RS-12-171, MPR-3801, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 12 of 13

From kanterella
(Redirected from RS-12-171)
Jump to navigation Jump to search
MPR-3801, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 12 of 13
ML12342A131
Person / Time
Site: Limerick Constellation icon.png
Issue date: 11/06/2012
From: Schlaseman C
Exelon Generation Co, MPR Associates
To:
Office of Nuclear Reactor Regulation
References
RS-12-171 MPR-3801, Rev 1
Download: ML12342A131 (41)


Text

Table C-2. Unit 0 Seismic Walkdown Checklists (SWCs)

Anchorage Awc-UO-Component ID Description Configuration xx Confirmed?

0OB132 Control Enclosure Safeguard 440V MCC Y 1 00B519 Spray Pond 440V AC Power MCC Y 2*

DIV I Spray Pond Pump Structure 120V AC 2*

01X566 Instrument Panel XFMR Control Panel Spray Pond Pump Structure N 2*

0AC564 Air Supply Fan OAK112 Control Structure Chiller N 8 0AP162 Control Room HVAC Chilled Water Pump N/A 8*

0AP506 RHR Service Water Pump Y 2 0AP548 Emergency Service Water Pump Y 2*

0BV543 B' Spray Pond PP. Structure Air Supply Fan Y 5 0CC667 ESW Division III Control Panel N AWC-U2-19 HD-078-027A Control Room Intake Damper N/A 6 HD-081-041A Spray Pond Intake Fan Damper N/A 7 HV-078-021 B Outside Air to MCR Isolation Valve N/A 3 HV-1 2-032A Spray Nozzles A Inlet N/A 4 PSH-12-004A RHR Service Water Pump 0A506 Loop A N/A 9 Limerick Generating Station Unit 2 C-416 MPR-3801, Revision 1 Correspondence No.: RS-12-171

Sheet 1 of 2 Status:@ N U Seismic Walkdown Checklist (SWC)

Equipment ID No. 0OB132 Equip. Class" (01) Motor Control Centers / Low & Medium Voltage Switchgears Equipment Description ControlEnclosure Safeguard 440VMCC Location: Bldg. Control Floor El. 304 Room, Area Room 619E Structure Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

qYl~NE

2. Is the anchorage free of bent, broken, missing or loose hardware?

I NDI UD- N/AD

3. Is the anchorage free of corrosion that is more than mild surface 14 NEI UD] N/AL]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? A NE UD N/Arn
5. Is the anchorage configuration consistent with plant documentation? YJZ NiD UD" N/AD (Note: This question only applies if the item is one of the 50% for t\V which an anchorage configuration verification is tequired.) .....

" '4t1 4 0evd tg4-ýb 01 "'wee po,10/ af 44vt IS bpie/ ^-. e~e !fV to' ?c4

6. Based on the 'toveanchorage evaluations, isme anchorage ree of Y9 Ud]

UDN naDo , ).00 Sedo j 01. V.

potentially adverse seismic conditions? 4 12 Enter the equipment class name from Appendix B: Classes of Equipment.

Limerick Generating Station Unit 2 C-417 MPR-3801, Revision 1 r.nrrPqnnndnP-nr. Nn *R .- 19-171

Sheet 2 of 2 Equipment ID No. 00B132 Equip. Class12 (01) Motor Control Centers / Low & Medium Voltage Switchgears Equipment Description ControlEnclosure Safeguard440VMCC Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y)ANO UD N/AD
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Ur N/AD and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?

XNEI UD N/AD

10. Based on the above seismic interaction evaluations, is equipment free YMNO UO ofpotentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y,< NE UD adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated by: Date: Il-

< C-4 >

Limerick Generating Station Unit 2 C-418 MPR-3801, Revision 1

.nrrP.qnnnHAnr.A Nn -

RR-19-171

Equipment ID: 00B132 Limerick Generating Station Unit 2 C-419 MPR-3801, Revision 1 r*nrrPqnnndPnr.p Nn

  • RR-19-171

Equipment ID: 00B132 Limerick Generating Station Unit 2 C-420 MPR-3801, Revision 1 r.nrrP-nnndPnr*P Nn- RR-19-171

