ML12342A110

From kanterella
Jump to navigation Jump to search
MPR-3796, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 6 of 12
ML12342A110
Person / Time
Site: Limerick Constellation icon.png
Issue date: 11/06/2012
From: Schlaseman C S
Exelon Generation Co, MPR Associates
To:
Office of Nuclear Reactor Regulation
References
RS-12-171 MPR-3796, Rev 1
Download: ML12342A110 (36)


Text

Sheet I of 2 Status:0, N U Seismic Walkdown Checklist (SWC),Asq i Equipment ID No. .Equip. Class-Equipment Description Pas 4 ont ('en1i (I,%) (ofw Pon,/$4; 4 7n Location:

Bldg. Reo&(- Floor El. -J- .Room, Area Manufacturer, Model, Etc. (optional but recommended) 4+OaA Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchora-e 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YCINXND UC N/AClN[ UO N/ACNE UC N/AC YE] NE UC N/A1(Y[X NE UC 12 Enter the equipment class name from Appendix B: Classes of Equipment.

  • C-3 >Limerick Generating Station Unit 1 MPR-3796, Revision 1 flnrrPqnnnrP.nrP Nni RR-19-171 C-176 Sheet 2 of 2 Equipment ID No.Equip. Class12 (6%) (oa I P 0 o 1 ck + A-d Equipment Description Ms KV e 4a's,4- ,t'-;'-f Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y)4 NEI YND UD N/AD UI- N/AS Y,% NEI U- N/A[:]Yh NEI US Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could Y)ý Nil US adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

NV/A-L Evaluated by Date: Limerick Generating Station Unit 1 MPR-3796, Revision 1 rnrrP.ýnnndPnr.p Nn -RRA 71 C-177 Equipment ID: 1AS921 Limerick Generating Station Unit 1 C-178 MPR-3796, Revision 1 rnrrp.nnndpnr'i Nn "R,--1-171 Equipment ID: 1AS921 I Limerick Generating Station Unit 1 MPR-3796, Revision 1 rnrrP.-nnndiPnr.P.

Nn -RR,-1 9-171 C-179 Equipment ID: 1AS921 Limerick Generating Station Unit 1 C-180 MPR-3796, Revision 1 rnrrPqnnndPnr-.

Nn* RR-19-171 Equipment ID: 1AS921 Limerick Generating Station Unit 1 C-181 MPR-3796, Revision 1 r.nrrPqnnndlPnr.P Nn- RR-1i2-171 Sheet I of 2 N U Seismic Walkdown Checklist (SWC)Equipment ID No. 1AT564 Equip. Class'2 2 Horizontal Tanks or Heat Exchangers Equipment Description Diesel Generator Jacket Water Exansion Tan Location:

Bldg. Diesel Floor El. 234 Room, Area Room 311]A Generator Building Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?fL .9 -rzff YdNO YQ2NE UO N/AD Y[rND UQ N/AD YO/Nn UD N/AD 5. Is the anchorage configuration consistent with plant documentation? ND (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.),I- U Y6 UD N/AD Ai/)I-6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YZND UO Enter the equipment class name from Appendix B: Classes of Equipment.

<C-3 >Limerick Generating Station Unit 1 MPR-3796, Revision 1 rlnrmrnnndPnrn.

Nn* RR-19-171 C-182 Sheet 2 of 2 Equipment ID No. 1AT564 Equip. Class 1 2 (20) Horizontal Tan or Heat Exchangers Equipment Description Diesel Generator Jacket Water Expansion Tanks Interaction Effects 4-L 7. Are soft targets free fronj impact x nearby eappment or s M?8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? YO/AI UE" N/AD U" N/AD UE] N/AO Yd NO UO Other Adverse Conditions

/11. Have you looked for and found no other seismic conditions that could Y["Ni" U[-adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated by: AK ~LLc~~Date: 'I// V4 __<C-4>Limerick Generating Station Unit 1 MPR-3796, Revision 1 Nn -PR-19-171 C-183 Equipment ID: 1AT564 I Limerick Generating Station Unit 1 MPR-3796, Revision 1 rnrrPqnnnr1.nr, Nn" RR-19-171 C-184 Equipment ID: 1AT564 Limerick Generating Station Unit 1 MPR-3796, Revision 1.nrrnnndPnr.

