Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 December 23, 2015 Ms. B. A. Nick President and Chief Executive Officer Dairyland Power Cooperative 3200 East Avenue South P.O. Box 817 La Crosse, WI 54602-0817
SUBJECT:
LA CROSSE BOILING WATER REACTOR MASTER INSPECTION PLAN -
CALENDAR YEAR 2016
Dear Ms. Nick:
In accordance with the U.S. Nuclear Regulatory Commission (NRC) Inspection Manual Chapter 2561, Decommissioning Power Reactor Inspection Program, and Inspection Manual Chapter 2690, Appendix A, Inspection Program Guidance for Reactor Site Independent Spent Fuel Storage Installations (ISFSI), the NRC Region III staff and management have developed a Master Inspection Plan (MIP) for La Crosse Boiling Water Reactor (LACBWR). The plan is based on your current performance and schedule of activities planned for the site for the period of January - December 2016 (CY16). The plan outlines how we intend to focus our Regional inspection resources to provide oversight for ISFSI and decommissioning activities.
Because this MIP is based, in part, on your proposed schedule of ISFSI and decommissioning activities for CY16, the plan and the focus of NRC inspection activities may change to reflect a change in your planned activities or your performance. In order to ensure that this MIP remains current, we request that you keep the Materials Control, ISFSI, and Decommissioning Branch staff informed of any significant changes in your proposed schedule of activities. You will be informed of any significant changes to the LACBWR inspection schedule.
The following is a list of the inspection procedures we expect to use during our inspections.
The specific procedures used during each inspection will depend on the specific decommissioning activities being conducted. Additionally, we plan to perform a follow-up inspection on the corrective actions associated with the Emergency Preparedness Notice of Violation issued on June 22, 2015. Additional inspection procedures may be used or inspections conducted if ISFSI or decommissioning activities warrant.
Inspection Procedure Title IP 37801 Safety Reviews, Design Changes, and Modifications IP 40801 Self-Assessment, Auditing, and Corrective Action IP 62801 Maintenance and Surveillance IP 71801 Decommissioning Performance and Status Review IP 83750 Occupational Radiation Exposure
B. Nick Inspection Procedure Title IP 83801 Inspection of Final Surveys IP 84750 Radioactive Waste Treatment, and Effluent and Environmental IP 86750 Solid Radioactive Waste Management and Transportation of Monitoring Radioactive Materials IP 92702 Followup on Corrective Actions for Violations and Deviations IP 60855 Operation of an ISFSI IP 81311 Physical Security Requirements for Independent Spent Fuel Storage Installations In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRCs website at http://www.nrc.gov/reading-rm/adams.html.
We will gladly discuss any questions you may have regarding these inspection plans. If you have any questions, please feel free to contact the following members of my staff:
Gene Bonano (Security and MC&A) at 630-829-9826, Peter Lee (HP/Decommissioning) at 630-829-9870, and Rhex Edwards (Decommissioning/ISFSI) at 630-829-9722.
Sincerely,
/RA/
Michael A. Kunowski, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket Nos. 050-00409; 072-00046 License No. DPR-45 cc: Distribution via La Crosse Service List
B. Nick Inspection Procedure Title IP 83801 Inspection of Final Surveys IP 84750 Radioactive Waste Treatment, and Effluent and Environmental IP 86750 Solid Radioactive Waste Management and Transportation of Monitoring Radioactive Materials IP 92702 Followup on Corrective Actions for Violations and Deviations IP 60855 Operation of an ISFSI IP 81311 Physical Security Requirements for Independent Spent Fuel Storage Installations In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRCs website at http://www.nrc.gov/reading-rm/adams.html.
We will gladly discuss any questions you may have regarding these inspection plans. If you have any questions, please feel free to contact the following members of my staff:
Gene Bonano (Security and MC&A) at 630-829-9826, Peter Lee (HP/Decommissioning) at 630-829-9870, and Rhex Edwards (Decommissioning/ISFSI) at 630-829-9722.
