Category:Letter
MONTHYEARIR 05000220/20244022024-11-20020 November 2024 Material Control and Accounting Program Inspection Report 05000220/2024402 and 05000410/2024402 (Cover Letter Only) IR 05000410/20240032024-11-0808 November 2024 Integrated Inspection Report 05000220/1014003 and 05000410/2024003 ML24317A1432024-11-0404 November 2024 Constellation Energy Generation, LLC, 2024 Annual Report - Guarantees of Payment of Deferred Premiums ML24268A3382024-10-16016 October 2024 Issuance of Amendment No. 253 Regarding the Modification of TS Surveillance Requirement 4.3.6.a Related to Adoption of TSTF-425, Revision 3 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests NMP2L2890, Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6)2024-10-0404 October 2024 Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6) IR 05000220/20243022024-10-0303 October 2024 Initial Operator Licensing Examination Report 05000220/2024302 ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24190A0012024-09-26026 September 2024 Issuance of Amendment Nos. 252 and 197 Regarding the Revision to Technical Specification Design Features Section to Remove Nine Mile Point Unit 3 Project Designation NMP1L3608, Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-09-20020 September 2024 Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000220/20240052024-08-29029 August 2024 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2024005 and 05000410/2024005) IR 05000220/20240102024-08-22022 August 2024 Age-Related Degradation Inspection Report 05000220/2024010 and 05000410/2024010 NMP1L3603, Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan2024-08-20020 August 2024 Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000220/20240022024-08-0505 August 2024 Integrated Inspection Report 05000220/2024002 and 05000410/2024002 ML24215A3002024-08-0202 August 2024 Operator Licensing Examination Approval ML24213A1412024-07-31031 July 2024 Requalification Program Inspection NMP1L3601, Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-07-31031 July 2024 Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation NMP2L2883, Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations2024-07-24024 July 2024 Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations ML24198A0852024-07-16016 July 2024 Senior Reactor and Reactor Operator Initial License Examinations RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3584, License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2024-06-13013 June 2024 License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling IR 05000220/20244012024-05-30030 May 2024 Security Baseline Inspection Report 05000220/2024401 and 05000410/2024401(Cover Letter Only) ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 NMP1L3591, Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request2024-05-18018 May 2024 Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request NMP1L3589, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-05-16016 May 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable ML24158A2052024-05-15015 May 2024 Annual Radioactive Environmental Operating Report NMP1L3582, 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 22024-05-15015 May 2024 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 2 IR 05000220/20240012024-05-10010 May 2024 Integrated Inspection Report 05000220/2024001 and 05000410/2024001 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds 05000410/LER-2024-001, Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum2024-05-0101 May 2024 Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests NMP1L3581, Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report2024-04-30030 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report NMP2L2877, 2023 Annual Environmental Operating Report2024-04-19019 April 2024 2023 Annual Environmental Operating Report NMP2L2878, Core Operating Limits Report2024-04-16016 April 2024 Core Operating Limits Report ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24092A3352024-04-0101 April 2024 NRC Office of Investigations Case No. 1-2023-002 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24074A2812024-03-14014 March 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000220/2024010 and 05000410/2024010 NMP1L3577, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-03-13013 March 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable IR 05000220/20230062024-02-28028 February 2024 Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2, (Reports 05000220/2023006 and 05000410/2023006) IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 NMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation 05000410/LER-2023-001, Supplement to LER 2023-001-00, Automatic Reactor Scram on Low Level Due to Partial Loss of Feedwater2024-01-30030 January 2024 Supplement to LER 2023-001-00, Automatic Reactor Scram on Low Level Due to Partial Loss of Feedwater NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations 2024-09-04
