Category:CORRESPONDENCE-LETTERS
MONTHYEARML18066A6881999-10-19019 October 1999 Forwards Rev 5 to Palisades Nuclear Plant COLR, Per Requirements of TS 6.6.5.Ltr Contains No New Commitments & No Revs to Existing Commitments ML18066A6871999-10-19019 October 1999 Forwards Response to NRC 990908 RAI Re Inservice Insp Program Relief Request 14.Ltr Contains No New Commitments & No Revs to Existing Commitments ML20217G4111999-10-12012 October 1999 Informs of Changes to Big Rock Point Defueled Emergency Plan, That Meet Requirements of 10CFR50.54(q) & Can Be Made Without NRC Approval.Changes to Plan Are Listed ML20212L9051999-10-0404 October 1999 Forwards Environ Assessment & Finding of No Significant Impact Re 990511 Application for Amend,As Supplemented on 990603 & 0728.Proposed Amend Would Make Changes to TSs by Deleting Definition,Site Boundary & Use ML18066A6741999-10-0202 October 1999 Forwards MOR for Sept 1999 for Palisades Nuclear Plant & Operating Data Rept Sheet for Month of Aug 1999.MOR for Aug 1999 Inadvertently Had Copy of Ref Data Sheet for Apr 1999 Data ML18066A6791999-10-0101 October 1999 Provides Response to RAI Re Draft Rept, Study of Air- Operated Valves in Us Nuclear Power Plants. ML18066A6621999-09-30030 September 1999 Notifies NRC That Util Will Implement ITS at Plant on or Before Oct 31,2000 & Attachments 1 & 2 Contains Request for License Condition Which Relates First Performance of New or Revised Surveillance Requirements to Implementation of ITS ML20217C5111999-09-30030 September 1999 Forwards Info Re Management & Funding of Irradiated Fuel Notification,Per 10CFR50.54(bb),in Response to NRC Telcon Rai.Revs to Original 990811 Submittal Are Indicated by Redline/Strikeout Method ML20217C2761999-09-30030 September 1999 Forwards Big Rock Point Plant Annual Rept of Facility Changes,Tests & Experiments,Iaw 10CFR50.59(b)(2).Rept Provides Summary of Changes to Facility Performed Since 981001.No Activities Classified as Tests or Experiments ML20212K7561999-09-30030 September 1999 Forwards Insp Rept 50-155/99-05 on 990731-0921,site Insp & 990929 Public Meeting.No Violations Noted ML18066A6601999-09-29029 September 1999 Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations. ML18066A6471999-09-17017 September 1999 Forwards Final Clean Copies of ITS & Bases Pages Which Incorporate All Changes Proposed in Listed Ltrs.Clean Copies Also Incorporate Some Editorial Changes & Bases Clarifications as Result of Ongoing Reviews to LCOs ML18066A6331999-09-0202 September 1999 Forwards Monthly Operating Rept for Aug 1999 & Revised Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant ML18066A6261999-08-26026 August 1999 Forwards Addl New Valve Relief Request as Alternative to Code Requirements That Will Provide Acceptable Level of Quality & Safety.Request Would Allow Use of App II, Check Valve Condition Monitoring Program, of ASME OM Code-1995 ML20211G1011999-08-25025 August 1999 Confirms Discussions & Agreement to Have Mgt Meeting in Region III Office on 990929.Purpose of Meeting to Discuss Decommissioning Activities,Priorities,Challenges & Successes & to Preview Plans & Schedules for Next Year ML20210V0561999-08-17017 August 1999 Advises of Plan to Stop Using Ofc Complex at Plant,Which Consumers Energy Co Had Provided for NRC Resident Inspectors Under 10CFR50.70(b)(1) ML20211D5661999-08-17017 August 1999 Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d).Attachments 1 & 2 Summarize Test Results at Palisades Plant,Big Rock Point Plant & Corporate Ofc ML18066A6111999-08-13013 August 1999 Requests Exemption from Certain Requirements of 10CFR50,App R, Fire Protection Program for Nuclear Power Facilities Operating Prior to 790101. Request Concerns Oil Collection Sys Requirements for PCP Motors ML20210S6961999-08-12012 August 1999 Forwards Insp Rept 50-155/99-04 on 990609-0730.No Violations Noted.No Safety Issues or Enforcement Items Were Identified During Insp ML20210S6291999-08-11011 August 1999 Forwards Notification to NRC for Review & Approval of Program Intending to Manage & Provide Funding for Mgt of All Irradiated Fuel at Big Rock Point Until Title of Fuel Is Transferred to Secretary of Energy for Disposal ML20210L0321999-08-0303 August 1999 Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety & Documents Listed in App B Being Released in Part (Ref FOIA Exemption 