Equipment ID: 00B132 I

Limerick Generating Station Unit 2 C-421 MPR-3801, Revision 1 f.nrrp~nnndfnrA Nn- R.R-19-171

Sheet 1 of 2 Status: (D N U Seismic Walkdown Checklist (SWC)

Equipment ID No. 00B519 Equip. Class 12 (01) Motor Control Centers / Low & Medium Voltage Switchgears Equipment Description S&ray Pond 440VAC Power MCC Location: Bldg. Spray Pond Floor El. 268 Room, Area 'Room 1000 Building Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one Y1<1 ND of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? UE. N/AD A 6., at b~'tfV'tx% heiy ' 4 At- to bef 1

y ebe Ag (ZVMS +1%Itebi

roo E-It/. AaU pl,D.&J kAvet ,v , ~'

CAI,-Ade, p Af, - AL1,dWA11 ., 7vetY7 14,11 ,'.i' v, Ce'OA.- fftOP&A.q*. V.40*,, ,,'V"V P# -t f,,-f t,. A,.tet.Ot (?ý.e.

3. Is the anchorage free of corrosion that is more than mild surface Yt2_JNU UD N/AD oxidation?

C.rI4AA -j fawe art.

4. Is the anchorage free of visible cracks in the concrete near the anchors? YdND- UD N/AD
5. Is'the anchorage configuration consistent with plant documentation? V 1"-I UD N/AD (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) ._ / *y Pei A pa.kD,,, D+. 5.esP -L 4..

tfi t*3 ~4'A1,eW Mijr&

6. Based on the above anchorage+valuations, is tl~e anchorage free of , $4N ,UD potentially adverse seismic conditions? iA0,4t,4,ty, 4a.j;Ks ftq6.-.

.. . . .. C# (46111 tdXi*

' to ýVe. Se4vj "k,-5#IP xw v., .*--x~t#,*

t, J+d. 12 Etrthe equipment class name from Appendix B: Classes of Equipment.

Vi imerick Generating Station Unit 2 C-422 MPR-3801, Revision 1 (flnrr~~nnnd~nr* Nn "RR-17-171

Sheet 2 of 2 Equipment ID No. 00B519 Equip. Class12 (01) Motor Control Centers / Low & Medium Voltage Switchgears Equipment Description Spray Pond 440VAC PowerMCC Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? -1UE] NI/AE 104f1et , o kr. -4v "AL 01 f IfA&

1 'A 4-2A rX I ' ýA &1*g1

8. A0hei*he Are 8.~ovre q 1i Ib "',

p*me t, distribution systems, ceiling tiles and 1irghtin*, -Y*.rN UQ NIADJ and masonry block walls not likely to collapse onto the equipment?

1511 afJv

9. Do attached lines have adequate flexibility to avoid damage? YXNEI UDi N/AE-
10. Based on the above seismic interaction evaluations, is equipment free 2!NEI UEJ of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Yi"NEI U3 adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) . A!e~ta-e,-

r-e '- ,

6CA~j,6 47 4L,, *-4fe, 6A --. e~i

!4 A,, 0ic~Y6 0.5 4 / e'-.V CA

&'f~.~A e~'~

ý 4~

j~~-it ., el U(4~ bl A ,t

~ d~V~trk. '~?

I l

(~e4 ~ 4te,4iLI1~s3 +~4' S 4s") -.1 Date:

Evaluated bv:

Yht (4ý-

<C-4 >

Limerick Generating Station Unit 2 C-423 MPR-3801, Revision 1 r.nrrP,,nnndhpnnP Nn - RR-19-171

-p . . .. -- - - -- - - - . --- - - -

  • (.)PKG. NO.2~ SECTI~ON ts IE~v 4
  • Iauc aaw vamc ow TXom a"#"f orsa
1) I. Plant

~m: 1  ; to&17& ~a so KW MOR ___OP,___________%Z S'C SEC TI Oý7 2M . '2I e .

