MPR-3801, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 5 of 13
ML12342A123
Person / Time
Site: Limerick Constellation icon.png
Issue date: 11/06/2012
From: Schlaseman C S
Exelon Generation Co, MPR Associates
To:
Office of Nuclear Reactor Regulation
References
RS-12-171 MPR-3801, Rev 1
Download: ML12342A123 (38)


Text

Sheet 1 of 2 Status: (D N U Seismic Walkdown Checklist (SWC)Equipment ID No. 2A1T558 Equip. Class1 2 (19) Vertical Tanks or Heat Exchangers Equipment Description Diesel Generator Starting Air Reservoir Location:

Bldg. Diesel Floor El. 217 Room, Area Room 315A Generator Building Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one YANEJ of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?Y 4 dLND UD N/AD 3' Is the anchorage free of corrosion that is more than mild surface YA ND oxidation?

UD N/AD 4. Is the anchorage free of visible cracks in the concrete near the anchors? YA ND UD N/AD 5. Is the anchorage configuration consistent with plant documentation?

Y)R.N- UD N/AD (Note: This question only applies if the item is one of the 50% for wich an anchorage configuration verification i& required.)

WAVtt O 6te Vf ~r :,eo(lde Lf Rev. 5/2 6. Based on the above anchorage evaluations, is the anchorage free of Y4 N.,ND UD potentially adverse seismic conditions?

12 Enter the equipment class name from Appendix B: Classes of Equipment.

< C-3 >Limerick Generating Station Unit 2 MPR-3801, Revision 1-nrrPqnnndnP.nr Nn -RR-19-171 C-149 Sheet 2 of 2 Equipment ID No. 2A1T558 Equip. Class" 2 (19) Vertical Tanks or Heat Exchangers Equipment Description Diesel Generator Starting Air Reservoir Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Al 0 c4 -4iý es 4 1 7" P;8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block v~alls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?KNO UO N/AQI Y)-N[fl UO N/AO i6tet -r44 39-N5 UD N/AD YZRI'NO UO Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could X DNO US adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

IIAAý, 2,16ýEvaluated by:-I Date: F-/1 A-/ f I, -'1110-1 beiýr k..,< C-4 >Limerick Generating Station Unit 2 MPR-3801, Revision 1 rnrrP~nnndInr..

Nn -Rg-19-171 C-150 Equipment ID: 2A1T558 I I Limerick Generating Station Unit 2 MPR-3801, Revision 1 flnrrmqnnndilnrp Nn -R,-19-171 C-151 Sheet 1 of 2 Status: n N U Seismic Walkdown Checklist (SWC)Equipment ID No. 2A2D101 Equip. Class" 2 (13) Batteries

& Rackss Equipment Description 125 VDC Battery Location:

Bldg. Control Floor El. 239 Room, Area Room 427 Structure Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchoraze 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Y9 NO 2. Is he anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

vo,ý o~ck,* SAPw//7 tf(Ie p,1 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

)& NEI YWNO UE N/AD U' N/AO YN-(NO U" N/AFNO UD N/AD/,4 /1 Z..Y) NO UD 12 Enter the equipment class name from Appendix B: Classes of Equipment.

<C-3 Limerick Generating Station Unit 2 MPR-3801, Revision 1 rnrrPnnndn(nP Nn -RS-19-171 C-152 Sheet 2 of 2 Equipment ID No. 2A2D101 Equip. Class 1 2 (13) Batteries

& Rackss Equipment Description 125 VDC Batteg Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

No' .IL/,- conc145 , 8.~ ~ ~ ~ ' Ar ovrha eupetditiuonstesceiln ie n ihig ~E DNA Y 1%,NO UD N/AD 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, D.q[ U[: N/AEl and masonry lloft, "alls,,not likely to coltas oto the equipment?

.9. Do attached lines have adequate flexibility to avoid damage? NEI ND U N/AE o/1 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?iolos WPt~w bt-4-"t 6/'YV-NO UO Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could yW0 NE UD adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

&W- t cgnoewiY~42.Limerick Generating Station Unit 2 MPR-3801, Revision 1 r~nrrP.ýnnnrIPnrA.Mn

  • RR-19.-171 C-153 Equipment ID: 2A2D101 I I Limerick Generating Station Unit 2 MPR-3801, Revision 1 rnrrAonnndPnrP Nn -RR-19-171 C-154 Equipment ID: 2A2D101 Limerick Generating Station Unit 2 MPR-3801, Revision 1 rnrrP.nnndlnr-Nn -RS-19-171 C-155 Equipment ID: 2A2D101 Limerick Generating Station Unit 2 MPR-3801, Revision 1 rnrrP~nnndinr.

