MONTHYEARPLA-5120, Forwards Change J to SSES Security Training & Qualification Plan.Without Encl1999-10-22022 October 1999 Forwards Change J to SSES Security Training & Qualification Plan.Without Encl ML18040B2951999-09-0808 September 1999 Requests Info Re Any NRC or Susquehanna Documented Concerns with MSIV Reliability Prior to Plant Trip & Assurance to Public That NRC Able to Detect Mgt Problems Early PLA-5094, Forwards,For Review,Change 00 to SSES Physical Security Plan.Without Encl1999-08-24024 August 1999 Forwards,For Review,Change 00 to SSES Physical Security Plan.Without Encl ML18040A9741999-07-0808 July 1999 Forwards Rev 30 to SSES Emergency Plan, Adding EAL to Account for Potential Conditions Associated with Dry Cask Storage Sys Being Installed at Plant ML20207G5051999-06-0707 June 1999 Informs That NRC Office of NRR Reorganized Effective 990328.As Part of Reorganization,Divison of Licensing Project Management Created PLA-5072, Forwards Change Nn to SSES Physical Security Plan.Util Determined That Changes Do Not Decrease Safeguards Effectiveness of Plan,Per 10CFR50.54(p).Encl Withheld from Public Disclosure,Per 10CFR73.211999-06-0404 June 1999 Forwards Change Nn to SSES Physical Security Plan.Util Determined That Changes Do Not Decrease Safeguards Effectiveness of Plan,Per 10CFR50.54(p).Encl Withheld from Public Disclosure,Per 10CFR73.21 ML18040A9731999-05-24024 May 1999 Submits Response to RAI Re Exemption from Biennial Exercise Schedule.Changing of Drill Date Will Not Reduce Level of Emergency Preparedness at Plant ML20195B2181999-05-20020 May 1999 Forwards Proprietary Decommissioning Status Rept for 10% Interest in Sses,Units 1 & 2.Proprietary Info Withheld,Per 10CFR2.790 ML18040B2901999-04-30030 April 1999 Forwards Summary Rept of Safety Evaluations Approved During Period from 961024-981029,per 10CFR50.59(b).Format of Rept, Listed PLA-5041, Forwards Proprietary & Redacted Decommissioning Rept of Financial Assurance for Util 90% Interest in Sses,Units 1 & 2,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per 10CFR2.7901999-03-29029 March 1999 Forwards Proprietary & Redacted Decommissioning Rept of Financial Assurance for Util 90% Interest in Sses,Units 1 & 2,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per 10CFR2.790 ML17164A9891999-03-12012 March 1999 Informs That Util 990312 Ltr (PLA-5040) Submitted to NRC, Missing Encl C.Requests to Replace Package in Entirety with Encl ML18040A9691999-03-12012 March 1999 Forwards Revised Proposed Amend 227 to License NPF-14, Proposing Changes to ANFB-10 Critical Power Correlation & MCPR Safety Limits ML18040A9721999-03-11011 March 1999 Requests That Date for full-participation SSES Exercise, Scheduled for Week of 991115,be Changed Due to FEMA Region III Scheduling Conflicts.Fema Requests That Exercise Date Be Changed to Week of 001031 PLA-4852, Forwards non-redacted Version of Pp&L,Inc Corporate Auditing Rept 739459-2-98,dated 980210.Informs That Document Contains Info to Be Withheld IAW 10CFR2.7901999-02-18018 February 1999 Forwards non-redacted Version of Pp&L,Inc Corporate Auditing Rept 739459-2-98,dated 980210.Informs That Document Contains Info to Be Withheld IAW 10CFR2.790 ML20203G5821999-02-17017 February 1999 Second Final Response to FOIA Request for Documents. Documents Listed in App C Being Released in Entirety. Documents Listed in App D Being Withheld in Part (Ref FOIA Exemption 5) ML20202F4761999-01-29029 January 1999 First Partial Response to FOIA Request for Documents.Records in App a Encl & Being Released in Entirety.App B Records Being Withheld in Part (Ref FOIA Exemption 7C) ML18040A9671999-01-29029 January 1999 Notifies That Util Implemented Severe Accident Mgt Strategy in Accordance with Ltr Dtd 950327.Emegency Plan Revs Which Were Required to Implement Strategy Were Submitted by Ltr Dtd 981125 ML18040A9681999-01-29029 January 1999 Requests Exemption from Requirements of 10CFR50 App E,Items IVF.2.b & C,To Allowed to Reschedule Federally Observed Full Participation Emergency Exercise for SSES from Wk of 991115 to Wk of 001031 ML18040A9651999-01-12012 January 1999 Submits Addl Info Re Proposed Amend 184 to License NPF-22 for ANFB-10 Critical Power Correlation & MCPR Safety Limits ML18030A1021998-12-16016 December 1998 Forwards Tables as Requested During 981202 Telcon Re Proposed Amend 184,dtd 980804,re ANFB-10 Critical Power Correlation & MCPR Safety Limits.Tables Provide Roadmap Identifying Applicability of References to TSs ML18030A4331998-11-25025 November 1998 Forwards Rev 29 to SSES Emergecny Plan.Changes Has Been Made Without Commission Approval as It Does Not Decrease Effectiveness of Plan & Plan as Changed Continues to Satisfy Applicable Requirements of App E to 10CFR50 ML20195J9101998-11-18018 November 1998 Forwards Notice of Withdrawal of Application for Amends to Facility Operating Licenses (Notice).Notice Has Been Filed with Ofc of Fr.Amends Would Have Revised TS to Eliminate HPCI Pump auto-transfer on High Suppression Pool Level ML20155F7201998-11-0303 November 1998 Final Response to FOIA Request for Documents.Documents Listed in App B Being Encl & Being Released in Entirety. Documents Listed in App C Being Withheld in Part (Ref Exemption 7C) ML18026A2941998-10-19019 October 1998 Forwards SSES ISI Outage Summary Rept for Unit 1 Tenth Refueling & Insp Outage ML18030A4321998-10-12012 October 1998 Forwards Rev 28 to SSES Emergency Plan, IAW Requirements of 10CFR50.54q.Change Is Summarized PLA-4993, Forwards Change Mm to SSES Physical Security Plan.Encl Withheld,Per 10CFR73.211998-10-12012 October 1998 Forwards Change Mm to SSES Physical Security Plan.Encl Withheld,Per 10CFR73.21 ML18030A1001998-10-12012 October 1998 Forwards Rev 27 to SSES Emergency Plan. Changes Become Effective Upon Implementation of Improved Tech Specs ML18030A4311998-09-29029 September 1998 Forwards Rev 27 & 28 to SSES Emergency Plan ML20151W4951998-09-10010 September 1998 Informs That as Part of NRC Probabilistic Risk Assessment Implementation Plan,Commission Assigned Two Senior Reactor Analysts (Sras) to Each Regional Ofc.T Shedlosky & J Trapp Has Been Assigned SRAs for Region I IR 05000387/19980081998-09-0808 September 1998 Provides Response to Violations Noted in Insp Repts 50-387/98-08 & 50-388/98-08.Corrective Actions:Current Administrative Controls on Fuel Level in EDG Day Tanks Will Remain in Effect Until TS Change is Approved ML18030A0991998-09-0808 September 1998 Provides Response to Violations Noted in Insp Repts 50-387/98-08 & 50-388/98-08.Corrective Actions:Current Administrative Controls on Fuel Level in EDG Day Tanks Will Remain in Effect Until TS Change Is Approved ML18026A4961998-08-31031 August 1998 Responds to NRC 980731 Ltr Re Violations Noted in Insp Repts 50-387/98-03 & 50-388/98-03.Corrective Actions:Procurement & Affected User Group Personnel Visited EDG Vendor Facilities to Appraise Vendor Work Practices & Discuss Expectations IR 05000387/19980031998-08-31031 August 1998 Responds to NRC 980731 Ltr Re Violations Noted in Insp Repts 50-387/98-03 & 50-388/98-03.Corrective Actions:Procurement & Affected User Group Personnel Visited EDG Vendor Facilities to Appraise Vendor Work Practices & Discuss Expectations ML20202F5501998-07-17017 July 1998 Responds to PP&L Corp Auditing Repts 739459-97,739459-1-97 & 739459-2-98 Re SSES Investigations Into Missed Alarm Tests ML20236P9451998-07-15015 July 1998 Forwards Emergency Response Data Sys Implementation Documents Including Data Point Library Updates for Oconee (Number 255),Dresden (Number 257) & Susquehanna (Number 258) ML18017A2181998-07-0808 July 1998 Forwards Final Version of SSES TS Implementing Improved Tech Specs of NUREG 1433.Implementation of Proposed Amend Is Predicated on NRC Issuance of Amends & Is Proposed to Not Exceed 90 Days from Date of Amend Issuance ML18030A4291998-07-0808 July 1998 Forwards Final Version of SSES TS Implementing Improved TS of NUREG-1433.Implementation of Proposed Amend Is Predicted on NRC Issuance of Amends & Proposed to Not Exceed 90 Days from Date of Amend Issue ML18026A2901998-06-0909 June 1998 Forwards Rev 26 to Emergency Plan IAW 10CFR50.54q.Summary of Changes Listed ML18026A2891998-05-22022 May 1998 Submits Withdrawal of Expedited Review/Approval of Tech Specs/Bases 3/4.3.7.11 & 3/4.11.2.6 & Response to Request for Addl Info Re Offgas Sys Mods ML18026A4941998-05-12012 May 1998 Responds to NRC Request to Resubmit Proposal to Change TS for Plant,Units 1 & 2,to Support Implementation of Improved TS & to Implement Provisions of GL 86-10 Re Relocation of Plant'S Fire Protection Program from TS to Another Document ML20202H1331998-04-16016 April 1998 Partially Deleted Ltr Re Concerns Raised to NRC Concerning PP&L Susquehanna Facility ML20216B6811998-04-0101 April 1998 First Partial Response to FOIA Request for Documents. Forwards Documents Listed in App a Being Released in Entirety ML17159A2341998-03-30030 March 1998 Forwards LER 97-007-01,per 10CFR50.73(a)(2)(i)(B).Revised LER Submitted to Modify Previous Position W/Regards to Entry Into TS 3.0.3 for Event PLA-4865, Forwards Listed non-redacted Pp&L,Inc Corporate Auditing Repts.Informs That Document Contains Info to Be Withheld IAW 10CFR2.7901998-03-11011 March 1998 Forwards Listed non-redacted Pp&L,Inc Corporate Auditing Repts.Informs