Sheet 1 of 2 Status: (@) N U Seismic Walkdown Checklist (SWC)Equipment ID No. 2CP206 Equip. Class 1 2 (04) Vertical Pumps Equipment Description Core Spray Pump & Driver Location:
Bldg. Reac Floor El. 177 Room, Area Room 185 Enclosure Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?YX NEI Yý'NEI UD N/AD Y1 NEI UD N/AD YýýNEI UO N/AED 5. Is the anchorage configuration consistent with plant documentation?
YX N[] UD N/AD (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of YWN]:N UD potentially adverse seismic conditions?
12 Enter the equipment class name from Appendix B: Classes of Equipment.
Limerick Generating Station Unit 2 MPR-3801, Revision 1 rnrrPqnrndpnr.P Nn -RR-19-171 C-261 Sheet 2 of 2 Equipment ID No. 2CP206 Equip. Class" 2 (04) Vertical Pumps Equipment Description Core Spray Pump & Driver Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?,No ov4r-WA eJ~nwv 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YXNNO UF" N/AO YgNEI U[-Q N/AOl V NEI UO N/AF VND UDO Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could Y>[ NO UI" adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Il/A Evaluated by: O&?hw ~r Date: 'r .0--7,< C-4 >Limerick Generating Station Unit 2 MPR-3801, Revision.1 rlnrrP.nnndPnr'P Nn ' R-1 9-171 C-262 Equipment ID: 2CP206 Limerick Generating Station Unit 2 MPR-3801, Revision 1 flnrrP..nnnHP~nrP Nn' Rg-19-171 C-263 Equipment ID: 2CP206 Limerick Generating Station Unit 2 MPR-3801, Revision 1 rnrrP-nnnH1~nr.
Nn* RR-19-171 C-264 Equipment ID: 2CP206 I Limerick Generating Station Unit 2 C-265 MPR-3801, Revision 1 r nrrPnnnHP~nrANn" RR-19-171 Sheet 1 of 2 Status:O(D N U Seismic Walkdown Checklist (SWC)Equipment ID No. 2CV211 Equip. Class" 2 (08) Fans & Air Handlers Equipment Description C Core Spray Pump Room Unit Cooler Location:
Bldg. Reacto Floor El. 190 Room, Area Room 185 Enclosure Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one Y NEI of the 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible craclq in the concretI near the anchors?MooAJ C 640{tV ok(r OnAW8' 4lo YXNO UE] N/AO NYN Ur- N/AE YK NO UE]N/AE]5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
wRev.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YX NE] UE N/AE]Yj NEI UD 12Enter the equipment class name fiom Appendix B: Classes of Equipment.
<C-3 >Limerick Generating Station Unit 2 MPR-3801, Revision 1 fnrrp,.nnndPnrP Nn* RR-19-171 C-266 Sheet 2 of 2 Equipment ID No. 2CV211 Equip. Class" 2 (08) Fans & Air Handlers Equipment Description C Core Spray Pump Room Unit Cooler Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?-g~o 6 r 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YO NO UQ N/AU Y)ND UD N/AU YKND UDJ N/AEl Y)< NE Un Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could YX N[: UI-adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Al/A O&W~ 'r Evaluated by: f ;;;ý \j 01 Date:<C-4 >Limerick Generating Station Unit 2 MPR-3801, Revision 1 CnrrP'nnnfi~nr.-
Nn" RR-19-171 C-267 Equipment ID: 2CV211 Limerick Generating Station Unit 2 MPR-3801, Revision 1 rnrrPnnndP.nrP.
