NYS00252D United States Nuclear Regulatory Commission Official Hearing Exhibit Submitted: December 21, 2011 Entergy Nuclear Operations, Inc.

In the Matter of:

Appendix D' (Indian Point Nuclear Generating Units 2 and 3)

ASLBP #: 07-858-03-LR-BD01 A detailed review of the APETs is difficult but not impossible. In the current documentation, the APETs were sufficiently described. Reviews were performed as described in Section D.3.3.

Docket #: 05000247 l 05000286 Comment: Early containment failure calculations are based on flawed accident progression event trees.

Pathways with a potential for pressure reduction in the reactor coolant system are neglected.

Exhibit #: NYS00252D-00-BD01 Identified: 10/15/2012

Response

In the draft analyses, the PWR event trees included several important depressurization mechanisms, namely. induced reactor coolant system hot leg failure. induced steam generator tube rupture. and reactor Admitted: 10/15/2012 Withdrawn:

coolant pump seal failure. The BWR event trees took into account the operation of the automatic depressurization systems. In the current analyses. the PWR event trees have been revised to include a possible reactor coolant primary system andlor secondary system depressurization by the operators and by Rejected: Stricken:

Other:

~

~

'.'j "

~....,

),,~

power-operated relief valves (PORYs) sticking open. The combined effect of these depressurization mechanisms was found to be important in the present risk analysis.

Comment: The risk reduction due to containment venting can be assessed only after a detailed study of S3.J.'cf.LS O~ venting procedures. relevant hardware. and plant response has been done. There is much disagreement as to the scenarios leading up to venting, the manner in which to vent, the vent size, re-isolating, and the effectiveness of venting. Containment venting should be included in the analyses only if procedures and equipment exist at the given plant.

Response

The actions included in the NUREG-llS0 analyses that could result in deliberate containment venting were those permitted by plant-specific operational procedures. Of the five plants studied, only two (Peach Bottom and Grand Gulf) had such procedures. For these two, the probability of successful venting was a function of the available procedures and hardware. For the Peach Bottom plant, it was found that venting with existing hardware and procedures was viable (had a high probability of success) for one type of acc~dent. the long-term loss of decay heat removal. For other sequences, the probability of successful venting was of low probability, principally because of hardware limitations (Ref. D.43). For the Grand Gulf plant. the situation is similar. For the long-term loss of decay heat removal sequences, the procedures exist and operators can vent from the control room. Credit was not given in the most frequent accident sequences (Le., station blackouts) because of unavailability of needed dc power.

D.6.2 Containment Loading Phenomena Comment: Studies of severe accident phenomena are conflicting. Some studies predict global hydrogen bums while others conclude that global combustion cannot occur. Some studies show that hydrogen detonations can occur while others show that diffusive burning will occur. Some studies show early containment failure while other studies show that an early failure can occur only as an interfacing-system loss-of-coolant accident. Some studies suggest that the steel shell of a containment can be breached when contacted by molten core debris while other studies suggest that heat will be conducted away from the shell at a sufficient rate to prevent meltthrough. The conflicting studies give little confidence in the conclusions that are drawn from them.

Response

It is agreed that the present information base on severe reactor accident phenomenology is limited and that this base sometimes contains conflicting data. The state of this information base is one reason why the NRC staff chose to characterize individual phenomenological issues and the associated risk analyses by probability distributions, rather than single-valued estimates, and make use of expert judgment. as done in other analyses of poorly understood issues. to review and interpret the available information.

Comment: NUREG-llS0 states that for BWRs direct containment heating is not a prominent cause of containment failure because the core support design will allow limited portions of the core to melt and fall into the lower vessel head, causing localized vessel failure before the bulk of the core accumulates in the lower head. This is assumed; no calculations or experiments are offered in support of this hypothesis.

NUREG-1150 D-18 OAGI0000611_00627

Appendix D

Response

Many'of the values used in the analyses found in draft NUREG-llS0 were inadequately justified. The current analyses have been more thoroughly documented. Issues such as the loads on a containment building at the time of reactor vessel breach, including the effects of direct containment heating, were determined through expert interpretation of available calculations and experiments. Details of these analyses are discussed in References D.1S and D.39.

