MPR-3801, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 9 of 13
ML12342A127
Person / Time
Site: Limerick Constellation icon.png
Issue date: 11/06/2012
From: Schlaseman C S
Exelon Generation Co, MPR Associates
To:
Office of Nuclear Reactor Regulation
References
RS-12-171 MPR-3801, Rev 1
Download: ML12342A127 (39)


Text

Sheet 1 of 2 Status: OY N U.Seismic Walkdown Checklist (SWC)Equipment ID No. 2FV21 1 Equip. Class" (08) Fans & Air Handlers Equipment Description B Core Spray Pump Room Unit Cooler Location:

Bldg. Reactor Floor El. 177 Room, Area Room 181 Enclosure Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

YO NEI 2. Is the anchorage free of bent, broken, missing or loose hardware?

Y 3. Is the anchorage free of corrosion that is more than mild surface Y oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? Y 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of Y potentially adverse seismic conditions?

Nt ND U- N/AD NEI NEI~NO UD N/AD UD N/AD UD N/AD KND U3 Enter the equipment class name from Appendix B: Classes of Equipment.

<C-3 >Limerick Generating Station Unit 2 MPR-3801, Revision 1 r.nrrqnnnHPnr No

  • RR-12-171 C-301 Sheet 2 of 2 Equipment ID No. 2FV211 Equip. Class" (08) Fans & Air Handlers Equipment Description B Core Spray Pump Room Unit Cooler Interaction Effects 7. Are soft targqts free fom impact by nearby equipment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?, " ove rW 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y'[Y NO UD N/AD YX NO U" N/A'YE ND UD N/AD YX NEIurj Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could NEI U["]adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary).Al/A Evaluated by: (1nAW I"I Mt Date: iI/L L)I-K<C-4>Limerick Generating Station Unit 2 MPR-3801, Revision 1 rTnrrAmnnndAnr.A Nn -R.2-19-171 C-302 Equipment ID: 2FV211 Limerick Generating Station Unit 2 MPR-3801, Revision 1 r.nrrPqnnndPlnP Nn -R.-19-171 C-303 Equipment ID: 2FV211 Limerick Generating Station Unit 2 MPR-3801, Revision 1 rnrrP.nnndHnrc.

Nn

  • RR-12-171 C-304 Equipment ID: 2FV211 Limerick Generating Station Unit 2 MPR-3801, Revision 1 rnrrp..nnnripnr.'

Nn RS-1 2-171 C-305 Equipment ID: 2FV211 Limerick Generating Station Unit 2 MPR-3801, Revision 1 rlnrrP.qnnndPnrn Nn- R.R-I1-171 C-306 Equipment ID: 2FV211 Limerick Generating Station Unit 2 MPR-3801, Revision 1 r.nrrP.qnnndtpnrP.

Nn

  • RR-I -171 C-307 Equipment ID: 2FV211 Limerick Generating Station Unit 2 C-308 MPR-3801, Revision 1 r.nrr6nnnrlPnr-Nn -P.R-1 9-171 Sheet 1 of 2 Status: (D) N U Seismic Walkdown Checklist (SWC)Equipment ID No. 2HV210 Equip. Class 1 2 (08) Fans & Air Handlers Equipment Description B & D RHR Pump Room Unit Cooler Location:

Bldg. Reactor Floor El. 183 Room, Area Room 174 Enclosure Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

YXEND 2. Is the anchorage free of bent, broken, missing or loose hardware?

YO NO UD] N/A[D 3. Is the anchorage free of corrosion that is more than mild surface Y NEI UO N/AE]oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? YKNE U N/Al],M nJ -- -,ol ,0,,,A0I on4 6k-4w cona a 4 5. Is the anchorage configuration consistent with plant documentation?

YKND UL] N/AD (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Y*'ND UEI potentially adverse seismic conditions?

2 Enter the equipment class name from Appendix B: Classes of Equipment.

<C-3 >Limerick Generating Station Unit 2 MPR-3801, Revision 1 r nrrQnnnrsnrA.Nn" RR-19-171 C-309 Sheet 2 of 2 Equipment ID No. 2HV210 Equip. Class" 2 (08) Fans & Air Handlers Equipment Description B & D RHR Pump Room Unit Cooler Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?-Af, ovmWo 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y; NE UD N/AO YX ND U0 N/AD vg ND UD N/AD Yg NE UD Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could YIND UD adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

N/A Evaluated by: Date: 00< C-4 >Limerick Generating Station Unit 2 MPR-3801, Revision 1 flnrramnnnHanrP.

