L-19-273, Submittal of Rev. 24 to Emergency Plan

From kanterella
Jump to navigation Jump to search
Submittal of Rev. 24 to Emergency Plan
ML19339D354
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/02/2019
From: Bezilla M
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML19339D353 List:
References
L-19-273
Download: ML19339D354 (2)


Text

FENOC' ~

5501 North State Route 2 Oak Harbor, Ohta 43449 FirstEnergy Nuclear 4Jera.tJng Company Mark 8. BBZJHB 419-321-7676 V1Ce President, Nuclear December 2, 2019 10 CFR 50, App. E 10 CFR 50.54(q)

L-19-273 10 CFR 72.4 ATTN: Document Control Desk United States Nuclear Regulatory Commission Washington, D.C. 20555-0001

SUBJECT:

Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Changes to Davis-Besse Nuclear Power Station Emergency Plan The purpose of this letter is to transmit Revision 34 to the Davis-Besse Nuclear Power Station (DBNPS) Emergency Plan. The DBNPS Emergency Plan, Revision 34, contains changes to support the plant computer upgrade. The DBNPS Emergency Plan, Revision 34 changes did not require NRC approval.

In accordance with the requirements of 10 CFR 50.54(q), Revision 34 to th~ Emergency Plan does not result in .a reduction in effectiveness of the Emergency Plan, as changed, and continues to satisfy the applicable requirements of 10 CFR 50.47(b) and 10 CFR 50, Appendix E. The DBNPS Emergency Plan, Revision 34 was effective November 12, 2019. Therefore, in accordance with 10 CFR 50.4(b)(5), the DBNPS hereby submits the aforementioned DBNPS Emergency Plan as Enclosure A. A summary of the changes to the DBNPS Emergency Plan are included in the Emergency Plan Revision 34 (Enclosure A), "Summary of Plan Changes," and in the 10 CFR 50.54(q), Screen/Evaluation in Enclosure 8.

There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. James M. Vetter, Regulatory Compliance and Emergency Response Manager, at (419) 321-7393.

  • ..a----e Sincerely,

~

Git ;l \\o....

Mark 8. Bezilla gae

Davis-Besse Nuclear Power Station, Unit 1 L-19-273 Page 2 of 2 Enclosure(s):

A. Davis-Besse Nuclear Power Station Emergency Plan, Revision 34 B. Davis-Besse Nuclear Power Station Emergency Plan, Revision 34, 10 CFR 50.54(q), Screen I Evaluation cc: Regional Administrator, NRC Region Ill Director, Office of Nuclear Material Safety and Safeguards DB-1 NRC Senior Resident Inspector DB-1 NRC/NRR Project Manager; w/o Enclosure Emergency Response Coordinator, NRC Region Ill; w/o Enclosure, with CD Utility Radiological Safety Board; w/o Enclosure