Nn
- RR-19-171 C-268 Equipment ID: 2CV211 Limerick Generating Station Unit 2 MPR-3801, Revision 1 rnrrPqnnndPn.'P Nn -RR-19-171 C-269 Equipment ID: 2CV211 Limerick Generating Station Unit 2 MPR-3801, Revision 1 rTnrrP.nnndHnrnP Nn
- RS-1t-171 C-270 Equipment ID: 2CV211 Limerick Generating Station Unit 2 MPR-3801, Revision 1 Nn RR-19-171 C-271 Sheet 1 of 2 Status:.( N U Seismic Walkdown Checklist (SWC)Equipment ID No. 2D1T558 Equip. Class" (19) Vertical Tanks or Heat Exchangers Equipment Description Diesel Generator Starting Air Reservoir Location:
Bldg. Diesel Floor El. 217 Room, Area Room 315D Generator Building Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free o{bent,.broken, missipg or loose hardware?I' C.,L 3. Is the anchorage free of corrosion that is more than mild surface 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration veI cation is requ ed.)6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YANEI.Y2ND UlD N/AD YJ-N[D Ul1 N/AD YfýDEJ UD N/AD1 YZN-1 UD N/AD'I /lSll-u-UD Enter the equipment class name from Appendix B: Classes of Equipment.
<C-3 >Limerick Generating Station Unit 2 MPR-3801, Revision 1 CnrrPnnndHnr. .Nn RR-19-171 C-272 Sheet 2 of 2 Equipment ID No. 2D1T558 Equip. Class" 2 (19) Vertical Tanks or Heat Exchangers Equipment Description Diesel Generator Starting Air Reservoir Interaction Effects 7. Are soft targetsee from impact by nearby e uipment r structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YýNO UD N/AEl YýýNO UO N/AD$ff NE UD N/AD Yj J- Ur!Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could NO UO adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary) 1A Evaluated by: Date: TALt (/q 1 9<C-4 >Limerick Generating Station Unit 2 MPR-3801, Revision 1 r".nrrP RR-19-171 C-273 Equipment ID: 2D1T558 Limerick Generating Station Unit 2 MPR-3801, Revision 1 ,nrrP-nnnrnP.nrA Nn *R-19-171 C-274 Sheet 1 of 2 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No. 2DC563 Equip. Class 1 2 (18) Control Panels & Cabinets Equipment Description Diesel Enclosure HVAC Control Panel Location:
Bldg. Diesel Floor El. 217 Room, Area Room 315D Generator Enclosure Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting othercomnents.
J Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hkardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anorage free of visibe cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
,*N[]£6NEI U-' N/A[I, U'- N/A" gND U" N/AD1 YDI ND UD N/AR V ND UD 12Enter the equipment class name from Appendix B: Classes of Equipment.
<C-3 *0 Limerick Generating Station Unit 2 MPR-3801, Revision 1 rlnrrP~nnnr1Pnr-P Nn
- RS-12-171 C-275 Sheet 2 of 2 Equipment ID No. 2DC563 Equip. Class 1 2 (18) Control Panels & Cabinets Equipment Description Diesel Enclosure HVAC Control Panel Interaction Effects 7. Are soft targets free from impact by nearby eqyipment or struures?
Y, NEI U"I N/ACD 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, .d, NEI U- N/ADl and masonry block walls not likely to collaps onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage? ýý N[] UO N/ADI 10. Based on the above seismic interaction evaluations, is equipment free 2 ND UF'of potentially adverse seismic interaction effects?Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could Z5C ["l UD adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary) 04/7,14 Al Evaluated by:--- 4---F, C-'~Date: 4ir Iq/< C4 >Limerick Generating Station Unit 2 MPR-3801, Revision 1 flnrrmnnndAnr.P Nn RR-172-171 C-276 Equipment ID: 2DC563 I Limerick Generating Station Unit 2 MPR-3801, Revision 1 flnrrP-nnnr1Ann-n Nn P*-19-171 C-277 Equipment ID: 2DC563 Limerick Generating Station Unit 2 MPR-3801, Revision 1 Cnrrp-nnndPnr.j Nn -RR-1 2-171 C-278 Sheet 1 of 2 Status: (9 N U Seismic Walkdown Checklist (SWC)Equipment ID No. 2DC661 Equip. Class 1 2 (18) Control Panels & Cabinets Equipment Description Panel D-Safeguard System Vertical Board Location:
Bldg. Contre/ Floor El. ýqRoom, Area Room 533 6, rt( m, Structure PA ý, 14',-r Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchoraee 1. Is the anchorage configuration verification required (i.e., is the item one YE!of the 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
Y) NEI UE- N/AO OtQL L 6ttj &;,, v-t- Ae-1d Cy"WMS- q 6 r,D Y,~NE 3. Is the anchorage free of corrosion that is more than mild surface Y ,NE' UE! N/Al]oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? YA NEI U[J N/AlO 5. Is the anchorage configuration consistent with plant documentation?
