Pp&L,Inc Corporate Auditing Repts.Informs That Document Contains Info to Be Withheld IAW 10CFR2.7901998-03-11011 March 1998 Forwards Listed non-redacted Pp&L,Inc Corporate Auditing Repts.Informs That Document Contains Info to Be Withheld IAW 10CFR2.790 ML17159A1781998-03-0202 March 1998 Forwards Proposed Amends 203 & 161 to License NPF-14 & NPF-22,revising Tech Specs to Be Consistent w/NUREG-1433,rev 1, Std Tech Specs for GE Plants,Bwr 4. PLA-4856, Forwards Proposed Amends to Licenses NPF-14 & NPF-22, Revising TS to Be Consistent w/NUREG-1433,rev 1, Std TS for GE Plants,Bwr 4. Proposed TS Consistent w/NUREG-1433,rev 1, Encl1998-03-0202 March 1998 Forwards Proposed Amends to Licenses NPF-14 & NPF-22, Revising TS to Be Consistent w/NUREG-1433,rev 1, Std TS for GE Plants,Bwr 4. Proposed TS Consistent w/NUREG-1433,rev 1, Encl PLA-4854, Provides Summary of Investigations That PP&L Performed in Response to Concerns Identified by Former Nuclear Plant Operator.Summary Requested by Cj Anderson on 9802131998-02-27027 February 1998 Provides Summary of Investigations That PP&L Performed in Response to Concerns Identified by Former Nuclear Plant Operator.Summary Requested by Cj Anderson on 980213 ML20203M5071998-02-26026 February 1998 Final Response to FOIA Request for Documents.Records in App a Being Placed in PDR & Encl.Records in App B Partially Withheld (Ref FOIA Exemption 6) ML20203B5931998-02-23023 February 1998 Ack Receipt of & Wire in Amount of $55,000 in Payment for Civil Penatly Proposed by NRC Ltr . Corrective Actions Will Be Examined During Future Inspections 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARPLA-5120, Forwards Change J to SSES Security Training & Qualification Plan.Without Encl1999-10-22022 October 1999 Forwards Change J to SSES Security Training & Qualification Plan.Without Encl ML18040B2951999-09-0808 September 1999 Requests Info Re Any NRC or Susquehanna Documented Concerns with MSIV Reliability Prior to Plant Trip & Assurance to Public That NRC Able to Detect Mgt Problems Early PLA-5094, Forwards,For Review,Change 00 to SSES Physical Security Plan.Without Encl1999-08-24024 August 1999 Forwards,For Review,Change 00 to SSES Physical Security Plan.Without Encl ML18040A9741999-07-0808 July 1999 Forwards Rev 30 to SSES Emergency Plan, Adding EAL to Account for Potential Conditions Associated with Dry Cask Storage Sys Being Installed at Plant PLA-5072, Forwards Change Nn to SSES Physical Security Plan.Util Determined That Changes Do Not Decrease Safeguards Effectiveness of Plan,Per 10CFR50.54(p).Encl Withheld from Public Disclosure,Per 10CFR73.211999-06-0404 June 1999 Forwards Change Nn to SSES Physical Security Plan.Util Determined That Changes Do Not Decrease Safeguards Effectiveness of Plan,Per 10CFR50.54(p).Encl Withheld from Public Disclosure,Per 10CFR73.21 ML18040A9731999-05-24024 May 1999 Submits Response to RAI Re Exemption from Biennial Exercise Schedule.Changing of Drill Date Will Not Reduce Level of Emergency Preparedness at Plant ML20195B2181999-05-20020 May 1999 Forwards Proprietary Decommissioning Status Rept for 10% Interest in Sses,Units 1 & 2.Proprietary Info Withheld,Per 10CFR2.790 ML18040B2901999-04-30030 April 1999 Forwards Summary Rept of Safety Evaluations Approved During Period from 961024-981029,per 10CFR50.59(b).Format of Rept, Listed PLA-5041, Forwards Proprietary & Redacted Decommissioning Rept of Financial Assurance for Util 90% Interest in Sses,Units 1 & 2,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per 