July 27, 1981 Docket No.
50-206 LS05-81 084 MEMORANDUM FOR:
William T. Russell, Chief Systematic Evaluation Program Branch, DL FROM:
Robert A. Hermann, Section Leader Systematic Evaluation Program Branch, DL Kenneth S. Herring Systematic Evaluation Program Branch, DL
SUBJECT:
TRIP REPORT: JUNE 1-3, 1981 MEETINGS WITH SOUTHERN CALIFORNIA EDISON REGARDING SAN ONOFRE UNIT 1 SEP SEISMIC REEVALUATION AND SSMRP AUXILIARY FEEDWATER SYSTEM SEISMIC ANALYSIS On June 1 through June 3, 1981, several meetings were held among representatives of the NRC and its consultants (LLNL and its subcontractors), and Southern California Edison (SCE) and its consultant (Bechtel) to obtain details regarding the San Onofre Unit 1 (SONGS 1) auxiliary feedwater (AFW) system related structures, systems, equipment, and components. This information is required for the NRC sponsored Seismic Safety Margins Research Program (SSMRP) seismic analyses of the SONGS 1 AFW system. In addition, a separate meeting between SCE and the NRC was held on June 1, 1981, to discuss the SCE seismic reanalysis scope and schedule under the Systematic Evaluation Program (SEP).
Significant items discussed at these meetings are described below.
SONGS 1 SSMRP AFW SYSTEM SEISMIC ANALYSIS June 1, 1981, was spent at the SONGS 1 site conducting a detailed walk-down of the SONGS 1 AFW system related structures, systems, equipment, and components.
This walk-dwon served to familiarize the NRC consultants, LLNL and its subcontrac tors, with the SONGS 1 AFW system to aid in their development of models and fault trees for the SSMRP seismic analysis.
June 2 and 3, 1981 was spent at the Bechtel and SCE offices in meetings among NRC, LLNL and its subcontractors, SCE and Bechtel discussing details of the SONGS 1 AFW system related structures, systems, equipment, and components.
As a result of the site visit and meetings, the list of additional information (Enclosure 1) was developed. This informa tion is required by LLNL, in addition to that already provided by SCE, to'perform the SSMRP seismic analysis of the SONGS 1 AFW system.
The information request contained in Enclosure 1 was provided to SCE at the June 3, 1981 meeting. Based upon discussions at this meeting, SCE agreed to provide LLNL with the requested information according to the schedule indicated in.,
OFFICE SURNAME 83107300126 810727 PDR ADOCK 05000206 BATE PDR c o.......o c...
I RD C YSO.......90 32 -2
[NRC FORM 318 1e/8)'NRCM 9240 OFFICIAL RECORD COPY
'tUSGPO: 1980-329-824
0 0
-2 Points at which LLNL and SCE structural seismic analysis results would be compared were determined by the NRC and LLNL after the June 1 and 2 meetings (Enclosure 2).
This was presented to SCE at the June 3 meeting. In addition, comparisons required to demonstrate the adequacy of the LLNL structural models were also discussed. Such comparisons are required for the verification of the adequacy of the LLNL structural models and large portions of their computer code, SMACS. This will also aid in the NRC verification of the Bechtel struc tural models and large portions of their computer code.
After much discussion among the representatives of the NRC, SCE, Bechtel, and LLNL and its subcontractors, the following conclusions regarding structural model verification were drawn:
- 1) For the Reactor and Diesel Generator Buildings, LLNL will perform seismic analyses using their models incorporating the same soil springs, and input time histories representing the ground spectra as were used by SCE in its previous analyses of these structures and the current analysis being performed to generate floor response spectra for the Reactor Building.
Results of the analyses will be reviewed for appropriate agreement.
- 2) Given the complexity of the soil representation for the Turbine, Fuel Storage, and Auxiliary and Control Buildings, SCE will provide the frequencies, mode shapes and model masses resulting from analyses of their models for the fixed-base analyses of their models for appropriate agreement.
