Notification of Part 21 - Potential Defect in Motors Shipped to DTE Electric Co
ML14101A344
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 04/10/2014
From: Thigpen J
Baldor Electric Co
To:
Office of Nuclear Reactor Regulation
References
50017
Download: ML14101A344 (5)


Text

0411012014 Paoo 1

.. /.0/...4.U.S.

Nuclear Re..ulal.rv Com nn fln.ratin.s Ce.nter Event Rnrt P,

aI,, I Part 21 (PAR)

Event #

50017 Rep Org: BALDOR ELECTRIC CO.

Notification Date / Time: 04/09/2014 15:19 (EDT)

Supplier: BALDOR ELECTRIC CO.

Event Date I Time: 03/19/2014 (EDT)

Last Modification: 04/09/2014 Region:

1 Docket #:

City: FLOWERY BRANCH Agreement State:

Yes County:

License #:

State: GA NRC Notified by: JAMES THIGPEN Notifications:

MALCOLM WIDMANN R2DO HQ Ops Officer: STEVE SANDIN PATTY PELKE R3DO Emergency Class: NON EMERGENCY NRR PART 21 GROUP EMAIL 10 CFR Section:

21.21(d)(3)(i)

DEFECTS AND NONCOMPLIANCE PART 21 - POTENTIAL DEFECT IN MOTORS SHIPPED TO DTE ELECTRIC COMPANY The following is excerpted from a report received by fax:

"NUCLEAR NONCONFORMANCE REPORT "1. CUSTOMER: DTE Electric Company, P.O. BOX 44440, DETROIT MI 48244 "2. PURCHASE ORDER: 4700670925 - QTY 2 "3. PART/COMPONENT NAME: AC MOTORS "4. PART/COMPONENT#: B1038686-010 T1/DTE P/N 100309425 and B1038686-010 T2/DTE P/N 100309425 "5. QUANTITY ON HAND - 1 SHIPPED-2 "6. LOCATION OF ALL UNITS: Motor in service at DTE, Enrico Fermi Power Plant 2 (Qty 1) and at Baldor Gainesville Motor Plant (Qty 1)

"7. DATE NONCONFORMANCE ASCERTAINED: March 13, 2014 "8. DESCRIPTION OF DEFECT/NONCONFORMANCE: This is a reportable 10CFR21 notification because we believe it is possible that the B1038686-010 T1, 1E motor shipped by Baldor Electric, contains a design where the shaft journal is not long enough to allow the proper fit between the motor shaft and the o-ring of the inpro seal rotating element.

0411012014 U.S. Nuclear Regulatory Commission Operations Center Event Report Pame 2 "The motor (BI038686-010 T2) returned for evaluation under RA310488951 was in response to the inpro seal separating. Upon inspection Baldor has determined the shaft journal is not long enough to allow the proper fit between the motor shaft and the o-ring of the in pro seal rotating clement.

"9. CORRECTIVE ACTION TAKEN: Baldor has notified DTE Electric Company's Quality Assurance of our findings. Through them we have initiated replacement of the motor identified as located at DTE, Enrico Fermi Power Plant 2.

"A review was completed by design engineering to determine this design issue has only occurred for the Specification ID B1038686, of which Baldor has only shipped the 2 motors identified above. The design of the shaft/inpro seal fit has been completed to correct the issue.

"10. ANY ADVICE RELATED TO DEFECT/NONCONFORMANCE: Separation of the rotating element from the in pro seal obviously reduces the full effectiveness of the in pro seal. However, if this were to occur, the motor is still functional. Baldor has confirmed the motor with a failed inpro seal as received is still equivalent to IP55. Grease from the DE bearing will still be retained as intended, and water ingress into the motor would only occur if sprayed directly. Baldor recommends continued use of B1038686-01OT1 until the next outage unless direct spray is expected. B1038686-010T2, which is currently in Baldor's possession, will be repaired by changing the rotating assembly. Baldor has notified DTE that we will be manufacturing a complete motor per the revised bill of material to replace B1038686-010TI which is currently in service.

"11. INDIVIDUAL COMPLETING THIS REPORT: James Thigpen, QA Manager, Baldor Electric, Gainesville, GA 30506, April 09, 2014"

04/09/2014 WED 15:19 FAX 0001/003 FAX Date 3S.&TDO03 IS A.tl.Do1Z

-) Ui',XG.