Nn

  • RR-19-171 C-3 10 Equipment ID: 2HV210 Limerick Generating Station Unit 2 MPR-3801, Revision 1 rnrrPqnnndPnr.P Nn
  • PR.-19-171 C-311 Equipment ID: 2HV210 Limerick Generating Station Unit 2 MPR-3801, Revision 1 r.nrrPqnnnrlPnr.-.

Nn

  • RR-1-71 C-312 Equipment ID: 2HV210 Limerick Generating Station Unit 2 MPR-3801, Revision 1 Nn RR-19-171 C-313 Equipment ID: 2HV210 0 Limerick Generating Station Unit 2 MPR-3801, Revision 1 rnrnP-nnndl~nr..

Nn -RR-1 -171 C-314 Equipment ID: 2HV210 Limerick Generating Station Unit 2 MPR-3801, Revision 1 rnrrP.nnndAnr.P Nn* RO-1?-171 C-315 Sheet 1 of 2 Status:& N U Seismic Walkdown Checklist (SWC)Equipment ID No. FT-51-2N001 Equip. Class'2 (17) Temperature Sensors/Local Instruments (Not on Racks)Equipment Description RHR HTXA & Pump A Discharge Flow Location:

Bldg. Reactor Floor El. 217 Room, Area Room 370W Enclosure Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorane 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?Y)ND U[] YVNE UC] N/A[]YVNE] UOD N/AO 5. Is the anchorage configuration consistent with plant documentation?

YP NE] UO] N/AC](Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yk NOi1Uf Enter the equipment class name from Appendix B: Classes of Equipment.

<C-3 >" Limerick Generating Station Unit 2 MPR-3801, Revision 1 rnrrP.mnnndPnr.P Nn* RR-19-171 C-316 Sheet 2 of 2 Equipment ID No. FT-51-2N001 Equip. Class 1 2 (17) Temperature Sensors/Local Instruments (Not on Racks)Equipment Description RHR HTXA & Pump A Discharge Flow Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?-MAo -4irkfI Y' NO UI" N/AD 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yb( NEI UD N/A]and masonry block walls not likely to collapse onto the equipment?,Fo QVe'dWoc 47,T 3 lY fh~4()1 4 C 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y)Z NE UD N/Al]Yjt'NO U0 Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YK NO Ul adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

NV/A a6tr V4'a~Evaluated by:.r2~7 I~~-::z::~-)

Date: 0//__ ýf , Limerick Generating Station Unit 2 MPR-3801, Revision 1 r.nrrP.nnndpnr-.

Nn -RR-19-171 C-317 Equipment ID: FT-51-2N001 Limerick Generating Station Unit 2 MPR-3801, Revision 1 Nn* R,-19-171 C-318 Equipment ID: FT-51-2N001 Limerick Generating Station Unit 2 MPR-3801, Revision 1 rnrr-.mnnndIPnrP.

Nn Rq-1 9-171 C-319 Equipment ID: FT-51-2N001 Limerick Generating Station Unit 2 MPR-3801, Revision 1 rnrrqnnnifnr Nn -R5-19-171 C-320 Sheet 1 of 2 Status: (5) N U Seismic Walkdown Checklist (SWC)Equipment ID No. HV-1 1-204A Equip. Class1 2 (05) Fluid (AirfHyd)

Valves Equipment Description RHR PP RM CLR A Supply Valve Location:

Bldg. Reactor Floor El. 177 Room, Area Room 173 Enclosure Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one YO No of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Y)4 NEL U" N/AO Yd NEI UE N/AQ 4. Is the anchorage free of visiblecacks in the concrete near the anchots? Yd NO U! N/Al 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YO NO UQl N/A)k YKNO Uf-2Enter the equipment class name from Appendix B: Classes of Equipment.

