8/11/2014 1
August14,2014 Nuclear WattsBarTPBARLoadingIncreaseLAR PreSubmittalMeeting Introduction 2
Nuclear
- PurposeofMeeting
- UpdateNRCManagementonTVAsPlantoSubmita LicenseAmendmentRequest(LAR)inJanuary2015 toIncreaseAllowableTPBARLoadingforWattsBar Unit1
8/11/2014 2
Agenda 3
Nuclear
- Introduction JimLemons
- Background MarkBurzynski
- DOETPBARLoadingPlans CarlaBorrelli
- TritiumPermeationExperience CherylThornhill
- ProjectedPathwayExposures MarkBurzynski
- PlantModifications CarlaBorrelli
- PostLOCAShutdownMarginAnalysis MarkBurzynski
- LicensingPlanandSchedule MarkBurzynski
- ClosingComments JimLemons
Background
4 Nuclear
- Background
- LicenseAmendment40IssuedonSeptember23,2002 AuthorizedLoadingUpto2304TPBARs
- AllowedLoadingSubsequentlyReducedtoAddressPost LOCAShutdownMarginIssues
- TVALetterDatedMarch22,2005NotifiedNRCofInterim CumulativeTPBARTritiumReleaseLimits
- WhileHigherthanProjectedPermeationRateswere Investigated
- LicenseAmendment77IssuedonMay4,2009Authorized LoadingUpto704TPBARs
8/11/2014 3
DOETPBARLoadingPlans 5
Nuclear
- DOETPBARLoadingPlansforWattsBarUnit1:
Cycle Date TPBARLoading TechSpecLimit C12 October 2012 544 704 C13 April2014 704 704 C14 October2015 704 704 C15 March2017 1104 1792*
C16 October2018 1504 1792*
C17 April2020 1792 1792*
- Proposed TritiumPermeation Experience(1/2) 6 Nuclear TVAandPNNLPerformedSurveillanceOfEstimatedTritium PermeationOverLast7CyclesofTPBARIrradiationfortheTritium ReadinessProgram.
- PermeationWasHigherthanOriginalDesignGoal,ButNoDesignorProduction FlawsHaveBeenIdentified.
Uncertaintybars represent90%
confidenceinterval
8/11/2014 4
TritiumPermeation Experience(2/2) 7 Nuclear OriginalFunctionalRequirementforTPBARTritiumPermeationinCycle6wasan Averageof1Ci/TPBAR/Year.
RadionuclideReleasestoEnvironmentatWBN1willbeManagedtoMeetNRC Requirementsin10CFRPart20and10CFRPart50AppendixI.
- ProposedManagementStrategyAssumesTPBARTritiumPermeationwillbe5.0 Ci/TPBAR/year.
ProjectedPathwayExposure(1/2) 8 Nuclear
- FSARChapter11RadiologicalConsequence AnalysesWillBeBasedon:
- ReleaseSourceTermBasedonNRCNUREG0017 MethodologytoCalculateanAverageMaximumHypothetical Release
- TPBARLoadingof1792TPBARs
- TPBARTritiumPermeationRateof5Curies/TPBAR/Year (BasedonConservativeUpperBoundofPlantData)
- UseofTVAQAComputerCodesGELCandQWATAto CalculateDosetoMaximumExposedOffsiteIndividual
8/11/2014 5
ProjectedPathwayExposure(2/2) 9 Nuclear
- ProjectedPathwayExposurestoMaximum HypotheticalIndividualRemainBelowNRCRegulatory LimitsforAllCases.
- ApplicableNRCRequirements(10CFRPart20and10 CFRPart50AppendixI)andTechnicalSpecifications WillBeMetforAllCases.