6) ML18066A5881999-07-30030 July 1999 Provides Rev to Instrument Channel Drift Measurement Submitted on 990611,in Response to NRC Comments on Util RAI Response for Sections 3.3,3.5 & 3.6 & Editorial Changes Revs Necessary for Consistency within ITS ML18066A5921999-07-30030 July 1999 Forwards Results of Review by Consumers Energy of Two NRC Draft Repts Entitled, Evaluation of Air-Operated Valves at Light-Water Reactors & Study of Air-Operated Valves in Us Nuclear Power Plants. ML18066A5971999-07-30030 July 1999 Forwards Markup of Draft NRC SE Re Util Proposal to Convert to Its.Ltr Contains No New Commitments & No Revs to Existing Commitments ML20210G8351999-07-29029 July 1999 Final Response to FOIA Request for Documents.Records in App a Encl & Will Be Available in PDR ML20210H2701999-07-28028 July 1999 Informs That Big Rock Point Commits to Listed Actions with Regard to 990511 Amend Request to Delete Definition of Site Boundary & Remove Site Map,Based on Discussion with NRC on 990728 ML18066A5651999-07-19019 July 1999 Forwards Corrections to Previously Submitted TS Section 3.7, Plant Systems, Converting to Its,Per NUREG-1432.Licensee Realized That Certain Provisions of CTS Had Been Inappropriately Replaced with Provisions from STS ML20209D6951999-07-0707 July 1999 Ack Receipt of Which Requested That NRC Reconsider Decision to Move NRC Resident Inspector from Big Rock Point Plant.Determined Decision to Be Correct One ML20210L0491999-06-30030 June 1999 Partially Deleted Request for FOIA Documents Re Source of High Alarms Generated by Radiation Effluent Detector or Detectors in Discharge Canal at Big Rock Point on 980314,15 & 25.Partially Deleted Info Encl ML20209B2081999-06-29029 June 1999 Discusses Closure of Response to RAI Re GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity. Rvid,Version 2 Issued as Result of Review of Responses.Info Should Be Reviewed & Comments Submitted by 990901 ML18066A5111999-06-29029 June 1999 Provides Voluntary Confirmation of Facility Readiness as Outlined in GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Disclosure & Response Encl ML20210G8791999-06-23023 June 1999 FOIA Request for All Document Communications Between NRC & Region III Involving R Landsman,B Jorgensen & R Caniano & NRC Staff Under Their Supervision & All Communications in Their Possession to & from Consumers Power Re Plant ML20209D7011999-06-21021 June 1999 Requests That NRC Reconsider Decision to Move Resident Inspector from Big Rock Point NPP ML20196E1601999-06-21021 June 1999 Forwards Insp Rept 50-155/99-03 on 990416-0608.No Violations Noted.Overall,Reactor Decommissioning Activities Performed Satisfactorily ML18066A5061999-06-17017 June 1999 Forwards Responses to NRC Questions for ITS LCOs 3.6.3 & 3.6.6 of 990126 Submittal.One Editorial Change in Addition to Those Made in Response to NRC Comments & Conforming Changes Made to Associated Bases,Encl ML18066A4991999-06-11011 June 1999 Forwards Responses to NRC Comments Re ITS Section 3.3 & Associated Revs to ITS Sections 1.0,3.3,3.4 & 3.9 of 990126 ITS Conversion Submittal.One Technical Change & Several Editorial Changes Unrelated to NRC Comments,Also Provided ML18066A4921999-06-0909 June 1999 Discusses Response of 980226 Violation Re Insp Rept 50-255/97-18 Re Failure to Take Adequate Corrective Action. Ltr Contains New Commitments & No Rev IR 05000255/19970181999-06-0909 June 1999 Discusses Response of 980226 Violation Re Insp Rept 50-255/97-18 Re Failure to Take Adequate Corrective Action. Ltr Contains New Commitments & No Rev ML18068A6011999-06-0808 June 1999 Forwards Description of Recent Changes Made to Palisades Site Emergency Plan,Excluding Minor & Editorial Changes Not Requiring Further Explanation ML18066A4881999-06-0404 June 1999 Provides Responses to NRC Questions & Associated Editorial Revs for ITS LCOs 3.6.1,3.6.2,3.6.4,3.6.5 & 3.6.7 of 980126 Submittal.Responses to Comments on Remaining Section 3.6 LCOs Will Be Submitted Separately ML20195D0371999-06-0303 June 1999 Forwards Revised Defueled Ts,Per 990511 Util Request.Page Format in Attachments 1 & 2 of Submittal Do Not Agree with Current Facility Defueled TS Format.Replacement of Encl Pages Requested ML20207F6631999-06-0303 June 1999 Forwards Rev 33 of Big Rock Point Plant Security Plan,Which Incorporates Exemption from Certain Requirements of 10CFR73 That