MONTHYEARML18302A2282018-10-19019 October 2018 Itt Enidine - USNRC 10CFR Part 21 Notification ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML15243A1742015-08-25025 August 2015 Part 21 Furmanite Nuclear Grade Leak Seal Material FSC-N-1B ML14365A0592014-12-23023 December 2014 Part 21 Notification - Baldor AC Motors with Potential Bearing End Cap Alignment Issues ML14210A0102014-07-23023 July 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML14204A7072014-07-23023 July 2014 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV ML14112A4812014-04-15015 April 2014 Letter from James Thigpen Nuclear Nonconformance Event Number 50017 ML14079A0272014-03-13013 March 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13044A0752013-02-0808 February 2013 Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology ML12347A3082012-12-12012 December 2012 Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology ML12283A2462012-09-28028 September 2012 Part 21 - Fairbanks Morse Opposed Piston EDG Oil Pump Leak ML12319A0122012-09-27027 September 2012 Error in Main Steam Line High Flow Calculational Methodology ML12158A4472012-06-0606 June 2012 Part 21 60-Day Interim Report Notification - Closufailure of CRD Collet Retainer Tube/Outer Tube Weld ML1127000672011-09-26026 September 2011 GE-Hitachi Part 21 Reportable Condition Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance ML1025202192010-09-0303 September 2010 Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance ML1018907392010-07-0101 July 2010 Part 21 Report Concerning Failure of Turbine Overspeed Reset Control Valve Diaphragm ML0701704602007-01-0808 January 2007 10CFR21 for FMEA and Pre-installation Setup of Woodward Digital Reference Unit (Dru); Fairbanks Morse Engine Reporting Id# 06-05 ML0602502602006-01-12012 January 2006 Attachment to 10CFR21 for Woodward Dru Fm Id# 06-01 ML0232901622002-11-18018 November 2002 Final Report, Stability Option III: Possible Successive Confirmation Count Resets - Not Reportable 2018-10-19
[Table view] Category:Deficiency Report (per 10CFR50.55e and Part 21)
MONTHYEARML22301A1742022-10-28028 October 2022 Global Nuclear Fuel Americas, LLC (GNF) - Part 21 60-Day Interim Report Notification: GNF3 Raised Water Rod (SC-22-04 Rt) ML19347A4262019-12-10010 December 2019 General Atomics - Reportable Occurrence Under 10CFR21: Reported Failure in Analog High Range Radiation Monitor (RP-2C) ML19121A1552019-04-15015 April 2019 Curtiss-Wright Nuclear Division, Enertech - 10 CFR Part 21 Notification for SF-1154 Hydraulic Fluid ML19101A0972019-04-0404 April 2019 Weir Valves & Controls USA, Inc. Part 21 Written Notification - Event Number: 53973 - 24 Class 150 Globe Alve for RHRSW HX Isolation MOV, E1150F068B at Detroit Edison - Fermi, Unit 2, Experienced Two Stem Failures ML19087A2512019-03-11011 March 2019 Weir Valves & Controls USA, Inc. - 10 CFR Part 21 Report: 24 Class 150 Globe Failed to Fully Open Due to the Failure of the Anti-Rotation Key ML18302A2282018-10-19019 October 2018 Itt Enidine - USNRC 10CFR Part 21 Notification ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML16294A2642016-10-18018 October 2016 Part 21 Report - Defective Current to Pressure Transducers ML16209A0502016-07-13013 July 2016 Part 21 - Furmanite Nuclear Grade Leak Seal Material FSC-N-1B ML15288A1992015-10-0909 October 2015 Part 21 Interim Report - Potential Defect on P/N 535-601 Moore Industries Milliamp Modules ML15223B2632015-08-10010 August 2015 Notification of Part 21 Interim Report - Potential Defect on P/N 535-601 Moore Industries Milliamp ML15223B2642015-08-0606 August 2015 Part 21 Report - Notification of Deviation Regarding Hk Circuit Breaker Pivot Pin ML15103A2442015-04-0606 April 2015 Part 21 Report - Deviation of Hk Circuit Breaker Close Latch Spring ML14365A0592014-12-23023 December 2014 Part 21 Notification - Baldor AC Motors with Potential Bearing End Cap Alignment Issues ML14274A0522014-09-22022 September 2014 Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities ML14265A0492014-09-12012 September 2014 Amendment to Part 21 Report from Abb, Inc Re Deviation of K-Line Circuit Secondary Close Latch (Event #50371) ML14237A1212014-08-15015 August 2014 Notification