YE! NEI Ul] N/A (Note: This question only applies if the item is one of the 50% for which an anchorage confi 'ion verification isvrquired.),d
- 6. Based on the above anchorage evaluations, is the anchorage free of YA NO Ul]potentially adverse seismic conditions?
O~tfIt, A4)A 0~~~ A 0~w- c~ffI6. *kA'44- tkW VwOXAA Wt"a vjýGv4o I trste Lk' 191 '"f~ '~t,^rA- C-'M&Lt CI1 n~"Jl 12 Enter the equipment class name from Appendix B: Classes of Equipment.
<C-3 >Limerick Generating Station Unit 2 C-279 MPR-3801, Revision 1 r.nrrP.nnniPnrA+
Nn -R.R-19-171 Sheet 2 of 2 Equipment ID No. 2DC661 Equip. Class 1 2 (18) Control Panels & Cabinets Equipment Description Panel D-Safeguard System Vertical Board Interaction Effects 7. 4rp soft targets free fom irpact by earby equipment or structures? UDI N/AD/VO &-( 5 e-,I 8t6. L Arvrha qupet,ý ditiuinsses eln ie n ihig 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?IL /I e,,^C-e-^
O,, ru VAL. ,R la,.C" I if4 *4 t n con &Iro~-.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y)' ND UD N/AD YAND UD N/A[: YJ& NO UEI Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could YX ND UD adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Evaluated Date: 2,< C-4>Limerick Generating Station Unit 2 MPR-3801, Revision 1 Nn
- RR-19-171 C-280 C.SWC- 2-I)CCO)1.4.6 Floor Mounting 1.4.6.1 Auxiliary Equipment Room, 289' Elevation Panels located in the Auxiliary Equipment Room are mounted on PGCC floor sections.
As shown in reference 5, sections similar to those at Limerick were tested to determine if there were any amplifications of accelerations to the panels. In-panel responses show that the floor sections actually attenuate the transmissibilty on the tested panels by as much as 10 percent. This is due to structural damping. The results presented in this report conservatively assume that the floor sections are rigid, and no credit is taken for the reduced transmissibility.
1A.6.2 Control Room, 269' Elevation.
Panels located in the control room (and C6 1-POO1) are bolted to a 4" base which is welded to the floor. This base was on the tested Limerick H12-P601, P603, and P661 panels. Examination of test data in panels without this base shows no appreciable difference in transmissibilities.
The base is therefore assumed rigid.1.4.7 Seismic Tests on Limerick H12-P603 Console Console H12-P603 was subjected to front-back/vertical dual axis OBE and SSE tests and resonance search tests in all three axes. It was not subjected to dual axis side-side tests due to its width. Examination of test data for similar, but taller consoles shows no degradation of performance during any of the dual axis tests. Data obtained during side-to-side resonance search tests for this panel show amplifications on the order of 2.0. Therefore, panel mounted equipment is not expected to respond severely to dual axis excitation in this direction.
Furthermore, the capabilities of devices on this panel are 8.5 g's or greater. For the reasons of similar console tests and sufficient margins, seismic qualification in the side-side direction is valid.1A.8 Exceptions to TRS enveloping RRS Examination of the TRS and RRS in Figure 4.1 shows that the TRS does not envelope the RRS in the ranges 2.8 to 3.3 Hz and 16 to 19 Hz. Qualification is still valid according to the following rationale taken from reference 7: "The TRS for each event is generally synthesized at 1/6 octave intervals or smaller, and the final test result is compared with the RRS. Currently, there are no well defined criteria for such a comparison other than the simple recommendation that the TRS envelope the RRS. Since this may not be practical for all frequencies tested, it is recommended that no more than five points of the TRS should fall below, and these no more than 10% below, the RRS in the frequency range between one-half of the equipment fundamental frequency and the ZPA high-frequency asypmtote." 1-6 Limerick Generating Station Unit 2 C-281 MPR-3801, Revision 1 Nn* RR-1A-171 Equipment ID: 2DC661 Limerick Generating Station Unit 2 MPR-3801, Revision 1 r.nrrPnnndPnr.P Nn -RR-12-171 C-282 Equipment ID: 2DC661 Limerick Generating Station Unit 2 MPR-3801, Revision 1 f.nrr-.-nnnrlPnr.A Nn RS'- 9-1-71 C-283 Sheet 1 of 2 Status: 6) N U Seismic Walkdown Checklist (SWC)Equipment ID No. 2DD1O1 Equip. Class 1 2 (13) Batteries
& Racks.. 4 f/-Equipment Description 125 V Batterv Location:
Bldg. Control Floor El. 217 Room, Area Room 3"80" Structure Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorane 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
YkNOl 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface Y oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors? Y 5. Is the anchorage configuration consistent with plant documentation?
