Category:Letter
MONTHYEARIR 05000348/20240032024-11-13013 November 2024 Integrated Inspection Report 05000348/2024003, 05000364/2024003 and 07200042/2024001 IR 05000348/20244032024-11-13013 November 2024 – Security Baseline Inspection Report 05000348/2024403 & 05000364/2024403 NL-24-0364, Notification of Deferral of Baffle Former Bolt Inspections from Farley 1R33 to 1R342024-10-31031 October 2024 Notification of Deferral of Baffle Former Bolt Inspections from Farley 1R33 to 1R34 NL-24-0392, Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-0022024-10-28028 October 2024 Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-002 NL-24-0396, Response to Request for Additional Information Related to Relief Request to Defer Charging Pump and Mini-Flow Isolation Valve Inservice Testing2024-10-25025 October 2024 Response to Request for Additional Information Related to Relief Request to Defer Charging Pump and Mini-Flow Isolation Valve Inservice Testing NL-24-0384, Request for Alternative RR-PR-04 for Inservice Testing of the 2A, 2B, and 2C Charging Pumps and Mini-Flow Isolation Valves2024-10-18018 October 2024 Request for Alternative RR-PR-04 for Inservice Testing of the 2A, 2B, and 2C Charging Pumps and Mini-Flow Isolation Valves NL-24-0320, License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,.2024-09-27027 September 2024 License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,. NL-24-0349, Units 1 and 2 - 10 CFR 26.719(c)(1) 30-Day Report Blind Performance Test Results Inconsistent with Sample Provided2024-09-20020 September 2024 Units 1 and 2 - 10 CFR 26.719(c)(1) 30-Day Report Blind Performance Test Results Inconsistent with Sample Provided NL-24-0341, Response to Request for Additional Information Related to the Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency2024-09-10010 September 2024 Response to Request for Additional Information Related to the Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency IR 05000348/20244012024-09-10010 September 2024 Security Baseline Inspection Report 05000348-2024401 and 05000364-2024401 ML24247A1102024-09-0505 September 2024 Corporate Notification Letter Aka 210-day Letter NUREG Rev 12 NL-24-0259, License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes2024-09-0404 September 2024 License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes NL-24-0340, Unit 1 - Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R322024-09-0404 September 2024 Unit 1 - Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R32 ML24242A1332024-08-29029 August 2024 Issuance of Amendment Nos. 250 and 247, Regarding License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature, Actions (EPID L-2024-LLA-0098) - Non-Proprietary ML24240A0812024-08-27027 August 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Revised Completion Time ML24233A0022024-08-27027 August 2024 Request for Withholding Information from Public Disclosure for Joseph M. Farley Nuclear Plant, Units 1 and 2, License Amendment Request Supplement to Change Technical Specification 3.6.5, Containment Air Temperature Actions IR 05000348/20240052024-08-26026 August 2024 Updated Inspection Plan for Joseph M. Farley Nuclear Plant, Units 1 and 2 - Report 05000348/2024005 and 05000364/2024005 IR 05000348/20244022024-08-26026 August 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000348/2024402 and 05000364/2024402 ML24226B2112024-08-22022 August 2024 Regulatory Audit Summary in Support of License Amendment Requests to Revise Technical Specification 3.6.5, Containment Air Temperature, Actions NL-24-0321, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information2024-08-16016 August 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information IR 05000348/20240022024-08-12012 August 2024 – Integrated Inspection Report 05000348-2024002 and 05000364-2024002 and Exercise of Enforcement Discretion ML24215A3772024-08-0707 August 2024 2024 Farley Requal Inspection Corporate Notification Letter ML24201A2032024-08-0101 August 2024 Request for Withholding Information from Public Disclosure for Joseph M. Farley Nuclear Plant, Units 1 and 2, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions ML24200A1392024-07-25025 July 2024 Regulatory Audit in Support