That Document Contains Info to Be Withheld IAW 10CFR2.790 ML17159A1781998-03-0202 March 1998 Forwards Proposed Amends 203 & 161 to License NPF-14 & NPF-22,revising Tech Specs to Be Consistent w/NUREG-1433,rev 1, Std Tech Specs for GE Plants,Bwr 4. PLA-4856, Forwards Proposed Amends to Licenses NPF-14 & NPF-22, Revising TS to Be Consistent w/NUREG-1433,rev 1, Std TS for GE Plants,Bwr 4. Proposed TS Consistent w/NUREG-1433,rev 1, Encl1998-03-0202 March 1998 Forwards Proposed Amends to Licenses NPF-14 & NPF-22, Revising TS to Be Consistent w/NUREG-1433,rev 1, Std TS for GE Plants,Bwr 4. Proposed TS Consistent w/NUREG-1433,rev 1, Encl PLA-4854, Provides Summary of Investigations That PP&L Performed in Response to Concerns Identified by Former Nuclear Plant Operator.Summary Requested by Cj Anderson on 9802131998-02-27027 February 1998 Provides Summary of Investigations That PP&L Performed in Response to Concerns Identified by Former Nuclear Plant Operator.Summary Requested by Cj Anderson on 980213 ML20203M5071998-02-26026 February 1998 Final Response to FOIA Request for Documents.Records in App a Being Placed in PDR & Encl.Records in App B Partially Withheld (Ref FOIA Exemption 6) ML20203B5931998-02-23023 February 1998 Ack Receipt of & Wire in Amount of $55,000 in Payment for Civil Penatly Proposed by NRC Ltr . Corrective Actions Will Be Examined During Future Inspections ML20216B7031998-02-22022 February 1998 Partially Deleted Ltr Requesting Copy of OI Rept on Plant, Unit 2,case 1-96-039 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARPLA-5120, Forwards Change J to SSES Security Training & Qualification Plan.Without Encl1999-10-22022 October 1999 Forwards Change J to SSES Security Training & Qualification Plan.Without Encl ML18040B2951999-09-0808 September 1999 Requests Info Re Any NRC or Susquehanna Documented Concerns with MSIV Reliability Prior to Plant Trip & Assurance to Public That NRC Able to Detect Mgt Problems Early PLA-5094, Forwards,For Review,Change 00 to SSES Physical Security Plan.Without Encl1999-08-24024 August 1999 Forwards,For Review,Change 00 to SSES Physical Security Plan.Without Encl ML18040A9741999-07-0808 July 1999 Forwards Rev 30 to SSES Emergency Plan, Adding EAL to Account for Potential Conditions Associated with Dry Cask Storage Sys Being Installed at Plant PLA-5072, Forwards Change Nn to SSES Physical Security Plan.Util Determined That Changes Do Not Decrease Safeguards Effectiveness of Plan,Per 10CFR50.54(p).Encl Withheld from Public Disclosure,Per 10CFR73.211999-06-0404 June 1999 Forwards Change Nn to SSES Physical Security Plan.Util Determined That Changes Do Not Decrease Safeguards Effectiveness of Plan,Per 10CFR50.54(p).Encl Withheld from Public Disclosure,Per 10CFR73.21 ML18040A9731999-05-24024 May 1999 Submits Response to RAI Re Exemption from Biennial Exercise Schedule.Changing of Drill Date Will Not Reduce Level of Emergency Preparedness at Plant ML20195B2181999-05-20020 May 1999 Forwards Proprietary Decommissioning Status Rept for 10% Interest in Sses,Units 1 & 2.Proprietary Info Withheld,Per 10CFR2.790 ML18040B2901999-04-30030 April 1999 Forwards Summary Rept of Safety Evaluations Approved During Period from 961024-981029,per 10CFR50.59(b).Format of Rept, Listed PLA-5041, Forwards Proprietary & Redacted Decommissioning Rept of Financial Assurance for Util 90% Interest in Sses,Units 1 & 2,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per 10CFR2.7901999-03-29029 March 1999 Forwards Proprietary & Redacted Decommissioning Rept of Financial Assurance for Util 90% Interest in Sses,Units 1 & 2,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per 10CFR2.790 ML18040A9691999-03-12012 March 1999 Forwards Revised Proposed Amend 227 to License NPF-14, Proposing Changes to ANFB-10 Critical Power Correlation & MCPR Safety Limits ML17164A9891999-03-12012 March 1999 Informs That Util 990312 Ltr (PLA-5040) Submitted to NRC, Missing Encl C.Requests to Replace Package in Entirety with Encl ML18040A9721999-03-11011 March 1999 Requests That Date for full-participation SSES Exercise, Scheduled for Week of 991115,be Changed Due to FEMA Region III Scheduling Conflicts.Fema Requests That Exercise Date Be Changed to Week of 001031 PLA-4852, Forwards non-redacted Version of Pp&L,Inc Corporate Auditing Rept 739459-2-98,dated 980210.Informs That Document Contains Info to Be Withheld IAW 10CFR2.7901999-02-18018 February 1999 Forwards non-redacted Version of Pp&L,Inc Corporate Auditing Rept 739459-2-98,dated 980210.Informs That Document Contains Info to Be Withheld IAW 10CFR2.790 ML18040A9671999-01-29029 January 1999 Notifies That Util Implemented