II. Va~tImp "Co *'ev O~O ~Nru

2. =958 cm £ ____
3. 4ft. MapeW If 5.0 pwtu Ibms a-N-k KOaO pimi. L-zmcare f~~

le MRe dEvi Sz"d Ed____________

2.~~ 1Ac4mA.N 4~bw1NM 2 orrA 6.tyDm.zt,Rwsioul in C.~~~~~~ 600 LP.i~~$~A rA~t

3. Znout mi adupt. N/~A' PoTJ ?urtiE t~. i. P4~
3. it1obwComm= ~rits a wPI 1tb....... adma. 26

-r%~~

b! #(TmsrLYJ-i ~ CA-E a, O FLOOnmn~PAUL"set

b. vs talo 2~~.0" VV 9 40" 1~4~~ 20 rGl ~ii~oAN Nf.. A Seno 60 Las VSIL 7.~ ~~TodndMISA ODMWF SR DE~-8,4 P-6 C-42O LinriE ni Geeatn -aio MPR380 Rvison.1

...-- -~. . E 5~-1-on Cnrmnnnrpflr Nn

Equipment ID: 00B519 I

Limerick Generating Station Unit 2 C-425 MPR-3801, Revision 1 r.nrrmnnndrnr.P Nn* RR-19-171

Equipment ID: 00B519 I

I Limerick Generating Station Unit 2 C-426 MPR-3801, Revision 1 rnrrP.nnnt*~nrP. Nn - RR-19-171

Sheet 1 of 2 Status:O N U Seismic Walkdown Checklist (SWC)

Equipment ID No. 101X566 Equip. Class1 2 (02) Transformers Equipment Description DIVI Spray Pond Pump Structure 120VAC Instrument PanelXFMR Location: Bldg. S&ray Pond Floor El. 268 Room, Area Room 1000 Building Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchora2e

1. Is the anchorage configuration verification required (i.e., is the item one YJZ Ni]

of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware? ~NEI UO mi9-
3. Is the anchorage free of cZrrosion that is more than mild surface 'NOJ UD N/AD oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? 9 [ UI- N/AD COW114"14y It, efý CAPOCtiV V1 V'14 "7t ~ re4Aws
5. Is the anchorage configuration consistent with plant documentation? Y* ND UD N/AD (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

C-632-, 04^

kev., (0 M-5.

9/7/12- /

6. Based on the above anchorage evaluations, is the anchorage free of Y .N& UD potentially adverse seismic conditions?

12 Enter the equipment class name from Appendix B: Classes of Equipment.

ý<C-3 >

Limerick Generating Station Unit 2 C-427 MPR-3801, Revision 1 CnrrP~nnndHnr. Nn - RR-19-171

Sheet 2 of 2 Equipment ID No. 01X566 Equip. Class12 (02) Transformers Equipment Description DIV I Spray Pond Pump Structure 120VAC Instrument PanelXFMR Interaction Effects

7. Are soft targets free from impact b nrby!eq*iPmet or structures? YfN'NE! U-1 N/AD At actb4ea
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y#]*NI" UD N/AD and masonry block walls not likely to collapse onto the equipment?

P fat(. .f kV1)d -hto-le(,e

9. Do attached lines have adequate flexibility to avoid damage? YE I-'I UE- N/AD YN-1 U-
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic .interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y" NEI U[-]

adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Date:

4 7 c Limerick Generating Station Unit 2 C-428 MPR-3801, Revision 1 r.nrrP.nnndPnr.p Nn* RR-19'-171

Equipment ID: 01X566 Limerick Generating Station Unit 2 C-429 MPR-3801, Revision 1 rlnrrA~nnnrlPnrP Nn

  • R.-1*-171

She t1of2 Status: N U Seismic Walkdown Checklist (SWC)

Equipment ID No. 0AC564 Equip. Class12 (18) Control Panels & Cabinets Equipment Description ControlPanel Spray PondPump StructureAir Supply Fan Location: Bldg. Spray Pond Floor El. 268 Room, Area Room 1000 Location: Bldg. Spray PodFloor El. 268 .... Room, Area Room 1000 Building Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoraze

1. Is the anchorage configuration verification required (i.e., is the item one YN of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YQ(NE1 UE' N/A-
3. Is the anchorage free of corrosion that is more than mild surface YIWNEJ- UQ- N/A' oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YW NEI U" N/AC-1
5. Is the anchorage configuration consistent with plant documentation? YrI NEI U-' N/At (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of "@-NE" UE-potentially adverse seismic conditions? .,

Al "&1V'(r' O 12 Enter the equipment class name from Appendix B: Classes of Equipment.