10CFR2.7901999-03-29029 March 1999 Forwards Proprietary & Redacted Decommissioning Rept of Financial Assurance for Util 90% Interest in Sses,Units 1 & 2,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per 10CFR2.790 ML18040A9691999-03-12012 March 1999 Forwards Revised Proposed Amend 227 to License NPF-14, Proposing Changes to ANFB-10 Critical Power Correlation & MCPR Safety Limits ML17164A9891999-03-12012 March 1999 Informs That Util 990312 Ltr (PLA-5040) Submitted to NRC, Missing Encl C.Requests to Replace Package in Entirety with Encl ML18040A9721999-03-11011 March 1999 Requests That Date for full-participation SSES Exercise, Scheduled for Week of 991115,be Changed Due to FEMA Region III Scheduling Conflicts.Fema Requests That Exercise Date Be Changed to Week of 001031 PLA-4852, Forwards non-redacted Version of Pp&L,Inc Corporate Auditing Rept 739459-2-98,dated 980210.Informs That Document Contains Info to Be Withheld IAW 10CFR2.7901999-02-18018 February 1999 Forwards non-redacted Version of Pp&L,Inc Corporate Auditing Rept 739459-2-98,dated 980210.Informs That Document Contains Info to Be Withheld IAW 10CFR2.790 ML18040A9681999-01-29029 January 1999 Requests Exemption from Requirements of 10CFR50 App E,Items IVF.2.b & C,To Allowed to Reschedule Federally Observed Full Participation Emergency Exercise for SSES from Wk of 991115 to Wk of 001031 ML18040A9671999-01-29029 January 1999 Notifies That Util Implemented Severe Accident Mgt Strategy in Accordance with Ltr Dtd 950327.Emegency Plan Revs Which Were Required to Implement Strategy Were Submitted by Ltr Dtd 981125 ML18040A9651999-01-12012 January 1999 Submits Addl Info Re Proposed Amend 184 to License NPF-22 for ANFB-10 Critical Power Correlation & MCPR Safety Limits ML18030A1021998-12-16016 December 1998 Forwards Tables as Requested During 981202 Telcon Re Proposed Amend 184,dtd 980804,re ANFB-10 Critical Power Correlation & MCPR Safety Limits.Tables Provide Roadmap Identifying Applicability of References to TSs ML18030A4331998-11-25025 November 1998 Forwards Rev 29 to SSES Emergecny Plan.Changes Has Been Made Without Commission Approval as It Does Not Decrease Effectiveness of Plan & Plan as Changed Continues to Satisfy Applicable Requirements of App E to 10CFR50 ML18026A2941998-10-19019 October 1998 Forwards SSES ISI Outage Summary Rept for Unit 1 Tenth Refueling & Insp Outage ML18030A4321998-10-12012 October 1998 Forwards Rev 28 to SSES Emergency Plan, IAW Requirements of 10CFR50.54q.Change Is Summarized ML18030A1001998-10-12012 October 1998 Forwards Rev 27 to SSES Emergency Plan. Changes Become Effective Upon Implementation of Improved Tech Specs PLA-4993, Forwards Change Mm to SSES Physical Security Plan.Encl Withheld,Per 10CFR73.211998-10-12012 October 1998 Forwards Change Mm to SSES Physical Security Plan.Encl Withheld,Per 10CFR73.21 ML18030A4311998-09-29029 September 1998 Forwards Rev 27 & 28 to SSES Emergency Plan ML18030A0991998-09-0808 September 1998 Provides Response to Violations Noted in Insp Repts 50-387/98-08 & 50-388/98-08.Corrective Actions:Current Administrative Controls on Fuel Level in EDG Day Tanks Will Remain in Effect Until TS Change Is Approved IR 05000387/19980081998-09-0808 September 1998 Provides Response to Violations Noted in Insp Repts 50-387/98-08 & 50-388/98-08.Corrective Actions:Current Administrative Controls on Fuel Level in EDG Day Tanks Will Remain in Effect Until TS Change is Approved ML18026A4961998-08-31031 August 1998 Responds to NRC 980731 Ltr Re Violations