ML13234A459

From kanterella
Jump to navigation Jump to search
Initial License Exam (Drm)
ML13234A459
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 08/21/2013
From: Hironori Peterson
Division of Reactor Safety III
To: Jeffery Lynch
Northern States Power Co
References
Download: ML13234A459 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 August 21, 2013 Mr. Jim Lynch Site Vice President Prairie Island Nuclear Generating Plant Northern States Power Company, Minnesota 1717 Wakonade Drive East Welch, MN 55089

SUBJECT:

PRAIRIE ISLAND NUCLEAR GENERATING PLANT REQUEST FOR WAIVER OF EXPERIENCE REQUIREMENT FOR INITIAL LICENSE EXAMINATION

Dear Mr. Lynch:

In a letter (L-PI-12-081) dated October 1, 2012, your staff requested an eligibility waiver for Mr. D. G. Larson for the August 2014 initial operator license examination. Your staff requested a waiver of five weeks of the six months responsible nuclear power plant experience at the plant for which the applicant seeks a license. The Operator Licensing and Human Performance Branch at NRC headquarters reviewed Mr. Larsons work experience at Prairie Island Nuclear Generating Plant and his prior experience in the U.S. Navy Nuclear Power Program in accordance with the Operator Licensing Examination Standards for Power Reactors, NUREG-1021 ES-202 D.2.a(1) and has determined that Mr. Larson requires a waiver of NRC experience requirements to sit for the examination. Therefore, when Mr. Larson submits his application for license, please have him request the experience waiver on his application and the waiver will be granted at that time. Mr. Larson will be required to complete the five weeks of power plant experience before an operator license can be issued after satisfactory performance on the operator license examination. When Mr. Larsons power plant experience requirement is satisfied, it will need to be documented in a manner comparable to Mr. Larsons original license application and signed by the Plant Vice President or his designated alternate.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents

J. Lynch Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-282; 50-306 License Nos. DPR-42; DPR-60 cc: Distribution via ListServ TM

J. Lynch Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-282; 50-306 License Nos. DPR-42; DPR-60 cc: Distribution via ListServ TM DISTRIBUTION:

Vivian Campbell RidsNrrPMPrairieIsland Resource RidsNrrDorlLpl3-1 Resource RidsNrrDirsIrib Resource Cynthia Pederson Anne Boland Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak DOCUMENT NAME: Ltr 082113 Prairie Island Initial License Exam (DRM).docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME DMcNeil:bl HPeterson DATE 08/19/13 08/21/13 OFFICIAL RECORD COPY