IR 05000346/2016404

From kanterella
(Redirected from ML16183A029)
Jump to navigation Jump to search
NRC Security Baseline Inspection Report 05000346/2016404 - Cover Letter Only (Nte)
ML16183A029
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/30/2016
From: Steven Orth
NRC/RGN-III
To: Boles B
FirstEnergy Nuclear Operating Co
References
IR 2016404
Download: ML16183A029 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION une 30, 2016

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION - NRC SECURITY BASELINE INSPECTION REPORT 05000346/2016404

Dear Mr. Boles:

On May 26, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Davis-Besse Nuclear Power Station. The NRC inspector discussed the results of this inspection with Mr. D. Saltz and other members of your staff. The inspector documented the results of this inspection in the enclosed inspection report.

One self-revealed finding of very low security significance was identified during this inspection.

This finding was determined to involve a violation of NRC requirements. The NRC is treating this violation as a Non-Cited Violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.

Additionally, the inspector documented two licensee-identified findings of very-low significance, (Green), identified during this inspection. The findings were determined to involve a violation of NRC requirements. The NRC is also treating these violations as a NCVs consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the subject or severity to any of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with copies to the Regional Administrator, Region III; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Davis-Besse Nuclear Power Station.

The self-revealed finding had a cross-cutting aspect in the area of Human Performance -

Teamwork, because individuals associated with the violation failed to communicate and coordinate their activities within and across organizational boundaries to ensure nuclear safety was maintained. [H.4]

Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. In addition, if you disagree with the cross-cutting aspect assigned to any finding in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region III, and the NRC Resident Inspector at the Davis-Besse Nuclear Power Station.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-346 License No. NPF-3 Nonpublic Enclosure:

IR 05000346/2016404 cc: M. Bear, State Liaison Officer Ohio Emergency Management Agency cc w/o encl: Distribution via LISTSERV SECURITY-RELATED INFORMANTION