MPR-3796, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 7 of 12
ML12342A112
Person / Time
Site: Limerick Constellation icon.png
Issue date: 11/06/2012
From: Schlaseman C S
Exelon Generation Co, MPR Associates
To:
Office of Nuclear Reactor Regulation
References
RS-12-171 MPR-3796, Rev 1
Download: ML12342A112 (40)


Text

Sheet 1 of 2 Status: 0 N U Seismic Walkdown Checklist (SWC)Equipment ID No. 1BE205 Equip. Class" 2 (19) Vertical Tanks or Heat Exchangers Equipment Description RHR Heat Exhanger Location:

Bldg. Reactor Floor El. 177 Room, Area Room 103 Enclosure Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

~M&~,w -)Re. 4*f 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y)ONEINEI U' N/AC x[ N[C UC1 N/A[YJK Nn U- N/AC-Y;NC- U[: N/ACj Y; NEI U]12 Enter the equipment class name from Appendix B: Classes of Equipment.

<C-3 >Limerick Generating Station Unit 1 MPR-3796, Revision 1 rnrrrmnnndnP.nr Nn* RR-19-171 C-212 Sheet 2 of 2 Equipment ID No. 1BE205 Equip. Class 1 2 (19) Vertical Tanks or Heat Exchangers Equipment Description RHR Heat Exhanger Interaction Effects 7. Are soft tar ets free from impact by nearby equipment or structures?

YX NO UD N/AD 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YV ND UD N/AD and masonry block walls not likely to colla se onto the equipment?

-Lone' rocewny ~~erocy I( O deq1lWrf r 4 OL,,fWJ 9. Do attached lines have adequate flexibility to avoid damage? )V ND UD N/AD 10. Based on the above seismic interaction evaluations, is equipment free YX ND UD of potentially adverse seismic interaction effects?Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YK(ND UDI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) il/A Date: 1/ < C-4 >Limerick Generating Station Unit 1 MPR-3796, Revision 1 rnrr~nnndpnrn

.Nn

  • RR-17-171 C-213 Equipment ID: 1BE205 i Limerick Generating Station Unit 1 MPR-3796, Revision 1 r'.nrr .qnnneiPnr.PNn*

RR-12-171 C-214 Equipment ID: 1BE205 Limerick Generating Station Unit 1 C-215 MPR-3796, Revision 1 rnrrP.nnnflPnrP Nn " RR-19-171 Equipment ID: 1BE205 Limerick Generating Station Unit 1 MPR-3796, Revision 1 rlnrrP.-nnndlnr.P Nn* RR-19-171 C-216 Equipment ID: 1BE205 Limerick Generating Station Unit 1 MPR-3796, Revision I r.nrrPnnndpnr'P Nnf RR-19-171 C-217 Equipment ID: 1BE205 Limerick Generating Station Unit 1 MPR-3796, Revision 1 N.n* RR-19-171 C-218 Equipment ID: 1BE205 Limerick Generating Station Unit 1 MPR-3796, Revision 1 rTnrrPqnnnrspnrA Nn -RR-12-171 C-219 Sheet 1 of 2 Status:& N U Seismic Walkdown Checklist (SWC)Equipment ID No. IBS252-1 Equip. Class 1 2 (19) Vertical Tanks or Heat Exchangers Equipment Description B PCIG/ADS Nitrogen Bottles Location:

Bldg. Reactor Floor El. 217 Room, Area Room 304E Enclosure Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one NM of the 50% of SWEL items requiring such verification)?

2. Is the anfhorage free of bqnt, b[okenb missing or loose 4lardware?

Lo2 Isfr the f b k YD NX UD N/AD L I TR- 10490 ecw-5 % 05-To',A cOJ%,Q 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

YX NEI UD N/ADl 4. Is the anchorage free of visible cracks in the concrete near the anchors? Y) NEI UI-D N/A[]5. Is the anchorage configuration consistent with plant documentation?

YPR NEI UD N/ADI (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic co ditions?L~ow oA 4 9 4 Ff,14 0 ,;k 4, YD NP(UO'R~mic 1 d4 I 2 Enter the equipment class name from Appendix B: Classes of Equipment.

