Letter Sequence RAI |
---|
TAC:MF0345, Revise PTLR Definition and References in ISTS 5.6.6, RCS PTLR (Approved, Closed) |
|
MONTHYEARML1233803362012-11-21021 November 2012 License Amendment Request Pursuant to 10 CFR 50.90: Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report Project stage: Request ML13022A3252013-01-22022 January 2013 MF0345 - Acceptance of Requested Licensing Action License Amendment Request- Relocation of PT Limit Curves to PTLR Project stage: Acceptance Review ML13091A0402013-03-25025 March 2013 Supplement to License Amendment Request to Relocate, the Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report Project stage: Supplement ML13086A0342013-04-16016 April 2013 MF0345-Proprietary Information Determination Letter to Licensee Submission Dated November 21, 2012 (Proprietary Information Determination Letter) Project stage: Other ML13172A1392013-06-20020 June 2013 Draft Rais, MF0345, LAR Revising and Relocating PT Limit Curves to Prlr Project stage: Draft RAI ML13214A3882013-07-31031 July 2013 License Amendment Request to Relocate the Pressure & Temperature Limit Curves to the Pressure & Temperature Limits Report - Supplemental Information in Response to NRC Request for Additional Information Project stage: Supplement ML13224A2652013-08-12012 August 2013 MF0345, Draft Follow-Up RAIs (Redacted), MF0345, LAR Revising and Relocating PT Limit Curves to PTLR Project stage: Draft RAI ML13231A1282013-08-22022 August 2013 Request for Additional Information Regarding the License Amendment Request for the Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report Project stage: RAI ML13254A1552013-09-0606 September 2013 Amendment Request to Relocate the Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report - Supplemental Information in Response to NRC Request for Additional Information Project stage: Supplement ML13217A0442013-09-12012 September 2013 Request for Withholding Information from Public Disclosure Responses to Requests for Additional Information Dated July 31, 2013 Project stage: RAI ML13256A3952013-09-13013 September 2013 Revised Draft Follow-Up Rais, MF0345, LAR Revising and Relocating PT Limit Curves to PTLR Project stage: Draft RAI ML13268A5582013-09-25025 September 2013 MF0345, Additional Draft Rais, MF0345, LAR Revising and Relocating PT Limit Curves to PTLR Project stage: Draft RAI ML13270A2772013-09-27027 September 2013 MF0345, Revised Additional Rais, MF0345, LAR Revising and Relocating PT Limit Curves to PTLR Project stage: RAI ML13311A0552013-09-30030 September 2013 Fluence Extrapolation in Support of NMP2 P-T Cure Update, MPM-913991, September 30, 2013, Attachment 3 Project stage: Other ML13256A0132013-10-0909 October 2013 Request for Withholding Information from Public Disclosure Responses to Requests for Additional Information Dated July 31, 2013 Project stage: RAI ML13311A0542013-11-0404 November 2013 Pressure and Temperature Limits Report (PTLR) PTLR-2, Revision 0 (Draft B) Project stage: Draft Other ML13311A0532013-11-0404 November 2013 License Amendment Request to Relocate the Pressure & Temperature Limit Curves to the Pressure and Temperature Limits Report - Supplemental Information in Response to NRC Request for Additional Information Project stage: Supplement ML13310C0632013-11-0606 November 2013 MF0345, Additional FOLLOW-UP RAI, MF0345, LAR Revising and Relocating PT Limit Curves to PTLR Project stage: RAI ML13353A3052013-12-13013 December 2013 License Amendment Request to Relocate the Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report - Supplemental Information in Response to NRC Request for Additional Information and Clarification.. Project stage: Supplement ML14003A0052014-01-15015 January 2014 Request for Withholding Information from Public Disclosure Responses to Requests for Additional Information Dated November 4, and December 13, 2013 Project stage: RAI ML14063A4742014-02-25025 February 2014 License Amendment Request to Relocate the Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report - Supplement to Revise Implementation Date Project stage: Supplement ML14057A5542014-05-29029 May 2014 Issuance of Amendment Regarding Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report Project stage: Approval 2013-08-12
