©2024 Westinghouse Electric Company LLC. All Rights Reserved Westinghouse Electric Company 1000 Westinghouse Drive Cranberry Township, Pennsylvania 16066 USA Mr. Jerry Segner Principal Project Manager Constellation Energy Generation, LLC Limerick Generating Station 3146 Sanatoga Road Pottstown, PA 19464 jerry.segner@constellation.com Direct Telephone:
(860) 731-6260 E-mail:
shakunma@westinghouse.com Contract:
00800304 Sales Order:
156102 Our Ref:
LIM-24-090, Revision 0 June 18, 2024 CONSTELLATION ENERGY GENERATION LIMERICK UNITS 1 AND 2 DIGITAL MODERNIZATION PROJECT Submittal of Limerick PPS LAR Proprietary and Non-Proprietary Documents
Dear Mr. Segner:
The purpose of this letter is to provide proprietary and non-proprietary versions of documents that were previously submitted to the NRC on the Limerick docket to support the PPS Upgrade LAR.
The documents do not contain any technical changes from the versions that were previously submitted; only the proprietary redactions were updated. Please note, during the preparation of EQ-QR-433-GLIM, it was discovered that Figure 2.2-1 was erroneously deleted from Revision 2 to Revision 3. Therefore, Revision 4 was created to add the figure back, and it will be provided in this submittal.
Attachments:
1.
EQ-EV-386-GLIM-P, Revision 2, Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements (Proprietary) 2.
EQ-EV-386-GLIM-NP, Revision 2, Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements (Non-Proprietary) 3.
EQ-QR-433-GLIM-P, Revision 4, Qualification Summary Report for the Plant Protection System Upgrade for Limerick Units 1 & 2 (Proprietary) 4.
EQ-QR-433-GLIM-NP, Revision 4, Qualification Summary Report for the Plant Protection System Upgrade for Limerick Units 1 & 2 (Non-Proprietary) 5.
APP-GW-GLR-611-P, Revision 3, ITAAC 2.5.02.14: Component Interface Module Design Process Technical Report (Proprietary) 6.
APP-GW-GLR-611-NP, Revision 3, ITAAC 2.5.02.14: Component Interface Module Design Process Technical Report (Non-Proprietary)
Westinghouse Non-Proprietary Class 3
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Westinghouse Non-Proprietary Class 3 Page 2 of 2 Our Ref: LIM-24-090, Revision 0 Electronically Approved Records Are Authenticated in the Electronic Document Management System If you have any questions or require additional information regarding this transmittal, please feel free to contact me at (860) 731-6260.
Sincerely, WESTINGHOUSE ELECTRIC COMPANY LLC Electronically Approved Matthew Shakun Principal Licensing Engineer cc: Constellation Energy Steven Hesse steven.hesse@constellation.com Kayla Marriner kaylalover.marriner@constellation.com Zina Gavin zina.gavin@constellation.com Mark Samselski mark.samselski@constellation.com David Molteni david.molteni@constellation.com Ashley Rickey ashley.rickey@constellation.com Frank Mascitelli francis.mascitelli@constellation.com Westinghouse Electric Company LLC Courtney Frank Westinghouse Parastoo Muse Westinghouse Boyan Setchenski Westinghouse Andrew Lutz Westinghouse Steve Merkiel Westinghouse Andrew Barth Westinghouse Cynthia Olesky Westinghouse Warren Odess-Gillett Westinghouse
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Westinghouse Non-Proprietary Class 3 Westinghouse Electric Company 1000 Westinghouse Drive Cranberry Township, PA 16066
© 2024 Westinghouse Electric Company LLC All Rights Reserved EQ-EV-386-GLIM-NP, Revision 2, Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements (Non-Proprietary)
LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
© 2022 Westinghouse Electric Company LLC All Rights Reserved Westinghouse Non-Proprietary Class 3 Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 Nuclear Safety Related September 2022 APPROVALS Function Name and Signature Authors Daniel W. Martin*
Principal Engineer, Qualification Operations Verifier Jonathan W. Drexler*
Principal Engineer, Qualification Operations Reviewer Robert W. Beasley*
Senior Engineer, Safety & Reactor Systems Engineering Approver Jason E. Mears* for Dante Mincin**
Manager, Qualification Operations
- Electronically approved records are authenticated in the electronic document management system.
- LTR-EQ-22-8 LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 i
Westinghouse Non-Proprietary Class 3 Template Version 0.2 LIST OF CONTRIBUTORS Revision Name and Title 0
None.
1, 2 Jennifer E. Moon Principal Engineer, Qualification Operations Suresh Channarasappa Consulting Engineer, Global Instrumentation and Control LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 ii Westinghouse Non-Proprietary Class 3 REVISION HISTORY RECORD OF CHANGES Revision Author(s)
Description Completed 0
Jonathan W. Drexler Jennifer E. Moon Original Issue.
3/7/2022 1
Daniel W. Martin Revised to incorporate NE-402, Rev.2 Added Reference to WCAP-16097-P, EQLR-232, and EPRI TR-102323-R4 and renumbered reference list.
Section 2.1: Clarified spectra included NE-402 as bounding in-equipment requirements.
Section 2.2: Updated environmental parameters Section 3.1: Removed evaluation of IERS as the basis for seismic qualification Section 3.2: Added reference to previous test program (EQLR-232) and clarified conclusion of qualification basis for mild environment.
Section 4.2: Added clarification that any additional requirements will be included in the final EQ summary report Section 5: Revised entire section.
No technical changes were made to EMC sections.
8/30/2022 2
Daniel W. Martin Revised to incorporate customer comments.
Updated Section 2.2, 3.2, and 5.
Removed Reference 8 and Table 2.2-2 Minor editorial changes made throughout.
Changed marked with revision bars.
No technical changes were made to EMC and Seismic sections.
See EDMS OPEN ITEMS Item Description Status None.
LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 iii Westinghouse Non-Proprietary Class 3 TABLE OF CONTENTS Section Title Page LIST OF CONTRIBUTORS.......................................................................................i REVISION HISTORY................................................................................................ii TABLE OF CONTENTS.............................................................................................iii LIST OF TABLES.......................................................................................................iv LIST OF FIGURES.....................................................................................................iv ACRONYMS AND TRADEMARKS.........................................................................v GLOSSARY OF TERMS............................................................................................vi REFERENCES............................................................................................................x SECTION 1 INTRODUCTION.......................................................................................................1-1 SECTION 2 LIMERICK QUALIFICATION REQUIREMENTS..................................................2-1 2.1 SEISMIC......................................................................................................................2-1 2.2 ENVIRONMENTAL...................................................................................................2-4 2.3 ELECTROMAGNETIC COMPATIBILITY..............................................................2-5 SECTION 3 ASSESSMENT OF QUALIFICATION......................................................................3-1 3.1 SEISMIC......................................................................................................................3-1 3.2 ENVIRONMENTAL...................................................................................................3-5 3.3 EMC.............................................................................................................................3-6 SECTION 4 INSTALLATION REQUIREMENTS AND MAINTENANCE, SURVEILLANCE, AND REPLACEMENT PROGRAM..........................................4-1 4.1 INSTALLATION LIMITATIONS..............................................................................4-1 4.2 MAINTENANCE, SURVEILLANCE, AND REPLACEMENT PROGRAM...........4-1 SECTION 5
SUMMARY
.................................................................................................................5-1 LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 iv Westinghouse Non-Proprietary Class 3 TABLE OF CONTENTS (cont.)
LIST OF TABLES Table Title Page Table 2.2-1.
[
]a,c..........................................................................................................2-4 Table 3.1-1.
[
]a,c.........................................3-4 Table 3.3-1.
[
]a,c...................................3-7 Table 3.3-2.
Test Standard Comparison...........................................................................................3-8 Table 3.3-3.
Emissions Comparison................................................................................................3-10 Table 3.3-4.
Susceptibility Comparison - Conducted Disturbances................................................3-20 Table 3.3-5.
Susceptibility Comparison - Surge Withstand Capability Disturbances.....................3-21 Table 3.3-6.
Susceptibility Comparison - Radiated Field Immunity Disturbances.........................3-23 Table 3.3-7.
[
]a,c..................................................3-25 LIST OF FIGURES Figure Title Page Figure 2.1-1.
Limerick SSE FRS at Elevation 269..........................................................................2-2 Figure 2.1-2.
Limerick SSE FRS at Elevation 289..........................................................................2-3 Figure 3.1-1.
Comparison of Limerick SSE FRS at Elevation 269 to JID:2312-R SSE TRS.........3-2 Figure 3.1-2.
Comparison of Limerick SSE FRS at Elevation 289 to JID:2312-R SSE TRS.........3-3 Figure 3.3-1.
Low Frequency Conducted Emissions Test Limit (CE101) - U.S. NRC RG 1.180, Revision 1.........................................................................................................3-11 Figure 3.3-2.
Low Frequency Conducted Emissions Test Limit (CE101) - U.S. NRC RG 1.180, Revision 2.........................................................................................................3-12 Figure 3.3-3.
Low Frequency Conducted Emissions Test Limit (CE101) - EPRI TR-102323, Revision 4....................................................................................................................3-13 Figure 3.3-4.
High Frequency Conducted Emissions Test Limit (CE102) - U.S. NRC RG 1.180, Revision 1 and Revision 2................................................................................3-14 Figure 3.3-5.
High Frequency Conducted Emissions Test Limit (CE102) - EPRI TR-102323, Revision 4....................................................................................................................3-15 Figure 3.3-6.
Low Frequency Radiated Emissions Test Limit (RE101) - U.S. NRC RG 1.180, Revision 1 and Revision 2................................................................................3-16 Figure 3.3-7.
Low Frequency Radiated Emissions Test Limit (RE101) - EPRI TR-102323, Revision 4....................................................................................................................3-17 Figure 3.3-8.
High Frequency Radiated Emissions Test Limit (RE102) - U.S. NRC RG 1.180, Revision 1 and Revision 2................................................................................3-18 Figure 3.3-9.
High Frequency Radiated Emissions Test Limit (RE102) - EPRI TR-102323, Revision 4....................................................................................................................3-19 LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 v
Westinghouse Non-Proprietary Class 3 ACRONYMS AND TRADEMARKS Acronyms used in the document are defined below to ensure unambiguous understanding of their use within this document.
Acronym Definition cont.
Continued DBA Design Basis Accident DBE Design Basis Event EMC Electromagnetic Compatibility EMI Electromagnetic Interference EMI/RFI Electromagnetic Interference/Radio Frequency Interference EPRI Electric Power Research Institute EQ Equipment Qualification ESD Electrostatic Discharge EUT Equipment Under Test F
Fahrenheit g
Free-Fall, Gravity, Acceleration Hz Hertz LOCA Loss-of-Coolant Accident NRC Nuclear Regulatory Commission OBE Operating Basis Earthquake PPS Plant Protection System Ref.
Reference RRS Required Response Spectra SSE Safe Shutdown Earthquake TID Total Integrated Dose TRS Test Response Spectra WCAP Westinghouse Commercial Atomic Power ZPA Zero Period Acceleration All product and corporate names used in this document may be trademarks or registered trademarks of other companies, and are used only for explanation and to the owners benefit, without intent to infringe.
LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 vi Westinghouse Non-Proprietary Class 3 GLOSSARY OF TERMS Standard terms used in the document are defined below to ensure unambiguous understanding of their use within this document.
Term Definition Class 1E The safety classification of electric equipment and systems that are essential to emergency reactor shutdown, containment isolation, reactor core cooling and containment and reactor heat removal that are otherwise essential in preventing significant release of radioactive material to the environment.
Damping An energy dissipation mechanism that reduces the amplification and broadens the vibratory response in the region of response. Damping is usually expressed as a percentage of critical damping. Critical damping is defined as the least amount of viscous damping that causes a single-degree-of-freedom-system to return to its original position without oscillation after initial disturbance.
Design Basis Accident (DBA) Those plant conditions resulting from various postulated equipment and piping failures during which safety-related equipment shall operate without impairment of the safety-related function in a harsh environment. A design basis accident is a subset of a design basis event.
Design Basis Event (DBE)
Any of the events specified in the stations safety analysis that are used to establish the acceptable performance for safety functions: events include anticipated transients, design basis accidents, external events, and natural phenomena.
Electromagnetic The ability of an equipment or system to function satisfactorily Compatibility (EMC) in its electromagnetic environment without introducing intolerable electromagnetic disturbances to anything in that environment.
Electromagnetic Electromagnetic disturbance which manifests itself in performance Interference (EMI) degradation, malfunction, or failure of electrical or electronic equipment.
Electrostatic Discharge (ESD) Refers to static electricity discharge.
Floor Acceleration The acceleration of a particular building floor (or equipment mounting) resulting from the motion of a given earthquake. The maximum floor acceleration is the zero period acceleration of the floor response spectrum.
LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 vii Westinghouse Non-Proprietary Class 3 GLOSSARY OF TERMS (cont.)
Term Definitions Functionality Ability of an active component or equipment to perform the mechanical and electrical motion required to fulfill its specified function when subjected to the prescribed service conditions.
Harsh Environment An environment expected as a result of the postulated service conditions appropriate for the design basis and post-design basis accidents of the station.
Maintenance Work performed on an item to keep it operable or restore it to operable condition.
Mild Environment An environment expected as a result of normal service conditions and extremes (abnormal) in-service conditions where seismic is the only design basis event of consequence.
Natural Frequency The frequency(s), at which body vibrates due to its own physical characteristics (mass and stiffness) when the body is distorted in a specific direction and then released.
Non-Safety Related Equipment that is not relied upon to perform a nuclear safety function.
Non-Seismic Category Non-Seismic Category applies to systems and components that are not designed for seismic loads. The anchorage of non-seismic systems and components shall be designed, using acceptance criteria for commercial structures, for equivalent static horizontal accelerations applied at the center of mass of the system or component.
Octave A frequency ratio of 2 to 1. One decade equals 3.32 octaves.
Operating Basis Earthquake An earthquake that could reasonably be expected to occur at the plant (OBE) site during the operating life of the plant considering the regional and local geology and seismology and specific characteristics of local subsurface material. It is that earthquake that produces the vibratory ground motion for which those features of nuclear power plant, necessary for continued operation without undue risk to the health and safety of the public, are designed to remain functional.
Power Spectral Density (PSD) The mean squared amplitude per unit frequency of a waveform. PSD is expressed in g2/Hz versus frequency for acceleration waveforms.
LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 viii Westinghouse Non-Proprietary Class 3 GLOSSARY OF TERMS (cont.)
Term Definitions Qualification The generation and maintenance of evidence to demonstrate that the equipment shall operate on demand to meet the system performance requirements.
Qualified Life The period of time prior to the start of a design basis event for which the equipment was demonstrated to meet the design requirements for the specified service conditions. The determination of qualified life shall consider potential aging mechanisms resulting from significant in-service thermal, radiation, and vibration sources and the effects of operational cycling (mechanical, electrical or both).
Required Response Spectrum The response spectrum issued by the user or agent as part of the (RRS) equipment specifications for seismic qualification purposes. The RRS is a plot of acceleration versus frequency describing the energy content of the earthquake time history. The RRS constitutes a requirement to be met during qualification activities.
Resonant Frequency A frequency at which a response peak occurs in a system subjected to forced vibration. This frequency is accompanied by a phase shift of response relative to the excitation.
Response Spectrum A plot of the maximum response, as a function of oscillator frequency, of an array of single-degree-of-freedom damped oscillators subjected to the same base excitation.
Safe Shutdown Earthquake An earthquake that is based on an evaluation of the maximum earthquake (SSE) potential considering the regional and local geology and seismology and specific characteristic of local subsurface materials. It is that earthquake that produces the maximum vibratory ground motion for which certain structures, systems, and components are designed to remain functional.
These structures are those defined as safety-related.
