Fy 2011 Lacrosse Safety and ISFSI Master Inspection Plan
ML103260255
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 11/19/2010
From: Brian Kemker
NRC/RGN-III/DNMS/DB
To: Berg W
Dairyland Power Cooperative
References
Download: ML103260255 (4)


Text

November 19, 2010 Mr. W. L. Berg General Manager Dairyland Power Cooperative 3200 East Avenue S.

P.O. Box 817 La Crosse, WI 54602-0817

SUBJECT:

LA CROSSE BOILING WATER REACTOR MASTER INSPECTION PLAN -

FISCAL YEAR 2011

Dear Mr. Berg:

In accordance with U.S. NRC Inspection Manual Chapter 2561, Decommissioning Power Reactor Inspection Program, the NRC Region III staff and management have developed a Master Inspection Plan (MIP) for LaCrosse Boiling Water Reactor (LACBWR). The plan is based on your current performance and schedule of significant decommissioning activities planned for the site for fiscal year (FY) 2011, which is from October 2010 through September 2011. The plan outlines how we intend to focus our Regional inspection resources to address significant ongoing decommissioning activities.

Because the FY 2011 MIP is based, in part, on your proposed schedule of significant decommissioning activities for FY 2011, the plan and the focus of NRC inspection activities may change to reflect a change in your planned decommissioning activities or your performance. In order to ensure that the FY 2011 MIP remains current, we request that you keep the Materials Control, ISFSI, and Decommissioning Branch staff informed of any significant changes in your proposed schedule of decommissioning activities. You will be informed of any significant changes to the LACBWR FY 2011 MIP.

We currently project the Region will conduct two inspections at LACBWR during FY 2011 to evaluate spent fuel pool safety and related routine decommissioning activities. Additional inspections will be scheduled as necessary regarding the construction of a large tank in the reactor cavity that will hold the dry fuel storage casks for off-loading the fuel. The Region will also conduct approximately three onsite inspections to evaluate the construction of the Independent Spent Fuel Storage Installation (ISFSI) Pad, and preoperational and operational related ISFSI activities, in addition to in-office review. Following is a list of the inspection procedures we expect to use during our inspections. The specific procedures used during each inspection will depend on the specific decommissioning activities being conducted. Additional inspection procedures may be used or inspections conducted if decommissioning activities warrant.

Security-related inspection activities will be addressed in a separate MIP.

W. Berg Inspection Procedure Inspection Procedure Title IP 60853 Review of 72.212(b) Evaluations IP 60856 Onsite Fabrication of Components and Construction of an Independent Spent Fuel Storage Installation IP 60854 Preoperational Testing of an ISFSI IP 60855 Operation of an ISFSI IP 36801 Organization, Management and Cost Controls IP 37801 Safety Reviews, Design Changes, and Modifications IP 40801 Self-Assessment, Auditing, and Corrective Action IP 60801 Spent Fuel Pool Safety IP 62801 Maintenance and Surveillance IP 71801 Decommissioning Performance and Status Review IP 83750 Occupational Radiation Exposure IP 84750 Radioactive Waste Treatment, and Effluent and Environmental Monitoring IP 86750 Solid Radioactive Waste Management and Transportation of Radioactive Materials In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.

We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Jeremy Tapp of my staff at (630) 829-9862.

Sincerely,

/RA/

Brian J. Kemker, Acting Chief Materials Control, ISFSI, and Decommissioning Branch Docket No. 50-409 License No. DPR-45 cc : Michael A. Brasel, Plant Manager Director of Field Operations, Department of Commerce Safety and Buildings Spark Burmaster, Coulee Region Energy Coalition State Liaison Officer Chief, Radiation Protection Section, WI Department of Health Social Services, Division of Health

W. Berg Inspection Procedure Inspection Procedure Title IP 60853 Review of 72.212(b) Evaluations IP 60856 Onsite Fabrication of Components and Construction of an Independent Spent Fuel Storage Installation IP 60854 Preoperational Testing of an ISFSI IP 60855 Operation of an ISFSI IP 36801 Organization, Management and Cost Controls IP 37801 Safety Reviews, Design Changes, and Modifications IP 40801 Self-Assessment, Auditing, and Corrective Action IP 60801 Spent Fuel Pool Safety IP 62801 Maintenance and Surveillance IP 71801 Decommissioning Performance and Status Review IP 83750 Occupational Radiation Exposure IP 84750 Radioactive Waste Treatment, and Effluent and Environmental Monitoring IP 86750 Solid Radioactive Waste Management and Transportation of Radioactive Materials In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS),

accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.

We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Jeremy Tapp of my staff at (630) 829-9862.

Sincerely,

/RA/

Brian J. Kemker, Acting Chief Materials Control, ISFSI, and Decommissioning Branch Docket No. 50-409 License No. DPR-45 cc : Michael A. Brasel, Plant Manager Director of Field Operations, Department of Commerce Safety and Buildings Spark Burmaster, Coulee Region Energy Coalition State Liaison Officer Chief, Radiation Protection Section, WI Department of Health Social Services, Division of Health DISTRIBUTION:

See next page DOCUMENT NAME: G:\DNMSIII\Work in progress\MIP - LACBWR MIP FY11 Draft.doc X Publicly Available Non-Publicly Available Sensitive X Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII N RIII E RIII E RIII NAME PJLee JETapp BKemker DATE 11/17/10 11/17/10 11/19/10 OFFICIAL RECORD COPY

Letter to W. L. Berg from Brian J. Kemker dated November 19, 2010

SUBJECT:

LA CROSSE BOILING WATER REACTOR (LACBWR) MASTER INSPECTION PLAN - FISCAL YEAR (FY) 2011 DISTRIBUTION:

B. Watson, FSME J. Hickman, FSME N. Orlando, FSME S. West, RIII S. Reynolds, RIII C. Lipa, RIII A. Baker, RIII H. Logaras, RIII V. Mitlyng, RIII P. Chandrathil, RIII R. Orlikowski, RIII K. Stoedter, SRI MCID Distribution