Nn" RS-2-171 C-156 Sheet 1 of 2 Status: (ON U Seismic Walkdown Checklist (SWC)Equipment ID No. 2AC208 Equip. Class 1 2 (18) Control Panels & Cabinets Equipment Description Unit Coolers Control Panel Location:

Bldg. Reactor Floor El. 201 Room, Area Room 284 Enclosure Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorase 1. Is the anchorage configuration verification required (i.e., is the item one Y! NA of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware? 1)f UE N/AD 3. Is the anchorage free of corrosion that is more than mild surface YX NE UE N/AE!oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors? YX NED UD N/AE!5. Is the anchorage configuration consistent with plant documentation?

YE! NE UO N/Aý(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of YE N;< UE potentially adverse seismic conditions?

2 Enter the equipment class name from Appendix B: Classes of Equipment.

<C-3 >Limerick Generating Station Unit 2 MPR-3801, Revision 1 rnrrPnnndipnr.m Nn -RR-19-171 C-157 Sheet 2 of 2 Equipment ID No. 2AC208 Equip. Class" 2 (18) Control Panels & Cabinets Equipment Description Unit Coolers Control Panel Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?X NO UD N/AD YXND UDi N/AD* ND UD N/AD YX ND UD Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could Y NI U adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

  • Lo 5 e oriIioc oIr cncAi'~i rwweIeA Per MR amqf qv~rVAA,, 4 Evaluated by: Date: C-4 >Limerick Generating Station Unit 2 MPR-3801, Revision 1 r.nrriqnnndPnreP Nn -RR-19-171 C-158 Equipment ID: 2AC208 Limerick Generating Station Unit 2 MPR-3801, Revision 1 r.nrrPznnndrPnr.

Nn" RP-19-171 C-159 Equipment ID: 2AC208 Limerick Generating Station Unit 2 C-160 MPR-3801, Revision 1 Nn *RS-12-171 Equipment ID: 2AC208 Limerick Generating Station Unit 2 MPR-3801, Revision 1.nrr~mnnndpnrP Nn -R.-12-171 C-161 Equipment ID: 2AC208 Limerick Generating Station Unit 2 MPR-3801, Revision 1 rnrrP.qnnndrinr.P Nn

  • RS-1 -171 C-162 Equipment ID: 2AC208 Limerick Generating Station Unit 2 MPR-3801, Revision 1 rnrrP.nnndrnr.p Nn -RS-19-171 C-163 Sheet 1 of 2 Status:nV N U Seismic Walkdown Checklist (SWC)Equipment ID No. 2AD106 Equip. Class" 2 (18) Control Panels & Cabinets Equipment Description 125 /250VDC Transducer Panel Location:

Bldg. Control Floor El. 239 Room, Area Room 429 Structure Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorase 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YEI I YVg NEI UE- N/AD YýL NEI UD N/AD YJ NEI UE- N/AD YQI ND U- N/AX YXNEI UD 1 2 Enter the equipment class name from Appendix B: Classes of Equipment.

<C-3 >Limerick Generating Station Unit 2 MPR-3801, Revision 1 f.nrrP.ýnnndPnrp Nn* RR-19-171 C-164 Sheet 2 of 2 Equipment ID No. 2AD106 Equip. Class 1 (I8) Control Panels & Cabinets Equipment Description 125 /250VDC Transducer Panel Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?,No s 0+ 4.1b YW NE UO N/AO 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YM NE UI and masonry block walls not likely to collapse onto the equipment?

-Mc5nry w0of1 (*-'nNC~A Per Owr ft1 Rev. Q] N/AO 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y% NO UQ N/AO Y' NO UO Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YX NO UO adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

WIA (Jrj~wf -Evaluated by:, Date: 4/I/ I[)I t C-4 >Limerick Generating Station Unit 2 C-165 MPR-3801, Revision 1 f.nrrP.fnnndfnlr.A Nn " RS-19-171 Equipment ID: 2AD106 Limerick Generating Station Unit 2 MPR-3801, Revision 1 mnrrP.-nnnlPnrp Nn .PS.-1-171 C-166 Equipment ID: 2AD106 I Limerick Generating Station Unit 2 MPR-3801, Revision 1 rnrrPqnnnrPtnrP Nn RR-19-171 C-167 Equipment ID: 2AD106 Limerick Generating Station Unit 2 MPR-3801, Revision 1 rnrrPnnndfinrP.