Comment: There are large uncertainties associated with direct containment heating (DCH). An industry group studied DCH and found it not to be a contributor to containment failure in the Sequoyah cavity design. Small-scale experiments indicate that 90 percent of the ejected melt will remain inside the cavity.

It is thought that, in the PWR reactor coolant system (RCS), hot leg failure can occur prior to the bottom head failure, precluding direct containment heating because the RCS would be at low pressure at the time of vessel failure. But other experimental studies done at a national laboratory indicate that DCH can occur. Analytical studies suggest that assuming depressurization by operators will not alleviate the problem since there are some accident scenarios in which depressurization cannot be achieved because of a lack of dc power.

Response

Since draft NUREG-llS0 was published in February 1987, the information base for quantifying important issues has been expanded. Among those that received considerable attention were contributors to containment loads during high-pressure melt ejection (including direct containment heating) and the potential for depressurizing the reactor vessel (including ReS hot leg failure). However, the information base remains incomplete. In the present study, experts in severe accidents were asked to interpret the information base and to generate probability distributions required for risk analyses. The experts who participated in this assessment and the information used to quantify containment loads at vessel breach are discussed in Sections C.S and C.6 of Appendix C.

Through expert judgment, it was concluded that the upper end of the range of potential containment loads accompanying high-pressure melt ejection reached high values (i.e., several times the containment design pressures). A containment analysis indicated, with relatively high confidence, that the Surry and the Zion containment structures could accommodate all but the highest of these loads. A similar conclusion could be drawn for the Sequoyah containment only if certaIn containment safety features operate (e.g., a substantial inventory of ice is in the ice condenser at the time of vessel breach). Regarding the RCS pressure at vessel breach, the current analyses indicate that in the majority of station blackout accident scenarios, at least one of several mechanisms (e.g., temperature-induced hot leg failure, reactor coolant pump seal failures) will reduce the pressure in the reactor coolant system to sufficiently low values to make high-pressure melt ejection unlikely. During other types of severe accident scenarios, manual actions, such as opening the pressurizer PORV, are likely to occur to similarly reduce the likelihood of high-pressure melt ejection.

Comment: When the necessary conditions exist, steam explosions can occur in a reactor vessel as a result of a degraded core contacting water in the lower head, and the explosion can be sufficiently energetic to cause reactor coolant system and containment building failure. Because of large uncertainties in this technical issue, it should be mathematically treated as a full issue in and of itself and not part of some other issue. The treatment should be consistent with previous studies done by the NRC and the industry.

Response

The probability of steam explosions sufficient to fail the containment building was treated as a separate issue and a probability distribution developed for the present version of NUREG-llS0. This distribution was developed by the NUREG-llS0 project staff using, as an initial basis, the work of the Steam Explosion Review Group (Ref. D.44). This work was updated (incorporating the possible effect of new information) by polling the individual members of the review group.

Comment: NUREG-l1S0 continues to carry the steam explosion issue along even though all but a few steam explosion researchers concluded that no issue remains. Considering this issue as a mechanism for D-19 NUREG-11S0 OAGI0000611 00628

Appendix D reactor vessel and containment failure is inconsistent with a previous study done by the NRC (the Steam Explosion Review Group).

Response

As discussed in the previous response. the present NUREG-1150 analyses of the potential for contain-ment building failure by in-vessel steam explosions are based on the work of the Steam Explosion Review Group.

Comment: In draft NUREG-1150, there is an accident sequence in which a containment failure leads to a failure of emergency core cooling, leading to core meltdown. This does not seem plausible.