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24312A1662024-11-0707 November 2024 Request for Additional Information (11/7/2024 E-mail) - LAR to Revise TSs to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3 ML24250A1062024-09-0606 September 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24234A2772024-08-21021 August 2024 NRR E-mail Capture - Final RAI - Constellation Energy, LLC - Fleet Request - Proposed Alternative Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds (L-2024-LLR-0031) ML24240A1902024-08-12012 August 2024 E-mail (8/12/2024) from R. Reynolds (CEG) to R. Guzman (NRC) - Corrected TS Pages for LAR TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML24213A2202024-07-31031 July 2024 Updated Change in Estimated Review Schedule Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML24197A0092024-07-15015 July 2024 Acceptance Review Determination for LAR to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling ML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24156A0082024-05-31031 May 2024 NRR E-mail Capture - Constellation Energy, LLC - Fleet Request - Acceptance of Proposed Alternative Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds (L-2024-LLR-0031 ML24131A0612024-05-10010 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24122B5072024-05-0101 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-591, Revision 0 ML24008A0592024-01-0808 January 2024 E-mail Dated 1-8-2024 from R. Guzman to R. Reynolds Correct TS Page 204 for License Amendment No. 250 Adoption of TSTF-505 ML24008A2622024-01-0808 January 2024 Acceptance Review Determination for Relief Request I5R-12, Concerning Installation of a FSWOL on RPV Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld ML23268A0022023-09-22022 September 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-264-A, Revision 0 ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC – Fleet Request – License Amendment Request to Adopt TSTF-580, Revision 1 ML23255A2872023-09-12012 September 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative to Use the Successive Inspection Requirements of BWRVIP-75-A ML23237B3972023-08-24024 August 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative Request to Use Updated BWRVIP Guidelines ML23205A2432023-07-19019 July 2023 NRC Staff Follow-up Question on Audit Question 18 TSTF-505 and 50.69 Regulatory Audit (E-mail Dated 7/19/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23205A2412023-07-11011 July 2023 NRC Staff Follow-up Comments on Audit Questions 6a, 6b, and 6c TSTF-505 and 50.69 Regulatory Audit (E-mail Dated 7/11/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23205A2422023-07-11011 July 2023 NRC Staff Follow-up Comments on Audit Questions 17 and 19 TSTF-505 and 50.69 Regulatory Audit (E-mail Dated 7/11/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23209A7692023-06-14014 June 2023 Draft Audit Results File TSTF-505 and 50.69 (E-mail Dated 6/14/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23209A7672023-06-13013 June 2023 Share File Observations on Response to Question 06 and 22 TSTF-505 and 50.69 (E-mail Dated 6/13/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23163A2292023-06-12012 June 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-580, Revision 1 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined ML23149A0012023-05-29029 May 2023 Audit Agenda TSTF-505 and 50.69 (E-mail Dated 5/29/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23142A0222023-05-22022 May 2023 Regulatory Audit Questions (PRA) TSTF-505 and 50.69 (E-mail Dated 5/22/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23118A3882023-04-28028 April 2023 Regulatory Audit Questions TSTF-505 and 50.69 (E-mail Dated 4/28/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23104A3472023-04-14014 April 2023 Verbal Authorization for Relief Request I5R-14, Proposed Alternative Associated with N2E Dissimilar Metal Weld Overlay Repair with Laminar Indication ML23093A1782023-04-0303 April 2023 E-mail from T. Loomis to R. Guzman Proposed Alternative to Utilize Specific Provisions of Code Case N-716-3 ML23090A1302023-03-31031 March 2023 Verbal Authorization for Relief Request I5R-11, Proposed Alternative Repair of Recirculation Inlet Nozzle N2E Dissimilar Metal Weld ML23087A2912023-03-28028 