Limerick Generating Station Unit 1 MPR-3796, Revision 1 CnrrP.qnnnk1AnrP Nn

  • RA-19-171 C-220 Sheet 2 of 2 Equipment ID No. 1BS252-1 Equip. Class'2 (19) Vertical Tanks or Heat Exchangers Equipment Description B PCIG/ADS Nitrogen Bottles Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?)M NO UD N/AD 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y; ND UD N/AD and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?NO UO N/AD Yý( NO UD Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could YX NO U[adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

  • ,~" Loaose fCome, W~4 cw+ýo (~owlveJ ~co~'4aei T 1 R Evaluated by: ate:< C-4 >Limerick Generating Station Unit 1 MPR-3796, Revision 1 CnrrP.nnndrfnr,.

Nn -R-129-171 C-221 Equipment ID: 1BS252-1 Limerick Generating Station Unit 1 MPR-3796, Revision 1 rnrrPqnnnrpnr.cP Nn -RR-19-171 C-222 Equipment ID: 1BS252-1 Limerick Generating Station Unit I MPR-3796, Revision 1 rnrrPnnnr]Pnr.P Nn

  • RR-19-171 C-223 Equipment ID: 1BS252-1 (N (N 40 Cv)Limerick Generating Station Unit 1 MPR-3796, Revision 1 t.Nn* R.R-19-171 C-224 Equipment ID: 1BS252-1 Limerick Generating Station Unit 1 MPR-3796, Revision 1 rnrrPqnnndpnr .Nn. RR-19-171 C-225 Sheet 1 of 2 Status: ( N U Seismic Walkdown Checklist (SWC)Equipment ID No. IBT528 Equip. Class" 2 (19) Vertical Tanks or Heat Exchangers Equipment Description B Diesel Generator Day Tank Location:

Bldg. Diesel Floor El. 217 Room, Area Room 312B Generator Building Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchoraie 1. Is the anchorage configuration verification required (i.e., is the item one YX NEI of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?

YýNf" I-5 1V~i4 ;.A 5VJ eam4614~I f bi' ý 4 2 ' /, 1I(&0~~N-0t0 ~ '4f4- 4v 4/elge 46~ qýAP AI~ fo-el -he1Xe' Ok.3. Is the anchorage free of corrosion that is more than mild surface Y(N1 oxidation?

UD N/AD UD N/AD UD N/AD 4. Is the anchorage free of visible cracks in the concrete near the anchors?KNO 11 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which ananchorage configuration verification is required.)

3 11? 0', iew,69, t S5C4.LOltDrwj JIc3l/4 4. 5B.6. Based on the above anchorage evaluations, is the anchorage free of, potentially adverse seismic conditions?

UD" N/AD'Y INO UD 1 2 Enter the equipment class name from Appendix B: Classes of Equipment.

<C-3 >Limerick Generating Station Unit 1 MPR-3796, Revision 1 rnrrP.-nnndPnr.P Nn -RR-12-171 C-226 Sheet 2 of 2 Equipment ID No. IBT528 Equip. Class" 2 (19) Vertical Tanks or Heat Exchangers Equipment Description B Diesel Generator Day Tank Interaction Effects 7. Are soft s free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse nto theequiment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?ýN 0 UD N/AD YgND UD N/AD Y<ND UD N/AD<NED UD Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could JCNDJ UD adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary).

Date:<C-4>Limerick Generating Station Unit 1 MPR-3796, Revision 1 rnrrm~nnndPlnrP Nn -P.-19-171 C-227 Equipment ID: 1BT528 Limerick Generating Station Unit 1 MPR-3796, Revision 1..nrrpqnnndPnrA.

Nn

  • RS-12-171 C-228 Sheet 1 of 2 Status:O N U Seismic Walkdown Checklist (SWC)Equipment ID No. 1 CC208 Equip. Class'" (18) Control Panels & Cabinets Equipment Description Unit Cooler Control Panel Location:

Bldg. Reactor Floor El. 201 Room, Area Room 208 Enclose Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

q4", Ovt 4 ') P(- !CC L0o o eV-6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

IiXNO Yxq NIl UI- N/AI-)X NIl Uil N/AO YX Nil U- N/AC Xý!(NEI Ui N/AD YJNC Uil 2 Enter the equipment class name from Appendix B: Classes of Equipment.

