MPR-3796, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 11 of 12
ML12342A116
Person / Time
Site: Limerick Constellation icon.png
Issue date: 11/06/2012
From: Schlaseman C S
Exelon Generation Co, MPR Associates
To:
Office of Nuclear Reactor Regulation
References
RS-12-171 MPR-3796, Rev 1
Download: ML12342A116 (39)


Text

Sheet 1 of 2 Status: () N U Seismic Walkdown Checklist (SWC)Equipment ID No. OAKI 12 Equip. Class 1 2 (09) Chillers Equipment Description Control Structure Chiller Location:

Bldg. Control Floor El. 200 Room, Area Room 258 Structure Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchoraae 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Qyowli.' P r- A 1 JA6 4. Is the anchorage free of visible cracks in the concrete near the anchors?() Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YEJ o YJX NEI UI- N/AD 4 NEI Y $NEI Uln N/AD UEJ N/AD YO NEIDUE N/AX YKND UD 12 Enter the equipment class name from Appendix B: Classes of Equipment.

<C-3 >Limerick Generating Station Unit 1 MPR-3796, Revision 1 flnrrmnnndfnrP Nn -RS-1 2-171 C-374 Sheet 2 of 2 Equipment ID No. OAK1 12 Equip. Class'2 (09) Chillers Equipment Description Control Structure Chiller Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Y ND UDJ N/AD 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YVF] UD N/AD an masonry block walls not likely to collapse o to the equipment?

VyoteYceI~.-( ?:Y ~ Ct ~Cn 61 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y%-ND UD N/AD YZO$ND UD Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could *NND UD adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

At ,7?/

hv: Evaluated hv: Date:-1-n K /" I/L,-6 Limerick Generating Station Unit 1 MPR-3796, Revision 1 (lnrrmnnndPnr.A Nn

  • RR-19-171 C-375 Equipment ID: OAK12 Limerick Generating Station Unit 1 MPR-3796, Revision 1 Cnrrp.nnndi.nr.

iNn RR-19-171 C-376 Equipment ID: QAKI 12 Limerick Generating Station Unit 1 MPR-3796, Revision 1 rnrrP~nnnd~nrp.

Nn ' R.R-19-171 C-377 Sheet 1 of 2 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No. OAP 162 Equip. Class" 2 (03) Horizontal Pumps Equipment Description Control Room HVAC Chilled Water Pump Location:

Bldg. Control Floor El. 200 Room, Area Room 258 Structure Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anehorae 1. Is the anchorage configuration verification required (i.e., is the item one YE! N&-of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent broken, missing or loose hardware?

_¶_0 N]3. Is the ancho age free of corrosion that is more than milcf-Iuface YNEI N/A[!

_-. ý_ , 4. Is the anchorage free of visible cracks in the concrete near the anchors? )X ND O/A 5. Is the anchorage configuration consistent with plant documentation?

YE! NE! UQ N/Ad (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of g 7 potentially adverse seismic conditions?

12 Enter the equipment class name from Appendix B: Classes of Equipment.

< C-3 >Limerick Generating Station Unit 1 MPR-3796, Revision 1 rnrrPv=nnndPnnrA.

Nn

  • R-19-171 C-378 Sheet 2 of 2 Equipment ID No. 0AP162 Equip. Class 1 2 (03) Horizontal Pumps Equipment Description Control Room HVAC Chilled Water Pump Interaction Effects 7. Are soft targets free from impact by nearby equi ment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y,4ND UEJ N/AD Y/NEI UD N/AD YA ND UQI N/AD:ýN UDJ Other Adverse Conditions
11. Have you looked for and found no other seismic conditions.that could YL D UD adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Date: (7 v< C-4 >Limerick Generating Station Unit 1 MPR-3796, Revision 1 f.nrrPAnnnHPnrPK Nn -RS-19-171 C-379 Equipment ID: 0AP162 I Limerick Generating Station Unit 1 MPR-3796, Revision 1 rnrrP.nnndlnr.P Nn- R.R-12-171 C-380 Equipment ID: 0AP162 Limerick Generating Station Unit 1 MPR-3796, Revision 1 flnrrPqnnndPtnrn.p Nn " PR-19-171 C-381 Sheet 1 of 2 Status:G0.