IDENTIFICATION OF NRC CONCERNS Two areas of concern to the NRC were identified during the June 1 and 2, 1981 site visit and meetings:
- 1) Adequacy of the fire hose connection provided as a back-up water supply to the AFW pumps, and
- 2) SCE's preliminary identification of substantial structural modifications required for masonry wall connections, the North and South Turbine Building Extensions, the East and West Feedwater Heater Platforms, and the Fuel Storage Building.
As a result of our November 24 and 25, 1980 site visit and walk-down, SCE committed to install a fire hose connection to the suction side of the AFW pumps to provide an alternate water supply should an earthquake disable normal supply paths. This connection has been provided, however, approximately 20 feet of the connection between the reinforced flexible hose and the fire hydrant consisted of a pipe laying laterally unsupported some 2 X 4 lumber resting on the ground. The connection of the pipe to the hydrant did not appear to provide for sufficient ductility to allow for large displacements OFFICEO SURNAMEO BATE 0.....................3 4........
NRC FORM 318110/80) NRCM 0244)
OFFICIAL RECORD COPY
- .USGPO: 1980-329-82 4
of the pipe. Based upon our corments, SCE agreed to either support the section of pipe or replace it with a fire hose. We agreed that either was appropriate.
In addition, SCE pointed out an alternate fire hose AFW pump water supply path from the vicinity fire pump discharge to the AFW pumps. We encouraged the installation of this hose. These items should be followed up with SCE to verify that the appropriate actions have been taken in both areas.
The following structural modifications have been preliminary identified by SCE:
- 1) Addition of substantial lateral bracing from floor to ceiling in both the north-south and east-west directions for the North and South Turbine Building Extensions and the East and West Feedwater Heater Platforms to increase their lateral resistance to seismic motions. This is also required to prevent their impact with the Turbine Pedestal during a seismic event.
- 2) Increase of the connection capacities at the edges of masonry walls to provide sufficient resistance to out-of-plane seismic wall loads.
- 3) Replacement of the east masonry wall of the Fuel Storage Building with a 14 inch thick reinforced concrete wall and the addition of steel framing in the area of the building above the top of the spent fuel pool to the roof for lateral resistance to seismic motion. In addition, Roberts steel decking is to be added in the area of the structure above the top of the spent fuel pool for missile protection.
The structural members for the modifications discussed in I and 3 above have been layed-out and sized with a Bechtel stated 95% confidence in their adequacy, based upon preliminary Bechtel analyses.
Their analyses are scheduled for completion in October 1981.
In addition, the loads which the masonry wall connections must resist will be determined by August 1981.
However, SCE stated that no modifications were planned for installation until after the completion of the SEP integrated safety assessment.
Based upon our inspection of the in-situ structures, we do not feel that such an installation schedule is appropriate. All such significant structural modifications should be implemented no later than January 1, 1983. Further more, certain of these modifications have a greater safety significance than the others and should be implemented within approximately 6 months in the following order of priority:
- 1) Addition of the North Turbine Building Extension bracing. Failure of this structure, induced by an earthquake, would impair the function of safety related systems, including the main steam lines and their isola tion valves, the feedwater and AFW system lines, ECCS lines, and the power supply cables for the charging pumps, thereby eliminating paths OFFICEO SURNAMEO BATE NRC FORM 3
12I9................
N C
F
-NRC FORM 318 (1@/80) NRCM 9240 OFFICIAL RECORD COPY
- USGPO: 1980-329-824
-4 for providing water to the containment and the reactor.
With loss of both the feedwater (main and auxiliary) and ECCS lines, and charging
-pumps, no means of decay heat removal would exist.
- 2) Addition of the West Feedwater Heater Platform bracing. Failure of this structure, induced by an earthquake, would impair the function of safety related systems, including the AFW pumps and instrument air compressors.
- 3) Strengthening of masonry wall connections. Failure of these walls, induced by an earthquake, would impair the function of safety related systems either attached to them or in their proximity.
