LG-22-101, Annual Commitment Change Summary Report
ML22322A154 | |
Person / Time | |
---|---|
Site: | Limerick ![]() |
Issue date: | 11/14/2022 |
From: | Gillin M Constellation Energy Generation |
To: | Office of Nuclear Reactor Regulation, Document Control Desk |
References | |
LG-22-101, SECY-00-045, RIS 2000-17 | |
Download: ML22322A154 (1) | |
Similar Documents at Limerick | |
---|---|
Category:Letter type:LG
MONTHYEARLG-23-106, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023
[Table view]Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information LG-23-097, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-13013 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation LG-23-081, Registration of Use of Casks to Store Spent Fuel2023-09-21021 September 2023 Registration of Use of Casks to Store Spent Fuel LG-23-059, Owner'S Activity Report (OAR-1) for Li2R 172023-08-10010 August 2023 Owner'S Activity Report (OAR-1) for Li2R 17 LG-23-040, Issuance of the Core Operating Limits Report (COLR) for Unit 2 Reload 17, Cycle 182023-05-31031 May 2023 Issuance of the Core Operating Limits Report (COLR) for Unit 2 Reload 17, Cycle 18 LG-23-031, Annual Occupational Radiation Exposure Report 20222023-04-28028 April 2023 Annual Occupational Radiation Exposure Report 2022 LG-23-033, 2022 Annual Radiological Environmental Operating Report2023-04-28028 April 2023 2022 Annual Radiological Environmental Operating Report LG-23-034, Annual Radioactive Effluent Release Report No. 482023-04-28028 April 2023 Annual Radioactive Effluent Release Report No. 48 LG-22-101, Annual Commitment Change Summary Report2022-11-14014 November 2022 Annual Commitment Change Summary Report LG-22-069, Registration of Spent Fuel Storage Casks Used at Limerick Generating Station2022-08-23023 August 2022 Registration of Spent Fuel Storage Casks Used at Limerick Generating Station LG-22-067, Registration of Spent Fuel Storage Casks Use2022-08-0505 August 2022 Registration of Spent Fuel Storage Casks Use LG-22-070, Owner'S Activity Report (OAR-1) for Li1R192022-07-21021 July 2022 Owner'S Activity Report (OAR-1) for Li1R19 LG-22-033, 2021 Annual Radiological Environmental Operating Report2022-04-29029 April 2022 2021 Annual Radiological Environmental Operating Report LG-22-034, Annual Radioactive Effluent Release Report No. 472022-04-29029 April 2022 Annual Radioactive Effluent Release Report No. 47 LG-22-040, Issuance of the Core Operating Limits Report (COLR) for Unit 1 Reload 19, Cycle 202022-04-29029 April 2022 Issuance of the Core Operating Limits Report (COLR) for Unit 1 Reload 19, Cycle 20 LG-22-038, Annual Occupational Radiation Exposure Report for 20212022-04-14014 April 2022 Annual Occupational Radiation Exposure Report for 2021 LG-21-101, Annual Commitment Change Summary Report2021-11-0808 November 2021 Annual Commitment Change Summary Report LG-21-107, Notification of the Use of a New General License for Spent Fuel Storage for the Limerick Generating Station2021-11-0404 November 2021 Notification of the Use of a New General License for Spent Fuel Storage for the Limerick Generating Station LG-21-090, Registration of Use of Casks to Store Spent Fuel2021-10-27027 October 2021 Registration of Use of Casks to Store Spent Fuel LG-21-075, Owner'S Activity Report (OAR-1)2021-08-0505 August 2021 Owner'S Activity Report (OAR-1) LG-21-063, Special Report: Accident Monitoring Instrumentation Inoperability2021-06-0101 June 2021 Special Report: Accident Monitoring Instrumentation Inoperability LG-21-048, Issuance of the Core Operating Limits Report Unit 2 Reload 16, Cycle 172021-05-21021 May 2021 Issuance of the Core Operating Limits Report Unit 2 Reload 16, Cycle 17 LG-21-039, Submittal of Annual Radioactive Effluent Release Report No. 462021-04-23023 April 2021 Submittal of Annual Radioactive Effluent Release Report No. 46 LG-21-038, 2020 Annual Radiological Environmental Operating Report2021-04-23023 April 2021 2020 Annual Radiological Environmental Operating Report LG-21-019, 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2)2021-04-0909 April 2021 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2) LG-21-037, Annual Occupational Radiation Exposure Report for 20202021-04-0202 April 2021 Annual Occupational Radiation Exposure Report for 2020 LG-20-105, Annual Commitment Change Summary Report2020-11-23023 November 2020 Annual Commitment Change Summary Report LG-20-094, Reporting NPDES Permit PA0051926 Renewal for Limerick Generating Station2020-10-14014 October 2020 Reporting NPDES Permit PA0051926 Renewal for Limerick Generating Station LG-20-058, Submittal of Revision to Fourth Ten-Year Interval for the Limerick Inservice Testing Program2020-09-21021 September 2020 Submittal of Revision to Fourth Ten-Year Interval for the Limerick Inservice Testing Program LG-20-087, Registration of Use of Casks to Store Spent Fuel 2020-22020-09-21021 September 2020 Registration of Use of Casks to Store Spent Fuel 2020-2 LG-20-083, Registration of Use of Casks to Store Spent Fuel2020-09-0303 September 2020 Registration of Use of Casks to Store Spent Fuel LG-20-065, Owner'S Activity Report (OAR-1)2020-07-0909 July 2020 Owner'S Activity Report (OAR-1) LG-20-044, Annual Radiological Effluent Release Report No. 452020-04-29029 April 2020 Annual Radiological Effluent Release Report No. 45 LG-20-036, Submittal of Annual Occupational Radiation Exposure Report for 20192020-03-13013 March 2020 Submittal of Annual Occupational Radiation Exposure Report for 2019 2023-09-21 Category:Report MONTHYEARML24026A2962024-01-26026 January 2024