C-3 >Limerick Generating Station Unit 2 MPR-3801, Revision 1 f.nrrfpqnndpnrn p Nn R5-19-171 C-321 Sheet 2 of 2 Equipment ID No. HV-1 1-204A Equip. Class 1 2 (05) Fluid (Air/Hyd)

Valves Equipment Description RtIR PP RM CLR A Supply Valve Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9466ol 4,tel Qvt]Wo wdl " d 4'9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?ND UD N/AD Yr ND W011 UD N/AD YN ND UD N/AD YW' ND UD Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Yjd ND UD adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) 0f14t¶9<- "IrhOAd Evaluated bv:-J. -..Date: AL I'/Limerick Generating Station Unit 2 MPR-3801, Revision 1 rnrrP'qnnndtPnr.P Nn

  • RR-12-171 C-322 Equipment ID: HV-1 1-204A 0 I Limerick Generating Station Unit 2 MPR-3801, Revision 1 flnrrp-nnnripnrn.p Nn " RR-19-171 C-323 Equipment ID: HV-11-204A Limerick Generating Station Unit 2 MPR-3801, Revision 1 Nn ' RS-19-171 C-324 Sheet 1 of 2 Status:(V N U Seismic Walkdown Checklist (SWC)Equipment ID No. HV-11-231D Equip. Class" (06) Motor Operated Valves Equipment Description ESWEDG JW Cooling Isolation Valve Location:

Bldg. Diesel Floor El. 217 Room, Area Room 315D Generator Enclosure Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YEIN~k V50NO UD N/AD YAND UD N/AD NEIN UD N/AD1 YDINEIUD]N/AZq%DNll UD 12 Enter the equipment class name from Appendix B: Classes of Equipment.

4, Limerick Generating Station Unit 2 MPR-3801, Revision 1 r Nnrr.nnnHlnrP Nn ' RA-19-171 C-325 Sheet 2 of 2 Equipment ID No. HV-11-231D Equip. Class" (06) Motor Operated Valves Equipment Description ESWEDG JW Cooling Isolation Valve Interaction Effects 7. Are soft targets frjee from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?DEI UD N/Anl XKND UDJ N/AD YANED UD N/AD YeD UD Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could A ND UE3 adversely affect the safety fInctions of the equipment?

Comments (Additional pages may be added as necessary)

Date: !h _.! 2--K C-4 >Limerick Generating Station Unit 2 MPR-3801, Revision 1 r.nrrA~nnndrnr.

Nn *R5R-19-171 C-326 Equipment ID: HV-11-231D Limerick Generating Station Unit 2 MPR-3801, Revision 1 rnrrPqnnndlnrP Nn -RR-1 -171 C-327 Sheet 1 of 2 Status: (V N U Seismic Walkdown Checklist (SWC)&40 0" +tj Val vts) A'Oý,J L V I"A -Equipment ID No. aV I)- ;z3,. Equip. Class12_Eauivment Descrintion Jq!dLe+ 6 1-0 11; -ýCr,4ff'p M/ve_Location:

Bldg. 1 Floor El. LZLti" Room, Area -.04 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchora~e 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the an rage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YE]Ng YJ, Nf- Uil N/AD Y% NO UI- N/AD YONEI UD" N/AD" YEI NO Ui N/Ag, Y ANf UEI 12 Enter the equipment class name from Appendix B: Classes of Equipment.

< C-3>Limerick Generating Station Unit 2 MPR-3801, Revision 1 Nn C-328 Sheet 2 of 2 o~ (ofrn6jW.+9e( hA)AC -~I A LI Equipment ID No. I-IV i i- 2 2. i; A Equip. CIaSS12. LI VZ IvF-4, 1T Equipment Description 9SW Tp.-Cka 2to.A-r VA'44, X / t _Interaction Effects 7. Are soft tarets free from impact b nearbyequipment or structures?

AVY fC t , ner y qui 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry bl 7 ck walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?",N[-i UFI N/AEl N[:N UEI N/A'YNDN U0 N/AF-UF-Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could Y N"NEI UQI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Date: /< C-4 >Limerick Generating Station Unit 2 MPR-3801, Revision 1 rnrrPqnnnrInnrA.