March 2023 Request for Additional Information (3/28/2023 E-mail) - Proposed Emergent I5R-11 Alternative Associated with a Weld Overlay on RPV Recirculation Nozzle N2E DM Weld ML23061A0522023-03-0202 March 2023 Request for Additional Information (3/2/2023 E-mail) - Proposed Alternative Associated with a Weld Overlay Repair to the Torus ML23047A3832023-02-15015 February 2023 (2-15-2023 Email from J. Nelson to R. Guzman) Long Island Power Authority and Long Island Lighting Company Request for Threshold Determination ML23033A0142023-02-0202 February 2023 E-mail Dated 2-2-2023 from R.Guzman to R.Reynolds Correction to Error in NMP1 TSTF-505 and 50.69 Audit Plan ML23019A3092023-01-19019 January 2023 Acceptance Review Determination License Amendment Request to Adopt 10 CFR 50.69 Categorization Process ML23019A3032023-01-19019 January 2023 Acceptance Review Determination License Amendment Requets to Adopt TSTF-505 ML23013A3332023-01-13013 January 2023 Acceptance Review Determination Proposed Alternative for Weld Overlay Repair to the Torus ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22342B1462022-11-21021 November 2022 NRR E-mail Capture - Acceptance Review for TSTF 295A ML22314A2262022-11-10010 November 2022 E-mail Dated 11/10/2022 Relief Request Associated with Pump Periodic Verification Tests of Core Spray System Pumps ML22301A0902022-10-28028 October 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-301, Revision 2 ML22252A1522022-09-0909 September 2022 Acceptance Review Determination Partial Adoption of TSTF-568 to Revise TS 3.3.1 for Primary Containment Oxygen Concentration ML22207A0192022-07-26026 July 2022 (E-mail Dated 7/26/2022) Setup of Online Reference Portal for Revision to Alternative Source Term Calculation for MSIV and Non-MSIV Leakage ML22207A0122022-07-26026 July 2022 Acceptance Review Determination Revision to Alternative Source Term Analysis for Containment Leakage ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22194A9412022-07-13013 July 2022 Request for Additional Information Relief Request CS-PR-02 (7/13/2022 e-mail) ML22173A0802022-06-22022 June 2022 E-mail Dated 6/22/2022, Acceptance of Requested License Amendment Request to Revise Surveillance Requirements to Reduce Number of Fast Starts of EDGs ML22075A0362022-03-16016 March 2022 Acceptance Review Determination - Relief Request CS-PR-02 Associated with Pump Periodic Verification Test of Core Spray System Pumps, E-mail Dated 3/16/2022 ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 2024-09-06
[Table view] |
Text
From: Vaidya, Bhalchandra Sent: Wednesday, November 06, 2013 4:18 PM To: 'Darling, Theresa H'; Kristensen, Kenneth J (Kenneth.Kristensen@cengllc.com); everett.perkins@cengllc.com Cc: McLellan, Thomas; Rosenberg, Stacey; Poehler, Jeffrey; Beall, Robert; Jackson, Christopher; Parks, Benjamin; Hardgrove, Matthew
Subject:
ADDITIONAL FOLLOW-UP RAI, MF0345, LAR Re: Revising and Relocating PT Limit Curves to PTLR
SUBJECT:
REVISED DRAFT FOLLOW-UP RAIs, Nine Mile Point Nuclear Station, Unit No. 2, Docket No. 50-410, License Amendment Request Pursuant to 10 CFR 50.90: Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report (TAC NO.MF0345)
By letter dated November 21, 2012, as supplemented by letter dated March 25, 2013, Nine Mile Point Nuclear Station, LLC (NMPNS, the Licensee), submitted a license amendment request (LAR) for Nine Mile Point Unit 2. The proposed amendment would modify Technical Specification (TS) Section 3.4.11, "RCS Pressure and Temperature (P/T) Limits," by replacing the existing reactor vessel heatup and cooldown rate limits and the pressure and temperature (P-T) limit curves with references to the Pressure and Temperature Limits Report (PTLR). In addition, a new definition for the PTLR would be added to TS Section 1.1, "Definitions," and a new section addressing administrative requirements for the PTLR would be added to TS Section 5.0, "Administrative Controls." By letters dated July 31, September 6, 2013, and November 4, 2013, the licensee provided the responses, to the RAIs transmitted by NRC on June 20, 2013 (ADAMS Accession Package No. ML13214A396). The Licensees Responses contained Proprietary information. (Agencywide Document Access and Management System (ADAMS) Accession Nos.