[Table view]Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS)- Syrs, . LG-23-059, Owner'S Activity Report (OAR-1) for Li2R 172023-08-10010 August 2023 Owner'S Activity Report (OAR-1) for Li2R 17 ML23177A2242023-06-26026 June 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection . LG-22-101, Annual Commitment Change Summary Report2022-11-14014 November 2022 Annual Commitment Change Summary Report ML22224A1492022-08-15015 August 2022 Review of Limerick Generating Station Defense in Depth and Diversity Common Cause Failure Coping Analysis, WNA-AR-01074-GLIM-P, Revision 2, July 2022, and the Licensing Technical Report for the Limerick Generating Station Units 1&2 Digital NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits2022-06-30030 June 2022 Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits ML22046A0742022-02-14014 February 2022 Review of Limerick Generating Station Defense in Depth and Diversity Common Cause Failure Coping Analysis, WNA-AR-01074-GLIM-P, Rev 1. Without Attachment 3 Enclosure ML21070A4122021-03-11011 March 2021 Requesting Revision to License Condition in Appendix C in Renewed Facility Operating License ML21083A1712021-02-28028 February 2021 Attachment 3: Limerick Generating Station, Unit 2, 006N3997NP, Revision 1, High Burnup Lead Use Assembly (Hblua) Information Report February 2021 RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping2021-01-0404 January 2021 Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping LG-20-105, Annual Commitment Change Summary Report2020-11-23023 November 2020 Annual Commitment Change Summary Report ML20303A1752020-10-23023 October 2020 Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting ML20106E8282020-04-15015 April 2020 Submittal of Analytical Evaluation of Core Spray Injection Nozzle-to-Safe End Weld (N5A) ML19228A0232019-08-15015 August 2019 Proposed Alternative to Utilize Code Case N-879 RS-18-051, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2018-06-0707 June 2018 Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events ML18129A3342018-05-0404 May 2018 Corrosion Evaluation of the Limerick Unit 2 N-160 Reactor Vessel Nozzle Modification, Framatome Document No. 51-9271770-002 (Non-Proprietary) ML17255A0302017-09-12012 September 2017 Independent Spent Fuel Storage Installation, Registration of Use of Casks to Store Spent Fuel ML17152A3052017-06-0101 June 2017 N-16D Nozzle Repair - Submittal of Analytical Flaw Evaluation, Design Analysis, and Corrosion Evaluation (Rev. 1) ML17137A0682017-05-16016 May 2017 Proposed Relief Request Associated with Reactor Pressure Vessel Nozzle Repairs ML17131A1802017-05-11011 May 2017 Issuance of the Core Operating Limits Report (COLR) for Reload 14, Cycle 15 RS-16-177, High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from The..2016-11-28028 November 2016 High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from The.. ML16309A0172016-11-0404 November 2016 10 CFR 50.59 and 1 O CFR 72.48 Evaluation 24-Month Summary Report for the Period July 1, 2014 Through June 30, 2016 ML16307A0202016-11-0202 November 2016 Special Report - Accident Monitoring Instrumentation Inoperability RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 12014-09-24024 September 2014 Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 ML14199A4112014-07-18018 July 2014 Special Report - Seismic Monitoring Instrumentation Inoperability ML14148A2802014-06-17017 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML14133A0222014-05-13013 May 2014 ACE Document Received at LIM Aam May 7, 2014 ML14133A0162014-05-13013 May 2014 ACE Attachment to NRC Chairman Macfarlane Letter of 3-31-14 ML14058B1562014-04-14014 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML14058B1202014-04-14014 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML13357A3312014-01-0606 January 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Limerick Generating Station, Units 1 and 2, TAC Nos.: MF0847 and MF0848 RS-13-138, Updated Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Limerick Generating Station, Unit 2, Report No. RS-13-1382013-10-0707 October 2013 Updated Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Limerick Generating Station, Unit 2, Report No. RS-13-138 ML13284A1112013-10-0707 October 2013 Appendix AD - Area Walk-by Checklists (Awcs) ML13143A2562013-05-16016 May 2013 NRC Reply to ACE Questions Received March 21 and 27, 2013 RS-13-084, Response to March 12, 2012, Request for Information Per 10 CFR 50.45.(f) Recommendations of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, Enclosure 5, Recommendation 9.3, Emergency..2013-04-30030 April 2013 Response to March 12, 2012, Request for Information Per 10 CFR 50.45.