Other: L-81-014, Advises That Seismic Considerations Were Applied to 480-volt Switchgear 1,125-volt Dc Switchgear 2,station Battery 1 & Inverter 3.Seismic Withstand Capability of All Electrical Components Was Enhanced by Elevated Anchorage, ML13308A705, ML13308A724, ML13308A730, ML13317A686, ML13317A689, ML13317A698, ML13317A708, ML13317A777, ML13319A763, ML13330A386, ML13333A422
|
MONTHYEARML13333A4221979-10-22022 October 1979 Forwards Responses to NRC post-TMI Requirements Re Design & Analysis,Operations,Rcs High Point Vents,Emergency Preparedness & Instrumentation to Monitor Containment Conditions Project stage: Other ML13331A0241980-12-11011 December 1980 Trip Rept of 801124 & 25 Visit to Site W/Util,Lll & Bechtel Power Corp for Review of Auxiliary Feedwater Sys Seismic Load Resistance & to Obtain Info Necessary to Perform Seismic Reliability Assessment Project stage: Approval ML13308A7051981-07-20020 July 1981 Forwards Aperture Cards of Previously Submitted Illegible Drawing.Drawing Files Do Not Contain Drawings 567865 & 567866 Indicating No Drawings Issued W/Such Numbers.W/O Encls Project stage: Other ML13319A7631981-07-27027 July 1981 Trip Rept of 810601-03 Site Visit Re SEP Seismic re-evaluation & Seismic Safety Margins Research Program Auxiliary Feedwater Sys Seismic Analysis Project stage: Other ML13330A3861981-07-28028 July 1981 Forwards Miscellaneous Consultant Ltrs & Drawing Providing Info Requested in 810714 & 22 Ltrs Re Auxiliary Feedwater Sys Project.W/O Encls Project stage: Other ML13330A3921981-08-10010 August 1981 Forwards Listed Info in Response to Lll 810722 Request for Info Re Auxiliary Feedwater Sys Project.W/O Encls Project stage: Request ML13308A7241981-08-13013 August 1981 Forwards Addl Info Required for NRC Analysis of Auxiliary Feedwater Piping Sys,In Response to NRC Project stage: Other ML13317A6901981-09-18018 September 1981 Forwards Info Requested 810714 for Auxiliary Feedwater Sys. Info Includes Item 2 of Ref a & Item A.10.a of 810602 & 03 Meeting Minutes,Respectively.Document Requested as Item 3, Ref a Provided W/Ltr SCE/LLL-12.W/o Encl Project stage: Meeting ML13317A6891981-09-18018 September 1981 Forwards Info in Response to 810714 Request Re Auxiliary Feedwater Sys Project.W/O Encls Project stage: Other ML13317A6861981-09-18018 September 1981 Forwards Info Requested in Re Geology & Seismology for Auxiliary Feedwater Sys Project.W/O Encls Project stage: Other ML13317A6801981-09-23023 September 1981 Forwards Bechtel 810918 & 0921 Ltrs Re Equipment Loads for Turbine Bldg Complex & Mod to Turbine Bldg Per Request for Info on Auxiliary Feedwater Sys Project.Drawings Describing Mod to column-girder Joints Will Be Sent 811015.W/o Encls Project stage: Request ML13304A8681981-09-28028 September 1981 Advises That Nothing Found in D Phifer Presentation Repostulated Faults That Might Pose Hazard to Facility Site Project stage: Request ML13317A7081981-09-29029 September 1981 Confirms Info Transmitted by Stawniczy in 810923 Telcon Re Auxiliary Feedwater Sys Project Project stage: Other ML13317A6981981-10-15015 October 1981 Forwards Drawings & Data Sheet for Condensate Storage Tank, Per 810928 Request.W/O Encl Project stage: Other ML13308A7301981-10-19019 October 1981 Forwards Addl Info Required for Analysis of Auxiliary Feedwater Piping Sys,Per .Main Stop Valve for Turbine Supplied by Westinghouse.List