Response

This type of accident sequence was first identified in the Reactor Safety Study (Ref. D.7) in 1975 as the S2C accident sequence in the Surry plant and as the TW sequence in the Peach Bottom plant. Since that time, analyses have been performed that indicate that the S2C sequence would not result in core damage in the Surry plant. However, the TW sequence has been investigated in a number of boiling water reactor PRAs and found in some cases to have a not insignificant frequency. For the present study of the Peach Bottom plant, this accident sequence made a small contribution to the core melt frequency, principally because the progression of the accident was slow. permitting operator intervention to preclude core damage.

Comment: The major contributors to Peach Bottom containment building failure appear to be the assumed overpressure failure in the wetwell above the water line, drywell head failure, or the assumed meltthrough of the drywell shell. NOI)e of these failure modes are supported to the degree necessary to warrant the level of confidence in the central estimate.

Response

Consideration of these failure modes in the present version of NUREG-llS0 made use of a spectrum of experimental and calculated data. Because these data were often conflicting. expert judgment was used to interpret the data and to develop the probability distributions needed for the risk studies.

The results of the Peach Bottom risk analysis for the present version of NUREG-1150 indicate that meltthrough of the drywell shell is the principal cause of early containment failure in that plant. However, high-pressure melt ejection remains a significant contributor to early containment failure.

Comment: The probabilities of hydrogen detonation in the BWR Mark III containment building and hydrogen combustion-induced failure of the Sequoyah containment building are overestimated. A detonation requires a very high concentration or a geometric configuration that will produce a sufficient flame acceleration. Data from over 40 tests in the Hydrogen Control Owners' Group 1/4-Scale Test Facility and other test data support the notion of containment-wide mixing that precludes high local concentrations and thus local detonations. The effects of diffusive combustion at the suppression pool surface controls the global hydrogen concentration from 4 to 6 volume percent, precluding flame acceleration. In a study of Sequoyah by an industry group, calculations indicate that during a station

.blackout accident. natural circulation in the containment will permit the recombination of combustible gases as the gases pass over hot debris in a reactor cavity without placing severe loads on the containment.

The large hydrogen loads that have been calculated result from inadequate credit given to the recombination of combustible gases.

Response

Experts, listed in Section C.4, of Appendix C, were asked to interpret information on hydrogen combustion. Each expert was familiar with published data and analyses regarding hydrogen combustion phenomena and their applicability to the distribution of hydrogen in a containment building, the ignition of hydrogen, and the attendant loads. Using these data, they developed distributions characterizing their NUREG-llS0 D-20 OAGI0000611 00629

Appendix D estimate of and uncertainty in selected parameters, such as ignition frequency, probability of deflagration/

detonation transition, and combustion loads. A summary of the probability distributions and their application in the Grand Gulf and the Sequoy'ah risk analyses is provided in Section C.4 of Appendix C.

Comment: The initiation of containment sprays in a BWR Mark III containment building should not lead to significant de-inerting. As the sprays cool the containment atmosphere, the reducing pressure will allow the suppression pool to flash as the saturation temperature is reached. The flashing will produce steam and at least partially re-inert the containment atmosphere. It is believed that a hydrogen burn after re-inerting is insufficiently energetic to cause containment building failure.

Response

The recovery of ac power allows both the containment sprays and the residual heat removal (RHR) system to operate. Eventually, the suppression pool will be cooled by the RHR system; this precludes flashing, and, hence, the containment will de-inert. It is thought that in a containment previously inerted by steam, and after the recovery of both ac power and containment sprays, the severity of a hydrogen burn depends on the relative timing of ignition. Ignition well after recovery of ac power (when the containment atmosphere is not inert) could result in a severe hydrogen bum. However, if ignition occurs soon after ac power recovery, a slow incomplete burn that does not threaten the containment or the dryweU could occur. Such incomplete burns are considered in the accident progression trees for Grand Gulf.

The spray de-inerting scenario is not as important in the current analyses as it was in the analyses of the earlier draft of NUREG-1150. Previously, the core damage frequency was dominated by long-term station blackout scenarios when the containment atmosphere is inert at the time of reactor vessel breach.

Currently, it is dominated by short-term station blackouts when the containment atmosphere is not inert at the time of vessel breach.

