TQ-AA-150-J020 Revision 00 Page 1 of 9 Job Performance Measure IA - Lineup IAC to Unit 2 Instrument Air Header JPM Number: S-N-i Revision Number: 01 Date: 04 / 2017 Developed By:

Exam Author Date Approved By:

Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 2 of 9 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure DOP 4700-03 Rev: 022 Procedure Rev:

Procedure Rev:

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 3 of 9 Revision Record (Summary)

Revision 00, Developed for ILT 15-1 (2016-301) NRC Exam Revision 01, Revised for ILT 16-1 (2016-301) NRC Exam SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 4 of 9 SIMULATOR SETUP INSTRUCTIONS

1. N/A In-plant JPM DOCUMENT PREPARATION
1. Mark up a copy of DOP 4700-03, Unit 2/3 Instrument Air Cross-Connect Operation through Step G.6, step G.7 is the next step to be performed.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 5 of 9 INITIAL CONDITIONS

1. Unit 3 is shut down for a refuel outage.
2. 2A IAC is unavailable due to an oil leak.
3. 2B, 3A, 3B, and 3C IACs are supplying their own unit.
4. Unit 2 is at 100% power and is experiencing an Instrument Air transient that is causing the Unit 2 Instrument Air header pressure to drop slowly.
5. The Unit Supervisor has determined a Unit 3 Instrument air compressor must be aligned to Unit 2.
6. Unit 2 SAC is running.
7. Main Control Room is monitoring IA parameters.
8. RP has completed surveys for all components above 7 ft., all results were less than minimum detectable.

INITIATING CUE

1. The Unit 2 Unit Supervisor has directed you to Cross-connect 3C Instrument Air Compressor to Unit 2 ONLY .
2. All applicable prerequisites of DOP 4700-03 have been met.
3. Your Pre Job Brief has been completed.
4. Notify the Unit Supervisor when you are complete with the task.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 6 of 9 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number NOTE Provide examinee the marked up copy of DOP 4700-03.

01 Identifies Step G.9 as the Proceeds to Step G.9. ___ ___ ___

correct step in DOP 4700-03.

CUE Type cues to be provided by evaluator in these areas or delete row as applicable.

02 Verify closed 3 4799 501A, 3C Verifies 3 4799 501A, 3C IAC ___ ___ ___

IAC DISCH TO U 3 INST AIR DISCH TO U 3 INST AIR HEADER ISOL VLV. HEADER ISOL VLV stem is in.

(Valve is located above 3B IAC)

CUE The component is in the position you described.

  • 03 Close 2/3-4799-424, U2/U3 Rotates 2/3-4799-424, U2/U3 ___ ___ ___

X-TIE SV. X-TIE SV clockwise until stem is in.

(Valve is located North of 3A IAC)

CUE The component is in the position you described.

  • 04 Open 2/3-4799-425, 3C IAC TO Rotates 2/3-4799-425, 3C IAC ___ ___ ___

U2 AIR SYS X-TIE SV. TO U2 AIR SYS X-TIE SV counter clockwise until stem is out.

(Valve is located North of 3A IAC)

CUE The component is in the position you described.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 7 of 9 Comment STEP ELEMENT STANDARD SAT UNSAT Number

  • 05 Open 2-47350-500, U2 INST Rotates 47350-500, U2 INST ___ ___ ___

AIR SYS XTIE FROM THE U3 AIR SYS XTIE FROM THE U3 INST AIR SYS. INST AIR SYS counter clockwise until stem is out.

(Valve is located North of Cardox tank)

CUE The component is in the position you described.

  • 06 Open 2-47350-329, U2 INST Rotates 2-47350-329, U2 INST ___ ___ ___

AIR HDR ISOL VLV. AIR HDR ISOL VLV counter clockwise until stem is out.

(Valve is located North of 2B IAC)

CUE The component is in the position you described.

07 Report completion of task to Reports completion of task to ___ ___ ___

Unit Supervisor. Unit Supervisor.

END JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 8 of 9 JPM

SUMMARY

Operators Name: Emp. ID#: ____________

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

IA - Lineup IAC to Unit 2 Instrument Air Header JPM Number: S-N-i Revision Number: 01 Task Number and

Title:

278N013 Lineup Unit 3 C Instrument Air Compressor to Unit 2 K/A Number and Importance: 295019.A1.02 3.3 / 3.1 Suggested Testing Environment: In-Plant Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): DOP 4700-03, Rev 022, UNIT 2-3 INSTRUMENT AIR CROSS-CONNECT OPERATION Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 20 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 9 of 9 INITIAL CONDITIONS

1. Unit 3 is shut down for a refuel outage.
2. 2A IAC is unavailable due to an oil leak.
3. 2B, 3A, 3B, and 3C IACs are supplying their own unit.
4. Unit 2 is at 100% power and is experiencing an Instrument Air transient that is causing the Unit 2 Instrument Air header pressure to drop slowly.
5. The Unit Supervisor has determined a Unit 3 Instrument air compressor must be aligned to Unit 2.
6. Unit 2 SAC is running.
7. Main Control Room is monitoring IA parameters.
8. RP has completed surveys for all components above 7 ft., all results were less than minimum detectable.

INITIATING CUE

1. The Unit 2 Unit Supervisor has directed you to Cross-connect 3C Instrument Air Compressor to Unit 2 ONLY .
2. All applicable prerequisites of DOP 4700-03 have been met.
3. Your Pre Job Brief has been completed.
4. Notify the Unit Supervisor when you are complete with the task.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 1 of 9 Job Performance Measure Containment - Bypass Drywell Cooler Trip JPM Number: S-N-j Revision Number: 11 Date: 04 / 2017 Developed By:

Exam Author Date Approved By:

Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 2 of 9 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure DEOP 0500-02 Rev: 17 Procedure Rev:

Procedure Rev:

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 3 of 9 Revision Record (Summary)

Revision 10, Revised for ILT 15-1 (2016-301) NRC Exam Revision 11, Revised for ILT 16-1 (2016-301) NRC Exam SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 4 of 9 SIMULATOR SETUP INSTRUCTIONS

1. N/A: In-Plant JPM DOCUMENT PREPARATION
1. Clean copy of DEOP 0500-02, BYPASSING INTERLOCKS AND ISOLATIONS SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 5 of 9 INITIAL CONDITIONS

1. A fire has occurred resulting in a loss of the feeder breakers to Busses 33-1 AND 34-1 from Busses 33 AND 34.
2. The Unit 3 and 2/3 Diesel Generators have started AND are powering Busses 33-1 and 34-1.
3. The loss of Busses 33-1 AND 34-1 caused a spurious trip of the Unit 3 Drywell Coolers.
4. RBCCW pressure is normal with the 2/3 RBCCW pump in operation lined up to Unit 3.
5. Drywell temperature and pressure are rising.

INITIATING CUE

1. The Unit Supervisor has directed you to perform the in-plant actions to bypass the Drywell Cooler trip signals to allow the restart of the Unit 3 Drywell Coolers for Drywell temperature control in accordance with DEOP 500-02.
2. Your Pre Job Brief has been completed.
3. Notify the Unit Supervisor when the in-plant actions are complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 6 of 9 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number NOTE Provide examinee a current copy of DEOP 500-02.

01 Proceed to Step G.3 of Locates Step G.3 ___ ___ ___

procedure NOTE The DEOP Equipment Storage Cabinet key must be obtained from the Unit Supervisor.

NOTE Examinee should locate the proper Equipment Box in the cabinet.

Tools required are: Electrical Tape, Standard Straight Screwdriver, Split Blade Screwdriver, and Insulated Gloves NOTE Do NOT allow examinee to remove the Equipment Box from the DEOP Equipment Storage Cabinet.

Lock cabinet and return DEOP key to Unit Supervisor PRIOR to leaving the Control Room.

02 Obtain appropriate Equipment OBTAINS appropriate ___ ___ ___

Box from the Control Room EQUIPMENT BOX from the DEOP Equipment Storage Control Room DEOP Cabinet. Equipment Storage Cabinet CUE DEOP Equipment Box you have identified is in your hand.

NOTE DS key is required for entry into the AEER 03 Proceed to the AEER and panel Locates Panel 903-32 ___ ___ ___

903-32 NOTE Simulated JPM - Examinee must explain the task.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 7 of 9 Comment STEP ELEMENT STANDARD SAT UNSAT Number

  • 04 Lift AND tape lead on 903-32 On 903-32 panel terminal block ___ ___ ___

panel terminal block AA AA terminal point 6 OR terminal terminal point 6 OR terminal point 7 point 7

  • Puts on insulated gloves.
  • Loosens screw with standard screwdriver.
  • Uses split blade screwdriver to grasp screw and remove it.
  • Tapes the loose wire with electricians tape.

CUE 903-32 panel terminal block AA terminal point 6 OR terminal point 7 screw is removed and the loose wire is taped.

