ML17202G685

From kanterella
Jump to navigation Jump to search
Submittal of Changes to Emergency Plan, Rev. 32
ML17202G685
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/12/2017
From: Boles B D
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML17202G660 List:
References
L-17-226
Download: ML17202G685 (2)


Text

FE NOCŽ RrstEnergy Nuclear Operating Company Brian D. Boles Vice President, Nuclear July 12, 2017 L-17-226 ATTN: Document Control Desk United States Nuclear Regulatory Commission Washington, D.C. 20555-0001

SUBJECT:

Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Changes to Davis-Besse Nuclear Power Station Emergency Plan 5501 North State Route 2 Oak Harbor, Ohio 43449 10 CFR 50, App. E 10 CFR 50.54(q) 10 CFR 72.4 419-321-7676 The purpose of this letter is to transmit Revision 32 to the Davis-Besse Nuclear Power. Station (DBNPS) Emergency Plan. DBNPS Emergency Plan, Revision 32, contains

  • Emergency Action Level (EAL) changes associated with incorporation of NEI 99-01, Revision 6, "Development of Emergency Action Levels for Non-Passive Reactors," which were approved for use by the NRC in a Safety Evaluation Report (SER) dated January 12, 2017. Revision 32 also contains changes that do not require NRC approval.

In accordance with the requirements of 10 CFR 50.54(q), Revision 32 to the Emergency Plan does not result in a reduction in effectiveness of the Emergency Plan, as changed, continues to satisfy the applicable requirements of 10 CFR 50.47(b) and 10 CFR 50, Appendix E. Revision 32 was effective June 22, 2017. Therefore, in accordance with 10 CFR 50.4(b)(5), the DBNPS hereby submits the aforementioned DBNPS Emergency Plan as Enclosure A. A summary of the changes to the DBNPS Emergency Plan are included in the 10 CFR 50.54(q) Initial Screening Report and 10 CFR 50.54(q) Evaluation as Enclosure B. There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. James M. Vetter, Emergency Response Manager, at (419) 321-7393.

Sincerely, Brian D. Boles vas Davis-Besse Nuclear Power Station, Unit 1 L-17-226 Page 2of2 Enclosure(s):

A. Revised DBNPS Emergency Plan B. DBNPS Emergency Plan 10 CFR 50.54(q) Initial Screening Report and 10 CFR 50.54(q) Evaluation cc: Regional Administrator, NRC Region Ill Director, Office of Nuclear Material Safety and Safeguards DB-1 NRC Senior Resident Inspector DB-1 NRC/NRR Project Manager; w/o Enclosure Emergency Response Coordinator, NRC Region Ill; w/o Enclosure, with CD Utility Radiological Safety Board; w/o Enclosure