Comment: The phenomena in core-concrete interactions are not well understood; the models used are only approximations that are inadequately validated. But even if detailed models could be formulated, it is unnecessary to be concerned with such details while neglecting to examine the location and the behavior of previously evolved fission products. Because a molten core has lost nearly all its fission product gases, the core-concrete interaction is depleted of fission products.

Response

The major phenomena of a core-concrete interaction are reasonably well known and understood. Based on experimental studies, models have been developed that adequately represent the phenomena (Refs.

D.24 and D.45 through D.47).

While a molten core has lost essentially all the volatile fission products by the time it has penetrated the reactor vessel and begun to interact with concrete, it will still retain a majority of the nonvolatile species.

The subsequent evolution of these nonvolatile species can have a significant impact on the overall consequences.

D.6.3 Containment Structural Response Comment: There is no universal definition of what constitutes a containment failure, including leak failures and penetration failures.

Response

The accident progression event trees make a distinction between different failure locations and magnitudes of leakage. The source terms for each accident progression bin account for the effects of these differences in leakage behavior. The issue of location and mode of failure is probably treated in greater detail in this study than in any previous PRA, making use of available calculations and experimental data on containment building responses to severe accident loads.

0-21 NUREG-1150 OAGI0000611 00630

Appendix D Comment: Experimental data on the ultimate potential strength of containment buildings and their failure modes are lacking. This lack of data renders questionable the methods used in draft NUREG-1150 for assigning probabilities and locations of failures.

Response

The present data on the potential strength of containment structures under severe accident loadings and the potential modes of failure are limited. For the current analyses. the structural engineering experts who reviewed and interpreted the available information are listed in Section C.B of Appendix C.

Except for the Grand Gulf plant. the experts addressed the response of the containment bUildip.gs studied in NUREG-USO to a range of quasistatic pressure loads associated with severe accident conditions. Other containment failure mechanisms, such as penetration by a missile. structural failure due to impulse loads (e.g .* hydrogen detonation for Grand Gulf and Sequoyah). and meltthrough by molten material, were not addressed by structural experts directly but were addressed for some plants through other aspects of the risk analysis. For example. drywell shell meltthrough in the Peach Bottom reactor (BWR Mark I containment) was addressed by a separate expert panel.

The results of the experts' reviews and judgments are described in Appendix C of NUREG-l1S0. Briefly.

the median failure pressure ranged from 50 and 65 psig for Grand Gulf and Sequoyah, respectively, to 125 and 130 psig for Surry and Zion. respectively. The uncertainty in these estimates spanned a range of approximately 50 to 70 psi, regardless of the absolute range of the design or failure pressure. For the two large, dry containments. Surry and Zion. the median failure pressure corresponds to approximately three times the containment design pressure. The median failure pressure of 65 psig for the ice condenser containment, Sequoyah, was substantially lower than that for the large. dry containments; however. this value corresponds to more than six times the design pressure. For the two BWR containments, the Mark I at Peach Bottom and the Mark III at Grand Gulf, the ultimate capacity of the containments was estimated to be 150 psig and SO psig, respectively. This corresponds to approximately three times the respective des~gn pressures. The failure pressure of the Mark I containment was judged to be extremely sensitive to the drywell atmospheric temperature. As described in Appendix C, Section C.B, the ultimate capacity of the Peach Bottom drywell shell may decrease to levels at or below the containment design pressure if the drywell temperature exceeds 1200°F.

Comment: The Electric Power Research Institute (EPRI) has been conducting experiments to confirm the hypothesis that steel-lined concrete containments will develop small leaks before experiencing gross failure when subjected to high internal pressures. Industry computer programs have been modified to represent the behavior of steel liners and concrete. Codes have been developed that have been validated against experiments and can be used to analyze actual containments. This source of information should be used in NUREG-1150.

Response

Results of the EPRI tests were discussed in the expert elicitation process and were used in quantifying the failure pressure and modes of the concrete containments. A participant in the EPRI program served on the containment performance panel of experts.