Noted in Insp Repts 50-387/98-03 & 50-388/98-03.Corrective Actions:Procurement & Affected User Group Personnel Visited EDG Vendor Facilities to Appraise Vendor Work Practices & Discuss Expectations IR 05000387/19980031998-08-31031 August 1998 Responds to NRC 980731 Ltr Re Violations Noted in Insp Repts 50-387/98-03 & 50-388/98-03.Corrective Actions:Procurement & Affected User Group Personnel Visited EDG Vendor Facilities to Appraise Vendor Work Practices & Discuss Expectations ML18017A2181998-07-0808 July 1998 Forwards Final Version of SSES TS Implementing Improved Tech Specs of NUREG 1433.Implementation of Proposed Amend Is Predicated on NRC Issuance of Amends & Is Proposed to Not Exceed 90 Days from Date of Amend Issuance ML18030A4291998-07-0808 July 1998 Forwards Final Version of SSES TS Implementing Improved TS of NUREG-1433.Implementation of Proposed Amend Is Predicted on NRC Issuance of Amends & Proposed to Not Exceed 90 Days from Date of Amend Issue ML18026A2901998-06-0909 June 1998 Forwards Rev 26 to Emergency Plan IAW 10CFR50.54q.Summary of Changes Listed ML18026A2891998-05-22022 May 1998 Submits Withdrawal of Expedited Review/Approval of Tech Specs/Bases 3/4.3.7.11 & 3/4.11.2.6 & Response to Request for Addl Info Re Offgas Sys Mods ML18026A4941998-05-12012 May 1998 Responds to NRC Request to Resubmit Proposal to Change TS for Plant,Units 1 & 2,to Support Implementation of Improved TS & to Implement Provisions of GL 86-10 Re Relocation of Plant'S Fire Protection Program from TS to Another Document ML17159A2341998-03-30030 March 1998 Forwards LER 97-007-01,per 10CFR50.73(a)(2)(i)(B).Revised LER Submitted to Modify Previous Position W/Regards to Entry Into TS 3.0.3 for Event PLA-4865, Forwards Listed non-redacted Pp&L,Inc Corporate Auditing Repts.Informs That Document Contains Info to Be Withheld IAW 10CFR2.7901998-03-11011 March 1998 Forwards Listed non-redacted Pp&L,Inc Corporate Auditing Repts.Informs That Document Contains Info to Be Withheld IAW 10CFR2.790 PLA-4856, Forwards Proposed Amends to Licenses NPF-14 & NPF-22, Revising TS to Be Consistent w/NUREG-1433,rev 1, Std TS for GE Plants,Bwr 4. Proposed TS Consistent w/NUREG-1433,rev 1, Encl1998-03-0202 March 1998 Forwards Proposed Amends to Licenses NPF-14 & NPF-22, Revising TS to Be Consistent w/NUREG-1433,rev 1, Std TS for GE Plants,Bwr 4. Proposed TS Consistent w/NUREG-1433,rev 1, Encl ML17159A1781998-03-0202 March 1998 Forwards Proposed Amends 203 & 161 to License NPF-14 & NPF-22,revising Tech Specs to Be Consistent w/NUREG-1433,rev 1, Std Tech Specs for GE Plants,Bwr 4. PLA-4854, Provides Summary of Investigations That PP&L Performed in Response to Concerns Identified by Former Nuclear Plant Operator.Summary Requested by Cj Anderson on 9802131998-02-27027 February 1998 Provides Summary of Investigations That PP&L Performed in Response to Concerns Identified by Former Nuclear Plant Operator.Summary Requested by Cj Anderson on 980213 ML20216B7031998-02-22022 February 1998 Partially Deleted Ltr Requesting Copy of OI Rept on Plant, Unit 2,case 1-96-039 PLA-4851, Provides Info That Was Requested by Cj Anderson on 980213 Re Former Util Employee Concern on Radwaste Control Room Offgas Panel Alarm Testing1998-02-18018 February 1998 Provides Info That Was Requested by Cj Anderson on 980213 Re Former Util Employee Concern on Radwaste Control Room Offgas Panel Alarm Testing ML20203M5791998-02-10010 February 1998 Enters Appeal Due to Lack of Response to FOIA Request 97-473 ML18030A0971998-02-0202 February 