Reflect Permanent Shutdown & Defueled Condition of Facility.Encl Withheld IAW 10CFR73.21(c) ML20207D1151999-05-27027 May 1999 Informs That Effective 990328,NRC Ofc of NRR Underwent Reorganization.Within Reorganization,Division of Licensing Project Management Created ML18066A4801999-05-24024 May 1999 Forwards Copy of Rev to NPDES Permit Number MI0001457 Renewal Application as Submitted to Mi Dept of Environ Quality on 990513 ML18066A4721999-05-18018 May 1999 Informs That During Period from 981101-990430,there Were No NPDES Permit Violations & No Repts of Oil,Salt or Polluting Matl Losses Were Made to Govt Agencies ML18066A4651999-05-17017 May 1999 Forwards ISI Program Relief Request 14 for NRC Approval in Accordance with 10CFR50.55(a)(3) as Requirement for Which Proposed Alternative Provide Acceptable Level of Quality & Safety.Rev 0 to SIR-99-032 Rept Also Encl ML18066A4611999-05-14014 May 1999 Requests Approval to Use Alternative Requirements IAW 10CFR50.55a(a)(3)(i),proposing to Follow Requirements of ASME Boiler & Pressure Vessel Code Case N-566-1.IST Program Relief Request 6 for NRC Approval Encl ML20206P4501999-05-11011 May 1999 Requests Transcript of 990413 Public Meeting in Rockville,Md Re Decommissioning of Big Rock ML20206P0921999-05-0707 May 1999 Responds to Discussing Impact That Delays to Wesflex Sys Approval Would Have on Big Rock Point Decommissioning Cost & Schedule ML20206H1011999-05-0404 May 1999 Forwards Safety Evaluation for Exemption from Certain Physical Protection Requirements.Enclosure Contains Safeguards Info & Being Withheld 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML18066A6881999-10-19019 October 1999 Forwards Rev 5 to Palisades Nuclear Plant COLR, Per Requirements of TS 6.6.5.Ltr Contains No New Commitments & No Revs to Existing Commitments ML18066A6871999-10-19019 October 1999 Forwards Response to NRC 990908 RAI Re Inservice Insp Program Relief Request 14.Ltr Contains No New Commitments & No Revs to Existing Commitments ML20217G4111999-10-12012 October 1999 Informs of Changes to Big Rock Point Defueled Emergency Plan, That Meet Requirements of 10CFR50.54(q) & Can Be Made Without NRC Approval.Changes to Plan Are Listed ML18066A6741999-10-0202 October 1999 Forwards MOR for Sept 1999 for Palisades Nuclear Plant & Operating Data Rept Sheet for Month of Aug 1999.MOR for Aug 1999 Inadvertently Had Copy of Ref Data Sheet for Apr 1999 Data ML18066A6791999-10-0101 October 1999 Provides Response to RAI Re Draft Rept, Study of Air- Operated Valves in Us Nuclear Power Plants. ML20217C2761999-09-30030 September 1999 Forwards Big Rock Point Plant Annual Rept of Facility Changes,Tests & Experiments,Iaw 10CFR50.59(b)(2).Rept Provides Summary of Changes to Facility Performed Since 981001.No Activities Classified as Tests or Experiments ML20217C5111999-09-30030 September 1999 Forwards Info Re Management & Funding of Irradiated Fuel Notification,Per 10CFR50.54(bb),in Response to NRC Telcon Rai.Revs to Original 990811 Submittal Are Indicated by Redline/Strikeout Method ML18066A6621999-09-30030 September 1999 Notifies NRC That Util Will Implement ITS at Plant on or Before Oct 31,2000 & Attachments 1 & 2 Contains Request for License Condition Which Relates First Performance of New or Revised Surveillance Requirements to Implementation of ITS ML18066A6601999-09-29029 September 1999 Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations. ML18066A6471999-09-17017 September 1999 Forwards Final Clean Copies of ITS & Bases Pages Which Incorporate All Changes Proposed in Listed Ltrs.Clean Copies Also Incorporate Some Editorial Changes & Bases Clarifications as Result of Ongoing Reviews to LCOs ML18066A6331999-09-0202 September 1999 Forwards Monthly Operating Rept for Aug 1999 & Revised Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant ML18066A6261999-08-26026 August 1999 Forwards Addl New Valve Relief Request as Alternative to Code Requirements That Will Provide Acceptable Level of Quality & Safety.Request Would Allow Use of App II, Check Valve Condition Monitoring Program, of ASME OM Code-1995 ML20211D5661999-08-17017 August 1999 Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d).Attachments 1 & 2 Summarize Test Results at Palisades Plant,Big Rock Point Plant & Corporate Ofc ML18066A6111999-08-13013 August 1999 Requests Exemption from Certain