N U Seismic Walkdown Checklist (SWC)Equipment ID No. 0AP506 Equip. Class12 (04) Vertical Pumps Equipment Description RHR Service Water Pump Location:

Bldg. Spray Pond Floor El. 268 Room, Area Room 1000 Building Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the. Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosionjhat is more thap mild surface, oxidation?

"7 kxtie- * ( t e t P 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Y'0 NEI 3_. NEI UD N/AD ,YlNO UD N/AD),;ND U- N/Al Y& Ni UOl N/AD 6 s njo. M-o2- 06oZ Rev. 4gl.6. Based on the above anchorage evaluations, is the anchorage free of O NE] U-potentially adverse seismic conditions?

12 Enter the equipment class name from Appendix B: Classes of Equipment.

<C-3 >" Limerick Generating Station Unit 1 MPR-3796, Revision 1 CrnrrPqnnnd1nrPP Nn -RR-12-171 C-382 Sheet 2 of 2 Equipment ID No. 0AP506 Equip. Class'2 (04) Vertical Pumps Equipment Description RHR Service Water Pump Interaction Effects 7. Are soft targets free from impact by nearbeqment or structures?

Y)f. NE UD N/AE" 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, Yo ND ULJ N/AEJ and masonry block walls not likely to colla se ontole eo nt? , 9. Do attached lines have adequate flexibility to avoid damage? Y4NI-[ UDI N/AEJ plot-~10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?~y~4EJU11 Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could NEI UOI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated by: J/0t- 4ýkd-e Date: is f/Il Plt< C-4 >Limerick Generating Station Unit I MPR-3796, Revision 1 r.nrrP..qnnndPnr'P Nn* P.R-19-171 C-383 Equipment ID: 0AP506 I I Limerick Generating Station Unit 1 MPR-3796, Revision 1 rnrrmnnndePnrA Nn" RR-19-171 C-384 Equipment ID: 0AP506 Limerick Generating Station Unit 1 MPR-3796, Revision 1 rnrr-.qnnnrlPnrP.

Nn -PR-19-171 C-385 Shej t of 2 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No. 0AP548 Equip. Class'- (04) Vertical Pumps Equipment Description Emergency Service Water Pump Location:

Bldg. Svrav Pond Floor El. 268 Room, Area Room 1000 Location:

Bldg. Spray Pond Floor El. 268 Room, Area Room 1000 Building Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

m fild 4 e. is aecot4 .4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluitions, is the anchorage free of potentially adverse seismic conditions?

YON3.5NEI Url N/AD Y4-;4 U[-] N/AD YAMN UIu N/AD YfN["] U- N/ArD 9N:-I UOI-12 Enter the equipment class name from Appendix B: Classes of Equipment.

<C-3 >" Limerick Generating Station Unit 1 MPR-3796, Revision 1 rnrrPgnnnrdiPnrnp Nn -RR-19-171 C-386 Sheet 2 of 2 Equipment ID No. 0AP548 Equip. Class12 (04) Vertical Pumps Equipment Description Emergency Service Water Pump Interaction Effects 7. A, esoft targets free from impact by nearby equi ment or structures?

8A ov e, dist s ,ad l Y&9ND UD N/AD 8. Are overhead equipment, distribution systems, ceiling. tiles and lighting, Yffl!ýRD UDI N/A[: and masonry block walls not likely to collapse onto the equipment?

^614t A4,4e .;(,e n$9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YZý'-] UD N/AD V11D UD Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could 4 .-D UD adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

~1 Pvn1inte~d hVy G/Date: Limerick Generating Station Unit 1 MPR-3796, Revision I rnrrPqnnndPnra.p Nn RRS-1 -171 C-387 Equipment ID: 0AP548 Limerick Generating Station Unit 1 MPR-3796, Revision 1.nrrA-nnndPnr..