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARRS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition NMP1L3591, Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request2024-05-18018 May 2024 Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request NMP1L3545, Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems .2023-08-0404 August 2023 Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems . NMP1L3519, Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-03-30030 March 2023 Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) NMP1L3516, Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-03-29029 March 2023 Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) NMP1L3478, Response to Request for Additional Information - Relief Request Associated with Pump Periodic Verification Tests of Core Spray System Pumps2022-08-0505 August 2022 Response to Request for Additional Information - Relief Request Associated with Pump Periodic Verification Tests of Core Spray System Pumps RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated2022-02-23023 February 2022 Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated P NMP1L3447, Constellation Energy Generation, LLC - Response to Request for Additional Information - Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs2022-02-0202 February 2022 Constellation Energy Generation, LLC - Response to Request for Additional Information - Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs NMP2L2794, Supplemental Information to Support Review of Nine Mile Point Nuclear Station, Unit 2, License Amendment Request to Adopt TSTF-582, Revision 02022-01-11011 January 2022 Supplemental Information to Support Review of Nine Mile Point Nuclear Station, Unit 2, License Amendment Request to Adopt TSTF-582, Revision 0 NMP2L2789, Response to Request for Additional Information by the Office of Reactor Regulation to Support Review of License Amendment Request to Adopt TSTF-582, Revision 02021-12-16016 December 2021 Response to Request for Additional Information by the Office of Reactor Regulation to Support Review of License Amendment Request to Adopt TSTF-582, Revision 0 NMP2L2787, Response to Request for Additional Information - Relief Request Associated with Excess Flow Check Valves2021-11-15015 November 2021 Response to Request for Additional Information - Relief Request Associated with Excess Flow Check Valves JAFP-21-0087, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-09-16016 September 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments NMP2L2773, Company - Response to Request for Additional Information2021-06-30030 June 2021 Company - Response to Request for Additional Information JAFP-21-0044, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-06-11011 June 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments NMP1L3402, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of License Amendment Request to Adopt TSTF-582, Revision 02021-06-0404 June 2021 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of License Amendment Request to Adopt TSTF-582, Revision 0 JAFP-21-0032, Response to Request for Additional Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting2021-04-20020 April 2021 Response to Request for Additional Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting NMP1L3376, Supplemental Information to Support Review of Nine Mile Point Nuclear Station, Unit 1, License Amendment Request to Adopt TSTF-334, Revision 22021-01-27027 January 2021 Supplemental Information to Support Review of Nine Mile Point Nuclear Station, Unit 1, License Amendment Request to Adopt TSTF-334, Revision 2 NMP1L3373, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of License Amendment Request to Adopt TSTF-334, Revision 22021-01-22022 January 2021 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of License Amendment Request to Adopt TSTF-334, Revision 2 NMP2L2754, Responses to Request for Additional Information Questions 27 and 28 to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 22021-01-0707 January 2021 Responses to Request for Additional Information Questions 27 and 28 to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 NMP2L2749, Responses to Request for Additional Information Questions 17 and 26 for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Rev. 22020-10-22022 October 2020 Responses to Request for Additional Information Questions 17 and 26 for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Rev. 2 NMP2L2745, Request for Additional Information for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, Revision 22020-10-0202 October 2020 Request for Additional Information for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 RS-20-112, Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-5682020-09-0303 