of Unavailable Info Encl Project stage: Other ML13317A7441981-11-0909 November 1981 Forwards Scheduling Info Re Results of re-evaluation of Structures & Revised Availability Dates.Info Supersedes Previous Availability Dates Transmitted in 810602-03 Meeting Minutes.W/O Encl Project stage: Meeting ML13317A7771981-12-0909 December 1981 Responds to Generic Ltr 81-14 Re Seismic Qualification of Auxiliary Feedwater Sys.Facility Can Continue to Operate W/O Undue Risk to Public Health & Safety Project stage: Other L-81-014, Advises That Seismic Considerations Were Applied to 480-volt Switchgear 1,125-volt Dc Switchgear 2,station Battery 1 & Inverter 3.Seismic Withstand Capability of All Electrical Components Was Enhanced by Elevated Anchorage1982-03-15015 March 1982 Advises That Seismic Considerations Were Applied to 480-volt Switchgear 1,125-volt Dc Switchgear 2,station Battery 1 & Inverter 3.Seismic Withstand Capability of All Electrical Components Was Enhanced by Elevated Anchorage Project stage: Other 1981-07-27
[Table View] |
Text
REGULATORY ORMATION DISTRIBUTION SY M (RIDS)
ACCESS40N NBR:81060$0359 DOC*DATEV 81/07/20 NOTARIZED: NO DOCKET #
FkCL;:50w206 San Onofre Nuclear Station, Unit 1, Southern Californ 05000206 AUTHNAME AUTHOR AFFILIATION SLASCHKE4IR,C.
Southern California Edison Co.
RECIPNAME1 RECIPIENT AFFILIATION CHUANGT.Y.
Lawrence.Livermore Laboratory
SUBJECT:
Forwards aperture cards of previously submitted illegible drawing.Drawing files do not contain Drawings 567865&
567866 indicating no drawings issued w/such numoers.W/o end s, DISTRIBUTION CODEv AQDIS COPIES RECEIVED:LTR IPENCLfQ. SIZE::,,=.
TITLE: GeneraI Distribution for efter Issuance of Operating.License NOTESt cy each:SEP Section Leader & J Hanchett (Region V) 05000206 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAMEi LTTR:ENCL ID CODE/NAME LTTR ENCLi ACTION:
ORa #5 BC 04 13 1
INTERNAL: D/DIRHUM FACOS 1
DIRrDIV OF LIC 1
I&E 0b NRC PDR 02 1
DELD 1
1 BR 10 1
RAD ASMT BR 1REG FI 01 1
EXTERNAL: ACRS 09 16 1
LPDR 03 1
1 NSIC 05 NTIS 1
1 CE TOTALINU48ERIOF COPIES REUIRED: LTTR.
ENCL:
AD12 S01 NRC July 20, 1981 SCE/LLL-7 Dr. Tien-Yuh Chuang Lawrence Livermore National Laboratory P.O. Box 808 Livermore, California 94550 Gentlemen:
Subject:
Auxiliary Feedwater System Project San Onofre Nuclear Generating Station Unit 1
Reference:
A. Your letter 81-SS-107 dated July 1, 1981 In Reference A, you stated that certain drawing prints which were previously sent to you were unreadable. Accordingly, aperture cards of these drawings are therefore enclosed for your use. The specific aperture cards which are provided are listed below:
568067-2 567925-2 568136-5 568068-4 567928-3 568137-5 568069-3 567929-3 568139-3 568075-2 567961-4 568140-10 567895-4 568135-6 568141-5 You also requested an aperture card or print of drawings 567865 and 567866.
Our drawing files do not include any 'record of these drawings, thus indicating that drawings were never issued with these numbers.
If you have any questions on any of this information, please let me know.
Sincerely, R. C. Blaschke Project Engineer RCB:0076 Enclosures cc:
(w/o enclosures)
C. Burger (NRC)
K. Herring (NRC)
S. Nowicki (NRC)
P. D. Smith (LLL) bcc: (w/o enclosures)
W. C. Moody/R. W. Krieger J. L. Rainsberry C. M. Knarr R. Verbeck/G. Stawniczvm CDM Files 8106050359 610720 NE Files PDR ADOCK 05000206 KP PDR~