(f) Recommendations of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, Enclosure 5, Recommendation 9.3, Emergency.. IR 05000456/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000272/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee ML13008A2192013-01-31031 January 2013 U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000454/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000461/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000237/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000373/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000352/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000219/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000277/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000254/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000289/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee RS-12-172, Company, Llc'S 180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2012-11-19019 November 2012 Company, Llc'S 180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML12342A1162012-11-0606 November 2012 MPR-3796, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 11 of 12 ML12342A1152012-11-0606 November 2012 MPR-3796, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 10 of 12 2024-01-26 Category:Miscellaneous MONTHYEARLG-23-059, Owner'S Activity Report (OAR-1) for Li2R 172023-08-10010 August 2023
[Table view]Owner'S Activity Report (OAR-1) for Li2R 17 LG-22-101, Annual Commitment Change Summary Report2022-11-14014 November 2022 Annual Commitment Change Summary Report ML21083A1712021-02-28028 February 2021 Attachment 3: Limerick Generating Station, Unit 2, 006N3997NP, Revision 1, High Burnup Lead Use Assembly (Hblua) Information Report February 2021 ML20303A1752020-10-23023 October 2020 Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting ML17255A0302017-09-12012 September 2017 Independent Spent Fuel Storage Installation, Registration of Use of Casks to Store Spent Fuel ML17131A1802017-05-11011 May 2017 Issuance of the Core Operating Limits Report (COLR) for Reload 14, Cycle 15 ML16309A0172016-11-0404 November 2016 10 CFR 50.59 and 1 O CFR 72.48 Evaluation 24-Month Summary Report for the Period July 1, 2014 Through June 30, 2016 ML14199A4112014-07-18018 July 2014 Special Report - Seismic Monitoring Instrumentation Inoperability ML14148A2802014-06-17017 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML14133A0222014-05-13013 May 2014 ACE Document Received at LIM Aam May 7, 2014 ML14058B1202014-04-14014 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML14058B1562014-04-14014 April 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident RS-13-138, Updated Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Limerick Generating Station, Unit 2, Report No. RS-13-1382013-10-0707 October 2013 Updated Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Limerick Generating Station, Unit 2, Report No. RS-13-138 ML13284A1112013-10-0707 October 2013 Appendix AD - Area Walk-by Checklists (Awcs) ML13143A2562013-05-16016 May 2013 NRC Reply to ACE Questions Received March 21 and 27, 2013 RS-13-084, Response to March 12, 2012, Request for Information Per 10 CFR 50.45.(f) Recommendations of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, Enclosure 5, Recommendation 9.3, Emergency..2013-04-30030 April 2013 Response to March 12, 2012, Request for Information Per 10 CFR 50.45.(f) Recommendations of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, Enclosure 5, Recommendation 9.3, Emergency.. IR 05000456/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000272/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000254/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000277/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000219/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000352/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000373/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000237/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee ML13008A2192013-01-31031 January 2013 U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000454/20132022013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000461/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee IR 05000289/20132012013-01-31031 January 2013 Exelon Generation Co., LLC, U.S. Nuclear Regulatory Commission (NRC) Office of Investigations (01) Investigation; Summary of 01 Report No. 3-2010-034; NRC Inspection Report Conference Letter - Licensee RS-12-172, Company, Llc'S 180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2012-11-19019 November 2012 Company, Llc'S 180-day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident ML12342A1022012-11-0606 November 2012 MPR-3801, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 13 of 13 ML12342A1032012-11-0606 November 2012 MPR-3796, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 1 of 12 ML12342A1042012-11-0606 November 2012 MPR-3796, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 2 of 12 ML12342A1052012-11-0606 November 2012 MPR-3796, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 3 of 12 ML12342A1062012-11-0606 November 2012 MPR-3796, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 4 of 12 ML12342A1072012-11-0606 November 2012 MPR-3796, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 5 of 12 ML12342A1102012-11-0606 November 2012 