Nn " RR-19-171 C-185 Sheet 1 of 2 Status: (D N U Seismic Walkdown Checklist (SWC)Equipment ID No. 1AV209 -lEquip. Class" 2 (08) Fans & Air Handlers Equipment Description HPCI Pump & Turbine Room Cooler Location:

Bldg. Reactor Floor El. 177 Room, Area Room 109 Enclosure Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one Y) NEI of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

'yon00~ 4ctnr m,~i oppmcs 4* ND UD N/AD YX ND UD N/AD c-$,A 4. Is the anchorage free of visible cracks in the concrete near the anchors? YX~ ND-Epoxy 61+ cooler hao4s;dle

' -ý cro4rJ; o-, eon"Cg4r leCaoe' c-paXy Croc4cj IV dAi '~ ow 0610 I~wvon coneO6 UD1 N/AD a4 e Puy I 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

MAýP2 oq # ,o+1 -(1), )ev. I9 1t (R 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YJR NDI UD N/AD YX NEI UD1 12 Enter the equipment class name from Appendix B: Classes of Equipment.

<C-3 >Limerick Generating Station Unit 1 MPR-3796, Revision 1 rnrrP.-nnndPnr.

Nn " RR-19-171 C-186 Sheet 2 of 2 Equipment ID No. 1AV209 Equip. Class 1 2 (08) Fans & Air Handlers Equipment Description HPCI Pump & Turbine Room Cooler Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?, a C 6~T4 461eý-Yd NO UO N/AO 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YM NO UO N/AO and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Vý( NE UD N/AO YI NO UD Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could Y)ý NO UO adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary).v.A (L~r ~r~VW~Evaluated by: Date: ./e ;-,o- --/ 0.Limerick Generating Station Unit 1 MPR-3796, Revision 1 rnrrPqnnnrIPnrP.

Nn

  • RA-19-171 C-187 Equipment ID: 1AV209 Limerick Generating Station Unit 1 MPR-3796, Revision 1 rnrrP.nnnrlPnrn Nn" R,-19-171 C-188 Equipment ID: 1AV209 I I Limerick Generating Station Unit 1 MPR-3796, Revision 1 C.nrrp-nnndPnr,*

Nn R--19-171 C-189 Equipment ID: 1AV209 Limerick Generating Station Unit 1 MPR-3796, Revision 1 r.nrrP..nnndpnr.p Nn RR-1 9-171 C-190 Sheet I of 2 Status:(9 N U Seismic Walkdown Checklist (SWC)Equipment ID No. IAV210 Equip. Class 1 2 (08) Fans & Air Handlers Equipment Description RHR Pump Room Unit Cooler Location:

Bldg. Reactor Floor El. 191 Room, Area Room 102 Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorafe 1. Is the anchorage configuration verification required (i.e., is the item one YX NE of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

YW NE UO N/AO Y% ND U-I N/AO 4. Is the anchorage free of visible cracks in the concrete near the anchors? YZNO UO N/AO AneAio&e +0 r44{)I am -)rw conCartf -free d c~ra a"5 necjr Trome~ rvnoorTk 5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YX NO UD N/AC YX4NO UO 12 Enter the equipment class name from Appendix B: Classes of Equipment.

<C-3 >" Limerick Generating Station Unit 1 MPR-3796, Revision 1 r.nrrPqnnndp.nrP.

Nn

  • RR-1 2-171 C-191 Sheet 2 of 2 EquipmentiDNo.

IAV210e Equip. Class" 2 (08) Fans & Air Handlers Equipment Description RHR Pump Room Unit Cooler Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

-'No c: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YK NO Uri N/AO YX NEI U- N/A[l YK NEI UO N/AD WNo Uo Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could YW NO UO adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

NIJA Evaluated by: 02M 16 Date:iA4L'~

P7"< C-4 )0-Limerick Generating Station Unit 1 MPR-3796, Revision 1 r.nrrPmnnndPnrp Nn

  • 1R-19-171 C-192 Equipment ID: 1AV210 Limerick Generating Station Unit 1 MPR-3796, Revision 1 C.nrrP..nnnrdPnrP.

