Letter Sequence Supplement |
|---|
|
|
MONTHYEARML14064A3232013-12-31031 December 2013 000N0123-FBIR-NP, Rev. 0, Fuel Bundle Information Report for Nine Mile Point 2 Reload 14 Cycle 15 Project stage: Request ML14002A1702014-01-0202 January 2014 Unacceptable Application with Opportunity to Supplement - Nine Mile Point Nuclear Station, Unit 2 - MF3056, License Amendment Request - Maximum Extended Load Line Limit Analysis Plus Project stage: Other ML14002A2202014-01-0202 January 2014 Revised Unacceptable Application with Opportunity to Supplement - Nine Mile Point Nuclear Station, Unit 2 - License Amendment Request - Maximum Extended Load Line Limit Analysis Plus Project stage: Other ML14023A6542014-01-21021 January 2014 License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus - Commitment Date to Provide Supplemental Information Project stage: Supplement ML14028A3982014-01-28028 January 2014 MF3056 - Acceptance of Requested Licensing Action License Amendment Request- Maximum Extended Load Line Limit Analysis Plus (Mellla+) Project stage: Acceptance Review ML14064A3222014-01-31031 January 2014 00N0123-SRLR, Rev. 2, Supplemental Reload Licensing Report for Nine Mile Point 2 (NMP2) Reload 14 Cycle 15 Extended Power Uprate (Epu)/Maximum Extended Load Line Limit Plus (Mellla+) Project stage: Request ML14051A1382014-02-14014 February 2014 Response to Request for Supplemental Information to License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus Project stage: Supplement ML14043A0062014-02-20020 February 2014 First Round of Requests for Additional Information Regarding License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus (Mella+) Project stage: RAI ML14063A4742014-02-25025 February 2014 License Amendment Request to Relocate the Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report - Supplement to Revise Implementation Date Project stage: Supplement ML14064A3212014-02-25025 February 2014 License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus - Core Reload and Safety Limit Supplemental Information Project stage: Supplement ML14064A3242014-02-28028 February 2014 000N2495-R1-NP, Rev. 0, Nine Mile Point Nuclear Station Unit 2 Comparison of Mellla+ Reference Design to Cycle 15 Design Characteristics Project stage: Request ML14029A0392014-03-0505 March 2014 Request for Withholding Information from Public Disclosure License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus, Dated November 1, 2013 Project stage: Withholding Request Acceptance ML14051A0152014-03-0606 March 2014 Request for Withholding Information from Public Disclosure License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus, Dated February 14, 2014 Project stage: Withholding Request Acceptance ML14071A4662014-03-10010 March 2014 License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus - Response to Srxb RAI 1 and RAI 2 Project stage: Request ML14071A2422014-03-12012 March 2014 NMP Unit 2, MF3056, 2nd Round of Draft RAIs - LAR License Amendment Request- Maximum Extended Load Line Limit Analysis Plus (Mellla+) Project stage: Draft RAI ML14083A0232014-03-31031 March 2014 Second Round of Request for Additional Information Regarding License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus (Mellla+) Project stage: RAI ML14139A4162014-05-14014 May 2014 License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus - Response to RAI STSB-1 and RAI STSB-2 Project stage: Response to RAI ML14204A3692014-08-14014 August 2014 Third Round of Request for Additional Information & Enclosure 1, Regarding License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus (Mellla+) (Tac No. MF3056) Project stage: RAI ML14065A0902014-09-0303 September 2014 Request for Withholding Information from Public Disclosure License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus, Dated February 25, 2014 (Tac No. MF3056) Project stage: Withholding Request Acceptance ML14072A0152014-09-0303 September 2014 Request for Withholding Information from Public Disclosure License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus, Dated March 10, 2014 Project stage: Withholding Request Acceptance ML14246A3962014-09-0303 September 2014 NMP Unit 2, MF3056, 4th Round of Draft RAIs - LAR License Amendment Request- Maximum Extended Load Line Limit Analysis Plus (Mellla+) Project stage: Draft RAI NMP2L2556, Response to Request for Additional Information, License Amendment Request for Maximum Extended Load Line Limit Analysis Plus2014-09-15015 September 2014 Response to Request for Additional Information, License Amendment Request for Maximum Extended Load Line Limit Analysis Plus Project stage: Response to RAI ML14260A1202014-11-0606 November 2014 Request for Withholding Information from Public Disclosure License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus, Dated September 15, 2014 (Tac No. MF3056) Project stage: Withholding Request Acceptance ML14314A2142014-11-10010 November 2014 MF3056, E-mail Capture - LAR Mellla+, Simulator Audit Plan, November 20-21, 2014 at the Plant Site Project stage: Approval ML14321A0642014-11-17017 November 2014 Point Unit 2, MF3056, LAR Mellla+, Supplement to the Simulator Audit Plan Project stage: Approval ML14351A4282014-12-11011 December 2014 Updated TIP Comparisons for Current Operating Conditions, GE-PPO- 1GYEF-KG1-742, Enclosure 2 Project stage: Request ML15002A1622015-01-26026 January 