Safety Function One of the processes or conditions (e.g., emergency negative insertion, post-accident heat removal, emergency core cooling, and post-accident radioactivity removal and containment isolation) essential to maintain plant parameters within acceptable limits established for a design basis event.
LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 ix Westinghouse Non-Proprietary Class 3 GLOSSARY OF TERMS (cont.)
Term Definitions Safety-Related Equipment that is relied upon to remain functional during and following design basis event to ensure the integrity of the reactor coolant pressure boundary; the capability to shut down the reactor and maintain it in a safe shutdown condition; and, the capability to prevent or mitigate the consequences of accidents that could result in potential off-site exposures comparable to the 10CFR Part 50.34 or 100.11 guidelines.
Seismic Category I A classification of structures, systems and components that shall be designed to withstand the effects of the SSE and maintain the specified design function and integrity.
Seismic Category II Non-safety-related equipment whose continued function is not required but whose failure could reduce the functioning of adjacent safety-related Seismic Category I equipment to an unacceptable level. This equipment shall be designed to withstand the effects of the SSE and maintain its structural integrity so that such failure shall not occur.
Service Conditions Environmental, loading, power and signal conditions expected as a result of normal operating requirements, expected extremes (abnormal) in operating requirements and postulated conditions appropriate for the design basis events of the plant.
Structural Integrity A condition describing an assembly or grouping of equipment relative to their ability to carry applicable loads within the limits of acceptable structural behavior.
Test Response Spectrum The response spectrum that is developed from the actual time history of (TRS) motion of the shake table.
Zero Period Acceleration The acceleration level of high frequency, non-amplified portion of the (ZPA) response spectrum. This acceleration corresponds to the maximum peak acceleration of the time history used to derive the response spectrum.
LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 x
Westinghouse Non-Proprietary Class 3 REFERENCES Following is a list of references used throughout this document.
- 1.
Constellation (Exelon) Specification NE-402, Revision 2, Plant Protection System (PPS)
Performance Specification.
- 2.
Westinghouse Drawing 10172D13, Revision (see ECO-20-01098-32), Limerick PPS Project PBOM. (Westinghouse Proprietary)
- 3.
Westinghouse Document, WCAP-16097-P-A, Revision 5, Common Qualified Platform Topical Report, May 2021. (Westinghouse Proprietary)
- 4.
Westinghouse Document, WCAP-17415-P, Revision 1, Addendum to Summary Qualification Report of Hardware Testing for Common Q Applications, September 2019. (Westinghouse Proprietary)
- 5.
Westinghouse Document EQ-MR-13-GLIM, Revision 0, Equipment Qualification Strategy and Plan for the Plant Protection System Upgrade, September 2022. (Westinghouse Proprietary)
- 6.
Constellation (Exelon) Document LS-0192, Revision 0, Dynamic Qualification Requirements for Control Room Panels, March 2, 1998. (attached)
- 7.
Constellation (Exelon) Document A1656919 E13, Seismic RRS (Required Response Spectra)
Curves for Aux Equipment Room Control Panels at EL 289 of Control Building/Structure, May 30, 2008. (attached)
- 8.
Not Used.
- 9.
EPRI Technical Report, TR-102323, Revision 4, Guidelines for Electromagnetic Interference Testing in Power Plants, September 2016.
- 10.
U.S. NRC Regulatory Guide 1.180, Revision 1, Guidelines for Evaluating Electromagnetic and Radio-Frequency Interference in Safety-Related Instrumentation and Control Systems, October 2003.
- 11.
Westinghouse Document JID:2312-R, Revision 0, Seismic Test for the Westinghouse Electric Company Three (3) AP1000 PMS Pentair Cabinets, June 2013. (Westinghouse Proprietary)
- 12.
Westinghouse Document, EQLR-232, Revision 0, Environmental Test Report for the AP1000 Protection and Safety Monitoring System and Nuclear Instrumentation System Auxiliary Panels, November 2012. (Westinghouse Proprietary)
- 13.
Westinghouse Document EQ-QR-252-APP, Revision 0, AP1000 Plant Protection and Safety Monitoring System Pentair Cabinets Seismic Qualification Report, August 2013. (Westinghouse Proprietary)
LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 xi Westinghouse Non-Proprietary Class 3
- 14.
Department of Defense Interface Standard, MIL-STD-461, Requirements for the Control of Electromagnetic Interference Characteristic of Subsystems and Equipment, Applicable revision identified in text.
- 15.
Oak Ridge National Laboratory Technical Report, ORNL/SPR-2016/108-R2, Technical Basis for Electromagnetic Compatibility Regulatory Guidance Update, July 2017.
- 16.
Commercial Standard, IEC 61000-4-6, Electromagnetic Compatibility (EMC) - Part 4: Testing and Measurement Techniques, Section 6: Immunity to Conducted Disturbances, Induced by Radio Frequency Fields, See text for applicable year of issue.
- 17.
Commercial Standard, IEC 61000-4-131, Electromagnetic Compatibility (EMC) - Part 4: Testing and Measurement Techniques, Section 13: Immunity to Harmonics and Interharmonics, See text for applicable year of issue.
- 18.
Commercial Standard, IEC 61000-4-16, Electromagnetic Compatibility (EMC) - Part 4: Testing and Measurement Techniques, Section 16: Test for Immunity to Conducted, Common Mode Disturbances in the Frequency Range 0 Hz to 150 kHz, See text for applicable year of issue.
- 19.
Commercial Standard, IEC 61000-4-4, Electromagnetic Compatibility (EMC) - Part 4: Testing and Measurement Techniques, Section 4: Electrical Fast Transient/Burst Immunity Test, See text for applicable year of issue.
- 20.
Commercial Standard, IEC 61000-4-5, Electromagnetic Compatibility (EMC) - Part 4: Testing and Measurement Techniques, Section 5: Surge Immunity Test, See text for applicable year of issue.
- 21.
Commercial Standard, IEC 61000-4-122, Electromagnetic Compatibility (EMC) - Part 4: Testing and Measurement Techniques, Section 12: Oscillatory Waves Immunity Tests, See text for applicable year of issue.
- 22.
Commercial Standard, IEC 61000-4-18, Electromagnetic Compatibility (EMC) - Part 4: Testing and Measurement Techniques, Section 18: Damped Oscillatory Wave Imunity Test, See text for applicable year of issue.
- 1. The 1998 version of IEC 61000-4-13 referenced in U.S. NRC Regulatory Guide 1.180 (Reference 10) does not exist since no version of this standard was issued in 1998. Therefore, it is assumed that the U.S. NRC had access to a draft copy of IEC 61000-4-13 when the U.S. NRC Regulatory Guide was released, and that the intended version to be referenced was the first version that was issued after 1995. The resulting version, IEC 61000-4-13:2002 (Reference 17), is referenced herein in order to satisfy the intent of Reference 10.
- 2. The 1996 version of IEC 61000-4-12 referenced in U.S. NRC Regulatory Guide 1.180 (Reference 10) does not exist. It is assumed that the U.S. NRC intended to reference the 1995 version of IEC 61000-4-12.
LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 xii Westinghouse Non-Proprietary Class 3
- 23.
Commercial Standard, IEC 61000-4-3, Electromagnetic Compatibility (EMC) - Part 4: Testing and Measurement Techniques, Section 3: Radiated, Radio-Frequency, Electromagnetic Field Immunity Test, See text for applicable year of issue.
- 24.
Commercial Standard, IEC 61000-4-8, Electromagnetic Compatibility (EMC) - Part 4: Testing and Measurement Techniques, Section 8: Power Frequency Magnetic Field Immunity Test, See text for applicable year of issue.
- 25.
Commercial Standard, IEC 61000-4-9, Electromagnetic Compatibility (EMC) - Part 4: Testing and Measurement Techniques, Section 9: Pulse Magnetic Field Immunity Test, See text for applicable year of issue.
- 26.
Commercial Standard, IEC 61000-4-10, Electromagnetic Compatibility (EMC) - Part 4: Testing and Measurement Techniques, Section 10: Damped Oscillatory Magnetic Field Immunity Test, See text for applicable year of issue.
- 27.
Commercial Standard, IEC 61000-4-2, Electromagnetic Compatibility (EMC) - Part 4: Testing and Measurement Techniques, Section 2: Electrostatic Discharge Immunity Test, See text for applicable year of issue.
(Last Page of Front Matter)
LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 1-1 Westinghouse Non-Proprietary Class 3 SECTION 1 INTRODUCTION Limerick PPS upgrade is implemented using previously qualified Common Q platform and other qualified equipment. An interim evaluation, prior to completion of formal plant specific qualification is documented in this report. The intent of this evaluation is to establish a confidence level that the previously qualified equipment is within the Constellation specification NE-402 (Reference 1) requirements for the Plant Protection System (PPS) digital modernization project. This evaluation does not address site specific PPS hardware configuration or installation requirements. The equipment being provided to Limerick Generating Station Units 1 and 2 for the PPS digital modernization project is identified by Westinghouse drawing 10172D13 (Reference 2).
The basic objectives for qualification of safety-related equipment are:
To reduce the potential for common mode failure due to environmental effects.
To demonstrate that the safety-related equipment is capable of performing its designated safety function during and after a Design Basis Event (DBE).
The seismic, environmental, and Electromagnetic Compatibility (EMC) qualification of the safety-related Common Q equipment documented by WCAP-16097-P-A (Reference 3) and WCAP-17415-P (Reference 4) is based on a combination of test and analysis.
The Equipment Qualification (EQ) strategy and plan for the PPS digital modernization project is documented by EQ-MR-13-GLIM (Reference 5). Section 2.3 of EQ-MR-13-GLIM (Reference 5) discusses that the goals of this EQ comparison to the previously qualified equipment are to show that the existing qualification can envelop the Limerick requirements. Additional/Subsequent analyses will be performed to ensure that the previous qualification is applicable for the PPS at Limerick Units 1&2.
(Last Page of Section 1)
LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 2-1 Westinghouse Non-Proprietary Class 3 SECTION 2 LIMERICK QUALIFICATION REQUIREMENTS 2.1 SEISMIC
[
]a,c LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 2-2 Westinghouse Non-Proprietary Class 3 Figure 2.1-1.
Limerick SSE FRS at Elevation 269 0.1 1
10 1
10 100 Acceleration (g)
Frequency (Hz)
Limerick SSE FRS for Elevation 269 1% damping Horizontal Vertical LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 2-3 Westinghouse Non-Proprietary Class 3 Figure 2.1-2.
Limerick SSE FRS at Elevation 289 0.1 1
10 1
10 100 Acceleration (g)
Frequency (Hz)
Limerick SSE FRS for Elevation 289 1% damping Horizontal Vertical LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 2-4 Westinghouse Non-Proprietary Class 3 2.2 ENVIRONMENTAL
]a,c Table 2.2-1.
[
]a,c
[
]a,c a,c LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 2-5 Westinghouse Non-Proprietary Class 3 2.3 ELECTROMAGNETIC COMPATIBILITY
[
]a,c (Last Page of Section 2)
(Last Page of Section 2)
LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 3-1 Westinghouse Non-Proprietary Class 3 SECTION 3 ASSESSMENT OF QUALIFICATION 3.1 SEISMIC
[
]a,c LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 3-2 Westinghouse Non-Proprietary Class 3 Figure 3.1-1.
Comparison of Limerick SSE FRS at Elevation 269 to JID:2312-R SSE TRS 0.10 1.00 10.00 100.00 1
10 100 Acceleration (g)
Frequency (Hz)
Limerick SSE FRS for Elevation 269 Compared to JID:2312-R SSE TRS 5% damping Horizontal Vertical JID:2312-R a1 FB SSE TRS JID:2312-R a2 SS SSE TRS JID:2312-R V SSE TRS LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 3-3 Westinghouse Non-Proprietary Class 3 Figure 3.1-2.
Comparison of Limerick SSE FRS at Elevation 289 to JID:2312-R SSE TRS 0.10 1.00 10.00 100.00 1
10 100 Acceleration (g)
Frequency (Hz)
Limerick SSE FRS for Elevation 289 Compared to JID:2312-R SSE TRS 5% damping Horizontal Vertical JID:2312-R a1 FB SSE TRS JID:2312-R a2 SS SSE TRS JID:2312-R V SSE TRS LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
LIM-24-090, Revision 0, Attachment 2 Limerick Units 1 and 2 Table 3.1-1.
EQ-EV-386-GLIM-NP, Rev. 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements
)a,c 3-4 Westinghouse Non-Proprietary Class 3 a,c
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 3-5 Westinghouse Non-Proprietary Class 3 3.2 ENVIRONMENTAL The Common Q platform equipment to be installed at Limerick is in a mild environment. A mild environment is an environment expected as a result of normal service conditions and extremes (abnormal) in service conditions where seismic is the only design basis event (DBE) of consequence.
When the equipment in installed in a mild environment where no significant aging mechanism exist, a design life is specified in lieu of a qualified life and the equipment reliability is managed through maintenance and surveillance activities.
The Common Q platform is comprised of commercial off-the-shelf components which are commercially dedicated for nuclear safety applications. [
]a,c
- 1. WCAP-16097-P-A (Reference 3) and WCAP-17415-P (Reference 4) identify the environmental test profile used for generic qualification of Common Q equipment located in a mild environment. [
]a,c LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 3-6 Westinghouse Non-Proprietary Class 3
[
]a,c 3.3 EMC The Common Q platform equipment were required to be qualified in accordance with the requirements of U.S. NRC Regulatory Guide 1.180 Revision 1 (Reference 10) for emissions and susceptibility. [
]a,c EMC for the Limerick PPS configuration shall be performed by type test to meet the requirements of EPRI TR-102323, Revision 4 and U.S. NRC Regulatory Guide 1.180, Revision 2. [
]a,c LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
LIM-24-090, Revision 0, Attachment 2 Limerick Units 1 and 2 Table 3.3-1.
EQ-EV-386-GLll"\1-NP, Rev. 2 3-7 Comparison of Equipment Qualification Hardware Testing fo1* Common Q Applications to Limerick Requirements Westinghouse Non-Proprietary Class 3 a,c
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 3-8 Westinghouse Non-Proprietary Class 3 Table 3.3-2.
Test Standard Comparison Susceptibility Tests Emission Tests Conducted IEC 61000-4-x Radiated IEC 61000-4-x MIL-STD-461E (supplemental)
IEC 61000-Conducted MIL-STD-461E Radiated MIL-STD-461E Low Frequency High Frequency Low Frequency High Frequency Surge EFT ESD Low Frequency High Frequency Low Frequency High Frequency EPRI TR-102323 Revision 4 (Safety-Related )
61000-4-13 61000-4-16 61000-4-6 61000-4-8 61000-4-9 61000-4-10 61000-4-3 4-5 4-12 4-18 4-4 4-2 CE101 CE102 RE101 RE102 U.S. NRC RG 1.180 Revision 1 61000-4-13 61000-4-16 61000-4-6 61000-4-8 61000-4-9 61000-4-10 61000-4-3 RS103 4-5 4-12 4-4 4-2 CE101 CE102 RE101 RE102 LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 3-9 Westinghouse Non-Proprietary Class 3
[
]a,c Emissions:
[
]a,c Technical report ORNL/SPR-2016/108-R2 (Reference 15) was commissioned by the U.S. Department of Energy to provide the U.S. NRC the technical basis for revising Regulatory Guide1.180. Reference 15 includes comparisons of MIL-STD-461E, MIL-STD-461F, and MIL-STD-461G military standards. The review concluded that MIL-STD-461F had no change of significance from the MIL-STD-461E test methods; most of the changes were refinements to improve test outcomes. Similarly, the review concluded that MIL-STD-461G had no change of significance from the MIL-STD-461F or MIL-STD-461E test methods. Therefore, other than subtle changes implemented to improve the test methods, MIL-STD-461G and MIL-STD-461E are concluded to be comparable.
LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 3-10 Westinghouse Non-Proprietary Class 3 Table 3.3-3.