41--- is 7"4 <C-3 >

Limerick Generating Station Unit 2 C-430 MPR-3801, Revision 1 rnrrp.nnndpnr-.p Nn ' PS-19-171

Sheet 2 of 2 Equipment ID No. 0AC564 Equip. Class12 (18) Control Panels & Cabinets Equipment Description ControlPanel Spray Pond Pump StructureAir Supply Fan Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y "-IN UD N/AD
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y ND UD N/AD and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YZ2ND UD N/AD
10. Based on the above seismic interaction evaluations, is equipment free ND UrI of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could NEIN-UD adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

P opatb'oe-f o 'j 6f -el WAY 4 e C e'o fe, Evaluated by:

I

-- Date:

41ý3ý fo--,. //_.. X/-ýgZj 2-I / -

- 6 7 .v Limerick Generating Station Unit 2 C-431 MPR-3801, Revision 1 rnrrP nnndPnr.PNn' RR-19-171

Equipment ID: 0AC564 t

Limerick Generating Station Unit 2 C-432 MPR-3801, Revision 1 rnrrFnnndPnrA Nn

  • RR-12-171

Equipment ID: 0AC564 Limerick Generating Station Unit 2 C-433 MPR-3801, Revision 1 Cnrrpnnndprnc.p. Nn

  • RR-19-171

Sheet 1 of 2 Status:(t N U Seismic Walkdown Checklist (SWC)

Equipment ID No. OAK1 12 Equip. Class 12 (09) Chillers Equipment Description ControlStructure Chiller Location: Bldg. Control Floor El. 200 Room, Area Room 258 Structure Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorane

1. Is the anchorage configuration verification required (i.e., is the item one YOEJo of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? NO UO N/AO
3. Is the anchorage fleeof corrosion that is more than mild surface U- N/Af oxidation? Qy . 1E: A X NEI 14OfAt ^td fv 'i
4. Is the anchbrage free of visible cracks in the concrete near the anchors? UE- N/An Y No U5. Is the anchorage configuration consistent with plant documentation?

(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Y)*NO Un-potentially adverse seismic conditions?

1 Enter the equipment class name from Appendix B: Classes of Equipment.

<C-3 >,

Limerick Generating Station Unit 2 C-434 MPR-3801, Revision 1 (TnrrPrnnndPnr'P Nn - RR-12-171

Sheet 2 of 2 Equipment ID No. OAK1 12 Equip. Class"2 (09) Chillers Equipment Description Control Structure Chiller Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YAND UD N/AD
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YOND uJr N/AD an masonry block walls not likely to collapse o t the equipment?

p- 6rb, 5Q

9. Do attached lines have adequate flexibility to avoid damage? YND UDj N/AD
10. Based on the above seismic interaction evaluations, is equipment free Y~NU of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YŽNND UD adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Date:

/ Is /

Limerick Generating Station Unit 2 C-435 MPR-3801, Revision 1 rlnrrP.qnnndf, nr.P Nn ' RR-19-171

Equipment ID: OAK112 Limerick Generating Station Unit 2 C-436 MPR-3801, Revision 1 flnrrm.qnnndrnr.p. Nn - RR-17-171

Equipment ID: OAK112 Limerick Generating Station Unit 2 C-437 MPR-3801, Revision 1 rnrrP~nnndfnr. Nn -RR-1 -171

Sheet 1 of 2 Status:& N U Seismic Walkdown Checklist (SWC)

Equipment ID No. OAP 162 Equip. Class' (03) Horizontal Pumps Equipment Description ControlRoom HVAC Chilled Water Pump Location: Bldg. Control Floor El. 200 Room, Area Room 258 Structure Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YI"IN]

of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent broken, missing or loose hardware?