1998 Forwards Proprietary Response to RAI Re Proposed License Amend 209 to TS Supporting Cycle 11 Reload.Proprietary Info Withheld,Per 10CFR2.790 ML20203G6071998-01-26026 January 1998 Forwards Redacted Version of Pp&L,Inc Corporate Auditings Interim Rept 739459-97,dtd 971015 & Affidavit Pursuant to 10CFR2.790 Justifying That Redacted Portions Be Withheld from Public Disclosure.Without Rept IR 05000387/19970031998-01-0606 January 1998 Provides Updated Response to Violations Noted in Insp Repts 50-387/97-03 & 50-388/97-03.Corrective Actions:Util Currently Scheduling Issuance of All Procedural Revs by End of First Quarter 1998 ML18030A4071998-01-0606 January 1998 Provides Updated Response to Violations Noted in Insp Repts 50-387/97-03 & 50-388/97-03.Corrective Actions:Util Currently Scheduling Issuance of All Procedural Revs by End of First Quarter 1998 ML18017A2931998-01-0606 January 1998 Provides Responses to Improved TS Section 3.8 Per 970324 NRC Rai.Schedule 980628 for Improved TS Implementation. Submittal of Revised Specifications Is Planned for Jan 1998 PLA-4828, Expresses Appreciation for Support Received by Former Project Manager C Poslusny1997-12-29029 December 1997 Expresses Appreciation for Support Received by Former Project Manager C Poslusny IR 05000387/19970041997-12-22022 December 1997 Resolves Commitments Made in Response to NOV Issued As Part of NRC Insp Repts 50-387/97-04 & 50-388/97-04 Dtd 970805. Proposed FSAR QA Program Description Changes,Reason for Changes & Basis Included for Approval ML18026A4901997-12-22022 December 1997 Resolves Commitments Made in Response to NOV Issued as Part of NRC Insp Repts 50-387/97-04 & 50-388/97-04 Dtd 970805. Proposed FSAR QA Program Description Changes,Reason for Changes & Basis Included for Approval ML20203M5741997-12-0505 December 1997 FOIA Request for Copy of Latest OI Rept on Susquehanna Ses Including All Exhibits & for Any Other Communication Between NRC & Susquehanna Ses/Pp&L PLA-4818, Forwards Redacted Version of Pp&L,Inc Corporate Auditings Rept 739459-1-97,dtd 971201 & Affidavit Pursuant to 10CFR2.790 Justifying That Redacted Portions Be Withheld from Public Disclosure.Without Rept1997-12-0404 December 1997 Forwards Redacted Version of Pp&L,Inc Corporate Auditings Rept 739459-1-97,dtd 971201 & Affidavit Pursuant to 10CFR2.790 Justifying That Redacted Portions Be Withheld from Public Disclosure.Without Rept 1999-09-08
[Table view] |
Text
Pennsylvania Power & Light Company Two North Ninth Street ~ Allentown, PA 18101-1179 ~ 610/774-5151 Robert G. Byram Senior Vice President Generation and Chief/Vuclear Officer 610/774-7502 Fax: 610/774-5019 At'R 1 8!9',I!
U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop Pl-137 Washington, D. C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION REPLY TO A NOTICE OF VIOLATION (50-388/97-01-01; 50-387/97-01-02; AND 50-387/97-01-03; 50/3S8/97-01-03) Docket Nos. 50-387 and 50-3SS This letter provides Pennsylvania Power and Light Company's response to the Notice of Violation (50-388/97-01-01; 50-388/97-01-02 and 50-387/97-01-03; 50-388/97-01-03) contained in NRC Integrated Inspection Report 50-387/97-01 and 50-388/97-01 dated March 14, 1997.
The notice requires submittal of a written reply within thirty (30) days of the date of the letter.
However, as discussed with Mr. Michael C. Modes of NRC Region I on April 14, 1997, PP&L has been authorized to delay the response until April 18, 1997. We trust that the Commission will find the attached response acceptable.