  • 05 Lift AND tape lead on 903-33 On 903-33 panel terminal block ___ ___ ___

panel terminal block AA AA terminal point 6 OR terminal terminal point 6 OR terminal point 7 point 7

  • Puts on insulated gloves.
  • Loosens screw with standard screwdriver.
  • Uses split blade screwdriver to grasp screw and remove it.
  • Tapes the loose wire with electricians tape.

CUE 903-33 panel terminal block AA terminal point 6 OR terminal point 7 screw is removed and the loose wire is taped.

06 Notify Unit Supervisor upon Notifies Unit Supervisor upon ___ ___ ___

completion of task. completion of task.

CUE Acknowledge report of task completion.

END JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 8 of 9 JPM

SUMMARY

Operators Name: Emp. ID#: ____________

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Containment - Bypass Drywell Cooler Trip JPM Number: S-N-j Revision Number: 11 Task Number and

Title:

295L074, Bypass the Trip of Drywell Coolers K/A Number and Importance: 295028.A1.03 3.9 / 3.9 Suggested Testing Environment: In-Plant Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): DEOP 0500-02, Rev 017, BYPASSING INTERLOCKS AND ISOLATIONS Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 15 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 9 of 9 INITIAL CONDITIONS

1. A fire has occurred resulting in a loss of the feeder breakers to Busses 33-1 AND 34-1 from Busses 33 AND 34.
2. The Unit 3 and 2/3 Diesel Generators have started AND are powering Busses 33-1 and 34-1.
3. The loss of Busses 33-1 AND 34-1 caused a spurious trip of the Unit 3 Drywell Coolers.
4. RBCCW pressure is normal with the 2/3 RBCCW pump in operation lined up to Unit 3.
5. Drywell temperature and pressure are rising.

INITIATING CUE

1. The Unit Supervisor has directed you to perform the in-plant actions to bypass the Drywell Cooler trip signals to allow the restart of the Unit 3 Drywell Coolers for Drywell temperature control in accordance with DEOP 500-02.
2. Your Pre Job Brief has been completed.
3. Notify the Unit Supervisor when the in-plant actions are complete.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 1 of 9 Job Performance Measure Place Zinc Injection System in Injection Mode JPM Number: S-N-k Revision Number: 00 Date: 05 / 2017 Developed By:

Exam Author Date Approved By:

Facility Representative Date SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 2 of 9 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

________ 1. Task description and number, JPM description and number are identified.

________ 2. Knowledge and Abilities (K/A) references are included.

________ 3. Performance location specified. (in-plant, control room, simulator, or other)

________ 4. Initial setup conditions are identified.

________ 5. Initiating cue (and terminating cue if required) are properly identified.

________ 6. Task standards identified and verified by SME review.

________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

________ 8. If an alternate path is used, the task standard contains criteria for successful completion.

________ 9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure DOP 3200-09 Rev: 26 Procedure Rev:

Procedure Rev:

________ 10. Verify cues both verbal and visual are free of conflict.

________ 11. Verify performance time is accurate

________ 12. If the JPM cannot be performed as written with proper responses, then revise the JPM.

________ 13. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 3 of 9 Revision Record (Summary)

Revision 00, New JPM created for 2017-301 (ILT 16-1) NRC Exam SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 4 of 9 SIMULATOR SETUP INSTRUCTIONS

1. N/A: In-Plant JPM DOCUMENT PREPARATION
1. Mark up a copy of DOP 3200-09, Rev 026, ZINC INJECTION SYSTEM OPERATION through step F.5 SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 5 of 9 INITIAL CONDITIONS

1. Unit 2 startup is in progress.
2. 2A RFP pump is operating
3. Zinc injection system has been pre-heated IAW DOP 3200-09.

INITIATING CUE

1. The Unit Supervisor has directed you to place the Zinc Injection System in injection mode IAW DOP 3200-09, Zinc Injection System Operation
2. Set injection flow rate to 100 gpm.
3. All applicable prerequisites of DOP 3200-09 have been met.
4. Your Pre Job Brief has been completed.
5. Notify the Unit Supervisor when you are complete with the task.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

SRRS: 3D.100; There are no retention requirements for this section

TQ-AA-150-J020 Revision 00 Page 6 of 9 JPM Start Time:

Comment STEP ELEMENT STANDARD SAT UNSAT Number NOTE Provide examinee the marked up copy of DOP 3200-09.