154NO /[-]

3. Is the anchoraee free of corrosion that is more than mild"i-urface oxidain/*14_- 0o V */ _ , t5 /
4. Is the anchorage free of visible cracks in the concrete near the anchors? )XNO 90 Aý
5. Is the anchorage configuration consistent with plant documentation? YO" NEl UD- N/Aý (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of 541 potentially adverse seismic conditions?

12 Enter the equipment class name from Appendix B: Classes of Equipment.

< C-3 >

Limerick Generating Station Unit 2 C-438 MPR-3801, Revision 1 rnrnrP.nnndrnr. Nn " RR-17-171

Sheet 2 of 2 Equipment ID No. 0AP162 Equip. Class12 (03) Horizontal Pumps Equipment Description ControlRoom HVAC Chilled Water Pump Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? YI(NF UD- N/AD
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, UD N/AD and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? YAND UE- N/AD
10. Based on the above seismic interaction evaluations, is equipment free *D1 UD of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y04 1 UI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Date:

J ZC1 1:2 v

Limerick Generating Station Unit 2 C-439 MPR-3801, Revision 1 rnrroqnnntlPnr.p Nn P R9-19-171

Equipment ID: 0AP162 I

Limerick Generating Station Unit 2 C-440 MPR-3801, Revision 1 rlnrrP.nnnrl~nrA. Nn - R5'-1-1-71

Equipment ID: 0AP162 Limerick Generating Station Unit 2 C-441 MPR-3801, Revision 1 rnrrPnnnrl-nrA Nn " P.R-12-171

Sheet 1 of 2 Status: *N U Seismic Walkdown Checklist (SWC)

Equipment ID No. 0AP506 Equip. Class12 (04) Vertical Pumps Equipment Description RHR Service Water Pump Location: Bldg. Spray Pond Floor El. 268 Room, Area Room 1000 Location: Bldg. SprayPn Floor El. 268 ,'Room, Area 'Room 1000 Building Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchora*e

1. Is the anchorage configuration verification required (i.e., is the item one Y0NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? 39 NDI UI N/AD
3. Is the anchorage free of corrosionhat is more than mild surfaceN )ZINO UD N/AD oxidation? -1 .4 c 41T Ce, /*/o G4 VK6%,, 4,1-twt ( 7Vbt,, .-. jfZ. t~l-C/Ie
4. Is the anchorage free of visible cracks in the corbrete near the anchors? VN' U" N/AD
5. Is the anchorage configuration consistent with plant documentation? Y& NDI Ul N/AD (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the potentially above seismic adverse anchorage evaluations, is the anchorage free of conditions? Y&N' U" 12 Enter the equipment class name from Appendix B: Classes of Equipment.

Limerick Generating Station Unit 2 C-442 MPR-3801, Revision 1 r.nrrPqnnnr1Pnr.P Nn - RR-19-171

Sheet 2 of 2 Equipment ID No. 0AP506 Equip. Class' 2 (04) Vertical Pumps Equipment Description RHR Service Water Pump Interaction Effects

7. Are soft targetsfree from impact by nearb eqment or structures? YA NEI UE1 N/AEI
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto e e nt?

AqjýfP 8 -t:,,~.4(dt P, t0 V

9. Do attached lines have adequate flexibility to atoid damage?
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

4V1 nul3 Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y NU] U"I adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated by: ft A-*v-. d* e Date: ki#o(IL

< C-4 >)

Limerick Generating Station Unit 2 C-443 MPR-3801, Revision 1 r.nrrPznondpner'. No

  • RR-19-171

Equipment ID: 0AP506 I

Limerick Generating Station Unit 2 C-444 MPR-3801, Revision 1 rlnrrPnnndPnr.P Nn

  • R-19-171

Equipment ID: 0AP506 Limerick Generating Station Unit 2 C-445 MPR-3801, Revision 1 f.nrrPmnnndpnc.P Nn

  • RR-12-171

Shert 1 of 2 Status: N U Seismic Walkdown Checklist (SWC)

Equipment ID No. OAP548 Equip. Class12 (04) Vertical Pumps Equipment Description Emtergencv Service Water Pump Location: Bldg. Spray Pond Floor El. 268 Room, Area Room 1000 Building Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoraze

1. Is the anchorage configuration verification required (i.e., is the item one 4NO of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YP*N[] U" N/Af"
3. Is the anchorage free of corrosion that is more than mild surface Y4-N[" UI" N/A-oxidation? 1i/t [QC6 c.&O,47.O acc , e.
4. Is the anchorage free of visible cracks in the concrete near the anchors? YAMNEI UE" N/AO-
5. Is the anchorage configuration consistent with plant documentation? Y(N'-I UUE" N/AE-(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of *934l-' UE potentially adverse seismic conditions?