Nn

  • RR-17-171 C-388 Sheet I of 2 Status: UN) N U Seismic Walkdown Checklist (SWC)Equipment ID No. 0BV543 Equip. Class 1 2 (08) Fans & Air Handlers Equipment Description B' Spray Pond PP. Structure Air Supply Fan Location:

Bldg. Spray Pond Floor El. 268 Room, Xrea Room 1005 Building Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible yacks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Per le~y Do *5 ) i& ti. 1)l+ i/r/:fq ma 91T11 z.-6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y NEI Yj NO Ur. N/A-YZND U- N/A-]UI N/A[-YIkNEI UD N/A[-])ONE] U[1 12Enter the equipment class name from Appendix B: Classes of Equipment.

  • C-3 >Limerick Generating Station Unit 1 MPR-3796, Revision 1 rnrrPnnnr1PnrP Nn -RR-19-171 C-389 Sheet 2 of 2 Equipment ID No. OBV543 Equip. Class'2 (08) Fans & Air Handlers Equipment Description B' Spray Pond PP. Structure Air Supply Fan Interaction Effects 7. Are soft targets tee from impact by nearbo equipmnt or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YJI UU N/AEJ)NED UD N/AEJ Y&NE] UDI N/AQ Y, ND UI Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could UEI adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Azz'Evaluated by: Date: L);//ll]//

Limerick Generating Station Unit 1 MPR-3796, Revision 1 CnrrP.nndPnnrP Nn

  • RR-19-171 C-390 Equipment ID: 0BV543 t Limerick Generating Station Unit 1 MPR-3796, Revision 1 rnrroqnnndp.nr.p Nn -RR-1 -171 C-391 Sheet 1 of 2 Status: (D N U Seismic Walkdown Checklist (SWC)Equipment ID No. 0CC667 Equip. Class 1 2 (18) Control Panels & Cabinets Equipment Description ESW Division III Control Panel Location:

Bldg. Control Floor El. 269 Room, Area Room 533 ( , (Structure Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchoraize

1. Is the anchorage configuration verification required (i.e., is the item one YO N]of the 50% of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware?

Y 0ND .UE] N/AO V'40 f ." 0 -1 $ ~i~$v4~14 C *5), ,* 10u SOW." 3. Is the anchorage free of corrosion that is more than mild surface 4 ND UO N/AD oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? Y4 N UL N/AD 5. Is the anchorage configuration consistent with plant documentation?

Y] NO UO N/AX (Note: This question only applies if the item is one of the 50% for whi h an anqhorage configuration verification is required.)

jAC 0 ;.- A belts -to Rof4. ,ic eAo-tt & ,e')wy M, e~lk -60 4-, Fe'd 'q ~C' 1'ý {u414%4"l (AvIDN Ioe of 6. Based on the aboVM anchorage evaluations,s the anchorake free of YXN U]potentially adverse seismic conditions?

.....~~~ ~ ~ , 1.. , -I" '.l er,.t. t fee, to evl Vt' pt( P4e.e6 -r ..,~ #, V,9..r V j 4-4 IVA/ e 4" P' P4efCAC Y-O 1 2 Enter the equipment class name from Appendix B: Classes of Equipment.

<C-3 >Limerick Generating Station Unit 1 C-392 MPR-3796, Revision 1 rnrr.nnnr1nrP.

Nn

  • RR-12-171 Sheet 2 of 2 Equipment ID No. 0CC667 Equip. Class" (0 8) Control Panels & Cabinets Equipment Description ESW Division III Control Panel Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

NEI U] N/AD Al'p *'f pf+ Sft 5 01-i AL ~f- t,, -# f eo626 4,J^ez..8. Are overhead equipment, distribution systems, ceiling tiles and lighting, d masonry block walls not likely to collapse onto the equipment?(Jt,,. rtc-, 4-q AW, -K Co-.t-1 &~om )9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?YE(NEI UD- N/ADI SNEI UD N/AD YffQ UD Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YJ-NDI UD adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Date: Y/3h2.*Limerick Generating Station Unit 1 MPR-3796, Revision 1 rnrrPqnnnd1Pnr'.P Nn

  • RR-19-171 C-393

1.4.5 Termination

Cabinets The frames and enclosures of Limerick termination cabinets are the same size and structurally identical to the tested termination cabinet (Reference 4). The only difference between the Limerick cabinets and the tested termination cabinet is the quantity and location of termination modules. This will not affect the structural capability of the cabinets.