Comment: In BWR analyses, secondary containments should be taken into account because there are divergent views on the capability of this structure to withstand a failure of the primary containment and to retain aerosols.

Response

In the current version of NUREG-1150, the decontamination factor (DF) of the reactor building was quantified through expert interpretation of available data. The judgments on the DFs (for several release rates, steam concentrations, and flow patterns) were based on models of and calculations from mechanistic codes. personally developed models, and experiments. A DF was not applied to the reactor building of the Grand Gulf plant because the most likely failure location is at the top of the containment; NUREG-1150 D-22 OAGI0000611 00631

Appendix D the only structure between the anticipated failure location and ,the environment is a corrugated metal structure that is judged to fail immediately after containment failure, Comment: The Peach 'Bottom analysis was based on the concept of a freestanding structure. However.

the failure pressure would be higher than considered in draft NUREG-1150 because the steel shell would get support from the concrete as it expands under pressure loading.

Response

The performance of the Peach Bottom steel shell was reviewed by an expert panel of structural engineers.

Data available to the panel members included an analysis by the Chicago Bridge and Iron Company on the structural capability of the Peach Bottom steel shell, explicitly including the effects of the concrete biological shield surrounding the shell. The results of the expert review are discussed in Section C.B of Appendix C.

Comment: The assumption that the dryweU shell fails as the molten core material contacts the shell is driven by expert judgment. The failure might be delayed or averted if the shell conducts heat away from the contact point rapidly.

Response

The potential for drywell shell failure by direct contact of molten core material has been analyzed by a number of organizations, including Brookhaven National Laboratory, Oak Ridge National Laboratory, Sandia National Laboratories, Massachusetts Institute of Technology, University of Wisconsin, Fauske &

Associates, Inc., and the Electric Power Research Institute. The results of these analyses are conflicting.

For the present version of NUREG-1150, the analyses were reviewed by experts listed in Section C.7 of Appendix C; their results are presented in the same section.

D.7 Source Terms and Consequences D.7.1 Methods Comment: The NUREG-1150 study and the findings are inconsistent with past research trends, which have been toward more mechanistic codes resulting in smaller uncertainties. The computer codes used in NUREG-llS0 are becoming less mechanistic and the uncertainties appear to be increasing.

Response

The NUREG-1150 study used a simplified approach for calculating radioactive releases because the large number of such estimates needed to express uncertainty could not all be made with the long-running and resource-intense codes such as the Source Term Code Package (STCP). Simple algorithms were used to make these calculations; the algorithms are collectively known as the XSOR codes. However. the bases for these algorithms were calculations with a set of more mechanistic codes. including the STCP (Ref. D.24).

CONTAIN (Ref. D.25), MELCOR (Ref. D.26). and MELPROG (Ref. 1)'.27).

In order to address the adequacy of the estimates provided by the parametric computer codes, complementary calculations were performed with the STCP to benchmark the parametric analyses. In general, the parametric calculations were found to be in reasonable agreement with the calculations from the STCP. Discrepancies in the parametric calculations, relative to the STCP calculations and to expert judgment, could be explained. Details of these comparisons are reported in Reference 0.30.

Comment: The uncertainties in risk have not been properly quantified because the Source Term Code Package used in NUREG-llS0 does not account for reevolution or resuspension of deposited fission products either in the reactor coolant system following vessel failure or in the containment. High temperatures would cause ruthenium, which is normally nonvolatile, to form oxides, which are volatile.

D-23 NUREG-llS0 OAGI0000611 00632

Appendix D

Response

The XSOR analyses in both the draft and the present studies account for a number of processes such as revaporization of material deposited on reactor coolant system surfaces and the volatilization of iodine from water pools late in the accident. The characterization of these processes was made in terms of probability distributions from expert elicitations. The bases for the expert judgments were provided by direct experimental evidence and analyses using mechanistic computer codes such as TRENDS (Ref.

D.48), which predicts iodine transport in containment, and a revaporization model developed by the Sandia National Laboratories for the SCDAP/RELAP code (Ref. D.49).