September 2020 Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-568 NMP2L2742, Response to Request for Additional Information by NRR to Support Review of Nine Mile Point Nuclear Station, Unit 2, License Amendment Request Re Risk Informed Categorization & Structures, Systems and Components2020-08-28028 August 2020 Response to Request for Additional Information by NRR to Support Review of Nine Mile Point Nuclear Station, Unit 2, License Amendment Request Re Risk Informed Categorization & Structures, Systems and Components ML20188A2642020-07-0606 July 2020 Clinton Power Station, R.E. Ginna Station, Limerick Station, Nine Mile Point Station & Peach Bottom Station - Proposed Alternative to Utilize Code Case OMN-26 - Response to Request for Additional Information NMP2L2713, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of Nine Mile Point Nuclear Station, Unit 2, License Amendment Request to Increase Allowable MSIV Leakage Rates2019-11-21021 November 2019 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of Nine Mile Point Nuclear Station, Unit 2, License Amendment Request to Increase Allowable MSIV Leakage Rates NMP2L2711, Byron Station; Calvert Cliffs; Clinton Power Station; LaSalle County Station; Limerick Generating Station; and Nine Mile Point Nuclear Station - Proposed Alternative to Utilize Code Case N-8792019-10-16016 October 2019 Byron Station; Calvert Cliffs; Clinton Power Station; LaSalle County Station; Limerick Generating Station; and Nine Mile Point Nuclear Station - Proposed Alternative to Utilize Code Case N-879 JAFP-19-0057, Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-8802019-06-0404 June 2019 Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-880 NMP1L3279, Response to Request for Additional Information - Proposed Alternatives to Utilize Code Cases N-878 and N-880 for Plants2019-05-0101 May 2019 Response to Request for Additional Information - Proposed Alternatives to Utilize Code Cases N-878 and N-880 for Plants NMP1L3264, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of Nine Mile Point Nuclear Station, Unit 1, License Amendment Request to Revise Technical Specifications 3.3.1 for Primary Contain2019-02-25025 February 2019 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of Nine Mile Point Nuclear Station, Unit 1, License Amendment Request to Revise Technical Specifications 3.3.1 for Primary Containm JAFP-19-0006, Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-8802019-01-0808 January 2019 Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-880 NMP2L2695, Supplement Information and Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of an Emergency License Amendment Request for One Time Extension to The.2018-12-0707 December 2018 Supplement Information and Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of an Emergency License Amendment Request for One Time Extension to The. NMP1L3248, Supplement to the Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of Nine Mile Point Nuclear Station, Unit 1, License Amendment Request to Apply TSTF-542, Revision 2, Reactor Pre2018-11-0202 November 2018 Supplement to the Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of Nine Mile Point Nuclear Station, Unit 1, License Amendment Request to Apply TSTF-542, Revision 2, Reactor Pres NMP1L3238, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of Nine Mile Point Nuclear Station, Unit 1, License Amendment Request to Apply TSTF-542, ...2018-10-0101 October 2018 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of Nine Mile Point Nuclear Station, Unit 1, License Amendment Request to Apply TSTF-542, ... NMP1L3233, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of Nine Mile Point Nuclear Station, Unit 1, Removal of Boraflex Credit License Amendment Request (L-2018-LLA-0039)2018-08-17017 August 2018 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of Nine Mile Point Nuclear Station, Unit 1, Removal of Boraflex Credit License Amendment Request (L-2018-LLA-0039) NMP1L3221, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 & 2, R. E. Ginna - Response to Request for Additional Information License Amendment Request to Adopt Emergency Action Level Schemes.2018-05-10010 May 2018 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 & 2, R. E. Ginna - Response to Request for Additional Information License Amendment Request to Adopt Emergency Action Level Schemes. RS-18-061, Response to Request for Additional Information Regarding Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis)2018-05-0202 May 2018 Response to Request for Additional Information Regarding Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis) ML18025A7992018-01-25025 January 2018 Response to Request for Additional Information Regarding Generic Letter 2016-01 NMP2L2662, Supplemental Information for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 