of Review of the License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature ML24199A2072024-07-24024 July 2024 TS 3-6-5 LAR - Individual Notice Transmittal Letter and NSHC - Rev 1 (1) - Letter NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 NL-24-0281, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions2024-07-18018 July 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML24184A0452024-07-0202 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A3762024-07-0101 July 2024 Nonacceptance of Requested Licensing Action License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature, Using Risk-Informed Process for Evaluations NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0230, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-3602024-06-28028 June 2024 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-360 NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in 05000348/LER-2024-002-01, Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel2024-06-19019 June 2024 Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) 05000348/LER-2024-001, Pressurizer Safety Valve Lift Pressure Outside of Technical Specifications Limits Due to Setpoint Drift2024-06-17017 June 2024 Pressurizer Safety Valve Lift Pressure Outside of Technical Specifications Limits Due to Setpoint Drift NL-24-0238, RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information2024-06-14014 June 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information NL-24-0229, Notice of Intent to Pursue Subsequent License Renewal2024-06-0707 June 2024 Notice of Intent to Pursue Subsequent License Renewal ML24149A0492024-06-0404 June 2024 SNC Fleet - Regulatory Audit in Support of Review of the License Amendment Request to Revise TS 1.1, Use and Application Definitions, and Add New Technical Specification 5.5.21 and 5.5.17, Online Monitoring Program, ML24143A0412024-05-28028 May 2024 Supplemental Information Needed for Using the Risk-Informed Process for Evaluation for the LAR to Change Technical Specification 3.6.5, Containment Air Temperature, Actions NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 NL-24-0188, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 IR 05000348/20240012024-04-24024 April 2024 Integrated Inspection Report 05000348/2024001 and 05000364/2024001 NL-24-0137, RIPE License Amendment Request to Change Containment Air Temperature Actions2024-04-19019 April 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions IR 05000348/20240102024-04-16016 April 2024 NRC Inspection Report 05000348/2024010 and 05000364/2024010 05000364/LER-2024-002, For Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel2024-04-15015 April 2024 For Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel IR 05000348/20240112024-04-12012 April 2024 Fire Protection Team Inspection Report 05000348/2024011 and 05000364/2024011 2024-09-05
[Table view] Category:License-Operator
MONTHYEARML23221A3292023-08-0909 August 2023 Post Examination Comments from Applicants and Facility.Pdf NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. IR 05000348/20233012022-08-0101 August 2022 Notification of Licensed Operator Initial Examination 05000348/2023301 and 05000364/2023301 NL-22-0240, SNC Response to Regulatory Issue Summary 2022-01: Preparation and Scheduling of Operator Licensing Examinations2022-03-31031 March 2022 SNC Response to Regulatory Issue Summary 2022-01: Preparation and Scheduling of Operator Licensing Examinations ML21286A6692021-10-13013 October 2021 301 2B ML21216A0992021-08-0404 August 2021 File 2B Administrative Items ML21216A1022021-08-0404 August 2021 File 2A3 Exam Administrative Items ML21214A3232021-08-0202 August 2021 301 SRO Written - Applicant Version ML21214A3172021-08-0202 August 2021 301 Exam RO Written - Applicant Version IR 05000324/20213642021-06-11011 June 2021 Exam Approval Letter 05000348/2021-301 and 05000324/2021-364 ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 IR 05000348/20203012020-12-0707 December 2020 05000348/2020301 & 05000364/2020301 2A-3 Exam Admin Items - Delayed Release ML20342A1382020-12-0707 December 2020 05000348/2020301 & 05000364/2020301 Adams 2B Exam Admin Items - Normal Release ML20342A2062020-12-0707 December 2020 