01 Verify Zinc Injection System has As described in the initial ___ ___ ___

been pre-heated conditions

  • 02 Close 2-3210-14, U2 FW ZIP Rotates 2-3210-14, U2 FW ZIP ___ ___ ___

SKID FILTER FLOW SKID FILTER FLOW CONTROL VLV CONTROL VLV clockwise CUE The component is in the position you described.

  • 03 Close 2-3210-12, U2 FW ZIP Rotates 2-3210-12, U2 FW ZIP ___ ___ ___

SKID FILTER INLET INBD SKID FILTER INLET INBD ISOL VLV ISOL VLV clockwise CUE The component is in the position you described.

  • 04 Close 2-3210-13, U2 FW ZIP Rotates 2-3210-13, U2 FW ZIP ___ ___ ___

SKID FILTER INLET OTBD SKID FILTER INLET OTBD ISOL VLV ISOL VLV clockwise CUE The component is in the position you described.

  • 05 Close 2-3210-15, U2 FW ZIP Rotates 2-3210-15, U2 FW ZIP ___ ___ ___

SKID FILTER OUTLET OTBD SKID FILTER OUTLET OTBD ISOL VLV ISOL VLV clockwise CUE The component is in the position you described.

  • 06 Close 2-3210-16, U2 FW ZIP Rotates 2-3210-16, U2 FW ZIP ___ ___ ___

SKID FILTER OUTLET INBD SKID FILTER OUTLET INBD ISOL VLV ISOL VLV clockwise CUE The component is in the position you described.

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 7 of 9 Comment STEP ELEMENT STANDARD SAT UNSAT Number

  • 07 Fully open 2-3210-3, U2 FW Rotates 2-3210-3, U2 FW ZIP ___ ___ ___

ZIP SKID OUTLET ISOL VLV SKID OUTLET ISOL VLV counter clockwise CUE The component is in the position you described.

  • 08 Throttle open 2-3210-2, U2 FW Rotates 2-3210-2, U2 FW ZIP ___ ___ ___

ZIP SKID OUTLET FLOW SKID OUTLET FLOW CONTROL VLV, to achieve CONTROL VLV counter approximately 100 gpm on clockwise FI 2-3241-138 Monitors FI 2-3241-138 for 100 gpm indication CUE FI 2-3241-138 indicates flow of 100 gpm 09 Notify NSO to confirm the Contacts MCR and informs ___ ___ ___

placard on Panel 902-6 reflects NSO that Zinc Injection is injection into applicable RFP aligned for Injection CUE Acknowledge report 10 Visually inspect skid Inspects the zinc skid for signs ___ ___ ___

components for leakage of leakage CUE No leakage is observed 11 Notify the Chemistry Contacts Chemistry Department ___ ___ ___

Department that Zinc Injection and informs that Zinc Injection is aligned for Injection is aligned for Injection CUE Acknowledge report 12 Report completion of task to Reports completion of task to ___ ___ ___

Unit Supervisor. Unit Supervisor.

END JPM Stop Time:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 8 of 9 JPM

SUMMARY

Operators Name: Emp. ID#: ____________

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Place Zinc Injection System in Injection Mode JPM Number: S-N-k Revision Number: 00 Task Number and

Title:

259L013 - Perform Startup of the First Reactor Feed Pump K/A Number and Importance: 259001.A1.01 3.3 / 3.3 Suggested Testing Environment: In-Plant Alternate Path: Yes No SRO Only: Yes No Time Critical: Yes No Reference(s): DOP 3200-09, Rev 026, Zinc Injection System Operation Actual Testing Environment: Simulator Control Room In-Plant Other Testing Method: Simulate Perform Estimated Time to Complete: 00 minutes Actual Time Used: minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be: Satisfactory Unsatisfactory Comments:

Evaluators Name (Print):

Evaluators Signature: Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

TQ-AA-150-J020 Revision 00 Page 9 of 9 INITIAL CONDITIONS

1. Unit 2 startup is in progress.
2. 2A RFP pump is operating
3. Zinc injection system has been pre-heated IAW DOP 3200-09.

INITIATING CUE

1. The Unit Supervisor has directed you to place the Zinc Injection System in injection mode IAW DOP 3200-09, Zinc Injection System Operation
2. Set injection flow rate to 100 gpm.
3. All applicable prerequisites of DOP 3200-09 have been met.
4. Your Pre Job Brief has been completed.
5. Notify the Unit Supervisor when you are complete with the task.

SRRS: 3D.100; There are no retention requirements for this section