Emissions Comparison Description Method U.S. NRC Regulatory Guide 1.180 EPRI TR-102323 Revision 4 Revision 1 Revision 2 Low Frequency Conducted Emissions MIL-STD-461 MIL-STD-461E, CE101 30 Hz to 10 kHz(1)
Figure 3.3-1(2)
MIL-STD-461E, CE101 30 Hz to 10 kHz(1)
AC - 2nd power frequency to 10 kHz MIL-STD-461, CE101 DC 30 Hz-10 kHz(1)
AC - 2nd power frequency to 10 kHz Figure 3.3-3(2)
High Frequency Conducted Emissions MIL-STD-461 MIL-STD-461E, CE102 10 kHz to 2 MHz(3)
Figure 3.3-4 MIL-STD-461E, CE102 10 kHz to 10 MHz(4)
Figure 3.3-4 MIL-STD-461, CE102 10 kHz to 10 MHz Figure 3.3-5 Low Frequency Radiated Emissions MIL-STD-461 MIL-STD-461E, RE101 30 Hz to 100 kHz Figure 3.3-6 MIL-STD-461E, RE101 30 Hz to 100 kHz Figure 3.3-6 MIL-STD-461, RE101 30 Hz to 100 kHz Figure 3.3-7 High Frequency Radiated Emissions MIL-STD-461 MIL-STD-461E, RE102 2 MHz to 10 GHz Figure 3.3-8 MIL-STD-461E, RE102 2 MHz to 10 GHz Figure 3.3-8 MIL-STD-461, RE102 2 MHz to 10 GHz Figure 3.3-9 Notes:
- 1. This test may be omitted for equipment where 1) the power quality requirements2 of the equipment are consistent with the existing power supply and design changes include power quality controls and 2) the equipment will not impose additional harmonic distortion on the existing power distribution system that exceed 5% total harmonic distortion (THD) or other power quality criteria established with a valid technical basis.
- 2. For AC-operated equipment with a fundamental current greater than 1A, the limit may be relaxed using dB relaxation = 20 log (fundamental current).
- 3. Same exemption as CE101 allowed (Note 1) up to 450 kHz.
- 4. Same exemption as CE101 allowed (Note 1) up to 150 kHz.
LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 3-11 Westinghouse Non-Proprietary Class 3 Figure 3.3-1. Low Frequency Conducted Emissions Test Limit (CE101) - U.S. NRC RG 1.180, Revision 1 LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 3-12 Westinghouse Non-Proprietary Class 3 Figure 3.3-2. Low Frequency Conducted Emissions Test Limit (CE101) - U.S. NRC RG 1.180, Revision 2 LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 3-13 Westinghouse Non-Proprietary Class 3 (Figure 5-4 from EPRI TR-102323, Revision 4)
Figure 3.3-3. Low Frequency Conducted Emissions Test Limit (CE101) - EPRI TR-102323, Revision 4 LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 3-14 Westinghouse Non-Proprietary Class 3 Figure 3.3-4. High Frequency Conducted Emissions Test Limit (CE102) - U.S. NRC RG 1.180, Revision 1 and Revision 2 LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 3-15 Westinghouse Non-Proprietary Class 3 (Figure 5-5 from EPRI TR-102323, Revision 4)
Figure 3.3-5. High Frequency Conducted Emissions Test Limit (CE102) - EPRI TR-102323, Revision 4 LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 3-16 Westinghouse Non-Proprietary Class 3 Figure 3.3-6. Low Frequency Radiated Emissions Test Limit (RE101) - U.S. NRC RG 1.180, Revision 1 and Revision 2 LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 3-17 Westinghouse Non-Proprietary Class 3 (Figure 5-6 from EPRI TR-102323, Revision 4)
Figure 3.3-7. Low Frequency Radiated Emissions Test Limit (RE101) - EPRI TR-102323, Revision 4 LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 3-18 Westinghouse Non-Proprietary Class 3 Figure 3.3-8. High Frequency Radiated Emissions Test Limit (RE102) - U.S. NRC RG 1.180, Revision 1 and Revision 2 LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 3-19 Westinghouse Non-Proprietary Class 3 (Figure 5-7 from EPRI TR-102323, Revision 4)
Figure 3.3-9. High Frequency Radiated Emissions Test Limit (RE102) - EPRI TR-102323, Revision 4 LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 3-20 Westinghouse Non-Proprietary Class 3 Susceptibility - Conducted
[
]a,c Table 3.3-4.
Susceptibility Comparison - Conducted Disturbances Description Test Standard Category U.S. NRC Regulatory Guide 1.180 Revision 1/Revision 2 EPRI TR-102323 Revision 4 Disturbances induced by radio-frequency fields Commercial IEC 61000-4-6 (1996/2013) 150 kHz to 80 MHz Test Level 3 (140 dBµV)
(Reference 16)
[
]a,c Conducted susceptibility, low frequency Commercial IEC 61000-4-13 (2002/2015) 16 Hz to 2.4 kHz Class 2 (Reference 17)
[
]a,c Commercial IEC 61000-4-16 (1998/2011) 15 Hz to 150 kHz Level 3 (Reference 18)
[
]a,c
[
]a,c LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 3-21 Westinghouse Non-Proprietary Class 3 Susceptibility - Surge Withstand Capability
[
]a,c Table 3.3-5.
Susceptibility Comparison - Surge Withstand Capability Disturbances Description Method U.S. NRC Regulatory Guide 1.180 Revision 1/Revision 2 EPRI TR-102323 Revision 4 Electrically Fast Transients/Bursts Commercial IEC 61000-4-4 (1995/2012)
[
]a,c
[
]a,c Surges Commercial IEC 61000-4-5 (1995/2014)
[
]a,c
[
]a,c 100 kHz ring wave Commercial IEC 61000-4-12 (1996/2006)
[
]a,c
[
]a,c
[
]a,c
[
]a,c
[
]a,c
[
]a,c
[
]a,c
[
LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 3-22 Westinghouse Non-Proprietary Class 3
]a,c Susceptibility - Radiated Field Immunity
[
]a,c LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 3-23 Westinghouse Non-Proprietary Class 3 Table 3.3-6.
Susceptibility Comparison - Radiated Field Immunity Disturbances Description Method U.S. NRC Regulatory Guide 1.180 Revision 1/Revision 2 EPRI TR-102323 Revision 4 Radiated Susceptibility, Electric Field Commercial IEC 61000-4-3 (1995/2010) 26 MHz to 1 GHz(1) 26 MHz to 6 GHz(2)
[
]a,c
[
]a,c Military MIL-STD-461E/G, RS103 30 MHz to 10 GHz
[
]a,c
[
]a,c Magnetic Field Immunity(5)
Commercial IEC 61000-4-8 (1993/2009) 50 Hz/60 Hz
[
]a,c
[
]a,c Commercial IEC 61000-4-9 (1993/2001) 50/60 Hz to 50 kHz
[
]a,c
[
]a,c Commercial IEC 61000-4-10 (1993/2001) 100 kHz and 1 MHz
[
]a,c
[
]a,c
[
]a,c LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 3-24 Westinghouse Non-Proprietary Class 3
[
]a,c LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 3-25 Westinghouse Non-Proprietary Class 3 Susceptibility - Electrostatic Discharge
[
]a,c Table 3.3-7.
[
]a,c
[
]a,c (Last Page of Section 3) a,c LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 4-1 Westinghouse Non-Proprietary Class 3 SECTION 4 INSTALLATION REQUIREMENTS AND MAINTENANCE, SURVEILLANCE, AND REPLACEMENT PROGRAM 4.1 INSTALLATION LIMITATIONS
[
]a,c 4.2 MAINTENANCE, SURVEILLANCE, AND REPLACEMENT PROGRAM
[
]a,c (Last Page of Section 4)
LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Limerick Units 1 and 2 Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements EQ-EV-386-GLIM-NP, Rev. 2 5-1 Westinghouse Non-Proprietary Class 3 SECTION 5
SUMMARY
A qualification program is in process to demonstrate that the PPS equipment to be supplied by Westinghouse Electric Company will be qualified for use at Limerick in accordance with Constellation specification NE-402 (Reference 1).
The seismic, environmental and EMC assessments discussed in Section 3 provide platform confidence that the existing qualification of representative Common Q equipment is also compliant with the Limerick requirements.
The qualification assessment discussed in Section 3.1 demonstrate that the previous seismic qualification of the Common Q platform envelops the Limerick requirements identified in Section 2.2; however, additional analysis and testing are required before seismic qualification can be justified in order to reconcile any differences between the previous test configurations and the Limerick configuration.
The qualification assessment discussed in Section 3.2 demonstrate that the Common Q platform is designed to continuously operate across the required temperature/humidity ranges for Limerick as specified in Section 2.2. However, additional analysis and testing are required before environmental qualification can be completed in order to reconcile any differences between the previous test configurations and the Limerick configuration. Specifically, all new (active) components will be environmentally evaluated and type tested similar to Common Q platform equipment to confirm the adequacy of the design.
The evaluations provided in Section 3.3 identify the differences between the various test methods and standards. EMC compliance of the safety-related equipment will be confirmed for the Limerick PPS upgrade by performing fully configured representative cabinet type-testing in compliance with the requirements identified in NE-402 (Reference 1).
Site specific installation of the equipment as well as seismic, environmental and EMC qualification of all safety-related equipment being provided by Westinghouse will be addressed in the plant specific PPS equipment qualification summary report for Limerick.
(Last Page of Section 5)
LIM-24-090, Revision 0, Attachment 2
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Westinghouse Non-Proprietary Class 3 Westinghouse Electric Company 1000 Westinghouse Drive Cranberry Township, PA 16066
© 2024 Westinghouse Electric Company LLC All Rights Reserved EQ-QR-433-GLIM-NP, Revision 4, Qualification Summary Report for the Plant Protection System Upgrade for Limerick Units 1 & 2 (Non-Proprietary)
LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
© 2024 Westinghouse Electric Company LLC All Rights Reserved Westinghouse Non-Proprietary Class 3 Global Instrumentation & Control Limerick Generating Station Constellation Energy Qualification Summary Report for the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 Nuclear Safety Related June 2024 APPROVALS Function Name and Signature Author Louis C. Jesso*
Principal Engineer, Qualification Operations Verifier Daniel W. Martin*
Principal Engineer, Qualification Operations Reviewers Robert Beasley*
Principal Engineer, Safety & Reactor Systems Engineering Boyan A. Setchenski*
Program Manager, Major Projects I&C Approver Dante Mincin*
Manager, Qualification Operations
- Electronically approved records are authenticated in the electronic document management system.
LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 i
Westinghouse Non-Proprietary Class 3 Template Version 1.9 LIST OF CONTRIBUTORS Revision Name and Title 0
None 1
None 2
None 3
None 4
None LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 ii Westinghouse Non-Proprietary Class 3 Template Version 1.9 REVISION HISTORY RECORD OF CHANGES Revision Author Description Completed 0
J.E. Mears Original Issue October 2023 1
J.E. Mears Revision 1 issued to address customer comments regarding IEEE Std 344. The review/comment resolution form is attached in EDMS.
November 2023 2
L.C. Jesso Updated with the following major changes:
Addition of a discussion of the test specimen and test configurations Addition of the environment testing results for components Addition of the environmental testing results for cabinets Addition of the EMC testing results for components Addition of the EMC testing results for cabinets Addition of a discussion of the hardware reconciliation of the EQ test specimen and production PPS hardware.
Content enhanced based upon feedback from the NRC inspection for the Limerick PPS in December 2023.
Due to the scope of changes, no change bars are used in this revision of the document.
Open Item OI-EQ-23-001 is closed.
January 2024 3
L.C. Jesso Updated to address customer review comments.
January 2024 4
L.C. Jesso Updated to add missing Figure 2.2-1 to address CAPs issue IR-2024-6048.
See EDMS LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 iii Westinghouse Non-Proprietary Class 3 Template Version 1.9 DOCUMENT TRACEABILITY & COMPLIANCE Created to Support the Following Document(s)
Document Number Executed Limerick Plant Protection System (PPS) Digital Upgrade Project 00800304 02/2022 LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 iv Westinghouse Non-Proprietary Class 3 Template Version 1.9 OPEN ITEMS Item Description Status OI-EQ-23-001 Limerick speicific environmental and EMC test programs and evaluations are currently in progress. Later revisions of this document will include information related to the environmental and EMC test programs and evaluations once they are completed.
The enviromental and EMC testing programs are completed. Section 3.2, Section 3.3, and Section 4 have been added to discuss the environmental and EMC testing and evaluations. This open item is closed.
Closed OI-EQ-23-002 Hardware reconciliations between the EQ test specimen hardware and the production hardware for the Limerick Units 1 & 2 PPS equipment are in progress. Based on the results of the hardware analysis in Section 4.4, a number of component differences between the EQ test specimen and the production PPS cabinets require additional anaylsis and/or testing in order to demonstrate qualification.
The issues documented in CAP Issue Report IR-2023-12161 and CAP Issue Report IR-2023-12158 shall be resolved as part of this reconciliation process.
The issues documented in RITS 78714, 78715, and 79463 shall be resolved as part of this reconciliation process.
This open item will be closed after the reconciliation process has been completed and all identified hardware has been qualified with results incorporated into this summary report.
Open LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 v
Westinghouse Non-Proprietary Class 3 Template Version 1.9 TABLE OF CONTENTS Section Title Page LIST OF CONTRIBUTORS.......................................................................................i REVISION HISTORY................................................................................................ii TABLE OF CONTENTS.............................................................................................v LIST OF TABLES.......................................................................................................vii LIST OF FIGURES.....................................................................................................viii ACRONYMS AND TRADEMARKS.........................................................................ix GLOSSARY OF TERMS............................................................................................x REFERENCES............................................................................................................xiii SECTION 1 INTRODUCTION.......................................................................................................1-1 SECTION 2 EQUIPMENT TO BE QUALIFIED............................................................................2-1 2.1 EQUIPMENT DESCRIPTION...................................................................................2-1 2.1.1 Equipment Identification.............................................................................................2-1 2.1.2 Equipment Interface/Boundary Conditions.................................................................2-4 2.2 EQ REQUIREMENTS................................................................................................2-5 2.2.1 Seismic.........................................................................................................................2-5 2.2.2 Environmental..............................................................................................................2-9 2.2.3 EMC.............................................................................................................................2-10 2.2.3.1 Performance Criteria for EMC.....................................................................................2-11 2.3 EQUIPMENT QUALIFICATION TEST SPECIMENS.............................................2-24 2.3.1 Overview......................................................................................................................2-24 2.3.2 Critical Hardware Components....................................................................................2-28 2.3.3 Functional Monitoring and Test Procedures................................................................2-30 SECTION 3 TYPE TESTING PERFORMED.................................................................................3-1 3.1 SEISMIC......................................................................................................................3-1 3.1.1 Component Seismic Testing........................................................................................3-1 3.1.1.1 Anomalies During Component Level Seismic Testing................................................3-5 3.1.2 Cabinet Level Seismic Testing....................................................................................3-6 3.1.2.1 Anomalies Prior To and After Cabinet Level Seismic Testing...................................3-8 3.2 ENVIRONMENTAL...................................................................................................3-14 3.2.1 Component Environmental Testing.............................................................................3-14 3.2.1.1 Anomalies During Component Level Environmental Testing....................................3-17 3.2.2 Cabinet Level Environmental Testing.........................................................................3-18 3.2.2.1 Anomalies During Cabinet Level Environmental Testing...........................................3-22 3.3 EMC.............................................................................................................................3-23 3.3.1 Component EMC Testing............................................................................................3-23 3.3.1.1 Anomalies During MCR Component Level EMC Testing..........................................3-25 3.3.2 Cabinet Level EMC Testing........................................................................................3-28 LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 vi Westinghouse Non-Proprietary Class 3 Template Version 1.9 3.3.2.1 Failures or Deviations During Cabinet Level EMC Testing........................................3-30 3.3.2.2 Anomalies During Cabinet Level EMC Testing..........................................................3-32 SECTION 4 ANALYSIS PERFORMED AND BASIS FOR QUALIFICATION..........................4-1 4.1 SEISMIC......................................................................................................................4-1 4.1.1 Seismic Evaluations Performed...................................................................................4-1 4.1.1.1 Main Control Room Component Evaluation...............................................................4-1 4.1.2 Dynamic Similarity Analysis.......................................................................................4-3 4.1.3 Basis for Seismic Qualification...................................................................................4-3 4.2 ENVIRONMENTAL...................................................................................................4-4 4.2.1 Environmental Evaluation...........................................................................................4-4 4.2.2 Basis for Environmental Qualification........................................................................4-8 4.3 EMC.............................................................................................................................4-9 4.3.1 EMC Evaluation..........................................................................................................4-9 4.3.2 Basis for EMC Qualification.......................................................................................4-9 4.4 HARDWARE RECONCILIATION............................................................................4-10 4.4.1 Hardware Reconciliation Methodology.......................................................................4-10 4.4.2 Hardware Reconciliation Conclusions.........................................................................4-10 SECTION 5 INSTALLATION REQUIREMENTS AND MAINTENANCE, SURVEILLANCE, AND REPLACEMENT PROGRAM....................................................................................5-1 5.1 INSTALLATION LIMITATIONS..............................................................................5-1 5.1.1 Use of Ferrites for EMC Qualification........................................................................5-4 5.2 MAINTENANCE, SURVEILLANCE, AND REPLACEMENT PROGRAM...........5-6 SECTION 6
SUMMARY
AND CONCLUSIONS..........................................................................6-1
6.1 CONCLUSION
S.........................................................................................................6-1 LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 vii Westinghouse Non-Proprietary Class 3 Template Version 1.9 TABLE OF CONTENTS (cont.)