Requirements of 10CFR50,App R, Fire Protection Program for Nuclear Power Facilities Operating Prior to 790101. Request Concerns Oil Collection Sys Requirements for PCP Motors ML20210S6291999-08-11011 August 1999 Forwards Notification to NRC for Review & Approval of Program Intending to Manage & Provide Funding for Mgt of All Irradiated Fuel at Big Rock Point Until Title of Fuel Is Transferred to Secretary of Energy for Disposal ML18066A5971999-07-30030 July 1999 Forwards Markup of Draft NRC SE Re Util Proposal to Convert to Its.Ltr Contains No New Commitments & No Revs to Existing Commitments ML18066A5921999-07-30030 July 1999 Forwards Results of Review by Consumers Energy of Two NRC Draft Repts Entitled, Evaluation of Air-Operated Valves at Light-Water Reactors & Study of Air-Operated Valves in Us Nuclear Power Plants. ML18066A5881999-07-30030 July 1999 Provides Rev to Instrument Channel Drift Measurement Submitted on 990611,in Response to NRC Comments on Util RAI Response for Sections 3.3,3.5 & 3.6 & Editorial Changes Revs Necessary for Consistency within ITS ML20210H2701999-07-28028 July 1999 Informs That Big Rock Point Commits to Listed Actions with Regard to 990511 Amend Request to Delete Definition of Site Boundary & Remove Site Map,Based on Discussion with NRC on 990728 ML18066A5651999-07-19019 July 1999 Forwards Corrections to Previously Submitted TS Section 3.7, Plant Systems, Converting to Its,Per NUREG-1432.Licensee Realized That Certain Provisions of CTS Had Been Inappropriately Replaced with Provisions from STS ML20210L0491999-06-30030 June 1999 Partially Deleted Request for FOIA Documents Re Source of High Alarms Generated by Radiation Effluent Detector or Detectors in Discharge Canal at Big Rock Point on 980314,15 & 25.Partially Deleted Info Encl ML18066A5111999-06-29029 June 1999 Provides Voluntary Confirmation of Facility Readiness as Outlined in GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Disclosure & Response Encl ML20210G8791999-06-23023 June 1999 FOIA Request for All Document Communications Between NRC & Region III Involving R Landsman,B Jorgensen & R Caniano & NRC Staff Under Their Supervision & All Communications in Their Possession to & from Consumers Power Re Plant ML20209D7011999-06-21021 June 1999 Requests That NRC Reconsider Decision to Move Resident Inspector from Big Rock Point NPP ML18066A5061999-06-17017 June 1999 Forwards Responses to NRC Questions for ITS LCOs 3.6.3 & 3.6.6 of 990126 Submittal.One Editorial Change in Addition to Those Made in Response to NRC Comments & Conforming Changes Made to Associated Bases,Encl ML18066A4991999-06-11011 June 1999 Forwards Responses to NRC Comments Re ITS Section 3.3 & Associated Revs to ITS Sections 1.0,3.3,3.4 & 3.9 of 990126 ITS Conversion Submittal.One Technical Change & Several Editorial Changes Unrelated to NRC Comments,Also Provided IR 05000255/19970181999-06-0909 June 1999 Discusses Response of 980226 Violation Re Insp Rept 50-255/97-18 Re Failure to Take Adequate Corrective Action. Ltr Contains New Commitments & No Rev ML18066A4921999-06-0909 June 1999 Discusses Response of 980226 Violation Re Insp Rept 50-255/97-18 Re Failure to Take Adequate Corrective Action. Ltr Contains New Commitments & No Rev ML18068A6011999-06-0808 June 1999 Forwards Description of Recent Changes Made to Palisades Site Emergency Plan,Excluding Minor & Editorial Changes Not Requiring Further Explanation ML18066A4881999-06-0404 June 1999 Provides Responses to NRC Questions & Associated Editorial Revs for ITS LCOs 3.6.1,3.6.2,3.6.4,3.6.5 & 3.6.7 of 980126 Submittal.Responses to Comments on Remaining Section 3.6 LCOs Will Be Submitted Separately ML20207F6631999-06-0303 June 1999 Forwards Rev 33 of Big Rock Point Plant Security Plan,Which Incorporates Exemption from Certain Requirements of 10CFR73 That Reflect Permanent Shutdown & Defueled Condition of Facility.Encl Withheld IAW 10CFR73.21(c) ML20195D0371999-06-0303 June 1999 Forwards Revised Defueled Ts,Per 990511 Util Request.Page Format in Attachments 1 & 2 of Submittal Do Not Agree with Current Facility Defueled TS Format.Replacement of Encl Pages Requested ML18066A4801999-05-24024 May 1999 Forwards Copy of Rev to NPDES Permit Number MI0001457 Renewal Application as Submitted to Mi Dept of Environ Quality on 990513 ML18066A4721999-05-18018 May 1999 Informs That