Severe Accident Mgt Strategy in Accordance with Ltr Dtd 950327.Emegency Plan Revs Which Were Required to Implement Strategy Were Submitted by Ltr Dtd 981125 ML18040A9681999-01-29029 January 1999 Requests Exemption from Requirements of 10CFR50 App E,Items IVF.2.b & C,To Allowed to Reschedule Federally Observed Full Participation Emergency Exercise for SSES from Wk of 991115 to Wk of 001031 ML18040A9651999-01-12012 January 1999 Submits Addl Info Re Proposed Amend 184 to License NPF-22 for ANFB-10 Critical Power Correlation & MCPR Safety Limits ML18030A1021998-12-16016 December 1998 Forwards Tables as Requested During 981202 Telcon Re Proposed Amend 184,dtd 980804,re ANFB-10 Critical Power Correlation & MCPR Safety Limits.Tables Provide Roadmap Identifying Applicability of References to TSs ML18030A4331998-11-25025 November 1998 Forwards Rev 29 to SSES Emergecny Plan.Changes Has Been Made Without Commission Approval as It Does Not Decrease Effectiveness of Plan & Plan as Changed Continues to Satisfy Applicable Requirements of App E to 10CFR50 ML18026A2941998-10-19019 October 1998 Forwards SSES ISI Outage Summary Rept for Unit 1 Tenth Refueling & Insp Outage PLA-4993, Forwards Change Mm to SSES Physical Security Plan.Encl Withheld,Per 10CFR73.211998-10-12012 October 1998 Forwards Change Mm to SSES Physical Security Plan.Encl Withheld,Per 10CFR73.21 ML18030A4321998-10-12012 October 1998 Forwards Rev 28 to SSES Emergency Plan, IAW Requirements of 10CFR50.54q.Change Is Summarized ML18030A1001998-10-12012 October 1998 Forwards Rev 27 to SSES Emergency Plan. Changes Become Effective Upon Implementation of Improved Tech Specs ML18030A4311998-09-29029 September 1998 Forwards Rev 27 & 28 to SSES Emergency Plan ML18030A0991998-09-0808 September 1998 Provides Response to Violations Noted in Insp Repts 50-387/98-08 & 50-388/98-08.Corrective Actions:Current Administrative Controls on Fuel Level in EDG Day Tanks Will Remain in Effect Until TS Change Is Approved IR 05000387/19980081998-09-0808 September 1998 Provides Response to Violations Noted in Insp Repts 50-387/98-08 & 50-388/98-08.Corrective Actions:Current Administrative Controls on Fuel Level in EDG Day Tanks Will Remain in Effect Until TS Change is Approved ML18026A4961998-08-31031 August 1998 Responds to NRC 980731 Ltr Re Violations Noted in Insp Repts 50-387/98-03 & 50-388/98-03.Corrective Actions:Procurement & Affected User Group Personnel Visited EDG Vendor Facilities to Appraise Vendor Work Practices & Discuss Expectations IR 05000387/19980031998-08-31031 August 1998 Responds to NRC 980731 Ltr Re Violations Noted in Insp Repts 50-387/98-03 & 50-388/98-03.Corrective Actions:Procurement & Affected User Group Personnel Visited EDG Vendor Facilities to Appraise Vendor Work Practices & Discuss Expectations ML18017A2181998-07-0808 July 1998 Forwards Final Version of SSES TS Implementing Improved Tech Specs of NUREG 1433.Implementation of Proposed Amend Is Predicated on NRC Issuance of Amends & Is Proposed to Not Exceed 90 Days from Date of Amend Issuance ML18030A4291998-07-0808 July 1998 Forwards Final Version of SSES TS Implementing Improved TS of NUREG-1433.Implementation of Proposed Amend Is Predicted on NRC Issuance of Amends & Proposed to Not Exceed 90 Days from Date of Amend Issue ML18026A2901998-06-0909 June 1998 Forwards Rev 26 to Emergency Plan IAW 10CFR50.54q.Summary of Changes Listed ML18026A2891998-05-22022 May 1998 Submits Withdrawal of Expedited Review/Approval of Tech Specs/Bases 3/4.3.7.11 & 3/4.11.2.6 & Response to Request for Addl Info Re Offgas Sys Mods ML18026A4941998-05-12012 May 1998 Responds to NRC Request to Resubmit Proposal to Change TS for Plant,Units 1 & 2,to Support Implementation of Improved TS & to Implement Provisions of GL 86-10 Re Relocation of Plant'S Fire Protection Program from TS to Another Document ML17159A2341998-03-30030 March 1998 Forwards LER 97-007-01,per 10CFR50.73(a)(2)(i)(B).Revised LER Submitted to Modify Previous Position W/Regards to Entry Into TS 3.0.3 for Event PLA-4865, Forwards Listed non-redacted Pp&L,Inc Corporate Auditing Repts.Informs That Document Contains Info to Be Withheld IAW 10CFR2.7901998-03-11011 March 1998 Forwards Listed non-redacted Pp&L,Inc Corporate Auditing Repts.Informs That Document Contains Info to Be Withheld IAW 10CFR2.790 ML17159A1781998-03-0202 March 1998 Forwards Proposed Amends 203 & 161 to License NPF-14 & NPF-22,revising Tech Specs to Be Consistent w/NUREG-1433,rev 1, Std Tech Specs for GE Plants,Bwr 4. PLA-4856, Forwards Proposed Amends to Licenses NPF-14 & NPF-22, Revising TS to Be Consistent w/NUREG-1433,rev 1, Std TS for GE Plants,Bwr 4. Proposed TS