MONTHYEARL-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan L-20-289, Emergency Plan Amendment Request2022-01-19019 January 2022 Emergency Plan Amendment Request L-21-218, Submittal of Rev. 35 to Emergency Plan2021-09-13013 September 2021 Submittal of Rev. 35 to Emergency Plan ML20066F4752020-02-17017 February 2020 Emergency Plan Off Normal Occurrence Procedure L-19-273, Submittal of Rev. 24 to Emergency Plan2019-12-0202 December 2019 Submittal of Rev. 24 to Emergency Plan L-18-271, License Amendment Request - Proposed Post-Shutdown Emergency Plan2019-02-0505 February 2019 License Amendment Request - Proposed Post-Shutdown Emergency Plan ML19008A1202018-12-0606 December 2018 Enclosure a - Revised Emergency Plan ML17202G6852017-07-12012 July 2017 Submittal of Changes to Emergency Plan, Rev. 32 L-17-226, Emergency Plan, Rev. 322017-06-22022 June 2017 Emergency Plan, Rev. 32 ML16263A3492016-08-29029 August 2016 Release in Progress Reference Material ML16146A1862016-05-18018 May 2016 DBRM-EMER-1500A, Revision 07, Emergency Action Level Basis Document ML0532604642004-02-23023 February 2004 Enclosure a, Davis-Besse Nuclear Power Station (DBNPS) Emergency Plan, Dated February 23, 2004, DBNPS Emergency Plan Implementing Procedure RA-EP-02245, Effective June 8, 2005 & DBNPS Emergency Plan Offnormal Occurrence Procedure RA-EP-0287 2023-10-19
[Table view] Category:Letter
MONTHYEARML24303A3282024-10-29029 October 2024 Information Request for the Cyber Security Baseline Inspection Identification to Perform Inspection ML24281A0662024-10-0404 October 2024 EN 57363 - MPR Associates, Inc. Report in Accordance with 10 CFR Part 21 on Incomplete Dedication of Contactors Supplied as Basic Components IR 05000346/20244032024-09-27027 September 2024 Security Baseline Inspection Report 05000346/2024403 ML24269A0552024-09-25025 September 2024 Submittal of the Updated Final Safety Analysis Report, Revision 35 05000346/LER-2021-001-01, Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground2024-09-19019 September 2024 Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter ML24260A2382024-09-16016 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24255A8032024-09-11011 September 2024 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1602024-09-0505 September 2024 Information Request to Support Upcoming Material Control and Accounting Inspection at Davis-Besse Nuclear Power Station L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000346/20240052024-08-22022 August 2024 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2024005) L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000346/20240022024-08-0101 August 2024 Integrated Inspection Report 05000346/2024002 IR 05000346/20244012024-07-30030 July 2024 Security Baseline Inspection Report 05000346/2024401 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification L-24-032, Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report2024-07-15015 July 2024 Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report L-24-063, License Amendment Request to Remove the Table of Contents from the Technical Specifications2024-07-0808 July 2024 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-24-024, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-19019 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-214, Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements2024-06-0505 June 2024 Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements L-24-019, Unit No.1 - Report of Facility Changes, Tests, and Experiments2024-05-22022 May 2024 Unit No.1 - Report of Facility Changes, Tests, and Experiments ML24142A3532024-05-21021 May 2024 Station—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-072, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 20232024-05-15015 May 2024 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 2023 L-24-111, Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-05-15015 May 2024 Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations L-24-031, Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage2024-05-14014 May 2024 Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage IR 05000346/20240012024-05-0303 May 2024 Integrated Inspection Report 05000346/2024001 L-24-069, Occupational Radiation Exposure Report for Year 20232024-04-30030 April 2024 Occupational Radiation Exposure Report for Year 2023 L-24-018, Submittal of Core Operating Limits Report, Cycle 24, Revision 02024-04-16016 April 2024 Submittal of Core Operating Limits Report, Cycle 24, Revision 0 ML24089A2582024-04-0101 April 2024 Request for Information for the NRC Quuadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000346/2024010 L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage ML24036A3472024-03-0707 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0076 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24057A0752024-03-0101 March 2024 The Associated Independent Spent Fuel Storage Installations ML24057A3362024-02-28028 February 2024 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) IR 05000346/20230062024-02-28028 February 2024 Re-Issue Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee IR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant ML24045A0322023-10-26026 October 2023 L-23-221 Proposed Exam Submittal Cover Letter L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments 2024-09-06
[Table view] |
Text
FE NOCŽ RrstEnergy Nuclear Operating Company Brian D. Boles Vice President, Nuclear July 12, 2017 L-17-226 ATTN: Document Control Desk United States Nuclear Regulatory Commission Washington, D.C. 20555-0001
SUBJECT:
Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Changes to Davis-Besse Nuclear Power Station Emergency Plan 5501 North State Route 2 Oak Harbor, Ohio 43449 10 CFR 50, App. E 10 CFR 50.54(q) 10 CFR 72.4 419-321-7676 The purpose of this letter is to transmit Revision 32 to the Davis-Besse Nuclear Power. Station (DBNPS) Emergency Plan. DBNPS Emergency Plan, Revision 32, contains
- Emergency Action Level (EAL) changes associated with incorporation of NEI 99-01, Revision 6, "Development of Emergency Action Levels for Non-Passive Reactors," which were approved for use by the NRC in a Safety Evaluation Report (SER) dated January 12, 2017. Revision 32 also contains changes that do not require NRC approval.
In accordance with the requirements of 10 CFR 50.54(q), Revision 32 to the Emergency Plan does not result in a reduction in effectiveness of the Emergency Plan, as changed, continues to satisfy the applicable requirements of 10 CFR 50.47(b) and 10 CFR 50, Appendix E. Revision 32 was effective June 22, 2017. Therefore, in accordance with 10 CFR 50.4(b)(5), the DBNPS hereby submits the aforementioned DBNPS Emergency Plan as Enclosure A. A summary of the changes to the DBNPS Emergency Plan are included in the 10 CFR 50.54(q) Initial Screening Report and 10 CFR 50.54(q) Evaluation as Enclosure B. There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. James M. Vetter, Emergency Response Manager, at (419) 321-7393.
Sincerely, Brian D. Boles vas Davis-Besse Nuclear Power Station, Unit 1 L-17-226 Page 2of2 Enclosure(s):
A. Revised DBNPS Emergency Plan B. DBNPS Emergency Plan 10 CFR 50.54(q) Initial Screening Report and 10 CFR 50.54(q) Evaluation cc: Regional Administrator, NRC Region Ill Director, Office of Nuclear Material Safety and Safeguards DB-1 NRC Senior Resident Inspector DB-1 NRC/NRR Project Manager; w/o Enclosure Emergency Response Coordinator, NRC Region Ill; w/o Enclosure, with CD Utility Radiological Safety Board; w/o Enclosure