Y (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
ieIIl Ke v. 6 A. pS'/IL 6. Based on the above anchorage evaluations, is the anchorage free of Y potentially adverse seismic conditions?
d< NO KNDI/N1 UF0 N/AD UD N/AN UE' N/A[UD N/AE]No UD 12 Enter the equipment class name from Appendix B: Classes of Equipment.
<C-3 >Limerick Generating Station Unit 2 MPR-3801, Revision 1 rlnrrmnnndHnr-Nn RR-19-171 C-284 Sheet 2 of 2 Equipment ID No. 2DD1O1 Equip. Class'2 (13) Batteries
& Racks Equipment Description 125 V Battek Interaction Effects 7. A e soft targets free from impact by nearby equipment or structures?
Y; ND UD N/AD E ti qrL- V4,( 50fct +P 4~Jry 4a" 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, );IgID UD N/AD and masonry block walls not likely to collapse onto the equipment?
Do i n have t f t avd d g -9. Do attachied lines have adequate flexibility to avoid damage? "j v~ U#1Nt 10. Based on the above seismic interaction evaluations, is equipment free Y* ND UD of potentially adverse seismic interaction effects?Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could 46ND UD adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary) 62~ 5-oA~ ý56al be f~f JAw~f" 0"t cA4 I 4.Evaluated Date:< C-4 >Limerick Generating Station Unit 2 MPR-3801, Revision 1 ,nrrP.nnndP~nr.P Nn
- R-12-171 C-285 Equipment ID: 2DD101 Limerick Generating Station Unit 2 MPR-3801, Revision 1 ('nrrPqnnndPnre.p Nn *R-19-171 C-286 Equipment ID: 2DD101 Limerick Generating Station Unit 2 MPR-3801, Revision 1.nrrPqnnnrflnr.P Nn" RR-1-1-71 C-287 Equipment ID: 2DD101 Limerick Generating Station Unit 2 MPR-3801, Revision 1 C.nrrPqnnndPnr.P Nn
- RR-19-171 C-288 Sheet I of 2 Status: (f N U Seismic Walkdown Checklist (SWC)Equipment ID No. 2DD 103 Equip. Class" (14) Battery Chargers and Inverters Eauin~ment Description Battery Charfer ,AVA4J Location:
Bldg. Controe Floor El. 217 Room, Area Room ' 8&Structure Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?Y0 ND Y;NO UD N/Al Y4 NE UD N/AO YK NO UD] N/Al 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an ancborage configuration verification is required.)
vI,, -d P, 0&5 2 , 10 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
YAgO UE- N/AC YP(NEI UD 12 Enter the equipment class name from Appendix B: Classes of Equipment.
< C-3 >Limerick Generating Station Unit 2 MPR-3801, Revision 1 r.nrrPqnnnrlpnr'-.
Nn -RR-1 9-171 C-289 Sheet 2 of 2 Equipment ID No. 2DD103 Equip. Class 1 2 (14) Battery Chargers and Inverters Equipment Description Batter Charger Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
N'ONO UD N/AO 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, an masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YjfNEI UO N/AO Y~q NO UO N/AO SNO UD Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could Yd "NO U" adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Date: I<C-4>Limerick Generating Station Unit 2 MPR-3801, Revision 1 r.nrrPqnnniPnr.P.