Ifyou have additional questions, please contact Mr. R. D. Kichline at (610) 774-7705.
Very truly yours.
R. G Attachmen copy: NRC Region I Mr. K. Jenison, NRC Sr. Resident Inspector Mr. C. Poslusny, Jr., NRC Sr. Project Manager 9704250i03 9704'f8 PDR ADOCK 05000387 8 PDR Ifffjffflfjffffflllmmllll
ATI ACIIMENTTO PLA-4600 page I of 6
~Vi 1 ~ti i~ (50-388/97-01-01)
Technical Specification (TS) 6.8.1 requires that written procedures shall be established and implemented for applicable procedures recommended in Appendix 'A'f Regulatory Guide 1.33, Revision 2, February 1978. Regulatory Guide 1.33, Appendix 'A', item 5, requires procedures for abnormal, off normal, and alarm conditions. Item 5 further states that procedures for annunciators should contain the immediate action that is to occur automatically and the immediate operator action.
Alarm response procedure AR-231-001 for the "Unit 2 Recomb Discharge H2 Conc Hi - Hi" annunciator lists the automatic action for a 2% hydrogen concentration as an Offgas System Isolation. Further, AR-231-001 Operator action 2.2.1 requires operators to ensure automatic actions occur.
Contrary to the above, on December 19, 1996, operators failed to ensure the automatic actions occurred after the "Unit 2 Recomb Discharge H2 Conc Hi - Hi" annunciator alarmed and after a grab sample showed a hydrogen concentration of 8%. Specifically, the offgas system did not automatically isolate and operators did not take immediate manual action to isolate it.
- 1. e V 1 i n The reason for the violation was that no guidance had been provided to the operators on actions to be taken upon notification that an offgas grab sample exceeded the hydrogen concentration automatic isolation limit; therefore, the shift had to determine the appropriate actions.
On December 19, 1996, during a recombiner swap from the Unit 2 recombiner to the common recombiner, common recombiner hydrogen concentrations were normal as indicated by control room indicators and the Technical Specification required grab sample taken at the start of the recombiner swapping evolution. Common recombiner temperatures were also normal.
Results of a second Technical Specification grab sample, taken approximately four hours later indicated a hydrogen concentration that exceeded the limit for an automatic isolation. Control room hydrogen concentration still indicated less than the automatic isolation limit with no upward trend. Common recombiner temperature indications were also still normal. Operators requested that another grab sample be taken to confirm the elevated hydrogen concentration results. This confirmatory grab sample also exceeded the limit for an automatic isolation.
Shift supervision made the decision to isolate the common offgas recombiner and place the Unit 2 recombiner back in service. After notification of the confirmatory elevated hydrogen concentrations the common recombiner "A" channel Hydrogen indication became erratic and the "Unit 0 Recomb Discharge H2 Conc Hi-I-Ii" annunciator alarmed in the control room.
Upon receipt of the alarm the appropriate alarm response procedure was entered. The alarm response procedure stated that an offgas isolation should occur and that if an automatic action
ATTACl.lMENT TO PLA-4600 Page 2 of 6 would not occur the operator were to ensure it did; however, it did not address the actions necessary to manually isolate offgas. Therefore, the shift had to determine the best way to perform the isolation.
- 2. Icv d a) The offgas system was manually isolated on December 19, 1996.
b) The offgas system alarm response procedures (AR-031, 131 and 231-001) were revised to include instructions how to manually isolate the offgas system when an automatic isolation does not occur upon receipt of a "hi - hi hydrogen concentration" alarm.
- 3. V W ihWil e kn v hrVi in Training of this event will be incorporated in the Manager of Operations training agenda.
- 4. t lian e Based on 2a above, PP8cL is in full compliance.
ATTACHMENTTO PLA-4600 Page 3 of6 10 CFR Part 50, Section 50.55a, "Codes and Standards," requires that protection systems meet the requirements of the Institute of Electrical and Electronic Engineers (IEEE) "Criteria for Nuclear Power Plant protection systems," Std 279-1971. IEEE 279, Section 4.13, requires that, ifthe protective action of some part of the protection system has been bypassed, or deliberately rendered inoperative for any purpose, this fact shall be continuously indicated in the control room.