During Period from 981101-990430,there Were No NPDES Permit Violations & No Repts of Oil,Salt or Polluting Matl Losses Were Made to Govt Agencies ML18066A4651999-05-17017 May 1999 Forwards ISI Program Relief Request 14 for NRC Approval in Accordance with 10CFR50.55(a)(3) as Requirement for Which Proposed Alternative Provide Acceptable Level of Quality & Safety.Rev 0 to SIR-99-032 Rept Also Encl ML18066A4611999-05-14014 May 1999 Requests Approval to Use Alternative Requirements IAW 10CFR50.55a(a)(3)(i),proposing to Follow Requirements of ASME Boiler & Pressure Vessel Code Case N-566-1.IST Program Relief Request 6 for NRC Approval Encl ML20206P4501999-05-11011 May 1999 Requests Transcript of 990413 Public Meeting in Rockville,Md Re Decommissioning of Big Rock ML18068A5831999-05-0303 May 1999 Forwards Proposed TS Section 3.5,in Response to NRC 990317 RAI Re Util 980126 TS Change Request Re Conversion to Improved Ts,Per NUREG-1432 ML20206J2411999-04-30030 April 1999 Submits Corrected Copy of Ltr Forwarding 1998 Consumers Energy Co Annual Rept. Ltr Contains Corrected Docket & License Number for Big Rock Point.With One Oversize Encl ML20217A8191999-04-29029 April 1999 Forwards Listed Matls Related to Palisades Plant June 1999 Initial License Exam ML20206E7821999-04-29029 April 1999 Forwards Annual Radioactive Environ Rept for 1998 for Big Rock Point Plant. Rept Includes Summaries,Interpretations & Statistical Evaluation of Results of Radiological Environ Monitoring Program ML20206E8271999-04-28028 April 1999 Forwards Palisades Plant Annual Radiological Environ Operating Rept for 1998. There Were No Reportable Events During This Period 05000155/LER-1992-008, Advises That Util Terminated Corrective Actions Re LER 92-008 of Loss of Station Power 125 Volt Dc sys.SOP-28 Has Been Deleted in Entirety.Commitments No Longer Applicable1999-04-26026 April 1999 Advises That Util Terminated Corrective Actions Re LER 92-008 of Loss of Station Power 125 Volt Dc sys.SOP-28 Has Been Deleted in Entirety.Commitments No Longer Applicable ML20207B4661999-04-23023 April 1999 Forwards Copy of Final Exercise Rept for Biennial Radiological Emergency Preparedness Exercise Conducted on 981201 for Palisades Npp.No Deficiencies Noted.Seven New Arcas Identified ML18066A4531999-04-0707 April 1999 Forwards ITS Pages 3.1.4-2 & 3.1.4-8,revising Completion Time for Action D.1,as Requested by NRC 990406 Telcon,Per TS Change Request Submitted 980126.Change Submitted Does Not Alter Conclusions of No Signficant Hazards Considerations ML18066A4481999-04-0202 April 1999 Responds to Violations Noted in Insp Rept 50-255/98-06. Corrective Actions:Nuclear Performance Assessment Dept Has Reviewed Observations & Agrees That Field Observations by Qualified Personnel Are Important Aspect of Program ML18066A4471999-03-30030 March 1999 Confirms Completion of Util Review of Design Engineering Contractor Cable Ampacity Evaluation.Evaluation Available at Plant for NRC Review ML18066A4411999-03-30030 March 1999 Forwards Response to NRC 990126 RAI Re TS Section 3.7 of Util 980126 LAR Request for Conversion to Its.Licensee Received Permission to Delay TS Section 3.6 Response to Allow for Addl Time for Preparation & Internal Review ML20196K7881999-03-29029 March 1999 Forwards Rept on Certification of Financial Assurance for Decommissioning for Big Rock Plant,Per 10CFR50.75(f)(1).Copy of Trust Agreement Between Consumers Energy & State Bank & Trust Co,Included in Rept ML18066A4441999-03-26026 March 1999 Submits Certification of Financial Assurance for Decommissioning of Palisades Nuclear Plant.Certified Rept of Status of Consumers Energy Co Decommissioning Funding & Trust Agreement Encl as Attachments 1 & 2 1999-09-30
[Table view] Category:PROFESSIONAL/INDUSTRIAL ASSOCIATION TO NRC
MONTHYEARML17275B3631971-06-21021 June 1971 Requests Info Re Dates of Planned Shutdown & Period of Time Before Full Licensing.Info Is Necessary to Eliminate Jurisdictional Situations Between Various Unions ML20126E3771971-03-12012 March 1971 Discusses 710311 Issue of Nucleonics Week Rept on R Nader Ltr Re Possible Consequences of Plane Crash Near Facility. Suggests Response to R Nader Compare Possible Destruction Caused by Incidents in Other Industries 1971-06-21
[Table view] |
Text
U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMEVa Z REGION V Report No.