of Potential Part 21 Re Notice of Deviation Regarding K-Line Circuit Breaker Secondary Close Latch ML14210A0102014-07-23023 July 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML14204A7082014-07-23023 July 2014 Enclosure 2, Description of Closure Evaluation, Non-Proprietary Information - Class I (Public) ML14204A7072014-07-23023 July 2014 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV ML14112A4812014-04-15015 April 2014 Letter from James Thigpen Nuclear Nonconformance Event Number 50017 ML14101A3442014-04-10010 April 2014 Notification of Part 21 - Potential Defect in Motors Shipped to DTE Electric Co ML14072A3262014-03-13013 March 2014 Enclosure 2: Description of Evaluation ML14072A3282014-03-13013 March 2014 Part 21 60-Day Interim Report Notification Re Unseating of Valve Spring on SSPV ML13340A3822013-12-0505 December 2013 Part 21 Reportable Condition Notification: Failure of Relay Logic Card Modules in 2 Out of 4 Voters ML13284A0842013-10-0303 October 2013 Deficiency Report from Baldor Electric Co., on Nuclear Nonconformance Event No. 49302 ML13238A2532013-08-21021 August 2013 Notification of Potential Part 21 Report - Foxboro Power Supply Potential Failures Due to Defective the Wraps and Holders ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13093A1542013-04-0202 April 2013 Part 21 Notification - Protective Relays May Not Be Qualified for Harsh Environments ML13093A1532013-04-0202 April 2013 Part 21 Report - Foxboro Power Supply Potential Failures Due to Defective Tie Wraps and Holders ML13042A0962013-02-0808 February 2013 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Error in Main Steam Line High Flow Calculational Methodology ML13044A0752013-02-0808 February 2013 Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12347A3082012-12-12012 December 2012 Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology ML12283A2462012-09-28028 September 2012 Part 21 - Fairbanks Morse Opposed Piston EDG Oil Pump Leak ML12319A0122012-09-27027 September 2012 Error in Main Steam Line High Flow Calculational Methodology ML1219103372012-07-0202 July 2012 Update 10 CFR Part 21 Notification of Defective Moore 535 Controllers ML12177A0562012-06-21021 June 2012 Part 21 - Reliability Degradation of Resistors in Trip Units and Readout Assemblies ML12163A1302012-06-0606 June 2012 Part 21 Report - Failure of CRD Collet Retainer Tube/Outer Tube Weld ML12158A4472012-06-0606 June 2012 Part 21 60-Day Interim Report Notification - Closufailure of CRD Collet Retainer Tube/Outer Tube Weld ML12153A0302012-05-29029 May 2012 Part-21 Notification - Protective Relays May Not Be Qualified for Harsh Environments ML12040A2832012-02-0707 February 2012 Notification of Potential Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance ML12038A0282012-02-0202 February 2012 Failure of CRD Collet Retainer Tube/Outer Tube Weld ML12032A2402012-02-0101 February 2012 Notification of Potential Part 21 - 60-Day Interim Report Notification: Failure of CRD Collet Retainer Tube/Outer Tube Weld ML11228A0842011-08-12012 August 2011 Notification of Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance ML1122401422011-08-11011 August 2011 Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance ML1035001742010-12-15015 December 2010 Notification of Potential Part 21 Re 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance ML1035100312010-12-15015 December 2010 Notification of Potential Part 21 Report Concerning Failure to Include Seismic Input in Reactor Control Blade Customer Guidance 2022-10-28
[Table view] |
Text
410 ft ....... . Baldor Electric Company 2A ,-P. LD* 0. Box 250, 4349 Avery Drive A MEMBER OF THE ABB GROUP 30542 USA Flowery Branch,TelGA678.947.7350 April 15, 2014 To: Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555
Dear Sir or Madam:
In accordance with Title 10, Code of Federal Regulations, Part 21, Baldor Electric is making Written and Final Notification as required by 10CFR21.21 for event #50017.
A. Name and address of the individual informing the NRC.
James Thigpen Quality Assurance Manager Baldor Electric/Gainesville Motor Plant 4349 Avery Drive Flowery Branch, Georgia 30506 B. Identification of Basic Component being Supplied.
