Meeting Slide for Watts Bar Nuclear Plant, Unit 1 Tpbar Loading Increase LAR Pre-Submittal Meeting
ML14231A067
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 08/11/2014
From:
Tennessee Valley Authority
To:
Office of Nuclear Reactor Regulation
Lingam S
Shared Package
ML14231A129 List:
References
Download: ML14231A067 (11)


Text

8/11/2014 1

August14,2014 Nuclear WattsBarTPBARLoadingIncreaseLAR PreSubmittalMeeting Introduction 2

Nuclear

  • PurposeofMeeting

- UpdateNRCManagementonTVAsPlantoSubmita LicenseAmendmentRequest(LAR)inJanuary2015 toIncreaseAllowableTPBARLoadingforWattsBar Unit1

8/11/2014 2

Agenda 3

Nuclear

  • Introduction JimLemons
  • Background MarkBurzynski
  • DOETPBARLoadingPlans CarlaBorrelli
  • TritiumPermeationExperience CherylThornhill
  • ProjectedPathwayExposures MarkBurzynski
  • PlantModifications CarlaBorrelli
  • PostLOCAShutdownMarginAnalysis MarkBurzynski
  • LicensingPlanandSchedule MarkBurzynski
  • ClosingComments JimLemons

Background

4 Nuclear

  • Background

- LicenseAmendment40IssuedonSeptember23,2002 AuthorizedLoadingUpto2304TPBARs

  • AllowedLoadingSubsequentlyReducedtoAddressPost LOCAShutdownMarginIssues

- TVALetterDatedMarch22,2005NotifiedNRCofInterim CumulativeTPBARTritiumReleaseLimits

  • WhileHigherthanProjectedPermeationRateswere Investigated

- LicenseAmendment77IssuedonMay4,2009Authorized LoadingUpto704TPBARs

8/11/2014 3

DOETPBARLoadingPlans 5

Nuclear

  • DOETPBARLoadingPlansforWattsBarUnit1:

Cycle Date TPBARLoading TechSpecLimit C12 October 2012 544 704 C13 April2014 704 704 C14 October2015 704 704 C15 March2017 1104 1792*

C16 October2018 1504 1792*

C17 April2020 1792 1792*

  • Proposed TritiumPermeation Experience(1/2) 6 Nuclear TVAandPNNLPerformedSurveillanceOfEstimatedTritium PermeationOverLast7CyclesofTPBARIrradiationfortheTritium ReadinessProgram.

- PermeationWasHigherthanOriginalDesignGoal,ButNoDesignorProduction FlawsHaveBeenIdentified.

Uncertaintybars represent90%

confidenceinterval

8/11/2014 4

TritiumPermeation Experience(2/2) 7 Nuclear OriginalFunctionalRequirementforTPBARTritiumPermeationinCycle6wasan Averageof1Ci/TPBAR/Year.

RadionuclideReleasestoEnvironmentatWBN1willbeManagedtoMeetNRC Requirementsin10CFRPart20and10CFRPart50AppendixI.

- ProposedManagementStrategyAssumesTPBARTritiumPermeationwillbe5.0 Ci/TPBAR/year.

ProjectedPathwayExposure(1/2) 8 Nuclear

  • FSARChapter11RadiologicalConsequence AnalysesWillBeBasedon:

- ReleaseSourceTermBasedonNRCNUREG0017 MethodologytoCalculateanAverageMaximumHypothetical Release

- TPBARLoadingof1792TPBARs

- TPBARTritiumPermeationRateof5Curies/TPBAR/Year (BasedonConservativeUpperBoundofPlantData)

- UseofTVAQAComputerCodesGELCandQWATAto CalculateDosetoMaximumExposedOffsiteIndividual

8/11/2014 5

ProjectedPathwayExposure(2/2) 9 Nuclear

  • ProjectedPathwayExposurestoMaximum HypotheticalIndividualRemainBelowNRCRegulatory LimitsforAllCases.
  • ApplicableNRCRequirements(10CFRPart20and10 CFRPart50AppendixI)andTechnicalSpecifications WillBeMetforAllCases.