Sincerely,
/RA/
Michael A. Kunowski, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket Nos. 050-00409; 072-00046 License No. DPR-45 cc: Distribution via La Crosse Service List DISTRIBUTION:
See next page ADAMS Accession Number: ML15357A284 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" =
Copy with attach/encl "N" = No copy OFFICE RIII DNMS RIII DNMS RIII DNMS RIII NAME PLee:ps MKunowski for REdwards MKunowski DATE 12/23/15 12/18/15 12/23/15 OFFICIAL RECORD COPY
Letter to B. A. Nick from Michael A. Kunowski dated December 23, 2015
SUBJECT:
LA CROSSE BOILING WATER REACTOR MASTER INSPECTION PLAN -
CALENDAR YEAR 2016 DISTRIBUTION:
Bruce Watson Marlayna Vaaler John Giessner Allan Barker Harral Logaras Carol Ariano Linda Linn MCID Distribution
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 December 23, 2015 Ms. B. A. Nick President and Chief Executive Officer Dairyland Power Cooperative 3200 East Avenue South P.O. Box 817 La Crosse, WI 54602-0817
SUBJECT:
LA CROSSE BOILING WATER REACTOR MASTER INSPECTION PLAN -
CALENDAR YEAR 2016
Dear Ms. Nick:
In accordance with the U.S. Nuclear Regulatory Commission (NRC) Inspection Manual Chapter 2561, Decommissioning Power Reactor Inspection Program, and Inspection Manual Chapter 2690, Appendix A, Inspection Program Guidance for Reactor Site Independent Spent Fuel Storage Installations (ISFSI), the NRC Region III staff and management have developed a Master Inspection Plan (MIP) for La Crosse Boiling Water Reactor (LACBWR). The plan is based on your current performance and schedule of activities planned for the site for the period of January - December 2016 (CY16). The plan outlines how we intend to focus our Regional inspection resources to provide oversight for ISFSI and decommissioning activities.
Because this MIP is based, in part, on your proposed schedule of ISFSI and decommissioning activities for CY16, the plan and the focus of NRC inspection activities may change to reflect a change in your planned activities or your performance. In order to ensure that this MIP remains current, we request that you keep the Materials Control, ISFSI, and Decommissioning Branch staff informed of any significant changes in your proposed schedule of activities. You will be informed of any significant changes to the LACBWR inspection schedule.
The following is a list of the inspection procedures we expect to use during our inspections.
The specific procedures used during each inspection will depend on the specific decommissioning activities being conducted. Additionally, we plan to perform a follow-up inspection on the corrective actions associated with the Emergency Preparedness Notice of Violation issued on June 22, 2015. Additional inspection procedures may be used or inspections conducted if ISFSI or decommissioning activities warrant.
Inspection Procedure Title IP 37801 Safety Reviews, Design Changes, and Modifications IP 40801 Self-Assessment, Auditing, and Corrective Action IP 62801 Maintenance and Surveillance IP 71801 Decommissioning Performance and Status Review IP 83750 Occupational Radiation Exposure
B. Nick Inspection Procedure Title IP 83801 Inspection of Final Surveys IP 84750 Radioactive Waste Treatment, and Effluent and Environmental IP 86750 Solid Radioactive Waste Management and Transportation of Monitoring Radioactive Materials IP 92702 Followup on Corrective Actions for Violations and Deviations IP 60855 Operation of an ISFSI IP 81311 Physical Security Requirements for Independent Spent Fuel Storage Installations In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRCs website at http://www.nrc.gov/reading-rm/adams.html.
We will gladly discuss any questions you may have regarding these inspection plans. If you have any questions, please feel free to contact the following members of my staff:
Gene Bonano (Security and MC&A) at 630-829-9826, Peter Lee (HP/Decommissioning) at 630-829-9870, and Rhex Edwards (Decommissioning/ISFSI) at 630-829-9722.
Sincerely,
/RA/
Michael A. Kunowski, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket Nos. 050-00409; 072-00046 License No. DPR-45 cc: Distribution via La Crosse Service List
B. Nick Inspection Procedure Title IP 83801 Inspection of Final Surveys IP 84750 Radioactive Waste Treatment, and Effluent and Environmental IP 86750 Solid Radioactive Waste Management and Transportation of Monitoring Radioactive Materials IP 92702 Followup on Corrective Actions for Violations and Deviations IP 60855 Operation of an ISFSI IP 81311 Physical Security Requirements for Independent Spent Fuel Storage Installations In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRCs website at http://www.nrc.gov/reading-rm/adams.html.
We will gladly discuss any questions you may have regarding these inspection plans. If you have any questions, please feel free to contact the following members of my staff:
Gene Bonano (Security and MC&A) at 630-829-9826, Peter Lee (HP/Decommissioning) at 630-829-9870, and Rhex Edwards (Decommissioning/ISFSI) at 630-829-9722.
Sincerely,
/RA/
Michael A. Kunowski, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket Nos. 050-00409; 072-00046 License No. DPR-45 cc: Distribution via La Crosse Service List DISTRIBUTION:
See next page ADAMS Accession Number: ML15357A284 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" =
Copy with attach/encl "N" = No copy OFFICE RIII DNMS RIII DNMS RIII DNMS RIII NAME PLee:ps MKunowski for REdwards MKunowski DATE 12/23/15 12/18/15 12/23/15 OFFICIAL RECORD COPY
Letter to B. A. Nick from Michael A. Kunowski dated December 23, 2015
SUBJECT:
LA CROSSE BOILING WATER REACTOR MASTER INSPECTION PLAN -
CALENDAR YEAR 2016 DISTRIBUTION:
Bruce Watson Marlayna Vaaler John Giessner Allan Barker Harral Logaras Carol Ariano Linda Linn MCID Distribution