AC Motor C. Name of firm supplying basic component.
Baldor Electric/Gainesville Motor Plant 4349 Avery Drive Flowery Branch, Georgia 30506 D. Nature of the defect, deviation, or failure to comply.
Subject:
Nuclear Nonconformance Event Number 50017 This is a reportable 10CFR21 notification because we believe it is possible that the B1038686-010 TI, 1E motor shipped by Baldor Electric, contains a design where the shaft journal is not long enough to allow the proper fit between the motor shaft and the o-ring of the inpro seal rotating element.
The motor (B1038686-010 T2) returned for evaluation under RA310488951 was in response to the inpro seal separating. Upon inspection Baldor has determined the shaft journal is not long enough to allow the proper fit between the motor shaft and the o-ring of the inpro seal rotating element.
/
Baldor Electric Company BAD O
- P. 0. Box 250, 4349 Avery Drive Flowery Branch, GA 30542 USA A MEMBER OF THE ABB GROUP Tel 678.947.7350 STEPS TAKEN TO PREVENT FUTURE OCCURRENCES A review was completed by design engineering to determine this design issue has only occurred for the Specification ID B1038686, of which Baldor has only shipped the 2 motors identified below.
Baldor has notified DTE Electric Company's Quality Assurance of our findings. We have initiated replacement of the motor identified as located at DTE, Enrico Fermi Power Plant 2.
The design of the shaft/inpro seal fit has been completed to correct the issue. Motor Bill of materials for the effected specification ID B1038686 has been corrected.
Engineering has also added this specific verification for sign off during the engineering design review process documented for all nuclear orders.
CONCLUSION The two motors identified need to be repaired or replaced.
The correction of the design for Spec. ID B589345 has already been implemented and verified to be correct.
Baldor has confirmed the motor with a failed inpro seal as received is still equivalent to IP55. Grease from the DE bearing will still be retained as intended, and water ingress into the motor would only occur if sprayed directly.
Baldor recommends continued use of B1038686-01OTI until the next outage unless direct spray is expected. Baldor has notified DTE that we will be manufacturing a complete motor per the revised bill of material to replace B1038686-01OTI which is currently in service.
B1038686-010T2, which is currently in Baldor's possession, will be repaired by changing the rotating assembly with the revised design.
D. The Discovery Date.
March 13, 2014.
E. The Quantity and Location of Motors Affected.
PART/COMPONENT NUMBER:
- 1) B1038686-010 TI & T2 DTE P/N 100309425
Baldor Electric Company 2A El EIDO R* P.O. Box 250, 4349 Avery Drive Flowery Branch, GA 30542 USA A MEMBER OF THE ABB GROUP Tel 678.947.7350 1 2 DTE Electric PO # 4700670925L/I 4700670925L/I End User/Sold to: DTE Electric Co. DTE Electric Co.
Motor PIN 100309425 100309425 Motor S/N B1038686-010 T1 B1038686-010 T2 Shipped On: 11/14/13 11/16/13 Replacement Will remain Motor ID B1 130579-010 Ti B1038686-010 T2 Motor returned to Motor in service at Baldor ,Flowery DTE, Enrico Fermi Branch for Inpro Status Power Plant 2 seal replacement.
F. The Corrective Action which has been completed.
Baldor has notified DTE Electric Company's Quality Assurance of our findings through our sales channel. Through them we have initiated replacement of the motor identified as located at DTE, Enrico Fermi Power Plant 2.
A review was completed by design engineering to determine this design issue has only occurred for the Specification ID B1038686, of which Baldor has only shipped the 2 motors identified above. The design of the shaft/inpro seal fit has been completed to correct the issue.
Baldor initiated corrective action per Baldor CAR-00420 on March 17, 2014 which was completed and received final approval by James Thigpen QA manager Baldor. Final verification of actions will be and verified for effectiveness by 7/15/2014.
G. Other Information.
Separation of the rotating element from the inpro seal obviously reduces the full effectiveness of the inpro seal.
However, if this were to occur, the motor is still functional.
Baldor has confirmed the motor with a failed inpro seal as received is still equivalent to IP55. Grease from the DE bearing will still be retained as intended, and water ingress into the motor would only occur if sprayed directly.
Sincerely, Mr. James Thigpen Quality Assurance Manager, Gainesville Motor Plant Baldor Electric Co.