22017-12-27027 December 2017 Supplemental Information for Nine Mile Point Nuclear Station, Unit 2, to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Revision 2 NMP2L2658, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of Nine Mile Point Nuclear Station, Unit 2, License Amendment Request to Adopt TSTF-542, Revision 2, Reactor Pressure Vessel Water2017-11-0303 November 2017 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of Nine Mile Point Nuclear Station, Unit 2, License Amendment Request to Adopt TSTF-542, Revision 2, Reactor Pressure Vessel Water NMP1L3180, Submittal of Relief Request NMP-RR-001 Concerning Nozzle-to-Vessel Weld and Inner Radii Examinations (Use of Code Case N-702)2017-09-18018 September 2017 Submittal of Relief Request NMP-RR-001 Concerning Nozzle-to-Vessel Weld and Inner Radii Examinations (Use of Code Case N-702) RS-17-053, Response to Request for Additional Information Regarding Generic Letter 2016-012017-04-27027 April 2017 Response to Request for Additional Information Regarding Generic Letter 2016-01 NMP1L3146, Response to Request for Additional Information to Relief to Perform Pressure Isolation Valve Leakage Testing at Frequencies Consistent with 10 CFR 50, Appendix J2017-04-0606 April 2017 Response to Request for Additional Information to Relief to Perform Pressure Isolation Valve Leakage Testing at Frequencies Consistent with 10 CFR 50, Appendix J RS-17-044, Response to Request for Additional Information Regarding Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography2017-03-13013 March 2017 Response to Request for Additional Information Regarding Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography RS-17-027, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal2017-03-10010 March 2017 Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 3, Flooding Focused Evaluation Summary Submittal ML17037A2652017-02-0606 February 2017 Response to Request for Information Concerning Regional Meteorological Conditions Characterizing Atmospheric Transport Processes within 50 Miles of the Plant RA-16-049, Response to Request for Additional Information Regarding Requests to Withhold Emergency Preparedness Documents from Public Disclosure2016-05-26026 May 2016 Response to Request for Additional Information Regarding Requests to Withhold Emergency Preparedness Documents from Public Disclosure ML16131A6542016-05-0404 May 2016 Response to a Question Raised During the Audit ML16131A6552016-05-0404 May 2016 White Paper Prepared in Response to a Question Raised During the Audit 2024-09-12
[Table view] |
Text
IBUTION AFTER ISSUANCE OF OPERATING LICENSE U.S. NUCI.EAR REGULATORY COMIV N DOCKET NUMBER FILE NUMBER NRC DISTRIBUTION FDR PART 50 DOCKET MATERIAL DATE OF DOCUMENT G Lear FROM:
'iagara Mohawk Pwr Corp 9-29-77 Syracuse, NY DATE RECEIVED G KRhode 10-3-77 E3NOTORIZED PROP INPUT FORM NUMBER OF COPIES RECEIVED gJ ETTER PfORIGINAI UN C LASS I F I E D CI COP Y DESCRIPTION ENCLOSURE lp addi info concerning spent fuel pool modificatio as requested in NRC ltr dtd 9-1-77..............
9p PLANT NAME:
Nine Mile Pt glil~r.~
le- 3-77 +f SAFETY FOR ACTION/INFORMATION BRANCH CHIEF: 7 INTERNAL D RI BUTION G FILE NRC PDR I a E (2)
OELD HANAUER CHECK STELLO EISENHUT SHAO BAER BUTLER GRIMES J. COLLINS EXTERNAL DISTRIBUTION CONTROL NUMBER LPDR:
TIC NSIC 16 CYS ACRS SENT CATE 0
'}r v~jy I'j l t.' I II/ P
(
gpss NIAGARA MOHAWK POWER CORPORATION
>>Ill&~',
NIAGARA l 'OHAWK 300 ERIE BOULEVARD, WEST SYRACUSE. N. Y. I3202 September 29, 1977 l f/f Director of Nuclear. Reactor Regulation c7
~Cfog Attn: Mr. George Lear, Chief Operating Reactors Branch g3 U. S. Nuclear Regulatory Commission 64~f g Washington, D. C. 20555 Cr Re: Nine Mile Point Unit 1 Docket No. 50-220 DPR-63
Dear Mr. Lear:
Your letter of September 1, 1977 requested additional information regarding the spent fuel pool modification for Nine Mile Point Unit,l. The enclosed information responds to, your request.
Very truly yours, NIAGARA MOHAWK POWER CORPORATION erald . Rhode Vice President- ngineering
/szd Enclosure
I' A
,I
Respons es to September 1, 1977 Nuclear Re ulator Commission uest;ions Nine Nile Point Unit 1 Docl<et No. 50-220 DPR-63 QUESTION 1: .Provide the average burn up expected for the spent fuel in the spent fuel pool (SFP).
RESPONSE: The average burn up of spent fuel in the spent fuel pool from the beginning of reactor life to the date at which the pool is completely filled (1984 fuel assemblies) is projected to be approximately 23,200 MK/NTU. The projected average burn up assumes no spent fuel is shipped off site.
QUESTION 2: Discuss any expected change in the radiological liquid effluents from the Liquid Radioactive Waste Disposal System (LRWDS) because of the proposed mod'ification. Discuss the impact of the filter precoat being transferred from the Spent Fuel Storage Pool Filtering System to the LRWDS.
