ML14365A122

From kanterella
Jump to navigation Jump to search
2014 Braidwood Station Initial License Examination Form ES-301-2 Rev 1
ML14365A122
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 11/24/2014
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
Shared Package
ML14344A989 List:
References
ES-301-2 50-456/OL-14, 50-457/OL-14
Download: ML14365A122 (2)


Text

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility:Braidwood Station Date of Examination: 11/10/14 Exam Level: RO SRO-I SRO-U Operating Test Number: 2014 301 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code*

Safety Function

a. SIM-102 Perform Movable Control Assembly Quarterly Surveillance D, S, P 1
b. SIM-205 Raise SI Accumulator level using 1B SI pump A, N, S 2
c. SIM-302 Transfer to Cold Leg Recirculation A, D, L, S 3
d. SIM-416S CD/CB Pump Trip N, S 4S
e. SIM-510 Start 1A CS pump for Surveillance M, S 5
f. SIM-608A Synchronize 1A DG and respond to Gov Adj and overspeed trip failures A, D, S 6
g. SIM-711 Place Channel Service Status from "Out of Service" to "In Service" N, S 7
h. SIM-801 Respond to a RCP Thermal Barrier Leak A, D, P, S 8

In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) i.IP-104 Local Reactor Trip A, D, E 1

j. IP-206 Local reset of Phase A D, E 2
k. IP-409S Locally start the 2B AF pump D, R 4S All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 /

4-6 / 2-3

< 9 /

< 8 / < 4

> 1 /

> 1 / > 1

> 1 /

> 1 / > 1

> 2 /

> 2 / > 1

< 3 / < 3 / < 2 (randomly selected)

> 1 /

> 1 / > 1

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Braidwood Station Date of Examination: 11/10/14 Exam Level: RO SRO-I SRO-U Operating Test Number: 2014 301 Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code*

Safety Function

a. SIM-102 Perform Movable Control Assembly Quarterly Surveillance D, S, P 1
b. SIM-205 Raise SI Accumulator level using 1B SI pump A, N, S 2
c. SIM-302 Transfer to Cold Leg Recirculation A, D, L, S 3
d. SIM-416S CD/CB Pump Trip N, S 4S
e.
f.

SIM-608A Synchronize 1A DG and respond to Gov Adj and overspeed trip failures A, D, S 6

g. SIM-711 Place Channel Service Status from "Out of Service" to "In Service" N, S 7
h. SIM-801 Respond to a RCP Thermal Barrier Leak A, D, P, S 8

In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

i.

IP-104 Local Reactor Trip A, D, E 1

j.

IP-206 Local reset of Phase A D, E 2

k. IP-409S Locally start the 2B AF pump D, R 4S All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 /

4-6 / 2-3

< 9 /

< 8 / < 4

> 1 /

> 1 / > 1

> 1 /

> 1 / > 1

> 2 /

> 2 / > 1

< 3 / < 3 / < 2 (randomly selected)

> 1 /

> 1 / > 1