FFECLItA;NC~r.

04/09/2014 Number of pages including cover sheet 3

To: NRC Operations Center From: James Thigpen Quality Assurance Mgr.

Baldor Electric Co.

4349 Avery Drive PO Box 250 Flowery Branch, Ga. 30542 Phone 301-816-5100 email jlthigpen@baldor.com Fax Phone 301-816-5151 Cc:

Phone (678) 947-7272 Fax Phone 678-947-7295 Remarks:

Er Urgent Z

For your review

[] Reply ASAP LI Please comment i have attached a Nuclear Nonconflormance Report which I am submitting in accordance with our quality pIln Iproedlue RGG(SOP)-0047 rev. 3. Procedure for I OCFR21 Implementation. I will need to know what event number oou have assigned to this nonconformance report so I caml complete a ibrmal notification as required by the procedures.

T'hank you.

James TIhigpen

04/09/2014 WED 15: 19 FAX BAfLDOw 0002/003 Reliance Electric P. 0. Box 250. 4349 Avery Drive Flowery Branch, GA 30542 USA Tel 678.947.7350 April 09, 2014 TITLE: Initial Notification Report-To:

NRC Operations Center Phone 301-816-5100 Fax 301-816-5151 D)ear Sir or Madam:

NUCLEAR NONCONFORMANCE REPORT

1. CUSTOMER:

DTE Electric Company P.O. BOX 44440 1ETROIT MI 48244

2. I I-RCIHASE ORI)ER:
1) 47()()670925 - QTY 2
3. PART/COMPONENT NAME: AC MOTORS
4. PART/COMPONENT #: 1) B1038686-010 TI
2) B 1038686-010 T2 I)TE P/N 100309425 DTE P/N 1.00309425
5. QUANTITY ON HtAND - I SHIPPED - 2
6. LOCATION OF ALL UNITS 1) Motor in service at ITE, Enrico Fermi Power Plant 2 (Qty 1)
2) At Baldor Gainesville Motor Plant (Qty 1)
7. DATE NONCONFORMANCE ASCERTAINED: March 13, 2014
8. DESCRIPTION OF DEFECT/NONCONFORMANCE: This is a reportable 10CFR21 notification because we believe it is possible that the 131038686-010 TI, IE motor shipped by Baldor Electric, contains a design where the shaft journal is not long enough to allow the proper fit between the motor shaft and the o-ring of the inpro seal rotating clement.

The motor (131038686-010 T2) returned for evaluation under RA310488951 was in response to the inpro seal separating. Upon inspection Baldor has determined the shaft journal is not long enough to allow the proper fit between the motor shaft and the o-ring of the inpro seal rotating element.

04/09/2014 WED 15:19 FAX 2003/003

"*"A&

D O

Reliance Electric B A LO P. 0 Box 250,44349 Avery rive Flowery Branch, GA 30542 USA i L-i", :

he. AB,

' C2OUP Te! 678.947.7350

9. CORRECTIVE ACTION TAKEN: Baldor has notified WIFE Electric Company's Quality Assurance of our findings. Through themn we have initiated replacement of the motor identified as located at I)TE, Enrico Fermi Power Plant 2.

A review was completed by design engineering to determine this design issue has only occurred for the Specification ID B1038686, of which Baldor has only shipped the 2 motors identified above. Thlie design of the shaft/inpro seal fit has been completed to correct the issue.

10. ANY ADVICE RELATEI)TO l)EFECT/NONCONFORMANCE: Separation of the rotating element from the inpro seal obviously reduces the full effectiveness of the inpro seal. However, if this were to occur, the motor is still functional.

Baldor has confirmed the motor with a failed inpro seal as received is still equivalent to IP55. Grease from the DEE bearing will still be retained as intended, and water ingress into the motor would only occur if sprayed directly.

Baldor recommends continued use of B1038686-01OTI until the next outage unless direct spray is expected. B1038686-010T2, which is currently in Baldor's possession, will be repaired by changing the rotating assembly. Baldor has notified DTE that we will be manufacturing a complete motor per the revised bill of material to replace 1B1038686-1lOTJ which is currently in service.

11. INDIVI)UAL COMPLETING THIlS IREPORIT
  • iames Thigpen QA Manager, Baldor Electric Gainesville, GA 30506 April 09, 2014