Consistent w/NUREG-1433,rev 1, Encl1998-03-0202 March 1998 Forwards Proposed Amends to Licenses NPF-14 & NPF-22, Revising TS to Be Consistent w/NUREG-1433,rev 1, Std TS for GE Plants,Bwr 4. Proposed TS Consistent w/NUREG-1433,rev 1, Encl PLA-4854, Provides Summary of Investigations That PP&L Performed in Response to Concerns Identified by Former Nuclear Plant Operator.Summary Requested by Cj Anderson on 9802131998-02-27027 February 1998 Provides Summary of Investigations That PP&L Performed in Response to Concerns Identified by Former Nuclear Plant Operator.Summary Requested by Cj Anderson on 980213 ML20216B7031998-02-22022 February 1998 Partially Deleted Ltr Requesting Copy of OI Rept on Plant, Unit 2,case 1-96-039 PLA-4851, Provides Info That Was Requested by Cj Anderson on 980213 Re Former Util Employee Concern on Radwaste Control Room Offgas Panel Alarm Testing1998-02-18018 February 1998 Provides Info That Was Requested by Cj Anderson on 980213 Re Former Util Employee Concern on Radwaste Control Room Offgas Panel Alarm Testing ML20203M5791998-02-10010 February 1998 Enters Appeal Due to Lack of Response to FOIA Request 97-473 ML18030A0971998-02-0202 February 1998 Forwards Proprietary Response to RAI Re Proposed License Amend 209 to TS Supporting Cycle 11 Reload.Proprietary Info Withheld,Per 10CFR2.790 ML20203G6071998-01-26026 January 1998 Forwards Redacted Version of Pp&L,Inc Corporate Auditings Interim Rept 739459-97,dtd 971015 & Affidavit Pursuant to 10CFR2.790 Justifying That Redacted Portions Be Withheld from Public Disclosure.Without Rept IR 05000387/19970031998-01-0606 January 1998 Provides Updated Response to Violations Noted in Insp Repts 50-387/97-03 & 50-388/97-03.Corrective Actions:Util Currently Scheduling Issuance of All Procedural Revs by End of First Quarter 1998 ML18030A4071998-01-0606 January 1998 Provides Updated Response to Violations Noted in Insp Repts 50-387/97-03 & 50-388/97-03.Corrective Actions:Util Currently Scheduling Issuance of All Procedural Revs by End of First Quarter 1998 ML18017A2931998-01-0606 January 1998 Provides Responses to Improved TS Section 3.8 Per 970324 NRC Rai.Schedule 980628 for Improved TS Implementation. Submittal of Revised Specifications Is Planned for Jan 1998 PLA-4828, Expresses Appreciation for Support Received by Former Project Manager C Poslusny1997-12-29029 December 1997 Expresses Appreciation for Support Received by Former Project Manager C Poslusny ML18026A4901997-12-22022 December 1997 Resolves Commitments Made in Response to NOV Issued as Part of NRC Insp Repts 50-387/97-04 & 50-388/97-04 Dtd 970805. Proposed FSAR QA Program Description Changes,Reason for Changes & Basis Included for Approval IR 05000387/19970041997-12-22022 December 1997 Resolves Commitments Made in Response to NOV Issued As Part of NRC Insp Repts 50-387/97-04 & 50-388/97-04 Dtd 970805. Proposed FSAR QA Program Description Changes,Reason for Changes & Basis Included for Approval ML20203M5741997-12-0505 December 1997 FOIA Request for Copy of Latest OI Rept on Susquehanna Ses Including All Exhibits & for Any Other Communication Between NRC & Susquehanna Ses/Pp&L PLA-4818, Forwards Redacted Version of Pp&L,Inc Corporate Auditings Rept 739459-1-97,dtd 971201 & Affidavit Pursuant to 10CFR2.790 Justifying That Redacted Portions Be Withheld from Public Disclosure.Without Rept1997-12-0404 December 1997 Forwards Redacted Version of Pp&L,Inc Corporate Auditings Rept 739459-1-97,dtd 971201 & Affidavit Pursuant to 10CFR2.790 Justifying That Redacted Portions Be Withheld from Public Disclosure.Without Rept 1999-09-08
[Table view] |
Text
CATEGORY j.
REGULARLY INFORMATION DISTRIBUTIO<i SYSTEM (RIDE)
ACCESSION NBR:9602160123 DOC.DATE: 96/02/12 NOTARIZED: YES DOCKET ¹ FACIL:50-387 Susqueh'anna Steam Electric Station, Unit 1, Pennsylva 05000387 50-388 Susquehanna Steam Electric Station, Unit 2, Pennsylva 05000388 AUTH. NAME AUTHOR AFFILIATION BYRAM,R.G. Pennsylvania Power & Light Co.
RECIP.NAME, RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Forwards proposed amends 196 & 154 to licenses NPF-14 & q+yyr C NFF-22,respectively, revisinS TS to implement 10CFRSO,App J, p~
Option B per guidance in final rule re primary reactor containment leakage testing for water-cooled power reactors. 'Wc ~<~ A DISTRIBUTION CODE: A017D COPIES RECEIVED:.LTR g ENCL TITLE: OR Submittal: Append J Containment Leak Kate Testing g SIZE:
E NOTES: 05000387 Q RECIPIENT COPIES 'RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL R PD1-2 LA 1 0 PDl-2 PD 1 1 POSLUSNYFC 1 1 Y INTERNAL: ACRS 1 1 NRR/DE/ECGB 1 1 OGC/HDS2 1 1 RES/DE/SEB 1 1 EXTERNAL: NOAC 1 1 NRC PDR 1 . 1 D
NOTES: 1 1 E.