The TRS envelops the RRS as shown in the Appendix, Fugure 4.2.These cabinets are located in the Control Room, elevation 269'.The SQRT forms for the Class 1E Termination Cabinets (P700 series) are contained in Section 3.1.4.6 Floor Mounting 1.4.6.1 Auxiliary iquipment Room, 289' Elevation Panels located in the Auxiliary Equipment Room are mounted on PGCC floor sections.

As shown in Ref. 5, sections similar to those at Limerick were tested to determine if there were any amplifications of accelerations to the panels. Panel accelerometer readings show that the floor sections actually reduce the transmissibility on the tested panels by as much as 10 percent. This is due to structural damping. The results presented in this report conservatively assume that the floor sections are rigid, and no credit is taken for the reduced transmissibility.

1.4.6.2 Control Room, 269' Elevation Panels located in the control room (and C61-POO1) are bolted to a 4" base which is welded to the floor. This base was on the tested Limerick H12-P601, P603, and P661 panels. Examination of test data in panels without this base shows no appreciable difference in transmissibilities.

The base is therefore assumed rigid.1-8 Limerick Generating Station Unit 1 C-394 MPR-3796, Revision 1 CnrrPqnnnrid~nrP Nn* RR-19-171 Equipment ID: 0CC667 i Limerick Generating Station Unit 1 MPR-3796, Revision 1 rlnrrP.,nnnrPlnr'P Nn

  • RR-19-171 C-395 Equipment ID: 0CC667 Limerick Generating Station Unit 1 MPR-3796, Revision 1 r.nrrspnnndipnr,-.

Nn -R.-19-171 C-396 Sheet 1 of 2 Status: (" N U Seismic. Walkdown Checklist (SWC)Equipment ID No. -'-BD Equip. Class 1 2 (08) Fans & Air Handlers Equipment Description Control Room Intake Dampe Location:

Bldg. C.Qv0t, I Floor El. 30L- Room, Area Manufacturer, Model, Etc. (optional but recommended)

ýIq -Instructions for Completing Checklist This checklist, may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YE N Y NE UE N/A[YX NE UO N/AO YK NO UE N/AE YE NE_ UE N/APx(_YXNE UE 12 Enter the equipment class name from Appendix B: Classes of Equipment.

< C-3 >Limerick Generating Station Unit 1 MPR-3796, Revision 1 flnrrP,=nnndinr-*

Nn* RR-19-171 C-397 Sheet 2 of 2 Equipment ID No. f tW9 0"Av Equip. Classl2 (08) Fans & Air Handlers Equipment Description Control Room Intake Damper Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?.No * &r5 Yb" NE UI- N/AE 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, YJ4 NM U and masonry block walls not likely to collapse onto the equipment?

well ~ect~[I N/AE are[- N/ACI 9. Do attached lines have adequate flexibility to avoid damage?YX NEI U 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y)4NEIUE1 Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could Y N U[adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Ljciwar q~'t Evaluated by: 6'Date: I< C-4 A>Limerick Generating Station Unit 1 MPR-3796, Revision 1 (,nrrPqnnndPnr.

Nn R.R-1 -171 C-398 Equipment ID: HD-78-027A Limerick Generating Station Unit 1 MPR-3796, Revision 1 rnrrPnnndPnrP Nn

  • RR-1.-171 C-399 Equipment ID: HD-78-027A I Limerick Generating Station Unit 1 MPR-3796, Revision 1.nrrqnnndrnrA Nn" RR-19-171 C-400 Equipment ID: HD-78-027A I I Limerick Generating Station Unit 1 MPR-3796, Revision 1 rTnrrP..nnndiPnr.P Nn
  • R.5;-l-171 C-401 Equipment ID: HD-78-027A Limerick Generating Station Unit 1 MPR-3796, Revision 1 rlnrrm'nnnri-nr.p Nn
  • R.-19-171 C-402 Sheet 1 of 2 Status: 0 N U Seismic Walkdown Checklist (SWC)Equipment ID No. HD-081-041A_

Equip. Class1 2 (08) Fans & Air Handlers Equipment Description Sv~ray Pond Intake Fan Damper Location:

Bldg. SpryPn Floor El. 268 Room, Area Room 1005 Building Manufacturer, Model, Etc. (optional but recommended)

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchoraee 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

YEllN2 K~NEI U- N/AD UE- N/AD UQ] N/AlD YEI NO U-N/A_J iNE UFI 12 Enter the equipment class name from Appendix B: Classes of Equipment.