2A-2 Final Op Test Items - Delayed Release ML20276A1282020-10-0202 October 2020 301 Post Exam Comments (PII Redacted) ML20276A1302020-10-0202 October 2020 Final SRO Exam Farley 2020-301 ML20276A1292020-10-0202 October 2020 Final RO Exam Farley 2020-301 NL-20-0265, SNC Response to Regulatory Issue Summary 2020-01: Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 SNC Response to Regulatory Issue Summary 2020-01: Preparation and Scheduling of Operator Licensing Examinations ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19239A4582019-08-27027 August 2019 Farley 2019 Post Examination Comments and Documentation ML19100A3572019-04-10010 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for Joseph M. Farley Nuclear Plant ML19045A3712019-02-12012 February 2019 March 2019 GFE Cover Letter Rii ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 ML18312A0902018-11-0808 November 2018 Exam Corporate Notification Letter Aka 210-day Letter NL-18-0550, Response to Regulatory Issue Summary 2018-02 - Preparation and Scheduling of Operator Licensing Examinations2018-04-23023 April 2018 Response to Regulatory Issue Summary 2018-02 - Preparation and Scheduling of Operator Licensing Examinations ML18086B0442018-02-16016 February 2018 Facility Cover Letter - Rii - March 2018 - GFE ML17212A4102017-07-31031 July 2017 301 Exam Administrative Items - Delay Release 2 Yrs ML17212A3752017-07-31031 July 2017 301 Exam Final Items - Delay Release 2 Yrs ML17212A4482017-07-31031 July 2017 301 Exam Administrative Items ML17137A3392017-05-17017 May 2017 301 Post Exam Comments ML17137A3342017-05-17017 May 2017 301 Final As-Given SRO Written Exam with Answer Key - (Delay Release 2 Years) ML17137A3162017-05-17017 May 2017 301 Final As-Given RO Written Exam with Answer Key - Delay Release 2 Years ML17137A1812017-05-17017 May 2017 Update SRO Written Answer Key Post Appeal ML17102B2332017-04-0707 April 2017 Operator Written Examination Approval 05000348/2017301 and 05000364/2017301 ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16259A0202016-09-13013 September 2016 Notification of Licensed Operator Initial Examination 05000348/2017301 and 05000364/2017301 ML16049A5112016-02-18018 February 2016 Initial Exam 2015-301 Final Administrative JPMs ML16049A5012016-02-18018 February 2016 Initial Exam 2015-301 Draft Administrative JPMs ML16049A5022016-02-18018 February 2016 Initial Exam 2015-301 Final Administrative Documents ML16049A4932016-02-18018 February 2016 Initial Exam 2015-301 Draft Administrative Documents ML16049A4942016-02-18018 February 2016 Initial Exam 2015-301 Draft RO Written Exam ML16049A5002016-02-18018 February 2016 Initial Exams 2015-301 Draft Sim In-Plant JPMs ML16049A4982016-02-18018 February 2016 Initial Exam 2015-301 Draft Simulator Scenarios ML16049A5062016-02-18018 February 2016 Initial Exam 2015-301 Final Simulator Scenarios ML16049A4952016-02-18018 February 2016 Initial Exam 2015-301 Draft SRO Written Exam ML16049A5122016-02-18018 February 2016 Initial Exam 2015-301 General Correspondence ML15316A1342015-11-10010 November 2015 Initial Exam 2015-301 Final SRO Written Exam ML16021A5012015-11-10010 November 2015 Initial Exam 2015-301 Post Exam Comments - PII Removed ML15316A1292015-11-10010 November 2015 Initial Exam 2015-301 Final RO Written Exam ML15120A4052015-04-28028 April 2015 Notification of Licensed Operator Initial Examination - 05000348/2015301 and 05000364/2015301 2023-08-09
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23221A3292023-08-0909 August 2023 Post Examination Comments from Applicants and Facility.Pdf NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. IR 05000348/20233012022-08-0101 August 2022 Notification of Licensed Operator Initial Examination 05000348/2023301 and 05000364/2023301 NL-22-0240, SNC Response to Regulatory Issue Summary 2022-01: Preparation and Scheduling of Operator Licensing Examinations2022-03-31031 March 2022 SNC Response to Regulatory Issue Summary 2022-01: Preparation and Scheduling of Operator Licensing Examinations ML21286A6692021-10-13013 October 2021 301 2B ML21216A1022021-08-0404 August 2021 File 2A3 Exam Administrative Items ML21216A0992021-08-0404 August 2021 File 2B Administrative Items ML21214A3172021-08-0202 