RESPONSE. While there may be a slight increase in the volume of filter sludge transferred -to the LRWDS due to the expected slight increase in filter change frequency, there should be no significant increase in the volume or concentration of liquid radio-active waste effluents.
At the present time, the spent fuel pool filter sludge is transferred to the LRWDS where it filtered and concentrated. The filter cake and is concentrator liquid are disposed of off site as solid radioactive waste. The waste disposal system is presently operating at approximately 60% of capacity. The modification is expected to increase the LRWDS usage by 1 percent.
Discuss the disposition of the material to be removed from the spent fuel pool (e.g., spent fuel racks, seismic restraints) during the proposed modification. If the material to be removed will be disposed of as solid waste, provide the volume of the package waste.
RHSPONSE: The existing spent fuel racks plus hardware will be removed from the spent fuel pool and disposed of in two phases. Phase 1 will clear the north half of the pool. It is anticipated that fuel and channel racks removed during Phase 1 will be disposed of as low level, shallow burial solid radwaste and will consist'of four shipments 9 feet by 8 feet by 15 feet in volume resulting in a total volume of 4,320 cubic feet, It is anticipated that the Phase 2 solid radwaste will be treated as Phase 1. The total volume of Phase 2 radwaste will be approximately equal to that of Phase -l.
Provide the volume of solid waste to be generated by the replacement of the filter precoat in the Spent Fuel Pool Filtering System. Provide the current frequency of operation and the normal flow rate through the filter. Provide the current frequency of replacing the filter precoat. Discuss and quantify any expected changes in the above due to the proposed modification.
RESPONSE: Presently the Spent Fuel Pool Filtration .System is operated continuously at a flow rate of approximately 600 gallons per minute. The filter precoat is changed approximately once every three months yielding an estimated 5 cubic feet of radioactive solids after waste treatment. The maximum expected filter change frequency will be once per two months to maintain the spent fuel pool radionuclide concentrations at present levels.
This increase in filter change frequency would increase the spent fuel pool contribution to solid xadioactive waste by approximately 2.5 cubic feet per 3 months or approximately 1% of our total quarterly radioactive waste generation f om filter sludge disposal in all systems.
QUESTION 5: Explain why no equipment modifications for the Spent Fuel Storage Pool Filtering System (SFSPFS) were proposed.
Consider that the proposed SFP modification may result in a factor of approximately eight times more afuel normal movements during the modification than during refueling which may increase the level of crud in the pool above that expe ted during a normal refueling.
Justify why SFSPFS is adequate to maintain lowcrud fuel pool concentration of radioactivity including so that there are reasonably low exposure levels in and around the fuel pool area during and after the modification.
RESPONSE The expansion of the spent fuel capacity at Unit 1 will be done in phases. During the first phase of installation approximately 1000 storage locations will be installed in the north half of the pool. The north half ofthere- the pool contains less than 200 spent fuel bundles, fore, the first phase should require moving only these fuel assemblies. During a normal refueling, approximately 150 to 200 fuel bundles are transferred from the core to the spent fuel pool. The fuel moves performed during a normal refueling would result in a higher concentration of radioactivity than the moves required for the first phase of installation due to length of time since shutdown associated with the bundles. The fuel bundles discharged during a refueling would be the most recently. irradiated exhibiting the highest radioactivity levels. The fuel bundles to be moved during the first phase of installation will have been in storage for a period of time, decreasing the crud radioactivity levels.
Therefore, fuel moves associated with the first phase of installation are not expected to result in any substantial increase in the level of crud in the pool above that expected during a normal refueling.
The econd phase of installation is not expected to take place until approximately 1980-81. Prior to this time, fuel assemblies in the south end of the pooi will on a gradual basis be transferred to the north end of the pool to allow adequate room for the second phase of installation. The movement of these fuel assemblies during this time period is not expected to result in any increase in the level of crud in the pool above that expected during a normal refueling.