<C-3 >Limerick Generating Station Unit 1 MPR-3796, Revision 1 Nn PR-19-171 C-229 Sheet 2 of 2 Equipment ID No. 1CC208 Equip. Class" 2 (18) Control Panels & Cabinets Equipment Description Unit Cooler Control Panel Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Y1 NO UE] N/AD-Fkauace'r1+

4UL~m- r to'reiinc Ly end COPs; nd+" 0 credcLbh'460r4 4,0 ~4orqe6 W~ow 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YXND UO N/AD Y;K NO Ui N/AD Y'? ND UD Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could Yj NI U"]adversely affect the safe functions of the equipment?
  • +,e f .c:",,v re Welcec j~ 5,,,ll f-"& Comments (Additional pages may be added as necessary)

.VIA Evaluated by: fl*AAJc r 6ZO Date:/11 Limerick Generating Station Unit 1 MPR-3796, Revision 1 r.nrrP..nnndInr.P Nn, PN 171 C-230 Equipment ID: 1CC208 Limerick Generating Station Unit 1 MPR-3796, Revision 1 rnrrPnnndP1nr.

Nn -RR-19-171 C-231 Equipment ID: 1CC208 Limerick Generating Station Unit 1 MPR-3796, Revision 1 hnrrmnnndpinr.p.

Nn

  • RR-19-171 C-232 Sheet I of 2 Status&ý N (XýSeismic Walkdown Checklist (SWC)Equipment ID No. 1CD105 V" Equip. Class" 2 (12) Distribution Panels Equipment Description 125VDC Fuse Box Location:

Bldg. Control Floor El. 217 Room, Area Room 324 Structure Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorase 1. Is the anchorage configuration verification required (i.e., is the item one YN of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?IN6AX Ii~(t- ZfC'pVE V1~3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?N/ACO 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

574o5-Ai UA~6-,o Y"I NEI UE-NE'I U13l 12 Enter the equipment class name from Appendix B: Classes of Equipment.

,(C-3 >" Limerick Generating Station Unit 1 MPR-3796, Revision 1 r.nrrPqnnnrPnrpA Nn" RR-19-171 C-233 Sheet 2 of 2 EquipmentiDNo.

ICD105 Equip. Class1 2 (12) Distribution Panels Equipment Description 125SVDC Fuse Box Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

-IfMALooL A, If I- teAp or-4~ £A)ýh 7"7-?) TO 1i0Z /8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YX NO-and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequae flexibility to avoid damage? Y NE UO N/A[I UDj N/AEF UOf N/Afl 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YWNO UO]Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could Y [N] ULI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) 4/.., /('I Evaluated by: A-Date:< C-4 >Limerick Generating Station Unit 1 MPR-3796, Revision 1 frnrrPqnnndpnr'.p Nn

  • RA 19-171 C-234 Equipment ID: 1CD105 Limerick Generating Station Unit 1 MPR-3796, Revision 1 PnR-19-171 C-235 Equipment ID: 1CD105 Limerick Generating Station Unit 1 MPR-3796, Revision 1 Nn
  • RR-19-171 C-236 Equipment ID: 1CD105 Limerick Generating Station Unit 1 C-237 MPR-3796, Revision 1 Nn -RR-19-171 Sheet 1 of 2 Status: () N U Seismic Walkdown Checklist (SWC)Equipment ID No. 1CV211 Equip. Class'2 (08) Fans & Air Handlers Equipment Description C Core SaraX Pump Room Unit Cooler Location:

Bldg. Reactor Floor El. 190 Room, Area Room 113 Enclosure Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?$An4 0 reJ 4o 4cf'I plcfryvisi eWcform a~r"Oti"--0icre-t, 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

.M&6ec, owl, Ft O.- -M-)ý- (1)) Re'v. I 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YX NO Y'M NEI U0[ N/A[l YX NO UE- N/AO YV NEI U- N/AO]croe 4m YI NEI UE- N/A[" YV NE UED 12 Enter the equipment class name from Appendix B: Classes of Equipment.-KC-3 Limerick Generating Station Unit 1 MPR-3796, Revision 1 r.nrrPnnndAnr..