LIST OF TABLES Table Title Page Table 2.1-1.
[
]a,c...................................................................................2-1 Table 2.1-2.
[
]a,c....................................................................2-4 Table 2.2-1.
[
]a,c...............................................................2-5 Table 2.2-2.
[
]a,c..............2-9 Table 2.2-3.
EMC Type Tests.........................................................................................................2-12 Table 2.3-1.
[
]a,c...2-27 Table 2.3-2.
[
]a,c............................................................2-28 Table 2.3-3.
[
]a,c....................................2-29 Table 2.3-4.
Test Procedures and Test Reports for the PPS Equipment EQ Testing.......................2-31 Table 3.1-1.
[
]a,c...............................3-1 Table 3.1-2.
[
]a,c.....................................3-6 Table 3.2-1.
[
]a,c....................3-14 Table 3.2-2.
[
]a,c.3-16 Table 3.2-3.
[
]a,c..........................3-18 Table 3.2-4.
[
]a,c.......3-20 Table 3.3-1.
[
]a,c...................................3-23 Table 3.3-2.
Summary of Component Level EMC Test Results......................................................3-24 Table 3.3-3.
[
]a,c.............3-25 Table 3.3-4.
[
]a,c.........................................3-28 Table 3.3-5.
Summary of Cabinet Level EMC Test Results............................................................3-29 Table 3.3-6.
[
]a,c...................................................................3-30 Table 4.1-1.
[
]a,c...........4-1 Table 4.2-1.
[
]a,c...4-4 Table 5.1-1.
[
]a,c........................................................................5-4 LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 viii Westinghouse Non-Proprietary Class 3 Template Version 1.9 TABLE OF CONTENTS (cont.)
LIST OF FIGURES Figure Title Page Figure 2.2-1.
Limerick SSE FRS at Elevation 269..........................................................................2-6 Figure 2.2-2.
Limerick SSE FRS at Elevation 289..........................................................................2-7 Figure 2.2-3.
Limerick SSE MCR IERS...........................................................................................2-8 Figure 2.2-4.
Low Frequency Conducted Emissions (CE101) Test Limit (U.S. NRC RG 1.180)....2-14 Figure 2.2-5.
Low Frequency Conducted Emissions (CE101) Test Limit (EPRI TR-102323)........2-15 Figure 2.2-6.
High Frequency Conducted Emissions (CE102) Test Limit (U.S. NRC RG 1.180)...2-16 Figure 2.2-7.
High Frequency Conducted Emissions (CE102) Test Limit (EPRI TR-102323)........2-17 Figure 2.2-8.
Magnetic Field Radiated Emissions (RE101) Test Limit (U.S NRC RG 1.180).........2-18 Figure 2.2-9.
Low Frequency Radiated Emissions (RE101) Test Limit (EPRI TR-102323)............2-19 Figure 2.2-10. Electric Field Radiated Emissions (RE102) Test Limit (U.S NRC RG 1.180)...........2-20 Figure 2.2-11. High Frequency Radiated Emissions (RE102) Test Limit (EPRI TR-102323)...........2-21 Figure 2.2-12. [
]a,c...................................................2-22 Figure 2.3-1.
[
]a,b..................2-25 Figure 2.3-2.
[
]a,c......................................2-26 Figure 3.1-1.
[
]a,c..........................................................................................3-3 Figure 3.1-2.
[
]a,c..........................................................................................3-4 Figure 3.1-3.
[
]a,c............................................................3-7 Figure 3.1-4.
[
]a,c..........................................................................................3-11 Figure 3.1-5.
[
]a,c..........................................................................................3-12 Figure 3.1-6.
[
]a,c.................................................................................................................3-13 Figure 3.2-1.
[
]a,c..................................3-15 Figure 3.2-2.
[
]a,c........................................3-19 Figure 3.2-3.
[
]a,c....................................3-21 Figure 4.1-1.
[
]a,c.......................4-2 Figure 4.2-1.
[
]a,c............................................4-5 Figure 4.2-2.
[
]a,c................4-6 Figure 4.2-3.
[
]a,c.......................................................4-7 Figure 4.2-4.
[
]a,c................4-8 Figure 5.1-1.
[
]a,c.......................................5-5 LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 ix Westinghouse Non-Proprietary Class 3 Template Version 1.9 ACRONYMS AND TRADEMARKS Standard acronyms used in the document are defined in WNA-PS-00016-GEN, Standard Acronyms and Definitions (Reference 1), or included below to ensure unambiguous understanding of their use within this document.
Acronym Definition AER Auxiliary Equipment Room CEG Constellation Energy Group CIM Component Interface Module DBA Design Basis Accident ECCS Emergency Core Cooling System EMC Electromagnetic Compatibility EMI Electromagnetic Interference EQ Equipment Qualification EUT Equipment Under Test FRS Floor Response Spectra IEEE Institute of Electrical and Electronics Engineers, Inc.
IERS In-Equipment Response Spectra LLC Limited Liability Company MCR Main Control Room NRC Nuclear Regulatory Commission NSSSS Nuclear Steam Supply Shutoff System PA Pennsylvania PGCC Plant Generation Control Center PPS Plant Protection System OBE Operating Basis Earthquake PPS Plant Protection System RCIC Reactor Core Isolation Cooling RFI Radio Frequency Interference RNI Remote Node Interface RPS Reactor Protection System RRS Required Response Spectra SSE Safe Shutdown Earthquake TID Total Integrated Dose TRS Test Response Spectra U.S.
United States ZPA Zero Period Acceleration All other product and corporate names used in this document may be trademarks or registered trademarks of other companies and are used only for explanation and to the owners benefit, without intent to infringe.
LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 x
Westinghouse Non-Proprietary Class 3 Template Version 1.9 GLOSSARY OF TERMS Standard terms used in the document are defined in WNA-PS-00016-GEN, Standard Acronyms and Definitions (Reference 1), or included below to ensure unambiguous understanding of their use within this document.
Term Definition Class 1E The safety classification of the electric equipment and systems that are essential to emergency reactor shutdown, containment isolation, reactor core cooling and containment and reactor heat removal or are otherwise essential in preventing significant release of radioactive material to the environment.
Electromagnetic Compatibility The ability of equipment or system to function satisfactorily in its (EMC) electromagnetic environment without introducing intolerable electromagnetic disturbances to anything in that environment.
Electromagnetic Interference Electromagnetic disturbance which manifests itself in performance (EMI) degradation, malfunction or failure of electrical or electronic equipment.
Mild Environment An environment expected as a result of normal service conditions and extremes (abnormal) in service conditions where seismic is the only design basis event of consequence.
Non-Seismic Non-safety related equipment that is not located near safety-related Class 1E equipment. Functional or structural failure of this equipment would not reduce the functioning of safety-related Class 1E equipment to an unacceptable level and seismic qualification of this equipment is not required.
Operating Basis Earthquake An earthquake that could reasonably be expected to occur at the plant (OBE) during the operating life of the plant considering the regional and local geology and seismology and specific characteristics of local subsurface material. It is that earthquake that produces the vibratory ground motion for which those features of the Nuclear Power plant, necessary for continued operation without undue risk to the health and safety of the public, are designed to remain functional. (For seismic qualification, five seismic events equal to one-half the Safe Shutdown Earthquake (SSE) are applied)
Qualification The generation and maintenance of evidence to ensure that the equipment will operate on demand to meet the system performance requirements.
LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 xi Westinghouse Non-Proprietary Class 3 Template Version 1.9 GLOSSARY OF TERMS (cont.)
Term Definition Radio Frequency Interference RFI is used interchangeably with EMI. EMI includes the entire (RFI) electromagnetic spectrum; RFI is more restricted to the radio-frequency band, generally considered to be between 10 kHz and 10 GHz.
Required Response Spectrum The response spectrum issued by the user or agent as part of the (RRS) equipment specification for seismic qualification purposes. The RRS is a plot of the acceleration versus frequency describing the energy content of the earthquake time history. The RRS constitutes the requirement to be met during qualification activities.
Response Spectrum A plot of the maximum response, as a function of oscillator frequency, of any array of single-degree-of-freedom damped oscillators subjected to the same base excitation.
Safe Shutdown Earthquake An earthquake that is based upon an evaluation of the maximum (SSE) earthquake potential considering the regional and local geology and seismology and specific characteristic of local subsurface material. It is the earthquake that produces the maximum vibratory ground motion for which certain structures, systems and components are designed to remain functional. These structures, systems and components are those necessary to ensure the integrity of the reactor coolant pressure boundary; the capability to shut down the reactor and maintain it in a safe shutdown condition; and the capability to prevent or mitigate the consequences of accidents that could result in potential off-site exposures comparable to the 10 CFR Part 100 guidelines.
Safety-Related Equipment that is relied upon to remain functional during and following design basis event to ensure the integrity of the reactor coolant pressure boundary; the capability to shut down the reactor and maintain it in a safe condition; and the capability to prevent or mitigate consequences of accidents that could result in potential off-site exposures comparable to the 10 CFR Part 50.34 guidelines.
Seismic Category I A classification of structures, systems and components that shall be designed to withstand the effects of a SSE and maintain the specified design function and integrity.
Seismic Category II Non-safety related equipment whose function is not required but whose failure could reduce the functioning of adjacent safety-related Seismic Category I equipment to an unacceptable level. This equipment shall be designed to withstand the effects of a SSE and maintain its structural integrity so that such failure shall not occur.
LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 xii Westinghouse Non-Proprietary Class 3 Template Version 1.9 GLOSSARY OF TERMS (cont.)
Term Definition Test Response Spectrum The response spectrum that is developed from the actual time history of (TRS) the motion of the shake table.
Zero Period Acceleration The acceleration level of the high frequency, non-amplified portion of (ZPA) the response spectrum. This acceleration corresponds to the maximum peak acceleration of the time history used to derive the spectrum.
LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 xiii Westinghouse Non-Proprietary Class 3 Template Version
1.9 REFERENCES
Following is a list of references used throughout this document. Revisions cited were used at the time of writing. Users of this document should refer to the revision specified. Notify the author regarding any issues of conflict.
- 1.
Westinghouse Document, WNA-PS-00016-GEN, Revision 8, Automation and Field Services Instrumentation and Control Systems Standard Acronyms and Definitions, September 2016.
(Westinghouse Proprietary)
- 2.
Constellation (Exelon) Specification NE-402, Revision 3, Plant Protection System (PPS)
Performance Specification, September 2022.
- 3.
Westinghouse Document EQ-MR-13-GLIM, Revision 0, Equipment Qualification Strategy and Plan for the Plant Protection System Upgrade, September 2022. (Westinghouse Proprietary)
- 4.
Westinghouse Drawing, 10173D29, Revision 0, Limerick Unit 1 & 2 Plant Protection System Cabinet Outline and Installation.. (Westinghouse Proprietary)
- 5.
10173D49, Rev. 0, LIMERICK UNIT 1 & 2 PPS MCR OUTLINE AND INSTALLATION DRAWING. (Westinghouse Proprietary)
- 6.
IEEE Std 344-1975, IEEE Recommended Practice for Seismic Qualification of Class 1E Equipment for Nuclear Power Generating Stations, The Institute of Electrical and Electronics Engineers, Inc.
- 7.
IEEE Std 344-1987, IEEE Recommended Practice for Seismic Qualification of Class 1E Equipment for Nuclear Power Generating Stations, The Institute of Electrical and Electronics Engineers, Inc.
- 8.
U.S. NRC Regulatory Guide 1.100, Revision 2, Seismic Qualification of Electric and Mechanical Equipment for Nuclear Power Plants, June 1988.
- 9.
Westinghouse Letter, LTR-EQ-14-31, Revision 0, Reconciliation of the Differences between IEEE Std. 344-1987 and IEEE Std. 344-1975, February 20, 2014. (Westinghouse Proprietary)
- 10.
Constellation (Exelon) Document LS-0192, Revision 0, Dynamic Qualification Requirements for Control Room Panels, March 2, 1998. (attached in EDMS)
- 11.
Constellation (Exelon) Document A1656919 E13, Seismic RRS (Required Response Spectra)
Curves for Aux Equipment Room Control Panels at EL 289 of Control Building/Structure, May 30, 2008. (attached in EDMS)
- 12.
IEEE Std 323-1974, IEEE Standard for Qualifying Class 1E Equipment for Nuclear Power Generating Stations, The Institute of Electrical and Electronics Engineers, Inc.
LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 xiv Westinghouse Non-Proprietary Class 3 Template Version 1.9
- 13.
U.S. NRC Regulatory Guide 1.89, Revision 1, Environmental Qualification of Certain Electric Equipment Important to Safety for Nuclear Power Plants, June 1984.
- 14.
IEEE Std 323-1983, IEEE Standard for Qualifying Class 1E Equipment for Nuclear Power Generating Stations, The Institute of Electrical and Electronics Engineers, Inc.
- 15.
EPRI Technical Report, TR-102323, Revision 4, Guidelines for Electromagnetic Interference Testing in Power Plants, September 2016.
- 16.
U.S. NRC Regulatory Guide 1.180, Revision 2, Guidelines for Evaluation Electromagnetic and Radio-Frequency Interference in Safety-Related Instrumentation and Control Systems, December 2019.
- 17.
Westinghouse Document, WNA-TS-00216-GEN, Revision 2, Plant Protection System Upgrade Equipment Qualification Unit Configuration and Test Specification, June 2023. (Westinghouse Proprietary)
- 18.
Westinghouse Drawing 10173D40 (ECO-23-00088-16), Rev. 4, Limerick PPS Equipment Qualification Cabinet Assembly Configurations. (Westinghouse Proprietary)
- 19.
Westinghouse Drawing 10173D41, Revision 2 (ECO-23-00143-7). Limerick PPS Equipment Qualification Support Equipment. (Westinghouse Proprietary)
- 20.
Westinghouse Drawing 10172D14, Rev. 1 (ECO-23-00910), Limerick PPS Project Deliverables.
(Westinghouse Proprietary)
- 21.