Nn -RR-19-171 C-193 Equipment ID: 1AV210 Limerick Generating Station Unit 1 MPR-3796, Revision 1 r.nrrP..nnndPnr.P.

Nn -RPR-19-171 C-194 Equipment ID: 1AV210 Limerick Generating Station Unit 1 MPR-3796, Revision 1 Nn" RR-19-171 C-195 Equipment ID: 1AV210 I 0 Limerick Generating Station Unit 1 MPR-3796, Revision 1 Nn -PR-1 2-171 C-196 Equipment ID: 1AV210 Limerick Generating Station Unit 1 MPR-3796, Revision 1 rTnrrP~nnndPnr.P Nn *RR-19-171 C-197 Sheet 1 of 2 Status& N U Seismic Walkdown Checklist (SWC)Equipment ID No. IAV512 Equip. Class'2 (08) Fans & Air Handlers Equipment Description DIESEL GENERATOR/Room Ventidiation Fan Location:

Bldg. Diesel Floor El. 217 Room, Area Room 311-A Generator Building Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchoraue 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?tic 6 z C- -(6 rp 7"-: -'e. j- I. ft I9NO YE2ND UD N/AD Y 1 ND UO N/AD YE~4IND UD N/AD 5. Is the anchorage configuration consistent withpl.t documentation?

YOE N[(Note: This question only applies if the item one of the' 50%Od for which an anchorage configuration verification is required.)DW Pr i1)Fl.-tr I/J/7O. 10J'11-6. Based on the above anchorage evaluations, is the anchorage free of YiNH potentially adverse seismic conditions?

-1 UD N/AD] UD 2 Enter the equipment class name from Appendix B: Classes of Equipment.

<C-3 >Limerick Generating Station Unit 1 MPR-3796, Revision 1 r.nrrPqnnnriPnr-P Nn -RR-19-171 C-198 Sheet 2 of 2 Equipment ID No. 1AV512 Equip. Class'2 (08) Fans & Air Handlers Equipment Description DIESEL GENERATOR/Room Ventiliation Fan Interaction Effects 7. Are soft targets free from impact by inearby equipment or structures?

YI('ND UD N/AD 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y 'NQ Ut] N/At]and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YIZNt Ut N/Al]Y&//NO Ut Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could Y[L2ND] Ut]adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary) vvtr-eA,J-,%

v-,c-4 In~ 5 q5 9) .lid CP%%Evaluated by:.3V 6 1 1 L-Date: -4/3 1 / 01 2.,< C-4 >" Limerick Generating Station Unit 1 MPR-3796, Revision 1 CnrrPqnnndPnr.PJ Nn" R.R-19-171 C-199 Equipment ID: 1AV512 Limerick Generating Station Unit 1 MPR-3796, Revision 1 Nn -RS-17-171 C-200 Sheet 1 of 2 Status:- ) N U Seismic Walkdown Checklist (SWC)Equipment ID No. 1B1K513 Equip. Class 2 (10) Air Comprens0or Equipment Description B Diesel Generator Starting Air Compressor B1 Location:

Bldg. Dirse Floor El. 217 Room, Area Room 311B Generator Building Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchoraee 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

yd~n 2. Is the anchorage free of bent, broken, missing or loose hardware?

Y9 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

,-." q 1"7 "-L NO U- N/A-NEI ULI N/AC NEI- U- N/AOl NC Ul-I N/A[--"7 6. Based on the above anchorage evaluations, is the anchorage free of 'YA NO " O potentially adverse seismic conditions?

1 Enter the equipment class name from Appendix B: Classes of Equipment.

Limerick Generating Station Unit 1 MPR-3796, Revision 1 r.nrrP.nnndrnrnP Nn

  • RR-19-171 C-201 Sheet 2 of 2 Equipment ID No. IBlKS13 Equip. Class 1 2 (10) Air Compressors Equipment Description B Diesel Generator Starting Air Compressor B1 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

IX4 NO UO N/AFI 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, 'ofNO UE N/AD and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have dequate flexibility to avoid damage? YNO UD N/AO 51no-It elA 40 10. Basedb, onhJ,~~ '-.- ./'z O UOO,.10. Based on the a~o-ve seismic interaction evaluations, is equipment free YOND UD of potentially adverse seismic interaction effects?Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could NO NDUp adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated Date:< C-4 )0 Limerick Generating Station Unit 1 MPR-3796, Revision 1 rnrrP.nnnr1.nr.