In addition, SCE should provide a detailed basis for continued operation un til the completion of all such significant structural modifications.
SEP SEISMIC REEVALUATION SCOPE AND SCHEDULE A meeting was held on June 1, 1981, among representatives of SCE and the NRC, to discuss the scope and the schedule for the SONGS 1 SEP seismic reevaluation program being conducted by SCE. The NRC required minimum scope for this seismic reevaluation was previously defined in the April 24, 1981 10 CFR 50.54(f) letter from the NRC to SCE regarding SEP Topic 111-6.
SCE stated that the current scope of their seismic reevalations contained the structures, systems and components required to reach cold shut down using natural circulation and included:
- 1) Those portions of primary loop not included in their April 29, 1977 report on seismic reevaluation of SONGS 1;
- 2) Portions of the main steam and feedwater systems;
- 3) The RHR and the auxiliary cooling systems;
- 5) The salt water cooling system;
- 6) The service water system;
- 7) Portions of instrument air;
- 8) Completion of the work on electrical equipment anchorage; and
- 9) Application of the ANCO test program to strict supported cable trays to qualify site cable tray.
Excluded from their current program, but included within the scope de fined in the April 24, 1981, NRC letter, are:
- 1) Engineeered safeguards features;
- 2) The containment spray ring;
- 3) The low pressure safety injection system; and
- 4) The long term recirculation pumps.
OFFICEO SURNAMEO BATE
.. c......e....c.2.
O FF CIAL RECO RD C....................
O NRC FORM 318 (10/80) NRCM 0240 OFFICIAL RECORD COPY
- USGPO: 1980-329-824
SCE was informed that their-current program was not considered complete and that it should conform to that outlined in the April 24, 1981, NRC letter.
Based upon these significant differences, it was decided that the scope as well as the schedule would be discussed further at a later SCE/NRC meeting.
In addition, SCE proposed the use of "sampling" analyses in response to the August 4, 1980 10 CFR 50.54(f) letter from the NRC to SCE to meet the January 1, 1982 analyses completion deadline described therein. SCE was informed that such an approach would not be acceptable for the SONGS 1 reanalyses. SCE was also informed that the NRC staff has not yet completed the review of SCE April 29, 1977 report on seismic reevaluation of SONGS 1 and it will be included in the review under Topic 111-6.
Robert A. Hermann, Section Leader Systematic Evaluation Program Branch Division of Licensing Kenneth S. Herring Systematic Evaluation Program Branch Division of Licensing
Enclosure:
As stated cc w/enclosure:
D. Eisenhut G. Lainas D. Crutchfield C. Berlinger S. Nowicki P. Y. Chen T. Cheng OFFICEO SEPB SEPB SEPB SEPBAYf.'
A *ADL SURNAMEO KHerring:b RHermann E.Kfta WRussell Gainas BATE) 7/,,0/81 7/ft /81 7/,20/
81 7/ V/81 81 o............................
c..O II RC DO.............................