Westinghouse Document, EQLR-529, Revision 0, Seismic Qualification Test Report for the Limerick Generating Station Main Control Room Components, July 2023. (Westinghouse Proprietary)
- 22.
Westinghouse Document, WNA-TP-07651-GEN, Revision 2, Plant Protection System Upgrade MCR Components Equipment Qualification Test Monitoring Procedure, May 2023.
(Westinghouse Proprietary)
- 23.
Clark Test Report, JID 23-00364, Revision 4, Qualification Test Report for the Westinghouse Limerick PPS Cabinets. October 2023
- 24.
Westinghouse Document, WNA-TR-06567-GEN, Revision 0, Plant Protection System Upgrade Equipment Qualification Test Cabinet Preconditioning Test Report, September 2023.
(Westinghouse Proprietary)
- 25.
Westinghouse Document WNA-TP-07320-GEN, Revision 1, Plant Protection System Upgrade Equipment Qualification Test Monitoring Procedure, July 2023. (Westinghouse Proprietary)
LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 xv Westinghouse Non-Proprietary Class 3 Template Version 1.9
- 26.
Westinghouse Document WNA-TR-06618-GEN, Revision 0, Plant Protection System Upgrade Equipment Qualification Test Cabinet Seismic Functional Monitoring Test Report, September 2023. (Westinghouse Proprietary)
- 27.
Westinghouse Document EQLR-536, Revision 0, Environmental Test Report for the Main Control Room Class 1E Components for Limerick Units 1&2, July 2023 (Westinghouse Proprietary)
- 28.
Westinghouse Document EQLR-555, Revision 0, Environmental Test Report for the Plant Protection System for Limerick Units 1&2, January 2024. (Westinghouse Proprietary).
- 29.
Westinghouse Document EQLR-522, Revision 0, Electromagnetic Compatibility Test Report for the Plant Protection System Upgrade for Limerick Units 1 and 2, January 2024. (Westinghouse Proprietary)
- 30.
Westinghouse Document EQLR-544, Revision 0, Electromagnetic Compatibility Report for the Plant Protection System Upgrade for Limerick Units 1 and 2, January 2024. (Westinghouse Proprietary)
- 31.
Westinghouse Document, CN-EQT-22-8, Revision 1, Qualification Evaluation of Plant Protection System Equipment for Limerick Generating Station Units 1 and 2 Main Control Room, April 2023. (Westinghouse Proprietary)
- 32.
Westinghouse Document, EQLR-517, Revision 0, Seismic Qualification Test Report for Flat Panel Displays, March 2023. (Westinghouse Proprietary)
- 33.
Westinghouse Document, CN-EQT-23-4, Revision 1, Dynamic Similarity of the Plant Protection System Cabinets for the Digital Modernization Program at Limerick Units 1&2, September 2023.
(Westinghouse Proprietary)
- 34.
Westinghouse Document 00000-ICE-37764, Revision 4, Summary Qualification Report of Hardware Testing for Common Q Applications, March 2014. (Westinghouse Proprietary)
- 35.
Westinghouse Document, WCAP-16166-P Supplement 1-E05, Revision 5, Equipment Qualification Report for AC160 Platform - PC Node Box / Flat Panel Display System Components, September 2019. (Westinghouse Proprietary)
- 36.
Westinghouse Document, EQLR-470, Revision 0, Mild Environment Test Report for the Core Protection Calculator System Equipment, September 2020. (Westinghouse Proprietary)
- 37.
Westinghouse Document, WCAP-16166-P Supplement 1-E07, Revision 0, Equipment Qualification Report for AC160 Platform - QUINT Power Supplies and Input Line Filter, October 2010. (Westinghouse Proprietary)
- 38.
Westinghouse Document, WNA-AR-01283-GLIM, Revision 0, Limerick Generation Station Units 1&2 Digital Modernization Project Plant Protection System Hardware Reconciliation Report, December 2023. (Westinghouse Proprietary)
LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 xvi Westinghouse Non-Proprietary Class 3 Template Version 1.9
- 39.
Westinghouse Document, EQ-EV-386-GLIM, Revision 3, Comparison of Equipment Qualification Hardware Testing for Common Q Applications to Limerick Requirements, November 2022. (Westinghouse Proprietary)
- 40.
Westinghouse Document, EQ-TP-538-GLIM, Revision 0, Environmental Test Procedure for the Main Control Room Class 1E Components for Limerick Units 1&2, May 2023. (Westinghouse Proprietary)
- 41.
Westinghouse Document, EQ-TP-547-GLIM, Revision 0, Environmental Test Procedure for the Plant Protection System for Limerick Units 1&2, November 2023. (Westinghouse Proprietary)
- 42.
Westinghouse Document, EQ-TP-542-GLIM, Revision 0, Seismic Test Procedure for the Limerick Generation Station Main Control Room Components, May 2023. (Westinghouse Proprietary)
- 43.
Westinghouse Document, EQ-TP-544-GLIM, Revision 0, Seismic Test Procedure for the Limerick PPS Equipment Qualification Cabinets, July 2023. (Westinghouse Proprietary)
- 44.
Westinghouse Document, EQ-TP-528-GEN, Revision 1, U.S. NRC Regulatory Guide 1.180, Revision 2 Generic Electromagnetic Compatibility Qualification Procedure, March 2023.
(Westinghouse Proprietary)
- 45.
Westinghouse Document, EQ-TP-517-GEN, Revision 1, Generic Electromagnetic Compatibility Qualification Test Procedure to meet the Requirements of EPRI TR-102323, Revision 4, September 2021. (Westinghouse Proprietary)
- 46.
Westinghouse Document, WNA-DS-04900-GLIM, Revision 3, Limerick Generating Station Units 1&2 Digital Modernization Project Plant Protection System - System Design Specification, February 2023. (Westinghouse Proprietary). Note: The reconciliation of later revisions of this document in comparison to Revision 3 is part of the reconciliation process for Open Item OI-EQ-23-002.
(Last Page of Front Matter)
LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 1-1 Westinghouse Non-Proprietary Class 3 Template Version 1.9 SECTION 1 INTRODUCTION The purpose of this report is to demonstrate the seismic, environmental, and Electromagnetic Compatibility (EMC) Equipment Qualification (EQ) of the Plant Protection System (PPS) in accordance with the requirements specified in the Performance Specification NE-402 (Reference 2) for Limerick Units 1 & 2.
This document describes the seismic, environmental, and EMC qualification for the PPS. The PPS equipment is identified in the Limerick Units 1 & 2 Equipment Qualification Strategy and Plan EQ-MR-13-GLIM (Reference 3) as:
Safety Class: 1E Seismic Category: I Environment: Mild The method of qualification employed for the PPS is a combination of test and analysis.
The process to perform the EQ of the PPS is summarized as follows:
The list of equipment (components and sub-assemblies) to be used in the PPS was identified.
A preliminary evaluation was performed on the major components to determine if any previous qualifications could be applied for the PPS. Additional (new) testing was identified.
Representative test specimens were designed to qualify the PPS cabinets and MCR components.
These specimens were constructed in a manner consistent with the production equipment and the test software was developed in the same manner as the production software.
EQ testing was performed.
The EQ test specimen hardware was reconciled with the as-built production PPS hardware for Unit 1 and Unit 2. (Open Item OI-EQ-23-002).
(Last Page of Section 1)
LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 2-1 Westinghouse Non-Proprietary Class 3 Template Version 1.9 SECTION 2 EQUIPMENT TO BE QUALIFIED 2.1 EQUIPMENT DESCRIPTION 2.1.1 Equipment Identification The PPS performs the necessary safety-related signal acquisition, calculations, setpoint comparison, coincidence logic, Reactor Protection System (RPS)/Nuclear Steam Supply Shutoff System (NSSSS)/Emergency Core Cooling System (ECCS) actuation functions, and component control functions to achieve and maintain the plant in a safe shutdown condition. ECCS also includes the Reactor Core Isolation Cooling (RCIC) functions. The PPS contains maintenance and test functions to verify proper operation of the system. The PPS is also responsible for meeting Class 1E post-accident monitoring and display requirements.
The PPS consists of four redundant divisions, designated 1, 2, 3, and 4. Redundant divisions are provided to satisfy single failure criteria and improve plant availability. Interdivisional communication is accomplished through optically coupled unidirectional datalinks that maintain independence and prevent fault propagation across divisions. For intra-divisional communication, each division utilizes a separate data bus to prevent propagation of failures across divisions and to enhance availability.
[
]a,c The PPS is built upon the Common Q platform used in many safety-related applications. [
]a,c Table 2.1-1.
[
]a,c a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 2-2 Westinghouse Non-Proprietary Class 3 Template Version 1.9 Table 2.1-1.
[
]a,c a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 2-3 Westinghouse Non-Proprietary Class 3 Template Version 1.9 Table 2.1-1.
[
]a,c a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 2-4 Westinghouse Non-Proprietary Class 3 Template Version 1.9 Table 2.1-2.
[
]a,c 2.1.2 Equipment Interface/Boundary Conditions
[
]a,c a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 2-5 Westinghouse Non-Proprietary Class 3 Template Version 1.9 2.2 EQ REQUIREMENTS 2.2.1 Seismic
[
]a,c seismic testing was performed in accordance with IEEE Std 344-1987 (Reference 7) and United States Nuclear Regulatory Commission (U.S. NRC) Regulatory Guide 1.100 (Reference 8). [
]a,c In accordance with U.S. NRC Regulatory Guide 1.100 (Reference 6) and IEEE Std 344-1987 (Reference 7), the equipment must demonstrate its required safety functions during and after the effects of five Operating Basis Earthquake (OBE) and one Safe Shutdown Earthquake (SSE) events without loss of functional or physical integrity.
[
]a,c Table 2.2-1.
[
]a,c
[
]a,c a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 2-6 Westinghouse Non-Proprietary Class 3 Template Version 1.9 Figure 2.2-1.
Limerick SSE FRS at Elevation 269 0.1 1
10 1
10 100 Acceleration (g)
Frequency (Hz)
Limerick SSE FRS for Elevation 269 1% damping Horizontal Vertical LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 2-7 Westinghouse Non-Proprietary Class 3 Template Version 1.9 Figure 2.2-2.
Limerick SSE FRS at Elevation 289 0.1 1
10 1
10 100 Acceleration (g)
Frequency (Hz)
Limerick SSE FRS for Elevation 289 1% damping Horizontal Vertical LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 2-8 Westinghouse Non-Proprietary Class 3 Template Version 1.9 Figure 2.2-3.
Limerick SSE MCR IERS LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 2-9 Westinghouse Non-Proprietary Class 3 Template Version 1.9 2.2.2 Environmental
[
]a,c Table 2.2-2.
[
]a,c The PPS is located in a mild environment and is not subject to the Design Basis Accident (DBA);
however, the PPS must be designed to operate in the environmental conditions for its installed location.
[
]a,c a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 2-10 Westinghouse Non-Proprietary Class 3 Template Version 1.9 2.2.3 EMC
[
]a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 2-11 Westinghouse Non-Proprietary Class 3 Template Version 1.9 2.2.3.1 Performance Criteria for EMC
[
]a,c The following EMC performance criteria are defined by the industry standards:
Performance Criterion A:
The equipment shall continue to operate as intended during and after the test. No degradation of performance or loss of function is allowed below a performance level specified by the manufacturer, when the equipment is used as intended. If the performance level is not specified by the manufacturer, this may be derived from the product description and documentation and what the user may reasonably expect from the equipment if used as intended.
Performance Criterion B:
The equipment shall continue to operate as intended after the test. No degradation of performance or loss of function is allowed below a performance level specified by the manufacturer, when the EUT is used as intended. The performance level may be replaced by a permissible loss of performance. However, during the test degradation of performance is allowed but no change of actual operating state or stored data is allowed. If the minimum performance level or the permissible performance loss is not specified by the manufacturer, either of these may be derived from the product description and documentation and what the user may reasonably expect from the equipment if used as intended.
Performance Criterion C:
Temporary loss of function is allowed during the test, provided the function is self-recoverable or can be restored by the operation of the controls.
[
]a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 2-12 Westinghouse Non-Proprietary Class 3 Table 2.2-3.
EMC Type Tests EMC Type Test Test Standard Frequency Range Test Levels & Limits Scope of Test Conducted Emissions, Low Frequency MIL-STD-461G, CE101(1) 30 Hz to 10 kHz
[
]a,c
[
]a,c Conducted Emissions, High Frequency MIL-STD-461G, CE102 10 kHz to 10 MHz
[
]a,c
[
]a,c Radiated Emissions, Magnetic Field MIL-STD-461G, RE101 30 Hz to 100 kHz
[
]a,c
[
]a,c Radiated Emissions, Electric Field MIL-STD-461G, RE102 2 MHz to 10 GHz
[
]a,c
[
]a,c Radiated Susceptibility, Electric Field MIL-STD-461G, RS103 6 GHz to 10 GHz 10 V/m
[
]a,c ESD IEC 61000-4-2 Air: +/-15 kV
Contact:
+/-8 kV
[
]a,c Radiated Susceptibility, Electric Field IEC 61000-4-3 26 MHz to 6 GHz(2) 10 V/m
[
]a,c EFT IEC 61000-4-4
[
]a,c
[
]a,c Surge, Combination Wave IEC 61000-4-5
[
]a,c
[
]a,c Conducted Susceptibility, High Frequency IEC 61000-4-6 150 kHz to 80 MHz 140 dBµV (10 Vrms)
[
]a,c Notes:
- 1. U.S. NRC Regulatory Guide 1.180 (Reference 16) clarifies that equipment could be exempt from this test if the power quality requirements of the equipment are consistent with the existing power supply and the equipment will not impose additional harmonic distortions on the existing power distribution system that exceed 5% Total Harmonic Distortion (THD). [
]a,c
- 2. [
]a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 2-13 Westinghouse Non-Proprietary Class 3 Table 2.2-3.
EMC Type Tests (cont.)
EMC Type Test Test Standard Frequency Range Test Levels & Limits Scope of Test Radiated Susceptibility, Magnetic Field IEC 61000-4-8 50 Hz/60 Hz 30 A/m Continuous, 300 A/m Short Duration
[
]a,c Radiated Susceptibility, Magnetic Field IEC 61000-4-9 300 A/m
[
]a,c Radiated Susceptibility, Magnetic Field IEC 61000-4-10 100 kHz, 1 MHz 30 A/m
[
]a,c Surge, Ring Wave IEC 61000-4-12
[
]a,c
[
]a,c Conducted Susceptibility, Harmonics and Interharmonics IEC 61000-4-13 16 Hz to 2.4 kHz
[
]a,c
[
]a,c Conducted Susceptibility, Low Frequency IEC 61000-4-16 15 Hz to 150 kHz
[
]a,c Continuous: 10 Vrms Short Duration: 100 Vrms
[
]a,c
[
]a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 2-14 Westinghouse Non-Proprietary Class 3 Figure 2.2-4.
Low Frequency Conducted Emissions (CE101) Test Limit (U.S. NRC RG 1.180)
LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 2-15 Westinghouse Non-Proprietary Class 3 Figure 2.2-5.
Low Frequency Conducted Emissions (CE101) Test Limit (EPRI TR-102323)
LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 2-16 Westinghouse Non-Proprietary Class 3 Figure 2.2-6.
High Frequency Conducted Emissions (CE102) Test Limit (U.S. NRC RG 1.180)
LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 2-17 Westinghouse Non-Proprietary Class 3 (Figure 5-5 from EPRI TR-102323, Revision 4)
Figure 2.2-7.
High Frequency Conducted Emissions (CE102) Test Limit (EPRI TR-102323)
LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 2-18 Westinghouse Non-Proprietary Class 3 Figure 2.2-8.
Magnetic Field Radiated Emissions (RE101) Test Limit (U.S NRC RG 1.180)
LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 2-19 Westinghouse Non-Proprietary Class 3 Figure 2.2-9.