Nn* RR-19-171 C-238 Sheet 2 of 2 Equipment ID No. 1CV211 Equip. Class 1 2 (08) Fans & Air Handlers Equipment Description C Core Spray Pump Room Unit Cooler Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YV Nil UO N/AO YD NO UO N/AD YX NE UD N/AO Yd NO U" Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could (P NO U-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) 10/Evaluated tvv-" 7 Date:

Limerick Generating Station Unit 1 MPR-3796, Revision 1 thnrrP~nnndPnrP.

Nn -RS-19-171 C-239 Equipment ID: 1CV211 Limerick Generating Station Unit 1 MPR-3796, Revision 1 flnrrP-nnndPnr.P Nn " RR-19-171 C-240 Equipment ID: 1CV211 Limerick Generating Station Unit 1 MPR-3796, Revision 1 f.nrrspqnnnripnr.p Nn " R5-19-171 C-241 Equipment ID: 1CV211 I I I Limerick Generating Station Unit 1 MPR-3796, Revision 1 r.nrrp-nnnrPnrnP Nn

  • RR-19-171 C-242 Sheet 1 of 2 Status: ( N U Seismic Walkdown Checklist (SWC)Equipment ID No. 1DC661 Equip. Class" (18) Control Panels & Cabinets Equipment Description Panel D SafejArd System Vertical Board Location:

Bldg. Control Floor El. 269 Room, Area Room 533 (/ / a Structure Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other commiets.Anc:horage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?

YE& ND U1 N/AD 3. ,011 Is the acog fVre of corso taismr -'t ha m"il surac 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?Y6ND 3U0 N/AD YA. ND UD1 N/AD 5. Is the anchorage configuration consistent with plant documentation?

YD ND UD N/](Note: This question only applies if the item is one of the 50% for which ap ancborage confitratiqu verification iyrequired, 1.1 ), b, --.S f*Ohi(,aur ja 4ia L -6. Based on the above anchdrage evaluations, is the anchorage free of Y9[ ND U13 potentially adverse seismic conditions?.

..- n -<060- " r- ,t -i_-12 Enter the equipment class name from Appendix B: Classes of Equipment.

Limerick Generating Station Unit 1 MPR-3796, Revision 1 Nn -RR-19-171 C-243 Sheet 2 of 2 Equipment ID No. 1DC661 Equip. Class 1 2 (18) Control Panels & Cabinets Equipment Description Panel D Safegard &stem Vertical Board Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

YM NO UO N/A]8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YJI NO UD] N/AD and masonry block walls not likely to collapse onto the equipment?

wvb ýju.,ca p w+0 CroI wA'i efWy'A 44~ -ke -f'*C (54d 9. Do attached lines have adequate flexibility to avoid damage? )X NO UD] N/Al]10. Based on the above seismic interaction evaluations, is equipment free YOK UD of potentially adverse seismic interaction effects?Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Ui" adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) o{'fý MegA Po'ef'* -M'rEvaluated Date: 0/< C-4 >Limerick Generating Station Unit 1 MPR-3796, Revision 1 rnrrP.qnnndPnr.P Nn -RR-19-171 C-244

1.4.5 Termination

Cabinets The frames and enclosures of Limerick termination cabinets are the same size and structurally identical to the tested termination cabinet (Reference 4). The only difference between the Limerick cabinets and the tested termination cabinet is the quantity and location of termination modules. This will not affect the structural capability of the cabinets.

The TRS envelops the RRS as shown in the Appendix, Fugure 4.2.These cabinets are located in the Control Room, elevation 269'.The SQRT forms for the Class 1E Termination Cabinets (P700 series) are contained in Section 3.1.4.6 Floor Mountins 1.4.6.1 Auxiliary 9quipment Room, 289' Elevation Panels located in the Auxiliary Equipment Room are mounted on PGCC floor sections.