Nn -W.19-171 C-329 Equipment ID: HV-11-233A Limerick Generating Station Unit 2 C-330 MPR-3801, Revision 1 r.nrrpnnndi~nr.p Nn -R.R-1 9-171 Equipment ID: HV-1 1-233A Limerick Generating Station Unit 2 MPR-3801, Revision 1 Nn

  • RR-19-171 C-331 Sheet 1 of 2 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No. HV-49-2F029 Equip. Class" 2 (06) Motor Operated Valves Equipment Description RCIC Suppression Pool Isolation Valve Location:

Bldg. Reactor Floor El. 177 Room, Area Room 179 Enclosure Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchoraize

1. Is the anchorage configuration verification required (i.e., is the item one Yri ND of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Y) NDI Ur- N/AD A ND UD N/AD 4. Is the anchorage free of visible cracks in the concrete near the anchors? ND UD N/AD nftA V/5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YO ND UO N/AD ýY, Nrl UQ 12 Enter the equipment class name from Appendix B: Classes of Equipment.>Limerick Generating Station Unit 2 MPR-3801, Revision 1 ,nrrP.nnnrdn.p.

Nn

  • RR-19-171 C-332 Sheet 2 of 2 Equipment ID No. HV-49-2F029 Equip. Class" 2 (06) Motor Operated Valves Equipment Description RCIC Suppression Pool Isolation Valve Interaction Effects 7. Are soft targets free from i;pact by nearby equipment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YX ND UD N/AD YA NEI UD N/AD YX ND UD N/AD Y) NDI UD Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could ND UD adversely affect the safety fimctions of the equipment?

Comments (Additional pages may be added as necessary) ff/A fo h ( 10 Wr A C ýEvaluated by:.6'/Date: ZYlI-~o-e( C--..---7< C4 >Limerick Generating Station Unit 2 MPR-3801, Revision 1 Nn -RR-19-171 C-333 Equipment ID: HV-49-2F029 I I i Limerick Generating Station Unit 2 MPR-3801, Revision 1 r.nrr# nnnHPnrPNn" R.R-19-171 C-334 Equipment ID: HV-49-2F029 I Limerick Generating Station Unit 2 MPR-3801, Revision 1 rnrrmnnnr1PnrP Nn -RS-I2-171 C-335 Sheet I of 2 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No. HV-51-2F014A Equip. Class'2 (06) Motor Operated Valves Equipment Descriptioi 2A RHR HTXRRHRSWInlet Valve Location:

Bldg. Reactor Floor El. 201 Room, Area Room 280 Enclosure Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorale 1. Is the anchorage configuration verification required (i.e., is the item one YE] N of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Y4 NEI UE N/A[]Yt NEI UE] N/AE]4. Is the anchorage free of visible cfacs in the concrete near the anchors? Y, 4 4E]N UO N/AEl ,,. .ne -ou pw v 4 Pij 4 0r 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YE NE] UE] N/AN YXNEI UOl 12Enter the equipment class name from Appendix B: Classes of Equipment.

<C-3 >Limerick Generating Station Unit 2 MPR-3801, Revision 1 rlnrrPqnnndP.nr.P Nn" RR-19-171 C-336 I Sheet 2 of 2 Equipment ID No. HV-51-2F014A Equip. Class" 2 (06) Motor Operated Valves Equipment Description 2A RHR HTXRFHRSW Inlet Valve Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

..NoA ~4*f d 1,tf5 Xj NO U" N/AO 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Ygf NEI and masonry block walls not likely to collapse onto the eqipment?e~~oPef <Q( ),d1hoVj1C ade?, Ty U0- N/AU 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YX NO UD N/AU YX NO UO Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YX NEI UU1 adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated by: " m 1 J PtV Date: 8/7//< C-4>Limerick Generating Station Unit 2 MPR-3801, Revision 1 l.nrrrpqnnndinrP Nn

  • RR-19-171 C-337 Equipment ID: HV-51-2F014A Limerick Generating Station Unit 2 MPR-3801, Revision 1 rnrrPznnndpnr-Nn -R-19-171 C-338 Equipment ID: HV-51-2F014A Limerick Generating Station Unit 2 MPR-3801, Revision 1 r.nrr-nnndHnrP Nn
  • R.-19-171 C-339