ML123380336 for November 21, 2012, submission, and ML13214A396 for July 31, 2012, submission, and ML13254A156 respectively).
With particular reference to the licensees November 4, 2013, submission, the Nuclear Regulatory Commission (NRC) staff has determined that additional information, which is provided below, is needed to complete its review.
====================================================================
==
Based on its review of the November 4, 2013, submission, the NRC staff has determined that the section of the revised PTLR, which states:
"The appendix B Adjusted Reference Temperature (ART) is defined based on a conservative extrapolation for up to 32 EFPY. The neutron fluence used for the ART was verified conservative per the NMP2 plant specific Reg. Guide 1.190 methods documented in Reference 6.2, approved in Reference 6.3 and 6.10," is not consistent with Section 4.2.1.2, "Fluence," of NEDC-33178P-A, which states that "It is noted that this report does not include development or licensing of vessel fluence methods, which are covered by other LTRs. It is assumed that such fluence methods would be utilized to develop the necessary and appropriate inputs for use in the P-T curve development methodology outlined in this report."
The licensee's use of a "conservative extrapolation," which does not specify how the extrapolation was performed, and subsequent verification of the conservatism using a RG 1.190-adherent method, is a plant-specific change to the methodology that the licensee proposes to reference in TS. Therefore, the NRC does not agree with licensee response to RAI 6, "This approach is fully consistent with NEDO-33178-A... which states that the input for fluence will be based on an approved RG 1.190 fluence method." The licensee's input is not based on such a method; rather, as the above quote from the PTLR (in blue) shows, it is verified using such a method.
The NRC staff will review and consider approval of such an approach as a plant-specific exception to NEDC-33178P-A. The staff notes that the licensee will calculate the fluence for determining the ART using either (1) values determined using an NRC-approved, RG 1.190-adherent method, or (2) a fluence estimate, which the licensee has verified is as conservative, using an NRC-approved, RG 1.190-adherent method.
The NRC staff has determined that the NMP2 disposition for fluence is different from every BWR precedent in that it introduces an NRC-approved RG 1.190 fluence monitoring program and reviews actual fluence on a routine basis, and proposes that, The fluence projections [in the PTLR] have been confirmed to be conservative (Page 2 of Enclosure to LAR). BWR Precedential amendments generally state which methods were used to determine the fluence value on which the ART calculations were based explicitly, without mention of a fluence monitoring program or verification effort.
Therefore, the proposed TS 5.6.7.b, in this LAR, will require the insertion of a note indicating that the analytical methods contain a plant-specific exception, approved by the NRC in its safety evaluation approving the proposed amendment. The licensee may wish to format the citation as follows:
- 1. NEDC-33178P-A, Revision 1, General Electric Methodology for Development of Reactor Pressure Vessel Pressure-Temperature Curves, dated June 2009, with noted exception for reactor vessel fluence calculations, as approved by NRC Safety Evaluation dated [Date would be supplied by NRC upon issuance of amendment].
====================================================================
=
Please contact me, ASAP, to schedule a tele-conference between the NRC staff and the licensee to discuss this request for follow-up RAI and to provide a firm commitment from the licensee for the Response to this RAI.
Since there have several tele-conferences on this LAR to discuss the NRC staffs concerns in the past, some involvement of managerial level would be helpful to ascertain that the licensee clearly understands the NRC staffs concerns.
- Thanks, Bhalchandra K. Vaidya Licensing Project Manager NRC/NRR/DORL/LPL1-1 (301)-415-3308 (O) bhalchandra.vaidya@nrc.gov