Low Frequency Radiated Emissions (RE101) Test Limit (EPRI TR-102323)
LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
LIM-24-090, Revision 0, Attachment 4 Constellation Energy E >
- i.
Ill "C -
"C C1) *-
u..
0 0
C1) -w 100 90 80 70 60 so 0.1 Figure 2.2-10.
EQ-QR-433-GLIM-NP, Rev. 4 1
Qualification Summary Report fo1*
the Plant Protection System Upgrade for Limerick Units 1 & 2 RE102 Op erating Env1 !!lope
._... ~
72
~
~
59 2
25 10 100 1000 10000 Frequency (MHz)
Electric Field Radiated Emissions (RE102) Test Limit (U.S NRC RG 1.180) 2-20 Westinghouse Non-Proprietary Class 3
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 2-21 Westinghouse Non-Proprietary Class 3 Figure 2.2-11.
High Frequency Radiated Emissions (RE102) Test Limit (EPRI TR-102323)
LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
LIM-24-090, Revision 0, Attachment 4 Constellation Energy Figure 2.2-12. [
EQ-QR-433-GLIM-NP, Rev. 4 2-22 Qualification Summary Report fo1*
the Plant Protection System Upgrade for Limerick Units 1 & 2 a,c Westinghouse Non-Proprietary Class 3
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 2-23 Westinghouse Non-Proprietary Class 3 Table 2.2-4.
IEC 61000-4-13 Operating Envelope Harmonic #
% of Supply Voltage 2
3 3
8 4
1.5 5
9 6
7 7.5 8
9 2.5 10 11 5
12 13 4.5 15 17 3
19 2
21 23 2
25 2
27 29 1.5 31 1.5 33 35 1.5 37 1.5 39 LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 2-24 Westinghouse Non-Proprietary Class 3 2.3 EQUIPMENT QUALIFICATION TEST SPECIMENS 2.3.1 Overview As described in Section 2.1, the PPS consists of multiple electrical cabinets that are separated into four divisions. [
]a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 2-25 Westinghouse Non-Proprietary Class 3 Figure 2.3-1.
[
]a,b a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 2-26 Westinghouse Non-Proprietary Class 3 Figure 2.3-2.
[
]a,c a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 2-27 Westinghouse Non-Proprietary Class 3
[
]a,c Table 2.3-1.
[
]a,c a,ca, LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 2-28 Westinghouse Non-Proprietary Class 3 2.3.2 Critical Hardware Components
[
]a,c Table 2.3-2.
[
]a,c a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 2-29 Westinghouse Non-Proprietary Class 3 Table 2.3-3.
[
]a,c a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 2-30 Westinghouse Non-Proprietary Class 3 2.3.3 Functional Monitoring and Test Procedures
[
]a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 2-31 Westinghouse Non-Proprietary Class 3 Table 2.3-4.
Test Procedures and Test Reports for the PPS Equipment EQ Testing Test Description EQ and Functional Test Procedures Test Report Environmental - Components EQ-TP-538-GLIM (Reference 40)
WNA-TP-07651-GEN (Reference 22)
EQLR-536 (Reference 27)
Environmental - Cabinets EQ-TP-547-GLIM (Reference 41)
WNA-TP-07320-GEN (Reference 25)
EQLR-555 (Reference 28)
Seismic - Components EQ-TP-542-GLIM (Reference 42)
WNA-TP-07651-GEN (Reference 22)
EQLR-529 (Reference 21)
Seismic - Cabinets EQ-TP-544-GLIM (Reference 43)
WNA-TP-07320-GEN (Reference 25)
JID 23-00364(1) (Reference 23)
WNA-TR-06618-GEN(2) (Reference 24)
EMC - Components EQ-TP-528-GEN(3) (Reference 44)
EQ-TP-517-GEN(3) (Reference 45)
WNA-TP-07651-GEN (Reference 22)
EQLR-522 (Reference 29)
EMC - Cabinets EQ-TP-528-GEN(3) (Reference 44)
EQ-TP-517-GEN(3) (Reference 45)
WNA-TP-07320-GEN (Reference 25)
EQLR-544 (Reference 30)
[
]a,c (Last Page of Section 2)
LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 3-1 Westinghouse Non-Proprietary Class 3 SECTION 3 TYPE TESTING PERFORMED 3.1 SEISMIC 3.1.1 Component Seismic Testing Component level seismic testing was performed for the PPS and associated MCR equipment as discussed in EQLR-529 (Reference 21). The tests were conducted at the Westinghouse facility in New Stanton, Pennsylvania (PA) in May 2023 under the direction of Westinghouse personnel. The seismic testing was performed in accordance with U.S. NRC Regulatory Guide 1.100 (Reference 8) and IEEE Std 344-1987 (Reference 7).
[
]a,c Table 3.1-1.
[
]a,c a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 3-2 Westinghouse Non-Proprietary Class 3 Note 1. The PPS Cabinets were qualified by a separate cabinet-level type-test program discussed in Section 3.1.2. The Isolation Barrier, Fiber Optic Bulkhead Connector, and Weed Modem (Receiver) were not included in the cabinet test specimens and were tested as components.
[
]a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 3-3 Westinghouse Non-Proprietary Class 3 Figure 3.1-1.
[
]a,c a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 3-4 Westinghouse Non-Proprietary Class 3 Figure 3.1-2.
[
]a,c a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 3-5 Westinghouse Non-Proprietary Class 3
[
]a,c 3.1.1.1 Anomalies During Component Level Seismic Testing
[
]a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 3-6 Westinghouse Non-Proprietary Class 3 3.1.2 Cabinet Level Seismic Testing
[
]a,c Table 3.1-2.
[
]a,c
[
]a,c a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 3-7 Westinghouse Non-Proprietary Class 3
[
]a,c Figure 3.1-3.
[
]a,c
[
]a,c a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 3-8 Westinghouse Non-Proprietary Class 3
[
]a,c 3.1.2.1 Anomalies Prior To and After Cabinet Level Seismic Testing 3.1.2.1.1 RITS 78685 - SCRAM HARP Circuit from EQ2 DO620 Channel 1
[
]a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 3-9 Westinghouse Non-Proprietary Class 3 3.1.2.1.2 RITS 78714 - EQ1 CSI Temperature Sensor Error due to AI688 Circuit and Fuse
[
]a,c 3.1.2.1.3 Corrective Action Identified After Seismic Testing
[
]a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 3-10 Westinghouse Non-Proprietary Class 3 3.1.2.1.4 RITS 78715 - ISOl2-K1 Driven by DI621 Ch. 4 Does Not Supply Enough Wetting Voltage
[
]a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
LIM-24-090, Revision 0, Attachment 4 Constellation Energy Figure 3.1-4.
EQ-QR-433-GLIM-NP, Rev. 4 3-11 Qualification Summary Report fo1*
the Plant Protection System Upgrade for Limerick Units 1 & 2
)a,c Westinghouse Non-Proprietary Class 3 a,c
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
LIM-24-090, Revision 0, Attachment 4 Constellation Energy Figure 3.1-5.
EQ-QR-433-GLIM-NP, Rev. 4 3-12 Qualification Summary Report fo1*
the Plant Protection System Upgrade for Limerick Units 1 & 2 Westinghouse Non-Proprietary Class 3 a,c
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
LIM-24-090, Revision 0, Attachment 4 Constellation Energy Figure 3.1-6.
EQ-QR-433-GLIM-NP, Rev. 4 3-13 Qualification Summary Report fo1*
the Plant Protection System Upgrade for Limerick Units 1 & 2
)a,c Westinghouse Non-Proprietary Class 3 a,c
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 3-14 Westinghouse Non-Proprietary Class 3 3.2 ENVIRONMENTAL 3.2.1 Component Environmental Testing
[
]a,c Table 3.2-1.
[
]a,c
[
]a,c a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 3-15 Westinghouse Non-Proprietary Class 3 Figure 3.2-1.
[
]a,c a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 3-16 Westinghouse Non-Proprietary Class 3 Table 3.2-2.
[
]a,c a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 3-17 Westinghouse Non-Proprietary Class 3
[
]a,c 3.2.1.1 Anomalies During Component Level Environmental Testing
[
]a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 3-18 Westinghouse Non-Proprietary Class 3 3.2.2 Cabinet Level Environmental Testing Component level mild environment testing was performed on representative PPS cabinets as discussed in EQLR-555 (Reference 28). The tests were conducted at the Westinghouse facility in New Stanton, Pennsylvania (PA) in December 2023 under the direction of Westinghouse personnel. The environmental testing was performed in accordance with IEEE Std 323-1974 (Reference 12) as endorsed by U.S. NRC Regulatory Guide 1.89 (Reference 13) and clarified by IEEE Std 323-1983 (Reference 14).
[
]a,c Table 3.2-3.
[
]a,c
[
]a,c a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 3-19 Westinghouse Non-Proprietary Class 3 Figure 3.2-2.
[
]a,c a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 3-20 Westinghouse Non-Proprietary Class 3 Table 3.2-4.
[
]a,c a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 3-21 Westinghouse Non-Proprietary Class 3 Figure 3.2-3.
[
]a,c a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 3-22 Westinghouse Non-Proprietary Class 3
[
]a,c 3.2.2.1 Anomalies During Cabinet Level Environmental Testing
[
]a,c 3.2.2.1.1 Corrective Action During Cabinet Level Environmental Testing
[
]a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 3-23 Westinghouse Non-Proprietary Class 3 3.3 EMC 3.3.1 Component EMC Testing Component level EMC was performed for the PPS MCR equipment as discussed in EQLR-522 (Reference 29). The tests were conducted at the Westinghouse facility in New Stanton, Pennsylvania (PA) from April through November of 2023 under the direction of Westinghouse personnel.
The EMC testing was performed in accordance with EPRI Topical Report TR-102323 (Reference 15) and U.S. NRC RG 1.180 (Reference 16) as discussed in Section 2.3
[
]a,c Table 3.3-1.
[
]a,c
[
]a,c a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 3-24 Westinghouse Non-Proprietary Class 3 Table 3.3-2.
Summary of Component Level EMC Test Results Test Standard Description Results MIL-STD-461G, CE101 Conducted Emissions 30 Hz to 10 kHz
[
]a,c MIL-STD-461G, CE102 Conducted Emissions 10 kHz to 10 MHz
[
]a,c MIL-STD-461G, RE101 Radiated Emissions 30 Hz to 100 kHz
[
]a,c MIL-STD-461G, RE102 Radiated Emissions 2 MHz to 10 GHz
[
]a,c MIL-STD-461G, RS103 Radiated Susceptibility 6 GHz to 10 GHz(4)
[
]a,c IEC 61000-4-2 Electrostatic Discharge (ESD)
[
]a,c IEC 61000-4-3 Radiated Susceptibility 26 MHz to 6 GHz(4)
[
]a,c IEC 61000-4-4 Electrical Fast Transient (EFT)
[
]a,c IEC 61000-4-5 Surge, Combination Wave
[
]a,c IEC 61000-4-6 Conducted Susceptibility 150 kHz to 80 MHz
[
]a,c IEC 61000-4-8 Power Frequency Magnetic Field Susceptibility
[
]a,c IEC 61000-4-9 Pulse Magnetic Field Susceptibility
[
]a,c IEC 61000-4-10 Damped Oscillatory Magnetic Field
[
]a,c IEC 61000-4-12 Surge, Ring Wave
[
]a,c IEC 61000-4-13 Harmonics and Interharmonics
[
]a,c IEC 61000-4-16 Conducted Susceptibility 15 Hz to 150 kHz
[
]a,c
[
]a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 3-25 Westinghouse Non-Proprietary Class 3 3.3.1.1 Anomalies During MCR Component Level EMC Testing
[
]a,c 3.3.1.1.1 High Frequency Conducted Emissions (CE102) Exceed Test Limits
[
]a,c Table 3.3-3.
[
]a,c
[
]a,c a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 3-26 Westinghouse Non-Proprietary Class 3 3.3.1.1.2 Magnetic Field Radiated Emissions (RE101) Exceed Test Limits
[
]a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 3-27 Westinghouse Non-Proprietary Class 3 3.3.1.1.3 Electric Field Radiated Emissions (RE102) Exceed Test Limits
[
]a,c 3.3.1.1.4 Power Supply Output Out-of-Tolerance During IEC 61000-4-5 Surge Test
[
]a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 3-28 Westinghouse Non-Proprietary Class 3 3.3.2 Cabinet Level EMC Testing
[
]a,c Table 3.3-4.
[
]a,c
[
]a,c a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 3-29 Westinghouse Non-Proprietary Class 3 Table 3.3-5.
Summary of Cabinet Level EMC Test Results Test Standard Description Results MIL-STD-461G, CE101 Conducted Emissions 30 Hz to 10 kHz
[
]a,c MIL-STD-461G, CE102 Conducted Emissions 10 kHz to 10 MHz
[
]a,c MIL-STD-461G, RE101 Radiated Emissions 30 Hz to 100 kHz
[
]a,c MIL-STD-461G, RE102 Radiated Emissions 2 MHz to 10 GHz
[
]a,c MIL-STD-461G, RS103 Radiated Susceptibility 6 GHz to 10 GHz(3)
[
]a,c IEC 61000-4-2 Electrostatic Discharge (ESD)
[
]a,c IEC 61000-4-3 Radiated Susceptibility 26 MHz to 6 GHz(3)
[
]a,c IEC 61000-4-4 Electrical Fast Transient (EFT)
[
]a,c IEC 61000-4-5 Surge, Combination Wave
[
]a,c IEC 61000-4-6 Conducted Susceptibility 150 kHz to 80 MHz
[
]a,c IEC 61000-4-8 Power Frequency Magnetic Field Susceptibility
[
]a,c IEC 61000-4-9 Pulse Magnetic Field Susceptibility
[
]a,c IEC 61000-4-10 Damped Oscillatory Magnetic Field
[
]a,c IEC 61000-4-12 Surge, Ring Wave
[
]a,c IEC 61000-4-13 Harmonics and Interharmonics
[
]a,c IEC 61000-4-16 Conducted Susceptibility 15 Hz to 150 kHz
[
]a,c
[
]a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 3-30 Westinghouse Non-Proprietary Class 3 3.3.2.1 Failures or Deviations During Cabinet Level EMC Testing
[
a,c Table 3.3-6.
[
]a,c
[
]a,c 3.3.2.1.1 Evaluation of Over-the-Limit Magnetic Field Radiated Emissions
[
]a,c a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 3-31 Westinghouse Non-Proprietary Class 3
[
]a,c 3.3.2.1.2 Disposition of Over-the-Limit Electric Field Radiated Emissions
[
]a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 3-32 Westinghouse Non-Proprietary Class 3 3.3.2.2 Anomalies During Cabinet Level EMC Testing
[
]a,c (Last Page of Section 3)
LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 4-1 Westinghouse Non-Proprietary Class 3 SECTION 4 ANALYSIS PERFORMED AND BASIS FOR QUALIFICATION During the initial phase of the PPS digital modernization program, evaluation EQ-EV-386-GLIM (Reference 39) was performed to evaluate the Common Q platform against the Limerick seismic, environmental and EMC requirements. The evaluation concluded that while the generic Common Q platform qualification provides confidence that the previous qualification is compliant with the Limerick requirements, it also concluded that additional seismic, environmental, and EMC testing and/or analyses were required to qualify the differences which exist between the previously qualified configurations and the Limerick configuration. Based on those differences, the additional testing documented in Section 3 was performed. [
]a,c 4.1 SEISMIC 4.1.1 Seismic Evaluations Performed 4.1.1.1 Main Control Room Component Evaluation
[
]a,c Table 4.1-1.