Regulatory Guide (RG) 1.47, May 1973, describes an acceptable method of complying with the requirements of IEEE Std 279. RG 1.47 states that an acceptable system will automatically indicate at the system level the bypass or deliberately induced inoperability of the protection system.
Contrary to the above, since initial operation, the bypass indication system (BIS) at Susquehanna has not provided the continuous control room indication required by IEEE 279, and 10 CFR 50.55a, when a portion of the residual heat removal system is bypassed. The BIS does not automatically indicate at the system level when an RHR pump is rendered inoperable by a trip circuit that is enabled when the pump's suction valve is not full open. As a result, the RHR system is inoperable during quarterly RHR suction valve testing and no automatic indication of this condition is provided at the system level.
- 1. ea theVi 1 i The Bypass Indication System (BIS) was provided as a part of the original Susquehanna SES design. Regulatory Guide 1.47 formed the regulatory basis for the design and implementation of the BIS. This Regulatory Guide requires that if the protective action of some part of the protection system has been bypassed or deliberately rendered inoperative for any purpose, this fact shall be continuously indicated in the control room. The Regulatory Guide also states that automatic indication of inoperability or a bypassed condition is not feasible for all the possible means by which safety-related systems could be rendered inoperable. Therefore, the intent of Regulatory Guide 1.47 requirements were interpreted to include a system design which utilized the BIS ~ the control room annunciator systems to aid the operator for long term indication of a safety system which was intentionally bypassed or otherwise rendered inoperable; The Susquehanna SES design includes a system level control room annunciator which provides immediate indication that the RHR Loop is out of service as soon as the keylock control switch for the RHR suppression pool suction valve is placed in the CLOSED position. Operation of this control switch also provides immediate indication on the BIS panel that the RHR suppression pool suction valve is closed. When the suction valve reaches the 100% closed position, limit switches in the valve operator provide parallel inputs to the same annunciator and BIS alarm points. Upon opening the RHR suppression pool suction
i ATTACHMENTTO PLA-4600 Page 4 of 6 valve, the control switch is placed to the OPEN position and when the valve is not 100%
closed the input to the system level out of service indication is removed. However, the trip circuit to the pump remains enabled (therefore continuing the inoperable condition) until the valve is 100% open. During this time the system level annunicator still remains energized due to the valve motor overload being manually inserted. This system level annunicator will remain until the operator verifies that the pump suction valve is full open at which time he will manually remove the motor overload which will clear the system level annunicator. This design is discussed, in general, in the Susquehanna SES FSAR in Section 7.3.2a.1.2.1.7. The NSSS portion of the BIS and control room annunciator designs were judged to meet the Regulatory Guide 1.47 requirements. However, upon further review of the system design, PP&L plans to develop a modification to the BIS and/or control room alarm system which provides the system level annunciation from the same RHR suppression pool suction valve position (i.e., not 100% open) as the pump trip logic.
- 2. rrec iv . e W ich av een ake n t e ul ciie l Corrective actions were taken to ensure the RHR suppression pool suction valve trip logic is deactivated after valve operation. Procedure changes were made to verify the trip relays are deenergized after the valve strokes open. These procedure changes will remain in effect until proper valve limit switch setup is verified. Administrative controls (i.e., the motor overloads for the RIIR suppression pool suction valves are enabled which provides system level indication in the control room) are in place to ensure that manual activation of the BIS and/or control room annunciator is performed for the time the RHR pump trip logic is enabled. This is considered acceptable because the operator will be monitoring the valve position during remote manual valve operation. These valves have no automatic opening features.
- 3. C W sich W'll ak n irh rVi l 1 a) A modification to the BIS indication or other control room alarm which provides additional system level annunciation as a result of a RHR suppression pool suction valve limit switch actuation when the valve is not 100% open will be developed. This modification is scheduled to be installed on both the Unit 1 and Unit 2 RHR suction valves prior to December 31, 1997.
b) An evaluation of the BIS and other control room alarm logic and inputs related to the various Emergency Core Cooling System (ECCS) motor operated valves with bypass indication will be performed and any necessary corrective actions will be taken prior to December 31, 1997.