12Enter the equipment class name from Appendix B: Classes of Equipment.

<C-3 >

Limerick Generating Station Unit 2 C-446 MPR-3801, Revision 1 r.nrrmqnnndpnr.p Nn - RR-19-171

Sheet 2 of 2 Equipment ID No. 0AP548 Equip. Class12 (04) Vertical Pumps Equipment Description Emergency Service Water Pump Interaction Effects

7. AIe soft targets free from impact by nearby equipment or structures? YoNE U0 N/AC

/V IoKk4rW

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yf I-'I UL N/AC and masonry block walls not likely to collapse onto the equipment? I Ov Il-Ad '( t l

-,, [C e a L"t' ( y P vvri 4t vj '(

9. Do attached lines have adequate flexibility to avoid damage? Y0;NQ UC N/AC
10. Based on the above seismic interaction evaluations, is equipment free Y klD UC of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could )e4DC UC adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Date: 54/1Z Z-

< C-4 >

Limerick Generating Station Unit 2 C-447 MPR-3801, Revision 1 rlnrrPqnnndP.nrP Nn - PS-19-171

Equipment ID: 0AP548 Limerick Generating Station Unit 2 C-448 MPR-3801, Revision 1 f.nrrP~nnndPlnrP Nn* RR-19-171

Sheet 1 of 2 Status: (2) N U Seismic Walkdown Checklist (SWC)

Equipment ID No. 0BV543 Equip. Class 12 (08) Fans & Air Handlers Equipment Description B' Spray Pond PP.StructureAir Supply Fan Location: Bldg. Spray Pond Floor El. 268 Room, Xrea Room 1005 Building Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is the anchorage configuration verification required (i.e., is the item one YrANEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Yo NEI U-] N/AC
3. Is the anchorage free of corrosion that is more than mild surface YZNI- U-] N/A[

oxidation?

4. Is the anchorage free of visible Vacks in the concrete near the anchors? YgN[-' UC- N/ACl

~~4,~ litI-

5. Is the anchorage configuration consistent with plant documentation? YJ;J NEI UD N/AD (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of )ONE] CUC potentially adverse seismic conditions?

12 Enter the equipment class name from Appendix B: Classes of Equipment.

< C-3 >

Limerick Generating Station Unit 2 C-449 MPR-3801, Revision 1 rnrrPqnnndr.nrP Nn RR-19-171

Sheet 2 of 2 Equipment ID No. OBV543 Equip. Class' 2 (08) Fans & Air Handlers Desripion Equimen ',pray Pond PP. Structure Air Sup ly Fan Interaction Effects

7. Are soft targets tree from impact by arb equipment or structures? YJKl-I Ul-1 N/AEI YCNI- UL- N/AO
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

N-NEI UO N/Afl

9. Do attached lines have adequate flexibility to avoid damage?

Y6 NO UI-I

10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YKVE- U-'

adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

.1'01 Evaluated by: / Date: 6);//

91 t 1V)I

< C-4 >,

Limerick Generating Station Unit 2 C-450 MPR-3801, Revision 1 rnrrsnnndPnrA.Nn RRA-19-171

Equipment ID: 0BV543 Limerick Generating Station Unit 2 C-451 MPR-3801, Revision 1 Snrrqnnndlnr-PNn*

RP-19-171

Sheet 1 of 2 Status: (D N U Seismic Walkdown Checklist (SWC)

Equipment ID No. 0CC667 Equip. Class12 (18) Control Panels & Cabinets Equipment Description ESW Division III ControlPanel Location: Bldg. Control Floor El. 269 Room, Area Room 533 C*,2 e (