<C-3 >Limerick Generating Station Unit 1 MPR-3796, Revision 1 rnreP'qnnndPnnrA Nn

  • RR-19-171 C-403 Sheet 2 of 2 Equipment ID No. HD-081-041A Equip. Class1 2 (08) Fans & Air Handlers Equipment Description Spray Pond Intake Fan Damper Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likly to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?4 NO UD NIAQ 9 NE"I UD N/AEI*ýN["I UO N/AO NE] Un Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could UE adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

Evaluated by: Date: 7 X/ )Z Limerick Generating Station Unit 1 MPR-3796, Revision 1 CnrrP.nnndPnr.P Nn" RR-19-171 C-404 Equipment ID: HD-081-041A I Limerick Generating Station Unit 1 MPR-3796, Revision 1 r Nn* RR-19-171 C-405 t oft 2 Status: N U Seismic Walkflown Checklist (SWC)EquipmentIDNo.

HV0-"44-031-IR Equip. Class,2 (0.5 (A ') VoLec, Equipment Description c)ikte Ar-t -6 'cR ISGIA 4 0t' Voilv Location:

Bldg.+in E Floor El. 01- Ro Manufacturer, N6d .(optional but recommended) om, Area la Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorafe 1. Is the anchorage configuration verification required (i.e., is the item one YEF NX of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?

Y'] NE UE N/AO 3. Is the anchorage free of corrosion that is more than mild surface Y, NDI UD N/AEJ oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? NEI UfjJ N/AO.Valvec ;b 5 -rY7~fvJo
orAuv -mQaJrKW 4,o Vo01V- oviJ r.4in~ ~~5. Is the anchorage configuration consistent with plant documentation?

YEI NEI UDi N/A'(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Y, NEI UF potentially adverse seismic conditions?

12 Enter the equipment class name from Appendix B: Classes of Equipment.

<C-3 >" Limerick Generating Station Unit 1 MPR-3796, Revision 1 r.nrremnnnlnr.P.

Nn

  • RR-12-171 C-406 Sheet 2 of 2 EquipmentIDNo. - ' Equip. Class'2 (os() (0 r/.y VoIt Equipment Description .Qtk"Ae Air --o IMCR T- Volyr Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?,No 'A 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

./ oV rIM o edeKO4 or 610ca W0il. ;V7.9. Do attached lines have adequate flexibility to avoid damage?Yo NEI U[J N/A]Y)Q Ni[ UI- N/AD]YXNEI UI- N/AE]10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?'Clor-e erc4'W'Ay e~1 c,(u&1d-'r 4o JAAuc-'t Gu aczeg UP I vce oll amcneAr w,11 ,10Vf +o r.46 x~NO Ut]Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could YA NEI ULJ adversely affect the safety functions of the equipment?

Comments (Additional pages may be added as necessary)

AI/A 00. £Kf L Evaluated by: 4r low Date: ) _e3 l Limerick Generating Station Unit 1 MPR-3796, Revision 1 r nrrAnnnhAnr-ANn RR-19-171 C-407 Equipment ID: HV-078-021B Limerick Generating Station Unit 1 MPR-3796, Revision 1 rTnrrPmnnndiPnr.P Nn RR-17-171 C-408 Equipment ID: HV-078-021B Limerick Generating Station Unit 1 MPR-3796, Revision 1 r R5-19-171 C-409 Equipment ID: HV-078-021B Limerick Generating Station Unit 1 MPR-3796, Revision 1 rnrrmnnnHdinr.

Nn* RR-19-171 C-410 Equipment ID: HV-078-021B Limerick Generating Station Unit 1 MPR-3796, Revision 1..nrrE~nnndPnr.P Nn

  • RR-19-171 C-411 Equipment ID: HV-078-021B Limerick Generating Station Unit 1 MPR-3796, Revision 1 r.nrrmnnndtnnr.

Nn " RR-19-171 C-412