Pathways PreliminaryProjected Doses NRCLimit Liquid(Realistic) 0.75mremTotalBody 3mrem Liquid(Design) 0.81mremTotalBody Gaseous(Realistic) 1.29mremTotalBody 10mrem 10.86mremCriticalOrgan 15mrem Gaseous(Design) 1.29mremTotalBody 10mrem 11.34mremCriticalOrgan 15mrem PreliminaryResultsBasedon1700TPBARs PlantModifications(1/2) 10 Nuclear
- Additionof500,000GallonTritiatedWaterTank System
- IncreaseFlexibilitytoManageRCSFeedandBleed UnderContingencyScenariosandTimeEffluent ReleasestoEnvironment
- AllowsChangestoOperatingStrategyforRCSFeed andBleedtoKeepTritiumConcentrationsLowand SimplifyOccupationalExposureControls
- Implementedunder10CFR50.59
8/11/2014 6
PlantModifications(2/2) 11 Nuclear
- ReplaceCheckValvesUsedforThermalReliefon CCSandERCW SupplyLineswithReliefValves
- EliminatesPostLOCAManualOperatorActionsfor Isolation
- PreviouslyApprovedbyNRCinLicenseAmendment IssuedonMarch29,2004
- Eliminates40GPMSourceofUnboratedWater LeakageintoContainment(Assumedfor16Hours)
- Implementedunder10CFR50.59 PostLOCAShutdown MarginAnalysis(1/5) 12 Nuclear
- PostLOCAReactivityAnalysiswillBeConsistent withPreviouslyApprovedbyNRCforLicense Amendment77withtheFollowingKeyChanges:
- EliminationofDilutionofSumpWaterfrom40GPM UnboratedWaterInLeakage
- ReduceRequiredRCSBoronConcentrationbyIncreased IFBALoading
- ModificationofSimplifiedAssumptionsonTPBAR LithiumLeaching
- TimeDependentLeachingRateUsed
- PreliminaryResultsShowSufficientShutdown Marginfor1792TPBARs
8/11/2014 7
PostLOCAShutdown MarginAnalysis(2/5) 13 Nuclear
- XenonFreePostLOCA-RSACItem3.16B
Conclusion:
744ppmcorewith1792 TPBARs canaccommodatecycle variations PreLOCACb (ppm)
PostLOCACb (ppm)
Design Limit (ppm)
Margin (ppm)
HFP EQXECb =744ppm 1792TPBARs 644 1923.0 2135.3 212.3 PreliminaryResults PostLOCAShutdown MarginAnalysis(3/5) 14 Nuclear
- HotLegSwitchover-RSACItem3.16A
Conclusion:
1792TPBARcoreat744ppm withtimedependentleachratemeets requirements PreLOCACb (ppm)
PostLOCACb (ppm)
Design Limit (ppm)
Margin (ppm)
HFPEQXECb =744ppm 1792 TPBARs 644 1607.0 1736.5 129.5 PreliminaryResults
8/11/2014 8
PostLOCAShutdown MarginAnalysis(4/5) 15 Nuclear
- ColdLegRecirculation-RSACItem3.11B
Conclusion:
1792TPBARsat744ppm coremeetsrequirements.
PreLOCACb (ppm)
PostLOCACb (ppm)
Design Limit (ppm)
Margin (ppm)
HFPEQXECb =744ppm 1792TPBARs 644 1817.0 2041.2 224.2 PreliminaryResults PostLOCAShutdown MarginAnalysis(5/5) 16 Nuclear
- RefloodRecriticality-RSACItem3.11C
Conclusion:
1792TPBARcoreat744ppm withtimedependentleachratemeets requirements.
PreLOCACb (ppm)
SmallLBLOCA (Keff)
HFPEQXECb =744ppm 1792TPBARs 644 0.976000 0.993956 PreliminaryResults
8/11/2014 9
LicensingActivities 17 Nuclear
- LicenseAmendmentRequesttoSupportTritium ProductionRequirements
- UpdateofPostLOCAReactivityAnalysisPreviously ApprovedbyNRCforLicenseAmendment77
- WouldIncludeDiscussionofExpectedEffluent Releases(UsingRealisticSourceTerm)andRadwaste SystemDesignandStationDose(UsingDesignBasis SourceTerm)for1792TPBARs TechnicalSpecificationChanges 18 Nuclear
- TechnicalSpecification(TS)ChangetoNew TPBARLimit
- ReviseTS4.2.1toReflectNewUpperLimitof1792 onTPBARLoading
- DeleteOutdatedTPBARInformationinSurveillance Requirements4.5.1.4and4.5.4.3
8/11/2014 10 LicensingActivitiesSchedule 19 Nuclear Closing 20 Nuclear
- TVAPlanstoSubmitaLicenseAmendment Requestfor1792TPBARsinJanuary2015
- SupportingAnalyseswillBoundOperating ExperiencewithTritiumPermeation
- SupportingAnalyseswillReflectPlantModifications MadetoIncreaseMargins
- AllRegulatoryRequirementsandPlantTechnical Specificationswillbemetwith1792TPBARCore Design
8/11/2014 11 Questions 21 Nuclear