Structure Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchoraze

1. Is the anchorage configuration verification required (i.e., is the item one YEI NX of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? YjNI"] .UE] N/All

-C vgeo17;*ike/ *5).t o, .M A.f. ,, 4-9

3. Is the anchorage free of corrosion that is more than mild surface X4,NE] UE] N/AE]

oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? Y -- lJ UE] N/AE]
5. Is the anchorage configuration consistent with plant documentation? YE] NEI UE] N/AX (Note: This question only applies if the item is one of the 50% for which an anqhorage configuration verification is required) ,. , I I.-

V.{~eC~-t. 4- hO4. s4Cj( o~t W 3 10fybats em4 C le -6* f,4~ aid ' i CVIci fo71,04-r'.6(i ft oft A."o

6. Based on the aboV anchorage evaluations,*s the anchorage free of Y NEI UE]

potentially adverse seismic conditions?

0o*&,,1(,

  • t,(A i S" Ck* * ' 1- V 3,,,t .* .0 *,.,*
  • 149V~e, OP ý4 A 10A/ e4""' Do NdteA C7G;-4t'14e 10 P"lIwCC-,.

12 Enter the equipment class name from Appendix B: Classes of Equipment.

<C-3 >

Limerick Generating Station Unit 2 C-452 MPR-3801, Revision 1 r.nrrP..nnndPnr.P Nn" RR-19-171

Sheet 2 of 2 Equipment ID No. 0CC667 Equip. Class"2 (18) Control Panels & Cabinets Equipment Description ESWDivision III ControlPanel Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Y NEI U[] N/At]

MuP fj'+ 11r-t A, fr- ý I1 oi'r-eý

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YId(Nt1 Ut] N/At]

and masonry block walls not likely to collapse onto the equipment?

V C) V4

9. Do attached lines have adequate flexibility to avoid damage? YaNt] Ut] N/At]
10. Based on the above seismic interaction evaluations, is equipment free YXTINED Ut]

of potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y*-NDI Ut]

adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated by: Date: _Y/3 2-C4ZI/

Limerick Generating Station Unit 2 C-453 MPR-3801, Revision 1 r.nrrP~nnndPnr.P Nn RR-12-171

Occ-o ) , t ..- o

'1 1.4.5 Termination Cabinets The frames and enclosures of Limerick termination cabinets are the same size and structurally identical to the tested termination cabinet (Reference 4). The only difference between the Limerick cabinets and the tested termination cabinet is the quantity and location of termination modules. This will not affect the structural capability of the cabinets. The TRS envelops the RRS as shown in the Appendix, Fugure 4.2.

These cabinets are located in the Control Room, elevation 269'.

The SQRT forms for the Class IE Termination Cabinets (P700 series) are contained in Section 3.

1.4.6 Floor Mounting 1.4.6.1 Auxiliary Equipment Room, 289' Elevation Panels located in the Auxiliary Equipment Room are mounted on PGCC floor sections. As shown in Ref. 5, sections similar to those at Limerick were tested to determine if there were any amplifications of accelerations to the panels. Panel accelerometer readings show that the floor sections actually reduce the transmissibility on the tested panels by as much as 10

-* percent. This is due to structural damping. The results presented in this report conservatively assume that the floor sections are rigid, and no credit is taken for the reduced transmissibility.

1.4.6.2 Control Room, 269' Elevation Panels located in the control room (and C61-POOI) are bolted to a 4" base which is welded to the floor. This base was on the tested Limerick H12-P601, P603, and P661 panels. Examination of test data in panels without this base shows no appreciable difference in transmissibilities. The base is therefore assumed rigid.

1-8 i)

Limerick Generating Station Unit 2 C-454 MPR-3801, Revision 1 r*nrrPqnnndpnrP Nn R5-19-171 I

Equipment ID: 0CC667 I

Limerick Generating Station Unit 2 C-455 MPR-3801, Revision 1 rnrrP.annndlPnr*p Nn* RR-12-171

Equipment ID: 0CC667 Limerick Generating Station Unit 2 C-456 MPR-3801, Revision 1 rnrrpnnnri-nrý- Nn R,-19-171