[
]a,c
[
]a,c a c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 4-2 Westinghouse Non-Proprietary Class 3 a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 4-3 Westinghouse Non-Proprietary Class 3 4.1.2 Dynamic Similarity Analysis
[
]a,c 4.1.3 Basis for Seismic Qualification
[
a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 4-4 Westinghouse Non-Proprietary Class 3 4.2 ENVIRONMENTAL 4.2.1 Environmental Evaluation
[
]a,c Table 4.2-1.
[
]a,c a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 4-5 Westinghouse Non-Proprietary Class 3
[
]a,c Figure 4.2-1.
[
]a,c a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
LIM-24-090, Revision 0, Attachment 4 Constellation Energy Figure 4.2-2.
EQ-QR-433-GLIM-NP, Rev. 4 Qualification Summary Repo11 fo1*
the Plant Protection System Upgrade fo1* Limerick Units 1 & 2 4-6 Westinghouse Non-Proprietary Class 3 a,c
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 4-7 Westinghouse Non-Proprietary Class 3 Figure 4.2-3.
[
]a,c a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 4-8 Westinghouse Non-Proprietary Class 3 Figure 4.2-4.
[
]a,c 4.2.2 Basis for Environmental Qualification
[
]a,c a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 4-9 Westinghouse Non-Proprietary Class 3 4.3 EMC 4.3.1 EMC Evaluation
[
]a,c 4.3.2 Basis for EMC Qualification
[
]a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 4-10 Westinghouse Non-Proprietary Class 3 4.4 HARDWARE RECONCILIATION
[
]a,c 4.4.1 Hardware Reconciliation Methodology
[
]a,c 4.4.2 Hardware Reconciliation Conclusions
[
]a,c (Last Page of Section 4)
LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 5-1 Westinghouse Non-Proprietary Class 3 SECTION 5 INSTALLATION REQUIREMENTS AND MAINTENANCE, SURVEILLANCE, AND REPLACEMENT PROGRAM 5.1 INSTALLATION LIMITATIONS
[
]a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 5-2 Westinghouse Non-Proprietary Class 3
[
]a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 5-3 Westinghouse Non-Proprietary Class 3
[
]a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 5-4 Westinghouse Non-Proprietary Class 3 5.1.1 Use of Ferrites for EMC Qualification
[
]a,c Table 5.1-1.
[
]a,c
[
]a,c a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 5-5 Westinghouse Non-Proprietary Class 3 Figure 5.1-1.
[
]a,c a,c LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 5-6 Westinghouse Non-Proprietary Class 3 5.2 MAINTENANCE, SURVEILLANCE, AND REPLACEMENT PROGRAM
[
]a,c (Last Page of Section 5)
LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Qualification Summary Report for Constellation Energy the Plant Protection System Upgrade for Limerick Units 1 & 2 EQ-QR-433-GLIM-NP, Rev. 4 6-1 Westinghouse Non-Proprietary Class 3 SECTION 6
SUMMARY
AND CONCLUSIONS
6.1 CONCLUSION
S An equipment qualification program was performed to demonstrate that the PPS equipment is qualified for use at Limerick Units 1 & 2. The equipment was qualified as Class 1E, and it was proven that it will perform its safety related functions during and after design basis events and in postulated abnormal environments. The equipment was shown to be immune to electromagnetic disturbances and to not produce excessive electromagnetic emissions in accordance with the industry testing standards and regulatory guidance for EMC qualification.
Seismic qualification was performed in accordance with U.S. NRC Regulatory Guide 1.100 (Reference 8) and IEEE Std 344-1987 (Reference 7). This meets the technical requirements of IEEE Std 344-1975 (Reference 6).
Environmental qualification was performed in accordance with IEEE Std 323-1974 (Reference 12) as endorsed by U.S. NRC Regulatory Guide 1.89 (Reference 13) and clarified by IEEE Std 323-1983 (Reference 14)
EMC qualification was performed in accordance with U.S NRC Regulatory Guide 1.180 (Reference 16) and EPRI Topical Report TR-102323 (Reference 15). While some of the EPRI test limits were not met, it was shown that sufficient margin exists to provide reasonable assurance that the equipment will perform as designed within the expected EMC environment.
The qualification testing identified in Section 3 for the PPS along with the supportive analyses identified in Section 4 demonstrate seismic qualification to the Limerick Units 1 & 2 requirements.
Based on the discussions above, it is concluded that the Limerick Units 1 & 2 PPS equipment meets the plant-specific EQ requirements as defined in Performance Specification NE-402 (Reference 2), LS-0192 (Reference 10), and A1656919 (Reference 11). The installation restrictions and limitations associated with this qualification are discussed in Section 5.1.
Closure of all open items identified in this report is required before the PPS equipment can be used in Limerick Units 1&2.
(Last Page of Section 6)
LIM-24-090, Revision 0, Attachment 4
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Westinghouse Non-Proprietary Class 3 Westinghouse Electric Company 1000 Westinghouse Drive Cranberry Township, PA 16066
© 2024 Westinghouse Electric Company LLC All Rights Reserved APP-GW-GLR-611-NP, Revision 3, ITAAC 2.5.02.14: Component Interface Module Design Process Technical Report (Non-Proprietary)
LIM-24-090, Revision 0, Attachment 6
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
Westinghouse Non-Proprietary Class 3 APP-GW-GLR-611-NP December 2016 Revision 3 AP1000 Design Certification ITAAC 2.5.02.14:
Component Interface Module Design Process Technical Report LIM-24-090, Revision 0, Attachment 6
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
WESTINGHOUSE NON-PROPRIETARY CLASS 3
- Electronically approved records are authenticated in the electronic document management system.
Westinghouse Electric Company LLC 1000 Westinghouse Drive Cranberry Township, PA 16066, USA
© 2016 Westinghouse Electric Company LLC All Rights Reserved APP-GW-GLR-611-NP Revision 3 AP1000 Design Certification ITAAC 2.5.02.14:
Component Interface Module Design Process Technical Report Shawn M. Downey*, Principal Engineer Standard Hardware Components December 2016 Reviewer:
Sarah T. DiTommaso*, Manager AP1000 ITAAC & Inspection Support Verifier:
Michael C. Shaffer*, Manager Independent Verification and Validation II Approved: Robert B. Phillips*, Manager Standard Hardware Components LIM-24-090, Revision 0, Attachment 6
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP WESTINGHOUSE NON-PROPRIETARY CLASS 3 AP1000 Revision 3 Page 4 of 34 TABLE OF CONTENTS RECORD OF REVISIONS.......................................................................................................................... 5 LIST OF TABLES........................................................................................................................................ 6 LIST OF FIGURES...................................................................................................................................... 6 LIST OF ACRONYMS AND TRADEMARKS........................................................................................... 7 1
INTRODUCTION........................................................................................................................... 8 1.1 PURPOSE........................................................................................................................... 8 1.2 SCOPE................................................................................................................................ 8 1.3 OVERVIEW OF CIM DESIGN PROCESSES.................................................................. 9 2
ITAAC 2.5.02.14 - ACCEPTANCE CRITERIA A....................................................................... 13 2.1 PROCESS FOR DESIGN REQUIREMENTS PHASE................................................... 13
2.2 CONCLUSION
................................................................................................................. 14 3
ITAAC 2.5.02.14 - ACCEPTANCE CRITERIA B....................................................................... 15 3.1 PROCESS FOR SYSTEM DEFINITION PHASE.......................................................... 15
3.2 CONCLUSION
................................................................................................................. 16 4
ITAAC 2.5.02.14 - ACCEPTANCE CRITERIA C....................................................................... 17 4.1 PROCESS FOR HARDWARE AND SOFTWARE DEVELOPMENT PHASE............. 17
4.2 CONCLUSION
................................................................................................................. 18 5
ITAAC 2.5.02.14 - ACCEPTANCE CRITERIA D....................................................................... 19 5.1 PROCESS FOR SYSTEM INTEGRATION AND TEST PHASE................................... 19
5.2 CONCLUSION
................................................................................................................. 20 6
ITAAC 2.5.02.14 - ACCEPTANCE CRITERIA E....................................................................... 21 6.1 PROCESS FOR INSTALLATION PHASE..................................................................... 21
6.2 CONCLUSION
................................................................................................................. 21 7
CONCLUSION.............................................................................................................................. 22 8
REFERENCES.............................................................................................................................. 23 APPENDIX A - RELATIONSHIP BETWEEN ITAAC 2.5.02.14 AND 2.5.02.11................................. 27 APPENDIX B - CIM LIFECYCLE PROCESS IMPLEMENTATION................................................... 28 LIM-24-090, Revision 0, Attachment 6
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP WESTINGHOUSE NON-PROPRIETARY CLASS 3 AP1000 Revision 3 Page 5 of 34 RECORD OF REVISIONS Revision Date Revision Description 0
October, 2015 Initial issue 1
November, 2015 Modified Appendix A - Figure 1 to show the lines from the requirements documents going to both the CIM design phase and PMS system definition phase.
Modified title of sub-section headers.
2 January, 2016 Per CAPAL # 100353533, added a reference for WEC 3.3.1 in the References section and corrected the reference for WEC 3.3.1 in Section 2.1.
Removed DCD from the acronym list.
Defined SHA in Section 2.1.
3 December, 2016 Clarified hardware testing in Section 5.1.
Added Appendix B to address process implementation. Added discussion of appendix B to Section 1.2.
Made minor revisions to Section 1.2 (Scope) and to Sections 2-7 to clarify inspections performed and conclusions.
Added revision numbers to references 16 and 42.
Added references 42-59.
LIM-24-090, Revision 0, Attachment 6
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP WESTINGHOUSE NON-PROPRIETARY CLASS 3 AP1000 Revision 3 Page 6 of 34 TABLE OF CONTENTS (cont.)
LIST OF TABLES Table Title Page Table 1
[
]a,c.................................................................. 10 LIST OF FIGURES Figure Title Page Figure 1
[
]a,c............................................. 27 LIM-24-090, Revision 0, Attachment 6
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP WESTINGHOUSE NON-PROPRIETARY CLASS 3 AP1000 Revision 3 Page 7 of 34 LIST OF ACRONYMS AND TRADEMARKS Acronyms used in the document are defined in WNA-PS-00016-GEN, Standard Acronyms and Definitions (Reference 31) or are included below to ensure unambiguous understanding of their use within this document.
CIM Component Interface Module EQ Equipment Qualification FMEA Failure Modes and Effects Analysis FPGA Field Programmable Gate Array HDL Hardware Description Language IDI Isolated Development Infrastructure ISE IV&V Simulation Environment ITAAC Inspections, Tests, Analyses and Acceptance Criteria IV&V Independent Verification and Validation PLS Plant Control System QA Quality Assurance PMS Protection and Safety Monitoring System RTL Register Transfer Logic SHA Software Hazards Analysis SIOS Standard I/O Simulator SPM Software Program Manual SRNC Safety Remote Node Controller Verilog is a registered trademark of Cadence Design Systems, Inc.
AP1000 is a registered trademark in the United States of Westinghouse Electric Company LLC, its subsidiaries and/or its affiliates. This mark may also be used and/or registered in other countries throughout the world. All rights reserved. Unauthorized use is strictly prohibited.
All other product and corporate names used in this document may be trademarks or registered trademarks of other companies, and are used only for explanation and to the owners benefit, without intent to infringe.
LIM-24-090, Revision 0, Attachment 6
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP WESTINGHOUSE NON-PROPRIETARY CLASS 3 AP1000 Revision 3 Page 8 of 34 1
INTRODUCTION 1.1 PURPOSE The purpose of this document is to provide a roadmap to the documentation that fulfills the inspections, tests, analyses and acceptance criteria (ITAAC) for PMS ITAAC 2.5.02.14.
1.2 SCOPE Sections 2 through 6 of this report covers the Component Interface Module - Safety Remote Node Controller (CIM-SRNC) Subsystem lifecycle processes used to support the design requirements phase, system definition phase, hardware and software development phase, system integration and test phase, and installation phase. Appendix B of this report addresses implementation of the processes utilized during the design requirements phase, system definition phase, hardware and software development phase, system integration and test phase, and installation phase. This appendix summarizes previous inspections performed on the CIM implementation documents throughout the lifecycle process to ensure that the lifecycle processes were adequately followed, and ensures that the IV&V phase summary report was produced indicating that the IV&V tasks were completed.
The ITAAC 2.5.02.14 Design Commitment is:
- 14. The Component Interface Module (CIM) is developed using a planned design process which provides for specific design documentation and reviews.
The ITAAC 2.5.02.14 Inspections, Tests, Analyses is:
An inspection and or an audit will be performed of the processes used to design the hardware, development software, qualification and testing.
The ITAAC 2.5.02.14 Acceptance Criteria are:
A report exists and concludes that CIM meets the below listed life cycle stages.
Life cycle stages:
- a. Design requirements phase, may be referred to as conceptual or project definition phase
- b. System definition phase
- c. Hardware and software development phase, consisting of hardware and software design and implementation
- d. System integration and test phase
- e. Installation phase LIM-24-090, Revision 0, Attachment 6
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP WESTINGHOUSE NON-PROPRIETARY CLASS 3 AP1000 Revision 3 Page 9 of 34 This report will document the processes inspected for each of the acceptance criteria. Although the ITAAC wording only covers the CIM, this document covers the life cycle process for the entire CIM-SRNC subsystem. [
]a,c 1.3 OVERVIEW OF CIM DESIGN PROCESSES This report describes the process used for the development of the Component Interface Module (CIM) -
Safety Remote Node Controller (CIM-SRNC) subsystem. The CIM-SRNC subsystem consists of standard components used within the Protection and Safety Monitoring System (PMS). A standard component is a component available for use by any project, and is not limited to AP1000 projects. The components include: CIM, SRNC, CIM base plate, SRNC base plate, single-width transition panel, double-width transition panel, and branch terminating device. Two of the components - the CIM and the SRNC - are based on field programmable gate array (FPGA) technology. The CIM-SRNC subsystem provides the interface to control Class 1E components and several non-class 1E components. It can receive inputs from PMS, the Plant Control System (PLS), and local controls on the CIM module. The CIM uses a priority-based logic to determine which input to act upon. The SRNC provides the communication interface to PMS for the CIM-SRNC subsystem. The CIM-SRNC subsystem is developed using a planned design process which provides for specific design documentation and reviews.
[
]a,c LIM-24-090, Revision 0, Attachment 6
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP WESTINGHOUSE NON-PROPRIETARY CLASS 3 AP1000 Revision 3 Page 10 of 34 Table 1
[
]a,c
[
]
a,c LIM-24-090, Revision 0, Attachment 6
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP WESTINGHOUSE NON-PROPRIETARY CLASS 3 AP1000 Revision 3 Page 11 of 34
[
]a,c LIM-24-090, Revision 0, Attachment 6
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP WESTINGHOUSE NON-PROPRIETARY CLASS 3 AP1000 Revision 3 Page 12 of 34
[
]a,c LIM-24-090, Revision 0, Attachment 6
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP WESTINGHOUSE NON-PROPRIETARY CLASS 3 AP1000 Revision 3 Page 13 of 34 2
ITAAC 2.5.02.14 - ACCEPTANCE CRITERIA A The acceptance criteria item a) in ITAAC 2.5.02.14 states:
A report exists and concludes that CIM meets the below listed life cycle stages.
- a. Design requirements phase, may be referred to as conceptual or project definition phase 2.1 PROCESS FOR DESIGN REQUIREMENTS PHASE The COL Appendix C ITAAC Design Requirements Phase corresponds to the concept phase and planning phase per Table 1. During the concept phase, the CIM-SRNC project team works with other Westinghouse project teams to develop the CIM-SRNC requirements. Concept phase activities include:
Reviewing and providing feedback on project requirements documents. This review includes design review activities per WEC 3.3.1, Design Reviews (Reference 42).
Defining overall project strategy, schedule, milestones, assurance requirements and verification strategy Exploring conceptual approaches to new CIM/SRNC design. Considerations include budgetary data and life cycle constraints and benefits.