5Q-397/8Q-17 License No. CPPR-93 Safeguards Group klashington Public Power Supply System P. 0. Box 968 Richland, llashington 99352 Washington Nuclear Project No. 2 (LINP-2)
Facility Name:
'HNP-2 Site, Benton County, llashington Inspection at:
October 7-10, 1980 Inspection conducted:
Inspectors: 3 6',.
>.r.
/
'/477/ /~ j2ic g~
. ga>st, eactor nspector ate Signed
../dec l4 X9g ner ea or nspec or ate Signed ate Signed Approved By: r</~Pl c R. C. Haynes, ense projects Section Date Signed Reactor Construction and Engineering Support Branch Summary:
Inspection durin the eriod of October 7-10, 1980 Reoor t No. 50-397/80-17)
Areas Inspected: Routine, unannounced inspection by regional based inspectors Ch g li ti i p i0 CFR 50.54(f) request; licensee actions on 50.55(e) reportable deficiency; investigation of allegations of concrete voids; maintenance of installed equipment; and licensee action on previous inspection findings. The inspection involved 70 inspector-hours onsite by three NRC inspectors.
Results: Of the areas inspected, no items of noncompliance or deviations were identified.
RV Form 219 (2)
~80$ 0+~
J DETAILS
- 1. Persons Contacted a ~ Washin ton Public Power Su@pl S stem WPPSS)
- W. C. Bibb, Project Manager
- R. G. Matlock, Managing Director':s Office
- B. A. Holmberg, Change Manager
- T. A. Gross, Task Force II Coordinator
- D. C. Timmins, Contract 215, Engineering Director
- J. P. Thorpe, Quality Assurance Engineer
- A. M. Sastry, Deputy Project Manager, System Turnover
- R. M. Foley, Deputy Project Manager, Engineering
- G. I. Wells, Deputy Project Manager, Construction
- R. J. Johnson, Project Quality Assurance Manager
- P. I. Verrios, Manager, Vendor Surveillance/Audits
~M. E. Witherspoon, Division Quality Assurance Manager
~R. M. Tanner, Contract 215, Quality Control Director C. R. Edwards, Principal Quality Assurance Engineer E. Carlson, Equipment Maintenance Coordinator
- b. Burns and Roe, Inc. B8R)
- M. J. Parise, Special Projects Manager
- H. R. Tuthill, Assistant Quality Assurance Manager R. D. Carmichael, Lead Surveillance Engineer L. F. Akers, Senior Welding Engineer Supervisor F. Weingard, Lead Nuclear/Mechanical Engineer B. Murphy, Hanger Engineering Supervisor J. Mahoney, Senior Supervisor - Mechanical Engineering R. Breland, Surveillance Engineer C. WSH Boecon/GERI WBG)
T. B. Page, Quality Assurance Manager P. Webster, Quality Engineering Documentation Supervisor J. Robanske, Maintenance Engineer
- Denotes attendance at the NRC management meeting on October 10, 1980.
In addition, Mr. A. D. Toth, the NRC Senior Resident Inspector, attended the meeting.
I
- 2. Plant Tour Upon arrival at the site, the inspectors conducted a tour to observe completed wo'rk and the general state of housekeeping and equipment maintenance.
No deviations or items of noncompliance were identified.
4
()
- 3. Licensee Response to 10 CFR 50.54 f Re uest a ~ (Open) Followu Item 50-397 80-14 02 - Task I Activities - Ex edite eso ution o Outstandsn Concerns an Pro ems - Nonconformance Resorts The inspector examined Project Management Instruction PMI 4-4, Revision 4, Contractor Control of Nonconformances. The instruction was revised to establish performance standards and to require the construction quality organization to monitor work activities to ensure incorporation of dispositioned NCR's. The Construction Management Instruction CMI-4 has been revised to reflect these responsibilities.