Nn ' C-290 Equipment ID: 2DD103 I Limerick Generating Station Unit 2 MPR-3801, Revision 1 rnrrP..nnnr1Pnr.
Nn" R,-12-171 C-291 Equipment ID: 2DD103 Limerick Generating Station Unit 2 MPR-3801, Revision 1 r.nrrP.nnndHnrP.
Nn -RS-1'-171 C-292 Sheet 1 of 2 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No. 2DG502 Equip. Class'2 (18) Control Panels & Cabinets Equipment Description
'EDG Excitation
&stem Cabinet Location:
Bldg. Diesel Floor El. 217 Room, Area Room 315D Generator Enclosure Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchoraize
- 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free of ben, broken, missing or loose hardware?3. Is the'anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage con A ation verification is rgluired.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
rN;I,'3J(NE]UD N/Ar1 YA-NI UEJ N/AD YZfND UE N/A" YD ND UD N/A4 YND UD 12 Enter the equipment class name from Appendix B: Classes of Equipment.
Limerick Generating Station Unit 2 MPR-3801, Revision 1 -CrnrrPqnnndP.nre' Nn -RR-19-171 C-293 Sheet 2 of 2 Equipment ID No. 2DG502 Equip. Class" 2 (18) Control Panels & Cabinets Equipment Description EDG Excitation S&stem Cabinet Interaction Effects 7. Are soft targets freefrom impact by nearby equipment or structures?
Vn..EI UD N/AD 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yfi DN UD N/All and masonry block walls not likely to collapse onto te equ nt?9. Do attached lines have adequate flexibility to avoid damage? YA NO U[- N/AD 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?UD Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could Y NE U adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Evaluated Date: F/h/Z-v Limerick Generating Station Unit 2 MPR-3801, Revision 1 rnrrP-nnnr1PnrP Nn RR-19-171 C-294 Equipment ID: 2DG502 I Limerick Generating Station Unit 2 MPR-3801, Revision 1 rnrrP..qnnnr~nri..
Nn -RR-19-171 C-295 Equipment ID: 2DG502 Limerick Generating Station Unit 2 C-296 MPR-3801, Revision 1 r(nrrPmnnndPnrA-Nn
- R.-1 9-171 Sheet I of 2 StatusO N U Seismic Walkdown Checklist (SWC)Equipment ID No. _,IDT56,'__
__ Equip. Class'2 Equipment 14-tit" -x,2~14ded'Location:
Bldg. 606 ti. Floor El. ! Roo, Manufacturer, Model, Etc. optional but recommended) 215- D Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorame 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?Y$,NE UQ N/ADJ SLNI- UDi N/A[J YNEI UDn N/AED 5. Is the anchorage configuration consistent with plant documentation?
YL,,ND UEI N/A.EJ 4/, 5/' a (Note: This question only applies if the item is one of the 50% for (hf which an ancoorage configuration verificatictn is required.)
A- -& 23 8k, a.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Y%9,NE Urn 12 Enter the equipment class name from Appendix B: Classes of Equipment,< C-3 >Limerick Generating Station Unit 2 MPR-3801, Revision 1 CnrrP.nnndiPnr.P Nn " RR-1A-171 C-297 Sheet 2 of 2 Equipment ID No. .' ,quip. Class2 2 .O -ylor',co w' ,"t T a" k Equipm ent D escription
' ieS t .( , _ ,n J Ck~t p4.;- " Ec .il a0 'I/ -5/1-Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Al1 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?) N[I U-IJ N/Al-I Yt NI] UI- N/AI]Y,9 4 bE UUI"I N/Al-'Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could Y# N M UE" adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
- -',k Evaluated by: (C~Date: ,.,12'I<C-4>Limerick Generating Station Unit 2 MPR-3801, Revision 1 r.nrrPqnnndH nrnp Nn ' R C-298 Equipment ID: 2DT564 Limerick Generating Station Unit 2 MPR-3801, Revision 1 rlnrrP.nnndPnrP Nn* R1-19-171 C-299 Equipment ID: 2DT564 Limerick Generating Station Unit 2 MPR-3801, Revision 1 flnrrsmnnndenr.P Nn" RR-19-171 C-300