Forwards Miscellaneous Consultant Ltrs & Drawing Providing Info Requested in 810714 & 22 Ltrs Re Auxiliary Feedwater Sys Project.W/O Encls
ML13330A386
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 07/28/1981
From: Blaschke R
SOUTHERN CALIFORNIA EDISON CO.
To: Chuang T
LAWRENCE LIVERMORE NATIONAL LABORATORY
References
SCE-LLL-8, TAC-43664, NUDOCS 8108260087
Download: ML13330A386 (2)


Text

4L4 Southern California Edison Company P 0 BOX Boo 2244 WALNUT GROVE AVENUE ROSEM EAD CALIFORNIA 91770 July 28, 1981 1

SCE/LLL-8 Dr. Tien-Yuh Chuang Lawrence Livermore National Laboratory P.O. Box 808 Livermore, California 94550 Gentlemen:

Subject:

Auxiliary Feedwater System Project S'an Onofre Nuclear Generating Station Unit 1

Reference:

A. Your letter 81-SS-123 dated July 22, 1981 B. Your letter 81-SS-116.dated July 14, 1981 Enclosed is the following information which you requested for the subject project:

1. Bechtel letter BPC/SCE-81-188 dated July 27, 1981 which provides computed (unsmoothed and unbroadened) response spectra at five locations in the reactor containment building.
2. Woodward Clyde Consultants' letter dated June 25, 1981 which provides descriptive informat on, including plots and tables of computed spectral values, for'the 0.67 g ground motion acceleration time history which we are using in conjunction with our BOP seismic.

reevaluation program.

3. Bechtel letter BPC/SCE-81-186 dated July 22, 1981 which provides plots of the fuel storage building and control building models which are being used by Bechtel in their current reevaluation work.
4. Drawing No. 5145331-4, entitled, "One Line for Construction Pos. 1 through 6."
5. Bechtel letter BPC/SCE-81-190 dated July 28, 1980 which provides the equipment loads being used for structures in the BOPS SR program

'(with the exception of the turbine building, which will be available for transmittal next week).

8108260087 81072 81 9

PDR ADOCK 05000206I P

PDR,)

Dr. Tien-Yuh Chuang

-2 Items 1 and 2 above were requested and identified as items 5a and 6 in Reference A, respectively. Item 3 above was requested as item 5 in Reference B, and item 4 above was requested in the March 24, 1981 meeting.

Item 5 above was requested in our June 3 meeting and is identified as item A.6 in the meeting minutes.

If you have any questions on any of this information, please call.

Sincerely, R. C. Blaschke Project Engineer Enclosures cc:

(w/o enclosures)

C. Burger (NRC)

K. Herring (NRC)

S. Nowicki (NRC)

P. D. Smith (LLL) hI