August 2021 301 Exam RO Written - Applicant Version ML21214A3232021-08-0202 August 2021 301 SRO Written - Applicant Version IR 05000324/20213642021-06-11011 June 2021 Exam Approval Letter 05000348/2021-301 and 05000324/2021-364 ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20342A1382020-12-0707 December 2020 05000348/2020301 & 05000364/2020301 Adams 2B Exam Admin Items - Normal Release ML20342A2062020-12-0707 December 2020 2A-2 Final Op Test Items - Delayed Release IR 05000348/20203012020-12-0707 December 2020 05000348/2020301 & 05000364/2020301 2A-3 Exam Admin Items - Delayed Release ML20276A1292020-10-0202 October 2020 Final RO Exam Farley 2020-301 ML20276A1282020-10-0202 October 2020 301 Post Exam Comments (PII Redacted) ML20276A1302020-10-0202 October 2020 Final SRO Exam Farley 2020-301 NL-20-0265, SNC Response to Regulatory Issue Summary 2020-01: Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 SNC Response to Regulatory Issue Summary 2020-01: Preparation and Scheduling of Operator Licensing Examinations ML19239A4582019-08-27027 August 2019 Farley 2019 Post Examination Comments and Documentation ML19100A3572019-04-10010 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for Joseph M. Farley Nuclear Plant ML18312A0902018-11-0808 November 2018 Exam Corporate Notification Letter Aka 210-day Letter NL-18-0550, Response to Regulatory Issue Summary 2018-02 - Preparation and Scheduling of Operator Licensing Examinations2018-04-23023 April 2018 Response to Regulatory Issue Summary 2018-02 - Preparation and Scheduling of Operator Licensing Examinations ML17212A4102017-07-31031 July 2017 301 Exam Administrative Items - Delay Release 2 Yrs ML17212A3752017-07-31031 July 2017 301 Exam Final Items - Delay Release 2 Yrs ML17212A4482017-07-31031 July 2017 301 Exam Administrative Items ML17137A3392017-05-17017 May 2017 301 Post Exam Comments ML17137A3342017-05-17017 May 2017 301 Final As-Given SRO Written Exam with Answer Key - (Delay Release 2 Years) ML17137A3162017-05-17017 May 2017 301 Final As-Given RO Written Exam with Answer Key - Delay Release 2 Years ML17137A1812017-05-17017 May 2017 Update SRO Written Answer Key Post Appeal ML17102B2332017-04-0707 April 2017 Operator Written Examination Approval 05000348/2017301 and 05000364/2017301 ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16259A0202016-09-13013 September 2016 Notification of Licensed Operator Initial Examination 05000348/2017301 and 05000364/2017301 ML16049A5002016-02-18018 February 2016 Initial Exams 2015-301 Draft Sim In-Plant JPMs ML16049A4942016-02-18018 February 2016 Initial Exam 2015-301 Draft RO Written Exam ML16049A4932016-02-18018 February 2016 Initial Exam 2015-301 Draft Administrative Documents ML16049A5022016-02-18018 February 2016 Initial Exam 2015-301 Final Administrative Documents ML16049A5012016-02-18018 February 2016 Initial Exam 2015-301 Draft Administrative JPMs ML16049A5112016-02-18018 February 2016 Initial Exam 2015-301 Final Administrative JPMs ML16049A5122016-02-18018 February 2016 Initial Exam 2015-301 General Correspondence ML16049A4952016-02-18018 February 2016 Initial Exam 2015-301 Draft SRO Written Exam ML16049A5062016-02-18018 February 2016 Initial Exam 2015-301 Final Simulator Scenarios ML16049A4982016-02-18018 February 2016 Initial Exam 2015-301 Draft Simulator Scenarios ML15316A1342015-11-10010 November 2015 Initial Exam 2015-301 Final SRO Written Exam ML16021A5012015-11-10010 November 2015 Initial Exam 2015-301 Post Exam Comments - PII Removed ML15316A1292015-11-10010 November 2015 Initial Exam 2015-301 Final RO Written Exam ML15120A4052015-04-28028 April 2015 Notification of Licensed Operator Initial Examination - 05000348/2015301 and 05000364/2015301 ML14351A1022014-12-17017 December 2014 301 Final Administrative JPMs ML14351A1032014-12-17017 December 2014 301 Post Exam Comments ML14351A0942014-12-17017 December 2014 301 Final Simulator and in Plant JPMs ML14351A0542014-12-17017 December 2014 301 Draft Administrative Documents 2023-08-09
[Table view] |
See also: IR 05000348/2014301
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200
ATLANTA, GEORGIA 30303-1257
January 16, 2014
Mr. T. A. Lynch
Vice President
Southern Nuclear Operating Company, Inc.