RESPONSE 5: Continued Host of the dose rate contribution above the pool is due to activity in the water from recently discharged spent fuel bundles. Since the proposed expansion would not increase the number of recently discharged bundles, the change in dose rates above the pool is expected to be insignificant.
Presently, the dose rate above the pool is controlled to between 5 and 10 MR/HR, by controlling the frequency of change of the spent fuel pool filter. As shown above, the expansion is not expected to result in any substantial increase in the level of crud in the pool above that normally expected during a refueling outage. Since the policy of changing the spent fuel filters as often as necessary to maintain the radiation dose rate around the spent fuel storage pool to levels between 5 and 10 MR/HR will continue, no increased occupational exposure is anticipated due to personnel working in the pool vicinity and no equipment modifications for the Spent Fuel Storage Pool Filtering System are required.
QUESTION 6: Provide a discussion of the increases and the doses to personnel from radionuclide concentrations in the SPP due to the expansion of the capacity of the SFP, including the following:
a) Identify t:he principle radionuclides and their respective concentrations in the spent fuel pool water found by gamma isotopic analysis during all operations. Identify the sample with respect to a specific operation (i.e.,
refueling, fuel handling, etc,).
b) Provide an estimate of the man-rem exposure that will be received during removal of the old racks and installation of the new ones.
c) Provide an estimate of the dose rates above
'he spent fuel pool from the concentrations of the radionuclides identified in (a), and the concomitant occupational exposure, in annual man-rem, due to all operations associated with fuel handling in the spent fuel pool area. Describe the impact of the proposed modifications on these estimates.
Include in your analysis the expected exposure from more frequent changing of the filter precoat.
RESPONSE: The attached isotopic analysis and gross activity data r indicate activity levels expected during normal operating refueling operations as well as those found during fuel channel cutting, crushing, and packaging. The fuel channel work is performed during normal station operation.
A preliminary conservative estimate of exposure during removal of the old racks and installation of new ones is approximately 16 man-rems. As working procedures are finalized, a more accurate exposure may be obtain-able. The 16 man-rems is based on the following assumptions".
8 weeks of installation (18 personnel around pool)
Use of a Diver (4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per day for 10 days) 5 MR/hr around pool 50 MR/hr in the pool This estimate is conservative when compared to rack replacements performed at Oyster Creek and Ginna.
RESPONSE 6: Continued Vhole body dose rates at the spent fuel pool rail generally vary between 5 and 10 millirem. Effective dose rates for work carried on in the vicinity of the pool amount to less than 5 millirem/hr because rates in many areas of the floor are only 1 to 2 millirem/hr.
An estimate of annual man-rems associated with fuel pool area work can be made by using the portion of refueling exposure received by operators, reactor physists, and instrument technicians (maintenance exposure should not be included since this exposure category includes drywe11 and vessel disas'sembly, decontamination, and reassembly). Contractor exposures should also be included.
NAN-RENS 1975 (including 1976 (Ho Refuelin Outa e) Refuelin Outa e)
Operators .9 0.05 Reactor Physists 0. 046 0.000 Instrument 6 Control 0. 588 0.010 Contractors 5. 134 2.652 The proposed modifications will not affect the portion of the exposure received during refueling. Since shipment of the spent fuel will be postponed, the modification ultimately will result in lower exposure for that operation due to increased decay time prior to shipment. Since dose rate at the fuel pool rail only varies slightly with fuel pool activity, and since this activity is easily controlled, the only impact on man-rems received in the fuel pool area will be that received during the modification.
The average man-rems received during waste processing and. shipment was 102 in 1975 and 104 in 1976. Xt is expected that filter sludge volume may increase by approximately 1%. This could increase exposures by approximately one man-rem/year if it were conservatively assumed all waste processing exposures were attributable to filter sludge.
Spent Fuel Pool Data Anal sis pci/ml Cs-134 Cs-137 Co-60 Operation D '~1977 CPM/ml MR/HR (x 10 ) ~(x 10 ~x10 Normal Operation 200-1000 Refueling ~2400 Fuel Channel Crusbing & Cutting 200-2700 5-10 14