Nn -R-19-171 C-202 Equipment ID: 1BIK513 Limerick Generating Station Unit 1 MPR-3796, Revision 1 CnrrA~nnnr1nnFn Nn " PR.-12-171 C-203 Sheet 1 of 2 Status: (D N U Seismic Walkdown Checklist (SWC)$0, Equipment ID No. I 1T558 Equip. Class1 2 (19) Vertical Tanks or Heat Exchan er Equipment Description B Diesel Generator Starting Air Reservoir B1 Location:

Bldg. Diee Floor El. 217 Room, Area Room 311B Generator Building Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchoragye

1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware?

j"NO- UI" N/AD 3. Is "e'anchoragefre of sion that is more than mild surface J NE] UI" N/AO1 oxidation? .d-lo,4 Ocz cv'- 4t1- o, 4/ a -- 6 *.4. Is the anchorage free of visible cracks in the concrete near the anchors? Y NEI UD N/A[!5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yý NEI UDJ N/AD Y)(NO UD 12 Enter the equipment class name from Appendix B: Classes of Equipment.

< C-3 >" Limerick Generating Station Unit 1 MPR-3796, Revision 1 rnrrnnndnnr.p Nn -RR-19-171 C-204 Sheet 2 of 2 Equipment ID No. 1 1T558 Equip. Class'2 (19) Vertical Tanks or Heat Exchangers Equipment Description B Diesel Generator Starting Air Reservoir BI Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and maso block walls not likely to collapse gnto the equipment'
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YtýNQ UD N/AO UMJ N/AO UD N/AD 5ff NEI U13 Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could 4'6N[j] UO adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Date: ,7 ý, r< C-4 >Limerick Generating Station Unit 1 MPR-3796, Revision 1 rnrrAqnnndP~nrp MNn" R5R-19-171 C-205 Equipment ID: 1B1T558 I Limerick Generating Station Unit 1 MPR-3796, Revision 1 rTnrrp'.nnndHPnrA.

Nn -RR-19-171 C-206 Sheet1of 2 Status:@~.

N U Seismic Walkdown Checklist (SWC)Equipment ID No. IBDI02 Equip. Class 1 2 (12) Distribution Panels Equipment Description Turbine Encloser 120 V Power Distribution Panel Location:

Bldg. Reacto Floor El. 254 Room, Area Room 452 Enclosure Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YO NX YK NO U- N/AD YPQ NO Ur N/AO X?<NE UE N/AE YE NE Ur N/ArNE UE 12 Enter the equipment class name from Appendix B: Classes of Equipment.

<C-3>Limerick Generating Station Unit 1 MPR-3796, Revision 1 .flnrrPnnndPnr.p Nn

  • RR-19-171 C-207 Sheet 2 of 2 Equipment ID No. IBD102 Equip. Class'2 (12) Distribution Panels Equipment Description Turbine Encloser 120 V Power Distribution Panel Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yo NE UD N/AO 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Y'Q NO- UEI N/AEI and masonry block walls not likel to collapse onto the equipment?.OZ- WQ Vt eeW Rto. 0 QrC Cc~~Rev F~'X5 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?t 1j c0eic, -pex, ok , YJX NO UOI N/AI-Yt NEI UE-ýamqr or Coulj e-6nt-Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YA NOi U"I adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

N/A Evaluated by t: (Jc~m~( qT~AV 41 Date: V1 L/' I D S/ýT-1 II< C-4 >)Limerick Generating Station Unit 1 MPR-3796, Revision 1 Nn

  • R.9-1 9-171 C-208 Equipment ID: 1BD102 Limerick Generating Station Unit I C-209 MPR-3796, Revision 1 r.nrrqnnndpnn--

Nn -RR-12-171 Equipment ID: 1BD102 Limerick Generating Station Unit 1 MPR-3796, Revision 1 r nrrfnnnHPnrPNn*

RR-19-171 C-210 Equipment ID: 1BD102!Limerick Generating Station Unit 1 MPR-3796, Revision 1 rnrrp'ýnnnrPnnrp Nn" RR-17-171 C-211