- 4. ate of Foll m liance PP&L will complete the installation of the modification noted in 3a above prior to December 31. 1997.
~,
V
~
ATTACHMENTTO PLA-4600 Page 5 of6
~Vi lai~n (50-387/97-01-02) 10 CFR 50, Appendix B, Criterion XVI, requires that licensees establish measures to assure that conditions adverse to quality such as failures, malfunctions, deficiencies, defective material and equipment and nonconformances are promptly identified and corrected.
Contrary to the above, two examples were identified where the licensee failed to control maintenance activities such that conditions adverse to quality were created and not promptly identified and corrected.
- l. In 1991, the licensee failed to implement adequate corrective actions in response to a vendor letter that identified a deficiency on the contact surfaces of the 'E'mergency diesel generator bridge transfer switch. As a result of the licensee's failure to implement corrective actions to preclude the condition identified by the vendor, the transfer switch failed to perform its function on December 10, 1996, during an 'E'mergency diesel surveillance test.
- 2. In December 1996, the licensee's corrective actions in response to the failed 'E'iesel generator transfer switch included the development of a trouble shooting plan. As a result of inadequate control and review of the trouble shooting plan, a failure was induced in safety related equipment and the 'E'mergency diesel generator failed a second surveillance test.
gCgHH¹
- 1. ea nf rth Vi lati n Ve The vendor letter dated June 7, 1991, which identified a concern related to the Emergency Diesel Generator (EDG) static exciter voltage regulator, stated that they recently were made aware that oxidization of the bridge transfer switch contacts may occur under certain conditions, but that the function of the system was not affected. The recommendations contained in the letter were incorporated into the appropriate IOM in July 1991. A specific corrective action to an unrelated 1992 EDG event was to generate a preventative maintenance (PM) activity that included, the bridge transfer switch on the A through D EDG's. The PM's on the A through "D" EDG's were issued in 1993 and were scheduled to be performed on a three years frequency beginning with the issuance of the PM. The PM's on these EDG's were completed in early 1995. The same PM was issued for the "E" EDG bridge transfer switch in 1995. This PM had the same scheduling frequency as the PM's for the other EDG's. The "E" EDG PM was scheduled to be performed in January 1998. The issuance and scheduling for the "E" EDG PM was considered to be acceptable since there had been no EDG problems related to the bridge transfer switch performance, due to the concern expressed in the 1991 vendor letter, prior to the December 10, 1996 event and because of age, design and operational differences between the "E" EDG and the other four EDG's.
ATTACHMENTTO PLA-4600 Page 6 of 6 During performance of silicone control rectifier (SCR) checks the Electrical Test technician lifted the primary lead on the SCR's, however, did not lift secondary wiring that interfaces directly with the Remote Gate Firing Module (RGFM) circuitry. This resulted in an improper voltage being applied to the RGFM circuitry. Consequently, electrical components in the RGFM were damaged to the extent that the expected voltage regulation for the "E" EDG could not be achieved.
These failures that occurred on the "E" EDG in December 1996, resulted in the "E" EDG being delayed to a status of a "ready" spare EDG. It was never placed in service or required for service.
- 2. IC en en 1 h The PM activity, which contained the recommendations identified in the 1991 vendor letter, was completed on February 10, 1997.
a) Repairs to the "E" EDG that occurred as a result of trouble shooting activities were completed on January 10, 1997.
b) Non-routine training of this event has been conducted with personnel who perform this
- 3. rr iv, t er Which W'rth trouble shooting activity.
r Vi la
'e Outstanding EDG vendor recommendations will be evaluated for incorporation into the EDG preventive maintenance program. The appropriate PM procedures will be revised to incorporate appropriate EDG vendor recommendations identified by the evaluation by February 1, 1998.
A precautionary'ote will be added to the appropriate EDG instruction and operation manual to assure that voltage considerations are addressed for troubleshooting activities. This precautionary note will be incorporated into the appropriate instruction by June 16, 1997.
- 4. ate f ull m liance Based on 2 above, PP&L is in full compliance.