The inspector reviewed the contract 215 procedure No. gA-5 for control of nonconformances and found that the procedure references the reader back to the 215 contract specification for conditions when the engineers nonconformance report form is to be used. The licensee stated that the applicable specification section will be appended to the contractor procedure.
The licensee is presently expanding the deficiency coding assigned to nonconformance reports to make trending more meaningful. The numbers and types of deficiencies will be related to productivity to determine trends and generic problems. Trending of nonconformance reports will begin after the new deficiency codes have been assigned to open nonconformance reports. The inspector had no further questions at this time.
- b. Ooen Leaden 9"
Followu to Restart Item 50-397 80-10 05 - Task II - Phase 1 Activities of Safet Re ated Work. Tas Force II Personne inspector reviewed procedure
'he No. RCSW-08, Rev. 0, "gualification and Certification of gA Personnel for RCSW -Task Force" against the requirements of Regulatory Guide 1.58, September 1980 and ANSI N.45.2.6-1978. The procedure appears to equal or exceed the requirements of ANSI N.45.2.6-1978. The procedure is not in accordance with Regulatory Guide 1.58-September 1980, paragraphs C.5, requiring Level. III personnel capability of reviewing and approving inspection, examination, and testing procedures and of evaluating the adequacy of such procedures to accomplish the inspection, examinations, and test objectives; C.6 requiring candidates for Level I, II and III to be a high school graduate or to have earned the General Education Development equivalent of a high school diploma; and C. 10, requiring documented objective evidence (i.e., procedures and record of written test) demonstrating that, the individual indeed does have "comparable" or "equivalent" competence to that which would be gained from having the required education and experience. The licensee's position with regard to compliance to Regulatory Guide 1.58, September 1980 and ANSI-N45.2.6-1978 has not yet been determined.
The inspectors examined the personnel qualification records of fifteen of the 41 task force members including all contract 215 team members. All personnel appeared to be qualified in accordance with ANSI N45.2.6-1978. Five of the fifteen persons reviewed have worked for other contractors on site or for the architect-engineer.
The inspector expressed concern about the objectivity of persons who may be assigned to review the work of their former employer, or their own work; The task force coordinator stated that he has detected no loss of objectivity. It appears that with the exception of one person, team members are not being assigned to the task force team examining their former employer. The inspector also expressed concern that no effort is being made to verify .the accuracy of resume statements. The task force coordinator did not consider this a problem, stating that he personally knows the task force members and their qualifications or they have been referred to him. This situation could change however, if additional task force members are hired. The subject of personnel qualifications will be examined during subsequent inspections. (50-397/80-17/01)
- 4. Licensee Action on 10 CFR 50.55 e Re ortable Deficiencies - Power Pi in om an - Poor e ments The existence of poor weldments in Power Piping Company Beam Attachment HS-42 was reported by, the licensee on August 20, 1980. The HS-142 sway brace brackets were supplied with undersized fillet welds with respect to the minimum requirements of ASt<E Section III, Division 1. In addition, examination of these weldments revealed incomplete fusion at the toe and legs of the fillet welds.
Stress analysis performed by the licensee have determined that a design deficiency exis)s for these brackets when loads are applied at an angle greater than 15 off the perpendicular. The calculations were made using ASflE allowable stress values.
The inspector discussed the proposed corrective actions with licensee personnel. A test program has been drafted and is going through the review and approval cycle. The testing is designed to evaluate the effect of the poor weldments on the structural integrity of the sway brace brackets.
That is, how the weld discontinuities affect the load requirements under worst case conditions.
The inspector expressed concern over the adequacy of the testing program to address the following areas:
(a) The effect of the undersized fillet welds and possible low heat input on the heat affected zone of the base metal. This would involve a metallographic analysis to determine the microhardness across the heat affected zone and to determine the presence of underbead cracking or martensitic structure in the heat affected zone. The information required for this analysis, which was unavailable at the site, includes the welding processes used,'he type and size of electrode, bracket materials and preheat and interpass temperature controls.
(b) The extent of lack of fusion and its uniformity throughout the selected samples.
(c) The extent that this problem affects other sway strut members such as the strut barrel to socket weld, sway strut to clamp weldment, and turn buckle welds.
The licensee acknowledged these concerns. Actions taken to resolve this deficiency will be examined during a subsequent inspection.
- 5. Licensee Action on Previous Ins ectin Findin s (Closed) Followu Item (50-397/80-14/01 : Calibration of Heldina Equipment for Sacnficia Shie d Wa Repair.