MPR-3796, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 6 of 12 ML12342A1182012-11-0606 November 2012 MPR-3801, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 1 of 13 ML12342A1122012-11-0606 November 2012 MPR-3796, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 7 of 12 ML12342A1132012-11-0606 November 2012 MPR-3796, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 8 of 12 ML12342A1142012-11-0606 November 2012 MPR-3796, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 9 of 12 ML12342A1152012-11-0606 November 2012 MPR-3796, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 10 of 12 ML12342A1162012-11-0606 November 2012 MPR-3796, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 11 of 12 ML12342A1172012-11-0606 November 2012 MPR-3796, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 12 of 12 ML12342A1192012-11-0606 November 2012 MPR-3801, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 2 of 13 ML12342A1212012-11-0606 November 2012 MPR-3801, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 3 of 13 ML12342A1222012-11-0606 November 2012 MPR-3801, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 4 of 13 ML12342A1232012-11-0606 November 2012 MPR-3801, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 5 of 13 ML12342A1242012-11-0606 November 2012 MPR-3801, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 6 of 13 ML12342A1252012-11-0606 November 2012 MPR-3801, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 7 of 13 ML12342A1262012-11-0606 November 2012 MPR-3801, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Revision 1, Part 8 of 13 2023-08-10 |
Text
Constellation SECY-00-045 RIS 2000-17 LG-22-101 November 14, 2022 U.S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, DC 20555-0001 Limerick Generating Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-39 and NPF-85 NRC Docket Nos. 50-352 and 50-353
Subject:
Annual Commitment Change Summary Report This report summarizes Limerick Generating Station (LGS) changes to NRC commitments that meet the threshold for reporting for the period from July 1, 2021 to June 30, 2022. Changes to these commitments are performed using procedure LS-AA-110, Commitment Management, which employs the guidance provided in NEI 99-04, Guidelines for Managing NRC Commitment Changes. NEI 99-04 was approved by the NRC for licensee use by SECY-00-045, Acceptance of NEI 99-04, "Guidelines for Managing NRC Commitments." Licensees were informed that NEI 99-04 was an acceptable process for control of regulatory commitments by the issuance of RIS 2000-17, Managing Regulatory Commitments made by Power Reactor Licensees to the NRC Staff, on September 21 , 2000.
LS-AA-110, Commitment Management, Section 4.7, "NRC Notification of Commitment Changes/Deletions," requires submittal of a written report once per calendar year. This report includes one commitment change summary with the details provided in the attachment.
There are no new regulatory commitments contained in this letter.
If you have any questions, please contact Jordan Rajan at (610) 718-2513.
Respectfully, Michael F. Gillin Vice President - Limerick Generating Station Constellation Energy Generation, LLC cc: Administrator Region I, USNRC USNRC Senior Resident Inspector, LGS
Attachment - List of Changed NRC Commitments November 14, 2022 Page 1 of 1 The following commitment change was implemented between July 1, 2021 and June 30, 2022 and requires NRC notification.
Commitment change tracking number: 2022-001 CT number: T04073 Commitment source document: Integrated Inspection Report 50-352/97-07, 50-353/97-07, Notice of Violation, October 27, 1997 Change: Revised
Subject:
Periodic Walkdown of All Locked Devices Statement of commitment:
Recurring Training for appropriate personnel regarding proper locked device manipulation is being developed. The first cycle of recurring training will be completed by April, 1998.
A process will be created to periodically sample a portion of the locked devices and ensure they are properly locked. This process will be in place by the end of December, 1997.
Commitment revised as follows:
Removed requirement to periodically sample a portion of locked devices to ensure they area properly locked.
Justification for change:
The commitment was a Limerick-specific commitment as a result of a 1997 NOV where several valves were found not adequately chained and locked to prevent movement. The fleet governance contained in OP-AA-108-103, LOCKED EQUIPMENT PROGRAM, does not require periodic verification of all locked devices at Constellation plants; it only requires quarterly audits of the locked device log. This is accomplished at Limerick under recurring task RT-6-000-909-0.
A review of the RTs for the locked valves back to 2011 has not identified any issues of devices being found not locked correctly. The commitment for performance of recurring training has been effective in ensuring personnel understand the importance of maintaining locked devices appropriately locked. In addition, current Human Performance Tools and the requirements of OP-AA-108-103 require an independent verification of restored locked devices after manipulation, ensuring they are returned to the proper configuration.