ML22199A179
Jump to navigation
Jump to search
| ML22199A179 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 04/05/2022 |
| From: | Randy Baker NRC/RGN-III/DRS/OLB |
| To: | Constellation Energy Generation |
| Baker R | |
| Shared Package | |
| ML20140A267 | List: |
| References | |
| BW220023 | |
| Download: ML22199A179 (1) | |
Text
ES-401 Record of Rejected K/As Form ES-401-4 Facility: Braidwood Station Date of Exam: March 7 - 18, 2022 Tier /
Group Randomly Selected K/A Reason for Rejection SRO T1/G2 G 2.4.9 Replaced - G 2.4.47 Per CE recommendation, these 2 Generic K/As was swapped to better match the Tier objectives for the questions, precluding the need to reselect replacement K/A and maintain balanced coverage for the examination.
SRO T2/G2 G 2.4.47 Replaced - G 2.4.9