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 17 ENCL 16
I' 0
0 ~
Pennsylvania Power 8 Light Company Two North Ninth Street ~ Allentown, PA 18101-1179 ~ 610/774-5151 Robert G. Byrem Senior Vice Presiden/-Nac/ear 610/774-7502 FAx: 610/774-5019 FEB j. 8 1996 U.S. Nuclear Regulatory Commission Attn.: Document Control Desk Mail Stop P1 - 137 Washington, D.C. 20555 SUSQUEHANNA STE<AM ELECTRIC STATION PROPOSED AMENDMENTNO. 196 TO LICE<NSE< NPF-14 AND PROPOSED AMENDMENTNO. 154 TO LICENSE NPF-22:
ADOPTION OF 10 CFR 50 APPENDIX J OPTION 8 Docket Nos. 50-387 and 50-388 The purpose of this letter is to notify the NRC of Pennsylvania Power & Light (PP&L)
Company's desire to perform containment leakage-rate testing in accordance with 10 CFR 50, Appendix J, Option B. In addition, PP&L proposes changes to Susquehanna SES Units 1 and 2 Technical Specifications to implement the requirements of Option B. This notification and proposed Technical Specification changes are being submitted in accordance with the guidance provided in the final rule regarding Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors.
The attached analysis discusses the safety basis for the proposed Technical Specification changes and concludes that the changes involve no significant hazards. The changes have been reviewed by the Plant Operations Review Committee and the Susquehanna Review Committee. We are committed to making these changes to achieve the manpower cost and radiation exposure reduction benefits which can be realized through performance based testing. The proposed changes are expected to yield annualized benefits in excess of $ 480,000 for the remainder of plant life. The proposed changes meet the Cost Beneficial Licensing Action criteria as outlined in NRC Administrative Letter, 95-02.
We would like to implement the proposed changes in support of our upcoming refueling outage on Susquehanna Unit 1. As a result, we ask that the NRC complete its review by May 15, 1996.
Any questions regarding this request should be directed to Mr. Terence Bannon.at (610) 774-4019.
Very truly yours, 9'602i60i23 9b02i2 PDR ADOCK 05000387 P PDR R..By m Attachment
>60033
0 V ~ +Qlj I H
'L f4% i II II ll Qlg t g
FILES R41-I/A17-2 PLA-4414 Document Control Desk copy: Regional Administrator - Region I Ms. M.Banerjee, NRC Sr. Resident Inspector Mr. C. Poslusny, Jr., NRC Sr. Project Manager Mr. W.P. Dornsife, Pa. DEP
ATTACHMENTTO PLA-4414 PAGE 1 of 6 SAFETY ASSESSMENT ADOPTION OF 10 CFR 50 APPENDIX J OPTION B The safety objective for reactor containments is stated in 10 CFR 50, Appendix A, "General Design Criteria for Nuclear Power Plants." General Design Criterion (GDC) 16, "Containment Design" requires "an essentially leak-tight barrier against the uncontrolled release of radioactivity to the environment..." for postulated accidents. The previous version of 10 CFR Part 50, Appendix J implemented GDC 16 through prescriptive containment leakage testing requirements that stipulated the tests that should be performed, the frequency of testing, and reporting of test results.
The revised 10 CFR 50, Appendix J regulation maintains the prescriptive leakage testing requirements (now referred to as Option A), but now recognizes a performance-based'eakage testing program (referred to as Option B) as an acceptable alternative to the prescriptive requirements. This performance-based leakage testing approach allows test intervals to be based on system and component testing performance, thereby providing greater flexibility and cost-benefit in implementing the safety objectives of the regulation.
The new 10 CFR 50, Appendix J, Option B regulation states that licensees may adopt Option B by notifying the NRC of their desire to implement, and submitting a request for Technical Specification revisions. Implementation must await NRC review and approval. 10 CFR 50, Appendix J, Option B, section V, paragraph B.3 states that NRC Regulatory Guide 1. 163 or other implementation document being used by a licensee to develop a performance-based leakage testing program must be included, by general reference, in the facility Technical Specifications. The regulation also states that the Technical Specification revisions must "contain justification, including supporting analyses, if the licensee chooses to deviate from methods approved by the Commission and endorsed in the regulatory guide."
Pennsylvania Power & Light Company requests NRC approval to implement the performance-based leakage testing approach for the Susquehanna Steam Electric Station, Units 1 and 2. PP&L intends to implement this approach in accordance with NRC Regulatory Guide 1. 163, Revision 0 dated September 1995, "Performance-Based Containment Leak-Test Program" and Nuclear Energy Institute (NEI) 94-01, Revision 0, dated July 26, 1995, "Industry Guideline for Implementing Performance-Based Option of 1 0 CFR 50 Appendix J ". PP&L takes no deviations from methods approved by the Commission and endorsed in the regulatory guide.