Nn

  • RR-l9-171 C-168 Equipment ID: 2AD106 I!Limerick Generating Station Unit 2 MPR-3801, Revision 1 rlnrrf.nnndrPnr-Nn* R5.-19-171 C-169 Sheet 1 of 2 Status:0 N U Seismic Walkdown Checklist (SWC)Equipment ID No. 2AD 160 Equip. Class 1 2 (14) Battery Chargers and Inverters Equipment Description A RPS & UPS Distribution Panel Static Inverter Location:

Bldg. Control Floor El. 254 Room, Area Room 453 Structure Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one YD]of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

AND US N/A[Y09.ND US N/AD 4. Is the anchorage free of visible cracks in the concrete near the anchors? Y6 NE UD N/AD 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YO NE] UD N/AK YO ND UD 12 Enter the equipment class name from Appendix B: Classes of Equipment.

< C-3 >Limerick Generating Station Unit 2 MPR-3801, Revision 1 r.nrrmnnndHnrP Nn -RR-19-171 C-170 Sheet 2 of 2 Equipment ID No. 2AD160 Equip. Class 1 2 (14) Battery Chargers and Inverters Equipment Description A RPS & UPS Distribution Panel Static Inverter Interaction Effects 7. Are soft targets free from i by t by equipment or structures?

A4 jx-fi '"sot 4.., YAND UD N/A[]8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YiNO Uf N/AL O and masonry block walls not likely to collapse onto the equipment?

.9. Do attached lines have adequate flexibility to avoid damage? Ul N/A L~t Opt 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?NEI NOU Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YA NO UF-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) z2//&ýI (AX'i _1___J 1 'k _-.rwauatU~ f / at&~ -pe: u< C-4 >Limerick Generating Station Unit 2 MPR-3801, Revision 1 CnrrnnnrIPinrP Nn -RR-19-171 C-171 Equipment ID: 2AD160 Limerick Generating Station Unit 2 MPR-3801, Revision 1 r.nrrApnnndnP.nr Nn* RR-19-171 C-172 Sheet I of 2 Status: ( N U Seismic Walkdown Checklist (SWC)Equipment ID No. 2AG501 Equip. Class 1 2 (15) Engine Generators Equipment Description D21 Diesel Generator Location:

Bldg. Diesel Floor El. Room, Area Room 4,2 Generator I ýIf'A Building Manufacturer, Model, Etc. (optional but recommended)

Instructions for Compleilng Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchoraee 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

YON 5 2. Is the anchorage free of bent, broken, missing or loose hardware?

Y DE] UD N/AD 3. Is the anchorage free of corrosion that is more than mild surface Y -'ND U[:] N/Al]oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? ý44F- UI' N/AD]5. Is the anchorage configuration consistent with plant documentation?

YI.NO U!] N/A[](Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of YJNl UD potentially adverse seismic conditions?

1 2 Enter the equipment class name from Appendix B: Classes of Equipment.

<C-3 >" Limerick Generating Station Unit 2 MPR-3801, Revision 1 r.nrrPqnnndPnr.P Nn -RR-19-171 C-173 Sheet 2 of 2 Equipment ID No. 2AG501 Equip. Class 1 2 (15) Engine Generators Equipment Description D21 Diesel Generator Interaction Effects 7. Are soft targetj free from impa t by nearby equipment or structures?

A°'c~c4. -C" "'" 96 ND UD N/A*8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y'N and masonry block walls not likely to collapse onto the equipment?