Joseph M. Farley Nuclear Plant
P.O. Drawer 470, BIN B500
Ashford, AL 36312
SUBJECT: JOSEPH M. FARLEY NUCLEAR PLANT - NOTIFICATION OF LICENSED
OPERATOR INITIAL EXAMINATION - 05000348/2014301 AND
05000364/2014301
Dear Mr. Lynch:
In a telephone conversation on January 13, 2014, between Mr. Billy Thornton, Lead Instructor
Exam Development, and Mr. Daniel Bacon, Senior Operations Engineer, arrangements were
made for the administration of licensing examinations at the Farley Nuclear Plant. The
operating test is scheduled to be administered during the weeks of October 6 and October 13,
2014. The written examination is scheduled to be administered the week of October 20, 2014.
The on-site preparatory week is scheduled for the week of September 15, 2014.
As agreed during the telephone conversation, your staff will prepare both the operating test and
written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,
"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory
Commission (NRC) regional office will discuss with your staff any changes that might be
necessary before the examinations are administered. Your staff has also agreed to make
copies of all examination materials that are necessary for administering the examination.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outline by July 23, 2014. Mr. Daniel Bacon provided the written examination outline to your staff
on January 6, 2014. The operating test, written examination, and the supporting reference
materials identified in Attachment 3 to ES-201 will be due by August 22, 2014. Pursuant to Title
10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized
representative of the facility licensee shall approve the outline, examination, and test before
they are submitted to the NRC for review and approval. All materials shall be complete and
ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in
your response be contained in a separate enclosure and appropriately marked. Any delay in
receiving the required examination and reference materials, or the submittal of inadequate or
incomplete materials, may cause the examinations to be rescheduled.
T. Lynch 2
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications, medical certifications, and waiver
requests (if any) at least 30 days before the first examination date. If the applications are not
received at least 30 days before the examination date, a postponement may be necessary.
Signed applications certifying that all training has been completed should be submitted at least
14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget (OMB) under approval number 3150-0018, which expires on April 30,
2016. The public reporting burden for this collection of information is estimated to average 500
hours per response, including the time for reviewing instructions, gathering and maintaining the
data needed, writing the examinations, and completing and reviewing the collection of
information. Send comments on any aspect of this collection of information, including
suggestions for reducing the burden, to the Information and Records Management Branch (T-6
F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet
electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information
and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,
Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosures will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of the NRCs document
system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-
rm.adams.html (the Public Electronic Reading Room).
T. Lynch 3
Thank you for your cooperation in this matter. Mr. Billy Thornton has been advised of the
policies and guidelines referenced in this letter. If you have any questions regarding the NRC's
examination procedures and guidelines, please contact Mr. Daniel Bacon at (404) 997-4518,
(Internet E-mail: Daniel.Bacon@nrc.gov), or me at (404) 997-4662, (Internet E-mail:
Eugene.Guthrie@nrc.gov).
Sincerely,
/RA/
Eugene F. Guthrie,
Chief Operations Branch 2
Division of Reactor Safety
Docket Nos.: 50-348, 50-364
License Nos.: NPF-2, NPF-8
cc: Distribution via Listserv
_ML14021A070____________ xG SUNSI REVIEW COMPLETE G FORM 665 ATTACHED
OFFICE RII:DRS RII:DRS
SIGNATURE DXB2 GXG
NAME BACON GUTHRIE
DATE 01/15/2013 01/16/2013
E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO
Letter to T. A. Lynch from Eugene F. Guthrie dated January 16, 2014
SUBJECT: JOSEPH M. FARLEY NUCLEAR PLANT - NOTIFICATION OF LICENSED
OPERATOR INITIAL EXAMINATION - 05000348/2014301 AND
05000364/2014301
Distribution:
RIDSNRRDIRS
PUBLIC
RidsNrrPMFarley Resource