UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200
ATLANTA, GEORGIA 30303-1257
October 3, 2013
Mr. Scott L. Batson
Site Vice President
Duke Energy Corporation
Oconee Nuclear Station
7800 Rochester Highway
Seneca, SC 29672-0752
SUBJECT: NOTIFICATION OF OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3
COMPONENT DESIGN BASES INSPECTION - NRC INSPECTION REPORT
05000269/2014007, 05000270/2014007, 05000287/2014007
Dear Mr. Batson:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
Region II staff will conduct a component design bases inspection (CDBI) at your Oconee
Nuclear Station, Units 1, 2, and 3 during the weeks of February 10 - 14, March 3 - 7, and
March 17 - 21, 2014. Jason Eargle, a Senior Reactor Inspector from the NRCs Region II
Office, will lead the inspection team. This inspection will be conducted in accordance with the
baseline inspection procedure, Procedure 71111.21, Component Design Bases Inspection,
issued August 14, 2012.
The inspection will evaluate the capability of risk-significant / low margin components to function
as designed and to support proper system operation. The inspection will also include a review
of selected operator actions, operating experience, and modifications.
During a telephone conversation on October 2, 2013, Mr. Eargle confirmed with Mr. Bob Meixell
and Ms. Judy Smith of your staff, arrangements for an information-gathering site visit and the
three-week onsite inspection. The schedule is as follows:
- Information-gathering visit: Week of January 13-17, 2014
- Onsite weeks: February 10 - 14, March 3 - 7, and March 17 - 21, 2014
The purpose of the information-gathering visit is to meet with members of your staff to identify
risk-significant components and operator actions. Information and documentation needed to
support the inspection will also be identified. Mr. Rudy Bernhard, a Region II Senior Reactor
Analyst, will support Mr. Eargle during the information-gathering visit to review probabilistic risk
assessment data and identify risk-significant components, which will be examined during the
inspection.
The Enclosure lists documents that will be needed prior to the information-gathering visit.
Please provide the referenced information to the Region II Office by December 13, 2013.
S. Batson 2
Additional documents will be requested during the information-gathering visit. The inspectors
will try to minimize your administrative burden by specifically identifying only those documents
required for inspection preparation. The additional information will need to be available to the
team in the Region II Office prior to the inspection teams preparation week of February 3, 2014.
Mr. Eargle will also discuss the following inspection support administrative details: (1) availability
of knowledgeable plant engineering and licensing personnel to serve as points of contact during
the inspection, (2) method of tracking inspector requests during the inspection, (3) licensee
computer access, (4) working space, (5) arrangements for site access, and (6) other applicable
information.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
Enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRC's Agencywide
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC
website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions, regarding the
information requested or the inspection, please contact Mr. Eargle at 404-997-4632 or contact
me at 404-997-4530.
Sincerely,
Rebecca L. Nease, Chief
Engineering Branch 1
Division of Reactor Safety
Docket Nos.: 50-269, 50-270, 50-287
License Nos.: DPR-38, DPR-47, DPR-55
Enclosure:
Information Request for Oconee Nuclear
Station, Units 1, 2, and 3 Component
Design Bases Inspection
cc: Distribution via Listserv
________________x SUNSI REVIEW COMPLETE FORM 665 ATTACHED
OFFICE RII:DRS RII:DRS RII DRS
NAME Eargle NEASE Mas
DATE 10/ 3 /2013 10/ 3 /2013 10/ /2013 10/ /2013 10/ /2013 10/ /2013 10/ /2013
E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO
2
3
Letter to Scott L. Batson from Rebecca L. Nease dated October 3, 2013.
SUBJECT: NOTIFICATION OF OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3
COMPONENT DESIGN BASES INSPECTION - NRC INSPECTION REPORT
05000269/2014007, 05000270/2014007, 05000287/2014007
Distribution
RIDSNRRDIRS
PUBLIC
RidsNrrPMOconee Resource
INFORMATION REQUEST FOR OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3
COMPONENT DESIGN BASES INSPECTION
Please provide the information electronically in .pdf files, Excel, or other searchable format on
CDROM (or FTP site, Sharepoint, etc.). The CDROM (or website) should be indexed and
hyperlinked to facilitate ease of use.
1. From your most recent probabilistic safety analysis (PSA) excluding external events and
fires:
a. Two risk rankings of components from your site-specific PSA: one sorted by Risk
Achievement Worth (RAW), and the other sorted by Birnbaum Importance
b. A list of the top 500 cutsets
2. From your most recent PSA including external events and fires:
a. Two risk rankings of components from your site-specific PSA: one sorted by RAW,
and the other sorted by Birnbaum Importance
b. A list of the top 500 cutsets
3. Risk ranking of operator actions from your site-specific PSA sorted by RAW. Provide
human reliability worksheets for these items.
4. List of time-critical operator actions with a brief description of each action.
5. List of Emergency and Abnormal Operating Procedures revised (significant) since October
1, 2011, with a brief description of each revision.
6. List of components with low design margins (i.e., pumps closest to the design limit for flow
or pressure, diesel generator close to design-required output, heat exchangers close to
rated design heat removal, and motor-operated valve risk-margin rankings, etc.), and
associated evaluations or calculations.
7. List of station operating experience evaluations/reviews performed, and documented in the
stations corrective action program, for industry events and safety-related equipment
failures/vulnerabilities (as communicated by NRC Generic Communications, Industry
Communications, 10 CFR Part 21 Notifications, etc) since October 1, 2011.
8. List and brief description of safety-related structures, systems, or components (SSCs)
design modifications implemented since October 1, 2011.
9. List and brief description of common-cause component failures that have occurred
since October 1, 2011.
10. List and brief description of operability evaluations completed since October 1, 2011.
Enclosure
2
11. List of equipment on the sites Station Equipment Reliability Issues List, including a
description of the reason(s) why each component is on that list, and summaries (if
available) of your plans to address the issue(s).
12. List and brief description of equipment currently in degraded or nonconforming status as
described in Regulatory Issue Summary 05-020.
13. List and reason for equipment classified in maintenance rule (a)(1) status from
October 1, 2011 to present.
14. Copies of system descriptions (or the design basis documents) for safety-related systems.
15. Copy of Updated Final Safety Analysis Report.
16. Copy of Technical Specification(s).
17. Copy of Technical Specifications Bases.
18. Copy of Technical Requirements Manual(s).
19. List and brief description of Root Cause Evaluations performed since October 1, 2011.
20. In-service Testing Program Procedure(s).
21. Corrective Action Program Procedure(s).
22. One-line diagram of electrical plant. (Electronic and full size - hard copy week of
January 13-17, 2014)
23. Index and legend for electrical plant one-line diagrams.
24. Primary AC calculation(s) for safety-related buses.
25. Primary DC calculation(s) for safety-related buses.
26. Piping and instrumentation diagrams (P&IDs) for safety-related systems. (Electronic and
1/2 size - hard copy week of January 13-17, 2014)
27. Index and Legend for P&IDs.
28. Copy of Operability Determination procedure(s).
30. Copies of corrective action documents (i.e. PIPs) associated with findings from previous
CDBI. (If applicable)
31. Index (procedure number, title, and current revision) of station Emergency Operating
Procedures, Abnormal Operating Procedures, and Annunciator Response Procedures.
32. Copy of any self-assessments performed in preparation for this inspection.
Enclosure
2
33. List of any condition reports generated in preparation for this inspection.
34. Copies of condition reports generated from previous CDBI (2011).
35. Contact information for a person to discuss PSA information prior to the information-
gathering trip. (Name, title, phone number, and e-mail address)