.USGP NRC FORM 318 (ie/80) NRCM 9240 OFFICIAL RECORD COPY
- USGPO:
1980-329-824
SAN ONOFRE 1 Docket No. 50-206 cc Charles R. Kocher, Assistant Mr. R. Dietch, Vice*President General Counsel Nuclear Engineering and Operations James Beoletto, Esquire Southern California Edison Company Southern California Edison Company 2244 Walnut Grove Avenue Post Office Box 800 Post Office Box 800 Rosemead, California 91770 Rosemead, California 91770 David R. Pigott Chickering & Gregory Three Embarcadero Center Twenty-Third Floor San Francisco, California 94111 Harry B. Stoehr San Diego Gas & Electric Company P. 0. Box 1831 San Diego, California 92112 Resident Inspector/San Onofre NPS c/o U. S. NRC P. 0. Box 4329 San Clemente, California 92672 Mission Viejo Branch Library 24851 Chrisanta Drive Mission Viejo, California 92676 Mayor City of San Clemente San Clemente, California 92672 Chairman Board of Supervisors County of San Diego San Diego, California 92101 California Department of Health ATTN: Chief, Environmental Radiation Control Unit Radiological Health Section 714 P Street, Room 498 Sacramento, California 95814 U. S. Environmetal Protection Agency Region IX Office ATTN:
EIS COORDINATOR 215 Freemont Street San Francisco, California 94111
0 INFORMATION TO BE TRANSMITTED Anticipated Date for SCE Transmittal
- 1. Modifications to Structures 6/2/81 (a) Turbine Building - braced frames 6/2/81 (b) Fuel Storage Building (i) fuel pool (ii) new wall, East end 10/1/81 (c) Masonry wall boundary information - connection details
- 2. Masonry Wall Property Study 9/1/81 (a) Computech results - type of wall (8 different location in structures; fragility assessment if available (all letter reports and final report) 7/1/81 (b) Equivalent linear properties @ DBE level 6/3/81 (c) I&E bulletin response on masonry walls
- 3. NSSS Model 6/2/81 (a) Letter of transmittal from W - received 6/2/81 6/3/81 (b) Tape (should receive by 6/17/81) 6/17/81 (c) Mass.point locations - to be obtained from W through SCE; all masses 6/17/81
- 4. Soil Property Variations - raw test data if available 7/1/81
- 5. Filler Sand Properties - containment sphere & foundation, range of properties 7/1/81
- 6. Live and Dead Load Assumptions - all buildings 6/17/81
- 7. Amendment 52 + 2 Sets of Questions & Answers on Sphere Enclosure Building
-2 Anticipated Date for SCE Transmittal 6/17/81
- 8. Soil Springs for Reactor Building spherical foundation 10/1/81
- 9. Fixed-Base Modes - frequencies; mode shapes; modal mass (a) Administration - Control Building (b) Turbine Building - fixed base modes for each structure separately, i.e., north and south turbine extension, turbine pedestal, east and west feedwater platform.
Also, time history analysis if necessary (c) Fuel Storage Building 7/1/81
- 10.
(a) Soil property information for reservior 6/17/81 (b) Size of excavated area - layout, etc.
-3 PIPING SYSTEMS Anticipated Date for SCE Transmittal 6/17/81
- 1. New AFWS drawings (P&ID) 6/3/81
- 2. Information about loss of offsite power 6/3/81
- 3. Maintenance information (maximum time plant can operate with auxiliary feedwater or diesel under repair) 6/3/81
- 5. Electrical layoqt 7/1/81
- 6. Service water cooling to the AFW pump P&ID to point which can be traced from drawings 6/17/81
- 7. P&ID's for five protection system 6/17/81
- 8. Stress iso's for each piping model of AFWS To be
- 9. Hanger details; valve information (configuration, Determined weight, yoke length or simplified valve model) 6/17/81
- 10.
Piping specification - Suction and discharge 6/17/81
- 11.
Design and operating conditions in terms of temperature and pressure 7/1/81
- 12.
SW reservoir and fire system:
Pipe material, configuration, etc.
6/17/81
- 13.
Insulation information for main steam and feedwater lines and auxiliary feedwater pump steam supply POSSIBLE STRUCTURAL RESPONSE QUANTITIES FOR SONGS-1
- 1. Containment sphere - forces at base - membrane stresses at intersection of sphere and foundation
- 2. Reactor building Foundation spectra Support points for NSSS - Response spectra - 4 support locations on operating deck
- 3. Turbine building
- a. West Feedwater Heater Platform Forces & moments at top and bottom of columns Response spectra on operating deck (floor above AFW pumps)
Response spectra on anchor block
- b. North Turbine Building Extension Forces and moments at top and bottom of columns In-structure spectra at main feedwater location - El. 30'O"
- c. Turbine Pedestal Base shear and moments
- 4. Administration - Control Building Response spectra at control room
- 5. Fuel Storage Building Possibly AFW piping attachment or fuel pool