9. Do 4 ataheieshv aIut kq It 9. Do attached lines have adeauate flexkibility to a o d aiO -Y-P-Nrl UD N/ADF UF N/AD S" --."0 10. Based.on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?,~NZN ULI Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could X ND UD" adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

<C-4>Limerick Generating Station Unit 2 MPR-3801, Revision 1 rlnrrpqnnndPnrA Nn* RR-19-171 C-174 Equipment ID: 2AG501 Limerick Generating Station Unit 2 MPR-3801, Revision 1 r.nrrP.nnnrli~nrj-Nn -R.R-12-171 C-175 Sheet 1 of 2 Status: (D N U Seismic Walkdown Checklist (SWC);kA3AO Equipment ID No. 4AIM2 Equip. Class" (18) Control Panels & Cabinets Equipment Description

,"'- E'. S D5 v I Location:

Bldg. R 0 Floo El. -.;I- b. +o,.rea Yar Manufacturer, Model, Etc. Toptional butr ended)Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YE] I, V,ýEJ UD N/A[]YNNEI UEJ N/AD Y NEI UED N/ADI YO NEI UO N/Aý(YE!NO UD 2 Enter the equipment class name from Appendix B: Classes of Equipment.

SC-3 >" Limerick Generating Station Unit 2 MPR-3801, Revision 1 rnrrp.nnndPnrP Nn" R.-19-171 C-176 Sheet 2 of 2 Equipment ID No.

  • Equip. Class 1 2 (18) Control Panels & Cabinets Equipment Description

+ IF I. IT Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

-00 0\feta;c'Y)K NEI UL N/AOU[J N/Ai 9. Do attached lines have adequate flexibility to avoid damage? Yg Ni]mo~ cr t 60~.l4 C rf V' vn 9a &" 4 60uY~n UEI N/AEI 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y) NE UEl Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YV/NI"I UE" adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

JV/A Evaluated by: Q0n 'AC 44 Date: r/< C-4 >Limerick Generating Station Unit 2 MPR-3801, Revision 1 rnrrm'nnndpnr.P Nn -R.R-1 -171 C-177 Equipment ID: 2AJ860 Limerick Generating Station Unit 2 C-178 MPR-3801, Revision 1 rnrrpnnnip~nrp Nn -RR-1 -171 Equipment ID: 2AJ860 Limerick Generating Station Unit 2 MPR-3801, Revision 1 r.nrri.nnnripnrP Nn

  • RR-19-171 C-179 Sheet 1 of 2 Status: ( N U Seismic Walkdown Checklist (SWC)Equipment ID No. 2AP202 Equip. Class'2 (04) Vertical Pumps Equipment Description 2A RHR Pump Location:

Bldg. Reactor Floor El. 177 Room, Area Room 173 Eneloayure Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchoralne

1. Is the anchorage configuration verification required (i.e., is the item one Y)4 NEI of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Y) ND UD N/AD Yv ND UD N/AI-4. Is the anchorage free of visible cracks in the concrete near the anchors? YKNE!5. Is the nchorage co 1uation consistent with plant documentation?

Y% ND (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

UD N/AD UD N/AD 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YPK ND UD 12 Enter the equipment class name from Appendix B: Classes of Equipment.

<C-3 >" Limerick Generating Station Unit 2 MPR-3801, Revision 1 rnrrn..nnnHl~nrP Nn ' RA-19-171 C-180 Sheet 2 of 2 Equipment ID No. 2AP202 Equip. Class" 2 (04) Vertical Pumps Equipment Description 2A RHR Pump Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

-o oS ew Yt NEI UI N/AO 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YX NEI UE] N/AE]and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YN NE UD N/AD YV NO UEJ Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could Yo NEI UD adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated by: r V ir e~Th Date: IwSol-<C-4>Limerick Generating Station Unit 2 MPR-3801, Revision 1 rnrrPaqnnndPnrP n-it R.R-19-171 C-181 Equipment ID: 2AP202 I Limerick Generating Station Unit 2 MPR-3801, Revision 1 rTnrrn~nnnrlPnru.

Nn -RR-19-171 C-182 Equipment ID: 2AP202 Limerick Generating Station Unit 2 MPR-3801, Revision 1 r.nrrfne1nr.Pn Nn RR-19-171 C-1 83 Equipment ID: 2AP202 I I Limerick Generating Station Unit 2 MPR-3801, Revision 1 r.nrrA~qnnnpnrlP Nn

  • R,-1t9-171 C-184 Equipment ID: 2AP202 I I Limerick Generating Station Unit 2 MPR-3801, Revision 1 rnrrp..nnndpnr.p Nn -RR-1-1 71 C-185 Equipment ID: 2AP202 Limerick Generating Station Unit 2 MPR-3801, Revision 1 Nn
  • RR-19-171 C-186