2014 Braidwood Station Initial License Examination Form ES-301-3
ML14365A125
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 11/24/2014
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
Shared Package
ML14344A989 List:
References
ES-301-3 50-456/OL-14, 50-457/OL-14
Download: ML14365A125 (1)


Text

ES-301 Operating Test Quality Checklist Form ES-301-3 Facility: Braidwood Date of Examination: 11/10/2014 Operating Test Number: 2014 NRC Initials

1. GENERAL CRITERIA a b* c#
a. The operating test conforms with the previously approved outline; changes are consistent with sampling requirements (e.g. , 10 CFR 55.45, operational importance, safety function distribution). ~ ~~
b. There is no day-to-day repetition between this and other operating tests to be administered during this examination.

!l }v. ~

c. The operating test shall not duplicate items from the applicants' audit test(s)(see Section D .1.a).

A '}.. ~

d. Overlap with the written examination and between different parts of the operating test is within acceptable limits. 1\ 1 I~
e. It appears that the operating test will differentiate between competent and less-than-competent applicants at the designated license level.

~ ~ I~

2. WALK-THROUGH CRITERIA -- -- --
a. Each JPM includes the following, as applicable:
  • initial conditions initiating cues
  • references and tools, including associated procedures

~

  • reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time critical by the facility licensee operationally important specific performance criteria that include: 1 I~

- detailed expected actions with exact criteria and nomenclature

- system response and other examiner cues

- statements describing important observations to be made by the applicant

- criteria for successful completion of the task

- identification of critical steps and their associated performance standards

- restrictions on the sequence of steps, if applicable

~

b. Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of the acceptance criteria (e.g., item distribution, bank use, repetition from the last 2 NRC examinations) specified on those forms and Form ES-201 -2.

1\ h

3. SIMULATOR CRITERIA -- -- --

The associated simulator operating tests (scenario sets) have been reviewed in accordance with j\ Ill Form ES-301-4 and a copy is attached.

~

a. Author Jacob Eilertson/

AJJ N~ ) / ) Uure Date 9/ 17/1 4

b. Facility Reviewer (*) Pete Moodie/ ~ _;_/ 9/22/14 c.

d.

NRC Chief Examiner ~) t.l'l1tfiR£ (.. l'()tfl~IZ.I ~~ L~~

NRC SopeNi>Oc~~~

NOTE:

,,T6\t4-

/,?/V,Wfi /;l;?r!f#<-~~2fif"-';

// V

  • The facili& si~nature is not applicable for NRC-developed tests U _.
  1. Independent NRC reviewer initial items in Column "c"; chief examiner concurrence is required .

/_~

ES-301 , Page 24 of 27