~
9602160123 In order to implement 10 CFR 50, Appendix J, Option B per the approved guidance, Susquehanna Units 1 and 2 Technical Specifications will be changed to establish and reference a Primary Containment Leakage Rate Testing Program. The program will be established,
ATTACHMENTTO PLA-4414 PAGE 2 of 6 implemented, and maintained in the Administrative Controls portion of the Technical Specifications under Specification 6.8, Procedures and Programs. A new Specification 6.8.5, Primary Containment Leakage Rate Testing Program, is being established under this change.
This Specification commits that the Primary Containment Leakage Rate Testing Program shall be in accordance with the guidelines contained in Regulatory Guide 1.163, "Performance-Based Containment Leak-Test Program", dated September 1995. This Specification also includes the definition of P, and L, for Susquehanna SES and specifies the Leak Rate Acceptance Criteria for Type A, B, and C tests and air locks.
A mark-up of each unit's Technical Specification sections affected by the proposed changes is included as an attachment to this analysis.
The Code of Federal Regulations 10 CFR 50, Appendix J establishes requirements for containment leakage tests for all operating licensees for water-cooled power reactors. Three tests are specified in the regulation; Type A-(integrated leakage), Type B (penetration local leakage),
and Type C (CIV local leakage). The NRC recently revised the regulations under 10 CFR 50, Appendix J to establish an alternate set of performance-based requirements under Option B.
This performance-based leakage testing approach allows Type A, B, and C test intervals to be based on system and component testing performance, thereby providing greater flexibility and cost-benefit in implementing the safety objectives of the regulation. PP&L is seeking to adopt the Option B requirements and amend the Susquehanna SES Technical Specifications as necessary to implement Option B. The following analysis provides the basis for the proposed Technical Specification changes.
Safety Analysis:
The effect of increasing containment leakage rate testing intervals has been evaluated by the Nuclear Energy Institute using the methodology described in NUREG-1493 and historical representative industry leakage rate testing data. The results of this evaluation, as published in NEI 94-01, Revision 0, are that the increased safety risk corresponding to the extended test intervals is small (less than 0.1 percent of total risk) and compares well to the guidance of the NRC's safety goal. In addition, as demonstrated by risk analyses contained in NUREG-1482, relaxation of the integrated leak rate test &equency does not significantly increase the probability or consequences of a previously evaluated accident. Integrated leakage rate tests have been demonstrated to be of limited value in detecting significant leakages Rom penetrations and isolation valves. The primary containment leak rate data and component performance history at Susquehanna SES are consistent with the conclusions reached in NUREG-1493 and NEI 94-01.
Therefore, the proposed license amendments adopting a performance-based approach for verification of leakage rates for isolation valves, containment penetrations, and the containment overall will continue to meet the regulatory goal of providing an essentially leak-tight containment boundary, and willprovide an equivalent level of safety as the current requirements.
/
V
( I
ATTACHMENTTO PLA-4414 PAGE 3 of 6 The revised Technical Specifications will continue to maintain the allowable leak rate (Lg as the Type A test performance criterion. In addition, a requirement to perform a periodic general visual inspection of the containment is part of the performance-based leakage testing program.
The revised Technical Specifications will continue to maintain the allowable leak rate (Lg as the Type B and C tests'erformance criterion. As supported by the findings of NUREG-1493, the percentage of leakages detected only by integrated leak rate tests is small (only a few percent) and Type B and C leakage tests are capable of detecting more than 97 percent of containment leakages*and virtually all such-leakages are identified by local leak rate tests (LLRTs) of containment isolation valves.
Therefore, implementing the 10 CFR 50 Appendix J Option B requirements for performance-based leakage testing at Susquehanna SES does not impact plant safety margins.
This analysis addresses proposed changes to Susquehanna SES Technical Specifications to implement the performance-based leakage testing approach established in 10 CFR 50, Appendix J, Option B in accordance with NRC Regulatory Guide 1. 163, Revision 0 dated September 1995, "Performance-Based Containment Leak-Test Program" and Nuclear Energy Institute (NEI) 94-01, Revision 0, dated July 26, 1995, "Industry Guideline for Implementing Performance-Based Option of 10 CFR 50 Appendix J". PPEcL takes no deviations from methods approved by the Commission and endorsed in the regulatory guide.
Tliisproposal does <<ot involve a sigIrificant increase in the probability or consequences ofan accident previously evaluated.
The proposed license amendments do not involve a significant increase in the probability or consequences of an accident previously evaluated. The proposed license amendments revise the Technical Specifications to reflect the adoption of a performance-based containment leakage-testing program. The Nuclear Regulatory Commission has approved the use of a performance-based option for containment leakage testing programs when it amended 10 CFR Part 50, Appendix J (60 FR 49495).
To 'adopt of the revised regulations, licensees are required to incorporate into their Technical Specifications, by general reference, the NRC regulatory guide or other plant specific implementing document. A new Administrative Controls Specification is being added to the Susquehanna SES Technical Specifications that requires the establishment and maintenance of a Primary Containment Leakage Rate Testing Program. As stated in the Technical Specification, this Primary Containment Leakage Rate Testing Program will conform with NRC Regulatory Guide 1.163, "Performance-Based Containment Leak-Rate Testing Program", dated September 1995. The Primary Containment Leakage Rate Testing Program establishes requirements intended to ensure on-going containment
ATTACHMENTTO PLA-4414 PAGE 4 of 6 integrity, including the performance of a periodic general visual inspection of the containment to detect early indications of structural deterioration.