As shown in Ref. 5, sections similar to those at Limerick were tested to determine if there were any amplifications of accelerations to the panels. Panel accelerometer readings show that the floor sections actually reduce the transmissibility on the tested panels by as much as 10-percent. This is due to structural damping. The results presented in this report conservatively assume that the floor sections are rigid, and no credit is taken for the reduced transmissibility.

1.4.6.2 Control Room, 269' Elevation Panels located in the control room (and C61-POO1) are bolted to a 4" base which is welded to the floor. This base was on the tested Limerick H12-P601, P603, and P661 panels. Examination of test data in panels without this base shows no appreciable difference in transmissibilities.

The base is therefore assumed rigid.1-8 Limerick Generating Station Unit 1 C-245 MPR-3796, Revision 1 rnrrPqnnnrlnrP Nn -RR-1-171 Equipment ID: 1DC661 I Limerick Generating Station Unit 1 MPR-3796, Revision 1 rnrrP.nnnlP~nrP Nn" RR-19-171 C-246 Equipment ID: 1DC661 Limerick Generating Station Unit 1 MPR-3796, Revision 1 Nn -R.R-i9-171 C-247 Sheet 1 of 2 Status:D N U Seismic Walkdown Checklist (SWC)Equipment ID No. IDD101 Equip. Class 1 2 (13) Batteries

& Racks Equipment Description 125V DC Battery Location:

Bldg. Control Floor El. 217 Room, Area Room 39f" Structure Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one YI_, NM-of the 50% of SWEL items requiring such verification)?

4131 , te, 10 141 afPriR"? N 'Y6 MUi_ .MATCHES 1W6. M -2L'0)' AL , 1/ 4 'R flj4( -A1T' tb,, 2. Is ihe anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?&."t ~,/CAJ!ý i 09.J07,o PK),j'UTN4N6 Nt-AP Ark H0gS.YP1 N1] Uf- N/AO Y. N- U- N/AQ YJ NEI UL- N/A-5. Is the anchorage configuration consistent with plant documentation?

YR NO UE" N/A-(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Tjyý, cit ýWA -#6j",1Sv1H"" T~"e4T .Pe /*N.bl'3SCnA

6. Based on the above anchorage evaluations, is the anchorage free of Y, NEI U0 S-c-ToI'q 7.)*potentially adverse seismic conditions?

n IS"3tfc#7 12 Enter the equipment class name from Appendix B: Classes of Equipment.

A C-3 >Limerick Generating Station Unit 1 MPR-3796, Revision 1 r.nrr.qnnndJnrP.

Nn

  • RR-19-171 C-248 Sheet 2 of 2 Equipment ID No. IDD101 Equip. Class 1 2 (13) Batteries

& Racks Equipment Description 125V DC Battery Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

YV4 NCI UD N/AD 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yp ND UIj- N/AD and masonry block walls not likely to collapse onto the equipment?

j-.4 iT ei x ruge rtave coia) ¢ toa As 6g p- s a 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YP, ND UD N/AD YjND UrI Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Yb.. NDI UD-adversely affect the safety functions of the equipment?

o ernsR .Adit -pae Sm/L CAP /4 rad ftded -ryKs ) iv W4 Namr o,' jpfA ) dvT 7wib j)s- I-V. V- '. -A:' ONf,01WA)r A bVEIPr 410F.- 04 Comments (Additional pages may be added as necessary)

Evaluated by Date: 3A z Y/'7 ba 4 C-4 >Limerick Generating Station Unit 1 MPR-3796, Revision 1 rlnrrP..nnnrIPnr.P Nn

  • R.-19-171 C-249 Equipment ID: lDD101 I Limerick Generating Station Unit 1 MPR-3796, Revision 1 rnrrP.mnnnr1-nr PNn *R-19-171 C-250 Equipment ID: lDD101 Limerick Generating Station Unit 1 MPR-3796, Revision 1 rnrrPqnnnriPnr.P Nn ' R.-19-171 C-251