Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML24026A296 | 26 January 2024 | Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS)- Syrs, . | |
LG-23-059, Owner'S Activity Report (OAR-1) for Li2R 17 | 10 August 2023 | Owner'S Activity Report (OAR-1) for Li2R 17 | |
ML23177A224 | 26 June 2023 | Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection . | Safe Shutdown Post Accident Monitoring Probabilistic Risk Assessment Operator Manual Action Scram Discharge Volume Excess Flow Check Valve Affidavit |
LG-22-101, Annual Commitment Change Summary Report | 14 November 2022 | Annual Commitment Change Summary Report | |
ML22224A149 | 15 August 2022 | Review of Limerick Generating Station Defense in Depth and Diversity Common Cause Failure Coping Analysis, WNA-AR-01074-GLIM-P, Revision 2, July 2022, and the Licensing Technical Report for the Limerick Generating Station Units 1&2 Digital | |
NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits | 30 June 2022 | Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits | Mururoa |
ML22046A074 | 14 February 2022 | Review of Limerick Generating Station Defense in Depth and Diversity Common Cause Failure Coping Analysis, WNA-AR-01074-GLIM-P, Rev 1. Without Attachment 3 Enclosure | Anticipated operational occurrence Post Accident Monitoring Feedwater Controller Failure Fuel cladding Coast down |
ML21070A412 | 11 March 2021 | Requesting Revision to License Condition in Appendix C in Renewed Facility Operating License | Safe Shutdown Ultimate heat sink Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Incorporated by reference Fukushima Dai-Ichi |
ML21083A171 | 28 February 2021 | Attachment 3: Limerick Generating Station, Unit 2, 006N3997NP, Revision 1, High Burnup Lead Use Assembly (Hblua) Information Report February 2021 | |
RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping | 4 January 2021 | Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping | Nondestructive Examination |
LG-20-105, Annual Commitment Change Summary Report | 23 November 2020 | Annual Commitment Change Summary Report | |
ML20303A175 | 23 October 2020 | Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting | |
ML20106E828 | 15 April 2020 | Submittal of Analytical Evaluation of Core Spray Injection Nozzle-to-Safe End Weld (N5A) | Dissimilar Metal Weld |
ML19228A023 | 15 August 2019 | Proposed Alternative to Utilize Code Case N-879 | |
RS-18-051, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events | 7 June 2018 | Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events | Safe Shutdown High winds Ultimate heat sink Mission time Tornado Missile Time to boil Safe Shutdown Earthquake Internal Flooding Operating Basis Earthquake Emergency Lighting Functionality Assessment FLEX Tornado Generated Missile Fukushima Dai-Ichi Design basis earthquake Spent Fuel Pool Instrumentation Time Critical Operator Action B.5.b Mitigating Strategies Earthquake Hardened vent |
ML18129A334 | 4 May 2018 | Corrosion Evaluation of the Limerick Unit 2 N-160 Reactor Vessel Nozzle Modification, Framatome Document No. 51-9271770-002 (Non-Proprietary) | Dissimilar Metal Weld |
ML17255A030 | 12 September 2017 | Independent Spent Fuel Storage Installation, Registration of Use of Casks to Store Spent Fuel | |
ML17152A305 | 1 June 2017 | N-16D Nozzle Repair - Submittal of Analytical Flaw Evaluation, Design Analysis, and Corrosion Evaluation (Rev. 1) | Weld Overlay Hydrostatic Dissimilar Metal Weld |
ML17137A068 | 16 May 2017 | Proposed Relief Request Associated with Reactor Pressure Vessel Nozzle Repairs | Non-Destructive Examination Weld Overlay Nondestructive Examination VT-2 Finite Element Analysis Liquid penetrant Through-Wall Leakage Dissimilar Metal Weld |
ML17131A180 | 11 May 2017 | Issuance of the Core Operating Limits Report (COLR) for Reload 14, Cycle 15 | MELLLA |
RS-16-177, High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from The.. | 28 November 2016 | High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from The.. | Safe Shutdown Earthquake Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Seismically rugged Earthquake |
ML16309A017 | 4 November 2016 | 10 CFR 50.59 and 1 O CFR 72.48 Evaluation 24-Month Summary Report for the Period July 1, 2014 Through June 30, 2016 | Post Accident Monitoring |
ML16307A020 | 2 November 2016 | Special Report - Accident Monitoring Instrumentation Inoperability | |
RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 | 24 September 2014 | Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 | Through-Wall Leak |
ML14199A411 | 18 July 2014 | Special Report - Seismic Monitoring Instrumentation Inoperability | |
ML14148A280 | 17 June 2014 | Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident | Safe Shutdown Unanalyzed Condition Operator Manual Action Fukushima Dai-Ichi Earthquake |
ML14133A022 | 13 May 2014 | ACE Document Received at LIM Aam May 7, 2014 | |
ML14133A016 | 13 May 2014 | ACE Attachment to NRC Chairman Macfarlane Letter of 3-31-14 | |
ML14058B156 | 14 April 2014 | Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident | Unanalyzed Condition Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
ML14058B120 | 14 April 2014 | Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident | Unanalyzed Condition Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
ML13357A331 | 6 January 2014 | Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Limerick Generating Station, Units 1 and 2, TAC Nos.: MF0847 and MF0848 | Safe Shutdown High winds Ultimate heat sink Safe Shutdown Earthquake Internal Flooding Operating Basis Earthquake Emergency Lighting FLEX Tornado Generated Missile Fukushima Dai-Ichi Design basis earthquake Frazil ice Earthquake |
RS-13-138, Updated Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Limerick Generating Station, Unit 2, Report No. RS-13-138 | 7 October 2013 | Updated Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Limerick Generating Station, Unit 2, Report No. RS-13-138 | Safe Shutdown Unanalyzed Condition Ultimate heat sink Safe Shutdown Earthquake Coatings FLEX Fukushima Dai-Ichi Design basis earthquake Spent Fuel Pool Instrumentation License Renewal Earthquake Hardened vent Seismic Walkdown Report |
ML13284A111 | 7 October 2013 | Appendix AD - Area Walk-by Checklists (Awcs) | Fukushima Dai-Ichi Scaffolding |
ML13143A256 | 16 May 2013 | NRC Reply to ACE Questions Received March 21 and 27, 2013 | |
RS-13-084, Response to March 12, 2012, Request for Information Per 10 CFR 50.45.(f) Recommendations of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, Enclosure 5, Recommendation 9.3, Emergency.. | 30 April 2013 | Response to March 12, 2012, Request for Information Per 10 CFR 50.45.(f) Recommendations of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, Enclosure 5, Recommendation 9.3, Emergency.. | Safe Shutdown High Radiation Area Fukushima Dai-Ichi Scram Discharge Volume Severe Accident Management Guideline Earthquake |
IR 05000456/2013202 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000272/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
ML13008A219 | 31 January 2013 | U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000454/2013202 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000461/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000237/2013202 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000373/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000352/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000219/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000277/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000254/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
IR 05000289/2013201 | 31 January 2013 | Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee | |
RS-12-172, Company, Llc'S 180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | 19 November 2012 | Company, Llc'S 180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | Safe Shutdown Unanalyzed Condition High Radiation Area Operator Manual Action Functionality Assessment Fukushima Dai-Ichi Earthquake Scaffolding |
ML12342A116 | 6 November 2012 | MPR-3796, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 11 of 12 | |
ML12342A115 | 6 November 2012 | MPR-3796, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 10 of 12 |