2015 Request for Withholding Information from Public Disclosure Submission Dated December 11, 2014, for Supplement Information for NRC Simulator Audit LAR for Mellla+ Project stage: Withholding Request Acceptance ML15033A0022015-01-30030 January 2015 MF3056, LAR - Mellla+, Revised RAI - Neutron Fluence Calculation Related Project stage: RAI ML15051A4642015-02-18018 February 2015 Response to Fifth Request for Additional Information Concerning License Amendment Request for Maximum Extended Load Line Limit Analysis Plus Project stage: Request ML15056A3792015-03-16016 March 2015 Request for Withholding Information from Public Disclosure Submission Dated February 18, 2015, for License Amendment Request Pursuant to 10 CFR 50.90 Maximum Extended Load Line Limit Analysis Plus Project stage: Withholding Request Acceptance ML15105A4432015-05-0404 May 2015 Draft Safety Evaluation for License Amendment Request - Mellla+ Project stage: Draft Approval ML15114A1602015-05-0707 May 2015 Issuance of Simulator Audit Report License Amendment Request Regarding MELLLA Plus Project stage: Approval ML15096A0762015-09-0202 September 2015 Issuance of Amendment Maximum Extended Load Line Limit Analysis Plus Project stage: Approval ML15210A3262015-09-0404 September 2015 LTR-15-0388-1 - John W. Stetkar Letter Nine Mile Point Nuclear Station Unit 2 Maximum Extended Load Line Limit Analysis Plus (Mellla+) License Amendment Request Project stage: Other 2014-03-12
[Table View] |
Text
James J. Stanley Plant General Manager-Nine Mile Point CENG.
a joint venture of 0Consteflation eDF SEnergy-ef NINE MILE POINT NUCLEAR STATION Office: 315-349-5205 Fax: 315-349-1321 E-mail: James.Stanley@cengllc.com February 25, 2014 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION:
SUBJECT:
REFERENCE:
Document Control Desk Nine Mile Point Nuclear Station, Unit 2 Renewed Facility Operating License No. NPF-69 Docket No. 50-4 10 Nine Mile Point Nuclear Station License Amendment Request to Relocate the Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report - Supplement to Revise Implementation Date (a) Letter from K. Langdon (NMPNS) to Document Control Desk (NRC), dated November 21, 2012, License Amendment Request Pursuant to 10 CFR 50.90:
Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report (b) Letter from P. Swift (NMPNS) to Document Control Desk (NRC), dated November 4, 2013, Nine Mile Point Nuclear Station License Amendment Request to Relocate the Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report - Supplemental Information in Response to NRC Request for Additional Information (c) Letter from C. Costanzo (NMPNS) to Document Control Desk (NRC), dated December 13, 2013, Nine Mile Point Nuclear Station License Amendment Request to Relocate the Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report - Supplemental Information in Response to NRC Request for Additional Information and Clarification of RAI EVIB-6 (TAC No.
MF0345)
Nine Mile Point Nuclear Station, LLC (NMPNS) hereby submits a supplement to a previously submitted license amendment request (LAR) to Nine Mile Point Unit 2 (NMP2) Renewed Facility Operating License NPF-69. The initial request, dated November 21, 2012 (Reference a), proposed to modify Technical Specification (TS) Section 3.4.11, "RCS Pressure and Temperature (P/T) Limits," by replacing the existing reactor vessel heatup and cooldown rate limits and the pressure and temperature (P/T) limit curves with references to the Pressure and Temperature Limits Report (PTLR). Other associated TS Nine Mile Point Nuclear Station P.O. Box 63, Lycoming, NY 13093 Aco/
Document Control Desk February 25, 2014 Page 2 changes would also be incorporated.
Supplemental information was submitted on November 4, 2013 (Reference b) and December 6, 2013 (Reference c).
The approval of the proposed license amendment was initially requested by November 22, 2013 (Reference a). The initial request was based on conservative projections for when NMP2 would reach the 22 Effective Full Power Year (EFPY) limit of the current PT curves in the NMP2 TS. The November 4, 2013 supplement (Reference b) requested approval of the proposed license amendment by May 31 2014, with implementation within 60 days. Updates to the EFPY calculations to account for actual Extended Power Uprate operation power and fluence project the existing P/T curves will remain valid through August 2014. To provide for flexibility in managing resources during the NMP2 spring refueling outage, and ensure the new PT curves are implemented in a timely manner, NMPNS requests a change in the implementation date for the approved license amendment from, "within 60 days," to, "no later than July 18, 2014."
This supplemental information does not affect the No Significant Hazards Determination analysis provided by NMPNS in Reference (a). Pursuant to 10 CFR 50.91(b)(1), NMPNS has provided a copy of this supplemental information to the appropriate state representative. This letter contains no new regulatory commitments.
Should you have any questions regarding the information in this submittal, please contact Everett (Chip)
Perkins, Director Licensing, at (315) 349-5219.
I declare under penalty of perjury that the foregoing is true and correct. Executed on February 25, 2014.
Sincerel CRC/KJK cc:
Regional Administrator, NRC Project Manager, NRC Resident Inspector, NRC A. L. Peterson, NYSERDA