Procedures for calibration of welding equipment is addressed in HBG Work Procedure No. 170, Rev. 1. This work procedure-received licensee approval on October 10, 1980. This procedure contains provisions to assure that electrical characteristics (amps, volts), and travel speed are as specified in the weld procedure specification and procedure qualification records.
The inspector had no further questions on this matter.
- 6. Maintenance of Installed E ui ment The inspected examined the HBG maintenance system for safety related mechanical equipment. Maintenance system consists of PMS card (issued at intervals as specified in maintenance manual for each equipment) which instructs the craft to perform required maintenance on specific equipment and a PM log which is the official record of maintenance performed on equipment.
PMS cards for RCIC pump, tag number RCIC-P-1, from 3/24/80 thru 7/28/80 were not in agreement with the maintenance manual for the pump. GE maintenance manual 050.3, Rev. 3 calls for the pump shaft to be rotated 10 times per month and oil changed each six month period. PMS card for the above dates had called for pump shaft to be rotated 1', times per month and oil changed each month.
PM list was found to have problems with missing maintenance entry.
HPCS pump, tag number HPCS-P-l, was shown on the PM list to have had no maintenance performed for the month of May, 1980. This was incorrect since a PMS card was found for the month of May, card was dated'5/21/80.
HBG did have a maintenance engineer looking into their PM log and PMS card system for these types of problems at the time this inspection was conducted.
A follow-up inspection will be done in this area after WBG has completed upgrade of their maintenance system. (50-397/80-17/02)
- 7. Alle ations of Concrete Voids in Turbine Buildin Mezzanine Area An allegation had been raised of concrete voids in the turbine building walls and floor at the mezzanine level.
Inspection was made of the turbine building south wall in the vicinity of main steam pipe whip support f/os. PWS-315-5, PWS-315-6, PWS-315-7 and PHS-315-8. No surface voids were found during the inspection.
The inspector will attempt to obtain the exact location of voids in the T-G building from the alleger. Follow-up inspection will be conducted if this information is obtained.
- 8. - Mana ement Interview At the conclusion of the inspection a meeting was held with licensee representatives denoted in Paragraph 1. The areas inspected and the observations and findings of the inspectors were stated.
ll 4
OPg 04 $ 80 Docket No. 50-397 EA-80-20 Mashington Public Power Supply System ATTN: ter. R. G. Hatlock NNP-2 Program Director P.O. Box 968 Richland, Washington 99352 Gentlemen:
This wi'll acknowledge receipt of your letter of November 26, 1980, in which you responded to our November 6, 1980 Amended Notice of Violation.
This will also acknowledge receipt of your check in the amount of Fifty-nine N
Thousand Five Hundred Dollars in full payment of the penalties proposed in the November 6, 1980 Amended Notice of Proposed Imposition of Civil Penalties.
Me have no further questions at this time regarding your proposed corrective actions. l<e will review the corrective actions .during future inspections of your licensed activities.
Sincerely, Original signed by DI1d3,ey Thompson Dudley Thompson, Director Enforcement and Investigations Office of Inspection and Enforcement cc: her. R. L. Ferguson Hanaging Director OFFICE) EI: IE EI:D SURNAME T.B e . b .s.O...Th.emption.
OATE N 12/3/80 12/, /80 NRC FORM 318 {9.76) NRCM 0240 U.S.'OVERNMENT PRINTING OFFICE: 1979 269-369
G I'f 3
I I'
Washington Publi wer Supply System- DEC'.0 4 1s80 Distribution:
PDR LPDR NSIC TIC ACRS(S).
SECY V. Stello, IE R. C. DeYoung, IE H. D. Thornburg, IE J. Taylor,. IE J. Henderson, IE CA (~,
H. R. Denton, NRR F. Ingram, PA J. P. Murray, ELD J. Lieberman, ELD R. Bachmann, ELD J. Crooks, MPA J. Cummings, OIA Enforcement Coordinators:
RI, RII, RIII, RIV, RV .
T. W. Brockett, IE IE Files Office of the Attorney General
'Central Files ATTN: Hon. Slade Gorton
~Civil Penalty B'ooked Attorney General CON Temple of Justice XOOS Reading'ile Olympia, Washington 98504 EDO Reading Utilities and Transportation Commission, Heal th Servi ces Di vi s i on ATTN: Robert C. Barley Department of Social 8 Health Services Chairman ATTN: Robert C. Will Highways-Licenses Bldg.
Radiation Control Program Olympia, Washington 98504 MS LD-ll Olympia, Washington 98504
4{,
(
l 1
1 ~