The effect of increasing containment leakage rate testing intervals has been evaluated by the Nuclear Energy Institute using the methodology described in NUREG-1493 and historical representative industry leakage rate testing data. The results of this evaluation, as published in NEI 94-01, Revision 0, are that the increased risk corresponding to the extended test interval is small (less than 0.1 percent of total risk) and compares well to the guidance of the NRC's safety goal. The primary containment leak rate data and component performance history at Susquehanna SES are consistent with the conclusions reached in NUREG-1493 and NEI 94-01. Therefore, adoption of performance-based verification of leakage rates for isolation valves, containment penetrations, and the overall containment boundary will provide an equivalent level of safety and does not involve a significant increase in the probability or consequences of an accident previously evaluated.
This proposal does not create the possibility ofa ne>v or different kind of accident from any accident previously evaluated.
No safety-related equipment, safety function, or plant operations will be altered as a result of the proposed license amendment.
The safety objective for the primary containment is stated in 10 CFR 50, Appendix A, "General Design Criteria for Nuclear Power Plants." The safety function of the primary containment will be met since the containment will continue to provide "an essentially leak tight barrier against the uncontrolled release of radioactivity to the environment..."
for postulated accidents. Therefore, the proposed license amendments will not create the possibility of a new or different kind of accident from any accident previously evaluated.
This change does not involve a significant reduction in a margin ofsafety.
As stated above, the Nuclear Regulatory Commission has approved the use of a performance-based option for containment leakage testing programs when it amended 10 CFR Part 50, Appendix J (60 FR 49495). The new Primary Containment Leakage Rate Testing Program will conform with NRC Regulatory Guide 1.163, Revision 0, dated September 1995, "Performance-Based Containment Leak-Rate Testing Program" by requiring that leakage testing intervals be established based on the criteria in Section 11.0 of NEI 94-01, Revision 0.
As discussed in Part 1 above, the effect of increasing containment leakage rate testing intervals has been evaluated by the Nuclear Energy Institute using the methodology described in NUREG-1493 and historical representative industry leakage rate testing data. The results of this evaluation, as published in NEI 94-01, Revision 0, are that the
l1 ATTACHMENTTO PLA-4414 PAGE 5 of 6 increased safety risk corresponding to the extended test intervals is small (less than 0.1 percent of total risk).and compares well to the guidance of the NRC's safety goal. In addition, as demonstrated by risk analyses contained in NUREG-1482, relaxation of the integrated leak rate test frequency does not significantly increase the probability or consequences of a previously evaluated accident. Integrated leakage rate tests have been demonstrated to be of limited value in detecting significant leakages from penetrations and isolation valves. The primary containment leak rate data and component performance history at Susquehanna SES are consistent with the conclusions reached in NUREG-1493 and NEI 94-01. Therefore, the proposed license amendments adopting a performance-based. approach for verification of leakage rates for isolation valves, containment penetrations, and the containment overall will continue to meet the regulatory goal of providing an essentially leak-tight containment boundary, will provide an equivalent level of safety, and do not involve a significant reduction in a margin of safety.
The, revised Technical Specifications will continue to maintain the allowable leak rate (Lg as the Type A test performance criterion. In addition, a requirement to perform a periodic general visual inspection of the containment is part of the performance-based leakage testing program.
The revised Technical Specifications will continue to maintain the allowable leak rate (Lg as the Type B and C tests'erformance criterion. As supported by the findings of NUREG-1493, the percentage of leakages detected only by integrated leak rate tests is small (only a few percent) and Type B and C leakage tests are capable of detecting more than 97 percent of containment leakages and virtually all such leakages are identified by local leak rate tests (LLRTs) of containment isolation valves.
Thus, the proposed license amendments do not involve a significant reduction in a margin of safety and will continue to support the regulatory goal of ensuring an essentially leak-tight containment boundary.
An environmental assessment is not required for the proposed change because the requested change conforms to the criteria for actions eligible for categorical exclusion as specified in 10 CFR 51.22(c)(9). The requested change will have no impact on the environment. The proposed change does not involve a significant hazards consideration as discussed in the preceding section.
The proposed change does not involve a significant change in the types or significant increase in the amounts of any effluents that may be released offsite. In addition, the proposed change does not involve a significant increase in individual or cumulative occupational radiation exposure.
The basis for this determination follows.
ATTACHMENTTO PLA-4414 PAGE 6 of 6 The proposed license amendments do not result in a significant change in the types or a significant. increase in the amounts of any effluent that may be released offsite. The proposed license am'endments do not introduce any new containment boundary changes nor do these proposed license amendments require any existing containment boundary systems to perform a different type of function than they are presently designed to perform. The proposed license amendments do not alter the function of existing containment boundary equipment and will ensure that the consequences of any previously evaluated accident do not increase. Therefore, PP&L has concluded that there will not be a significant increase in the types or amounts of any effluent that may be released offsite and, as such, does not involve irreversible environmental consequences beyond those already associated with normal operation.
These amendments do not result in an increase in individual or cumulative occupational radiation exposure. Implementation of a performance-based containment leakage rate testing approach will allow test intervals to be based on system and component performance. Therefore, the increased test intervals that are permitted under a performance-based leakage testing program are actually expected to decrease cumulative occupational exposure.
It is requested that this change be approved as soon as possible but no later than May 15, 1996, with implementation within 30 days of the date of issuance.