The planning phase is initiated upon completion of the project requirements documents to drive subsequent creation of the required planning documents. These requirements documents are listed below:
WNA-PD-00050-GEN, Component Interface Module (CIM) and Safety Remote Node Controller (SRNC) Development Project Plan (Reference 9).
WNA-DS-01272-GEN, Safety System Remote Node Controller Requirements Specification (Reference 14).
WNA-DS-01271-GEN, Component Interface Module Hardware Requirements Specification (Reference 12).
WNA-DS-02331-GEN, Component Interface Module Logic Specification (Reference 13).
The following planning documents are created after the project requirements documents above are completed. Descriptions of the plans are given in section 1.3 of this document.
6105-00015, CIM-SRNC Software Program Manual, (Reference 1).
6105-00000, CIM-SRNC Management Plan, (Reference 2).
6105-00001, CIM-SRNC QA Plan, (Reference 3).
6105-00013, CIM-SRNC IV&V Plan, (Reference 4).
6105-00002, CIM-SRNC CM Plan, (Reference 6).
6105-00005, CIM-SRNC Test Plan, (Reference 7).
6105-00014, CIM-SRNC FPGA Development Plan, (Reference 8).
[
]a,c LIM-24-090, Revision 0, Attachment 6
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP WESTINGHOUSE NON-PROPRIETARY CLASS 3 AP1000 Revision 3 Page 14 of 34
[
]a,c
2.2 CONCLUSION
[
]a,c LIM-24-090, Revision 0, Attachment 6
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP WESTINGHOUSE NON-PROPRIETARY CLASS 3 AP1000 Revision 3 Page 15 of 34 3
ITAAC 2.5.02.14 - ACCEPTANCE CRITERIA B The acceptance criteria for item b) in ITAAC 2.5.02.14 are:
A report exists and concludes that CIM meets the below listed life cycle stages.
- b. System Definition Phase 3.1 PROCESS FOR SYSTEM DEFINITION PHASE The COL Appendix C ITAAC System Definition Phase corresponds to the requirements phase per Table 1. During the requirements phase, both the software requirements and the hardware requirements are developed.
6105-00014, CIM-SRNC FPGA Development Plan (Reference 8) controls the development and documentation of software requirements. Software Requirements Specifications (SRSs) are developed during the planning and requirements phases for the CIM and SRNC. Inputs, such as installation support requirements, system constraints, CIM-SRNC management plan, risk analysis, system functional software requirements, and any applicable system interface requirements from the system requirements specification provide the necessary system and functional requirements to develop software requirements and hardware design.
The CIM and SRNC FPGA requirements are developed and refined per NA 4.51, Field Programmable Gate Array (FPGA) Development Procedure (Reference 11). The CIM FPGA requirements are derived from higher-level requirements [
]a,c Following the completion of the software requirements documents, the IV&V team independently reviews them in accordance with 6105-00013, CIM-SRNC IV&V Plan (Reference 4).
[
]a,c LIM-24-090, Revision 0, Attachment 6
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP WESTINGHOUSE NON-PROPRIETARY CLASS 3 AP1000 Revision 3 Page 16 of 34
[
]a,c
3.2 CONCLUSION
[
]a,c LIM-24-090, Revision 0, Attachment 6
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP WESTINGHOUSE NON-PROPRIETARY CLASS 3 AP1000 Revision 3 Page 17 of 34 4
ITAAC 2.5.02.14 - ACCEPTANCE CRITERIA C The acceptance criteria item c) in ITAAC 2.5.02.14 states:
A report exists and concludes that CIM meets the below listed life cycle stages.
- c. Hardware and software development phase, consisting of hardware and software design and implementation 4.1 PROCESS FOR HARDWARE AND SOFTWARE DEVELOPMENT PHASE The COL Appendix C ITAAC Hardware and Software Development Phase corresponds to the design and implementation phases per Table 1. During the design and implementation phases, both software and hardware are developed.
6105-00014, CIM-SRNC FPGA Development Plan (Reference 8), controls the design of the CIM and SRNC software. The software design documentation is produced during the design phase. The design team produces the CIM and SRNC FPGA designs and documents these designs in accordance with 6105-00014 in software design descriptions for both the CIM and SRNC. The software design descriptions provide a detailed description of the software architecture and the interfaces between the software components and between the software, hardware, and instrumentation of the FPGA design in the CIM and SRNC. [
]a,c The FPGA design documents are placed under configuration control in accordance with 6105-00002, CIM-SRNC CM Plan (Reference 6). [
a,c The design team implements the CIM and SRNC FPGA software designs in accordance with 6105-00014, CIM-SRNC FPGA Development Plan (Reference 8) using the tools identified in 6105-00030, CIM-SRNC Design Tools (Reference 30).
[
]a,c LIM-24-090, Revision 0, Attachment 6
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP WESTINGHOUSE NON-PROPRIETARY CLASS 3 AP1000 Revision 3 Page 18 of 34
[
]a,c The hardware team ensures that detailed specifications and documentation of the hardware are completed as required by 6105-00000, CIM-SRNC Management Plan (Reference 2). [
]a,c
4.2 CONCLUSION
[
]a,c LIM-24-090, Revision 0, Attachment 6
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP WESTINGHOUSE NON-PROPRIETARY CLASS 3 AP1000 Revision 3 Page 19 of 34 5
ITAAC 2.5.02.14 - ACCEPTANCE CRITERIA D The acceptance criteria for item d) in ITAAC 2.5.02.14 states:
A report exists and concludes that CIM meets the below listed life cycle stages.
- d. System integration and test phase 5.1 PROCESS FOR SYSTEM INTEGRATION AND TEST PHASE The COL Appendix C ITAAC System Integration and Test Phase corresponds to the test phase of the development stage per Table 1. During the system integration and test phase, software and hardware are integrated and type tested to confirm that the design requirements are being met.
[
]a,c Building the RTL for the CIM to create the image to be flashed is controlled by 6105-20025, CIM FPGA Build Procedure (Reference 19), and building the RTL for the SRNC to create the image to be flashed is controlled by 6105-10025, SRNC FPGA Build Procedure (Reference 20). [
]a,c Overall testing of the CIM and SRNC is described in 6105-00005 CIM-SRNC Test Plan (Reference 7).
[
]a,c The validation testing results are documented in the IV&V Phase Summary Report. In addition, IV&V validation testing [
]a,c is conducted per WNA-TP-04019-GEN, CIM SRNC Subsystem Test Procedure (Reference 24).
[
]a,c LIM-24-090, Revision 0, Attachment 6
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP WESTINGHOUSE NON-PROPRIETARY CLASS 3 AP1000 Revision 3 Page 20 of 34
5.2 CONCLUSION
[
]a,c LIM-24-090, Revision 0, Attachment 6
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP WESTINGHOUSE NON-PROPRIETARY CLASS 3 AP1000 Revision 3 Page 21 of 34 6
ITAAC 2.5.02.14 - ACCEPTANCE CRITERIA E The acceptance criteria for item e) in ITAAC 2.5.02.14 states:
A report exists and concludes that CIM meets the below listed life cycle stages.
- e. Installation phase 6.1 PROCESS FOR INSTALLATION PHASE The COL Appendix C ITAAC Installation Phase corresponds to the manufacturing and test phases per Table 1. [
]a,c
6.2 CONCLUSION
[
]a,c LIM-24-090, Revision 0, Attachment 6
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP WESTINGHOUSE NON-PROPRIETARY CLASS 3 AP1000 Revision 3 Page 22 of 34
[
]a,c 7
CONCLUSION
[
]a,c LIM-24-090, Revision 0, Attachment 6
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP WESTINGHOUSE NON-PROPRIETARY CLASS 3 AP1000 Revision 3 Page 23 of 34 8
REFERENCES
[
]a,c LIM-24-090, Revision 0, Attachment 6
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP WESTINGHOUSE NON-PROPRIETARY CLASS 3 AP1000 Revision 3 Page 24 of 34
[
]a,c LIM-24-090, Revision 0, Attachment 6
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP WESTINGHOUSE NON-PROPRIETARY CLASS 3 AP1000 Revision 3 Page 25 of 34
[
]a,c LIM-24-090, Revision 0, Attachment 6
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP WESTINGHOUSE NON-PROPRIETARY CLASS 3 AP1000 Revision 3 Page 26 of 34
[
a,c LIM-24-090, Revision 0, Attachment 6
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP WESTINGHOUSE NON-PROPRIETARY CLASS 3 AP1000 Revision 3 Page 27 of 34 APPENDIX A - RELATIONSHIP BETWEEN ITAAC 2.5.02.14 AND 2.5.02.11 Figure 1
[
]a,c a,c LIM-24-090, Revision 0, Attachment 6
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP WESTINGHOUSE NON-PROPRIETARY CLASS 3 AP1000 Revision 3 Page 28 of 34 APPENDIX B - CIM LIFECYCLE PROCESS IMPLEMENTATION
[
]a,c A. Design Requirements Phase As described in section 2.1 of this report, the design requirements phase consists of a concept phase and a planning phase. As discussed in section 2.1 of this report, the planning phase was initiated upon completion of the requirements documents below to drive subsequent creation of the required planning documents:
WNA-PD-00050-GEN, Component Interface Module (CIM) and Safety Remote Node Controller (SRNC) Development Project Plan (Reference 9).
WNA-DS-01272-GEN, Safety System Remote Node Controller Requirements Specification (Reference 14).
WNA-DS-01271-GEN, Component Interface Module Hardware Requirements Specification (Reference 12).
WNA-DS-02331-GEN, Component Interface Module Logic Specification (Reference 13).
The following planning documents were created after the project plan and requirements documents above are completed. These plans are the documents which implement the above requirements documents:
6105-00015, CIM-SRNC Software Program Manual, (Reference 1).
6105-00000, CIM-SRNC Management Plan, (Reference 2).
6105-00001, CIM-SRNC QA Plan, (Reference 3).
6105-00013, CIM-SRNC IV&V Plan, (Reference 4).
6105-00002, CIM-SRNC CM Plan, (Reference 6).
6105-00005, CIM-SRNC Test Plan, (Reference 7).
LIM-24-090, Revision 0, Attachment 6
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP WESTINGHOUSE NON-PROPRIETARY CLASS 3 AP1000 Revision 3 Page 29 of 34 6105-00014, CIM-SRNC FPGA Development Plan, (Reference 8).
[
]a,c B. System Definition Phase As described in section 3.1 of this report, both the CIM software requirements and the hardware requirements were developed during the system definition phase. The CIM software requirements were released in 6105-20004, CIM FPGA Software Requirements Specification (Reference 43) and the SRNC software requirements were released in 6105-10004, SRNC FPGA Software Requirements Specification (Reference 44). Following the completion of the software requirements documents, the IV&V team independently reviewed them in accordance with 6105-00013, CIM-SRNC IV&V Plan (Reference 4) and documented the results in 6105-00092, CIM-SRNC IVV Phase Summary Report (Reference 48).
[
]a,c Also in the system definition phase, the requirements traceability matrix (RTM) documents, 6105-10010, Safety Remote Node Controller Requirements Traceability Matrix (Reference 56) and 6105-20010, Component Interface Module Requirement Traceability Matrix (Reference
- 57) were produced by the design team in accordance with 6105-00014, CIM-SRNC FPGA Development Plan (Reference 8). These RTMs trace high level CIM and SRNC hardware and software requirements to specific requirements, ensuring each requirement is met with accuracy.
These documents are maintained through the subsequent life cycle phases.
The IV&V team performed an evaluation of activities in this phase per 6105-00013, CIM SRNC IV&V Plan (Reference 4). The results of the evaluations performed by IV&V were documented LIM-24-090, Revision 0, Attachment 6
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP WESTINGHOUSE NON-PROPRIETARY CLASS 3 AP1000 Revision 3 Page 30 of 34 in the applicable revision of 6105-00092, CIM-SRNC IVV Phase Summary Report (Reference 48).
System Definition Phase Process Implementation Documents 6105-20004, CIM FPGA Software Requirements Specification (Reference 43) 6105-10004, SRNC FPGA Software Requirements Specification (Reference 44) 6105-00092, CIM-SRNC IVV Phase Summary Report (Reference 48) 6105-60019, CIM-SRNC Software Hazard Analysis Report (Reference 45) 6105-20008, CIM Reliability Analysis (Reference 46) 6105-10008, SRNC Reliability Analysis (Reference 47) 6105-10010, Safety Remote Node Controller Requirements Traceability Matrix (Reference 56) 6105-20010, Component Interface Module Requirement Traceability Matrix (Reference
- 57)
Table 2: [
]a,c C. Hardware and Software Development Phase As described in section 4.1 of this report, the Hardware and Software Development Phase corresponds to the design and implementation phases per Table 1. During the design and implementation phases, both the CIM software and hardware were developed. The design team produced the CIM and SRNC FPGA designs and documented these designs in accordance with 6105-00014 in software design descriptions for both the CIM and SRNC. The software design for the CIM was documented in 6105-20014, CIM FPGA Software Design Description (Reference
- 49) and the software design for the SRNC was documented in 6105-10014, SRNC FPGA Software Design Description (Reference 50). [
]a,c a,c LIM-24-090, Revision 0, Attachment 6
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP WESTINGHOUSE NON-PROPRIETARY CLASS 3 AP1000 Revision 3 Page 31 of 34
[
]a,c The IV&V team performed an evaluation of activities in this phase per 6105-00013, CIM SRNC IV&V Plan (Reference 4). The results of the evaluations performed by IV&V were documented in the applicable revision of 6105-00092, CIM-SRNC IVV Phase Summary Report (Reference 48).
[
]a,c Hardware and Software Implementation Phase Process Implementation Documents 6105-60019, CIM-SRNC Software Hazard Analysis Report (Reference 45) 6105-00092, CIM-SRNC IVV Phase Summary Report (Reference 48) 6105-20014, CIM FPGA Software Design Description (Reference 49) 6105-10014, SRNC FPGA Software Design Description (Reference 50)
LIM-24-090, Revision 0, Attachment 6
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP WESTINGHOUSE NON-PROPRIETARY CLASS 3 AP1000 Revision 3 Page 32 of 34 1200-00007, CIM Binary, Actel FPGA (Reference 52) 1200-00008, SRNC Binary, Actel FPGA (Reference 53)
[
]a,c Table 3: [
]a,c D. System Integration and Test Phase
[
]a,c a,c LIM-24-090, Revision 0, Attachment 6
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP WESTINGHOUSE NON-PROPRIETARY CLASS 3 AP1000 Revision 3 Page 33 of 34
[
]a,c Table 4: [
]a,c E. Installation Phase As described in section 6.1 of this report, the Installation phase of the CIM life cycle is defined to be a manufacturing activity in which software images are loaded into the CIM and SRNC and the CIM and SRNC modules are tested in the production environment [
]a,c a,c LIM-24-090, Revision 0, Attachment 6
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
APP-GW-GLR-611-NP WESTINGHOUSE NON-PROPRIETARY CLASS 3 AP1000 Revision 3 Page 34 of 34
[
a,c IV&V performed an evaluation of the installation activities in accordance with 6105-00013, CIM SRNC IV&V Plan (Reference 4) and the results of this review is documented in 6105-00092, CIM-SRNC IVV Phase Summary Report (Reference 48).
Installation Phase Process Implementation Documents 6105-00092, CIM-SRNC IVV Phase Summary Report (Reference 48)
[
]a,c Table 5: [
]a,c a,c LIM-24-090, Revision 0, Attachment 6
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)
LIM-24-090 Revision 0 Proprietary Class 2 (R)
- This page was added to the quality record by the PRIME system upon its validation and shall not be considered in the page numbering of this document.**
Approval Information Author Approval Shakun Matthew A Jun-19-2024 09:58:36 Files approved on Jun-19-2024
- This record was final approved on 06/19/2024 09:58:36. (This statement was added by the PRIME system upon its validation)