Pathways PreliminaryProjected Doses NRCLimit Liquid(Realistic) 0.75mremTotalBody 3mrem Liquid(Design) 0.81mremTotalBody Gaseous(Realistic) 1.29mremTotalBody 10mrem 10.86mremCriticalOrgan 15mrem Gaseous(Design) 1.29mremTotalBody 10mrem 11.34mremCriticalOrgan 15mrem PreliminaryResultsBasedon1700TPBARs PlantModifications(1/2) 10 Nuclear

  • Additionof500,000GallonTritiatedWaterTank System

- IncreaseFlexibilitytoManageRCSFeedandBleed UnderContingencyScenariosandTimeEffluent ReleasestoEnvironment

- AllowsChangestoOperatingStrategyforRCSFeed andBleedtoKeepTritiumConcentrationsLowand SimplifyOccupationalExposureControls

- Implementedunder10CFR50.59

8/11/2014 6

PlantModifications(2/2) 11 Nuclear

  • ReplaceCheckValvesUsedforThermalReliefon CCSandERCW SupplyLineswithReliefValves

- EliminatesPostLOCAManualOperatorActionsfor Isolation

  • PreviouslyApprovedbyNRCinLicenseAmendment IssuedonMarch29,2004

- Eliminates40GPMSourceofUnboratedWater LeakageintoContainment(Assumedfor16Hours)

- Implementedunder10CFR50.59 PostLOCAShutdown MarginAnalysis(1/5) 12 Nuclear

  • PostLOCAReactivityAnalysiswillBeConsistent withPreviouslyApprovedbyNRCforLicense Amendment77withtheFollowingKeyChanges:

- EliminationofDilutionofSumpWaterfrom40GPM UnboratedWaterInLeakage

- ReduceRequiredRCSBoronConcentrationbyIncreased IFBALoading

- ModificationofSimplifiedAssumptionsonTPBAR LithiumLeaching

  • TimeDependentLeachingRateUsed
  • PreliminaryResultsShowSufficientShutdown Marginfor1792TPBARs

8/11/2014 7

PostLOCAShutdown MarginAnalysis(2/5) 13 Nuclear

  • XenonFreePostLOCA-RSACItem3.16B

Conclusion:

744ppmcorewith1792 TPBARs canaccommodatecycle variations PreLOCACb (ppm)

PostLOCACb (ppm)

Design Limit (ppm)

Margin (ppm)

HFP EQXECb =744ppm 1792TPBARs 644 1923.0 2135.3 212.3 PreliminaryResults PostLOCAShutdown MarginAnalysis(3/5) 14 Nuclear

  • HotLegSwitchover-RSACItem3.16A

Conclusion:

1792TPBARcoreat744ppm withtimedependentleachratemeets requirements PreLOCACb (ppm)

PostLOCACb (ppm)

Design Limit (ppm)

Margin (ppm)

HFPEQXECb =744ppm 1792 TPBARs 644 1607.0 1736.5 129.5 PreliminaryResults

8/11/2014 8

PostLOCAShutdown MarginAnalysis(4/5) 15 Nuclear

  • ColdLegRecirculation-RSACItem3.11B

Conclusion:

1792TPBARsat744ppm coremeetsrequirements.

PreLOCACb (ppm)

PostLOCACb (ppm)

Design Limit (ppm)

Margin (ppm)

HFPEQXECb =744ppm 1792TPBARs 644 1817.0 2041.2 224.2 PreliminaryResults PostLOCAShutdown MarginAnalysis(5/5) 16 Nuclear

  • RefloodRecriticality-RSACItem3.11C

Conclusion:

1792TPBARcoreat744ppm withtimedependentleachratemeets requirements.

PreLOCACb (ppm)

Intermediate LBLOCA (Keff)

SmallLBLOCA (Keff)

HFPEQXECb =744ppm 1792TPBARs 644 0.976000 0.993956 PreliminaryResults

8/11/2014 9

LicensingActivities 17 Nuclear

  • LicenseAmendmentRequesttoSupportTritium ProductionRequirements

- UpdateofPostLOCAReactivityAnalysisPreviously ApprovedbyNRCforLicenseAmendment77

- WouldIncludeDiscussionofExpectedEffluent Releases(UsingRealisticSourceTerm)andRadwaste SystemDesignandStationDose(UsingDesignBasis SourceTerm)for1792TPBARs TechnicalSpecificationChanges 18 Nuclear

  • TechnicalSpecification(TS)ChangetoNew TPBARLimit

- ReviseTS4.2.1toReflectNewUpperLimitof1792 onTPBARLoading

- DeleteOutdatedTPBARInformationinSurveillance Requirements4.5.1.4and4.5.4.3

8/11/2014 10 LicensingActivitiesSchedule 19 Nuclear Closing 20 Nuclear

  • TVAPlanstoSubmitaLicenseAmendment Requestfor1792TPBARsinJanuary2015

- SupportingAnalyseswillBoundOperating ExperiencewithTritiumPermeation

- SupportingAnalyseswillReflectPlantModifications MadetoIncreaseMargins

- AllRegulatoryRequirementsandPlantTechnical Specificationswillbemetwith1792TPBARCore Design

8/11/2014 11 Questions 21 Nuclear