The basis for the STCP analysis of the ruthenium release is the CORSOR model, which is a semiempirical model based on a number of reasonably prototypic experiments. The distribution of release estimates that was actually used in the risk study was obtained from a panel of source term experts. The range of release for the ruthenium group is quite broad. The thermodynamics of ruthenium are considered explicitly in the VANESA model in the STep, which predicts core-concrete release. Vapor species considered by VANESA are Ru, RuO, RU02' Ru0 3 , and Ru04

  • Ruthenium oxidation was also considered in the development of source terms for direct containment heating and steam explosions.

Comment: All research efforts in the past several years have been geared toward making the source term estimates more mechanistic. The NUREG-1150 study goes against these trends by developing and using simple algorithms to estimate source terms. The algorithms do not represent the same level of understanding of source terms as do the mechanistic codes, such as the Source Term Code Package (STCP). The algorithms are merely linear combinations of aggregated variables representing many factors determining source terms, one of the most important of which, timing, is not included. At least the important source terms should be calculated with the STCP, not extrapolated with simple parametric codes. There is no justification for assuming that the variables are linearly related as was done in the simplified parametric source term codes.

Response

With the introduction of quantitative uncertainty analyses in NUREG-1150, a'large number of source term calculations became necessary. The number needed was far too many to be performed with a mechanistic code. In addition, no one code contained the "best" models for all phenomena considered potentially important to the transport analyses. As a result, parametric computer codes were developed, based on the results of detailed calculations of accidents by a number of computer codes, including the Source Term Code Package (STCP) (Ref. D.24), the CONTAIN code (Ref. D.25). and other codes.

While time is not a formal variable in the parametric codes, time dependency of fission product release is included, in that the releases are broken up into in-vessel and ex-vessel portions. Other factors include the timing of containment failure, the time periods over which the containment sprays operate, and the timing of concrete attack.

Comment: The NRC must convince the public and the nuclear community that the Source Term Code Package (STCP) is reliable. The STCP imposes choices on model selection, and no attempt has been made to determine if a different choice would give a significantly different outcome. The NRC should hold a workshop on the STCP and publish a description of the STCP. Because the STep has not been extensively used in the nuclear community, it is important to review the code; an international consensus may be needed.

Response

The STCP has been extensively reviewed, as discussed in Reference D.24. In that study, the NRC staff assessed the technology for estimating source terms. The study was reviewed by the American Physical Society (reported as Ref. D.36), The STCP and the results obtained with it were an integral part of a series of meetings between the NRC and an industry group (IDCOR) to exchange technical information.

In addition, the STCP has also been the subject of validation and verification efforts by groups other than those involved in its development (Refs. D.SO and D.S1). It has been used by numerous organizations in NUREG-llS0 D-24 OAGI0000611 00633

Appendix D the United States and abroad and, through agreements with the NRC, researchers report their experience in using the code.

The default model selections in the STCP are those that are believed to be most consistent with the understanding of relevant phenomena and considering the limitations of the code. A different choice of models yields different results and, for this reason, choices other than default choices are discouraged.

Because the modeling of particular scenarios may require use of alternative assumptions, the model choices are still available in the STCP.

The input decks to operate the STCP were developed using the Final Safety Analysis Report of a plant, information from the plant owners, information from the reactor manufacturers, and information obtained during visits to plants. For any particular STCP calculation, the input data were verified.

The NRC staff recognizes that the STCP has limitations, which are reported in Reference D.24. To compensate for the limitation in the NUREG-l1S0 study, expert judgment was used. The judgment is based on the information available at the time of the calcdations, such as experimental studies and analytical studies using the STCP and other codes. The judgments were factored into the risk estimates through empirically based algorithms collectively known as the XSOR codes; the variables in these codes are more general and subjective than the variables found in the mechanistic codes such as the STCP but semi quantitatively account for phenomena for which rigorous models do not exist. Whenever possible, a mechanistic source term calculation benchmarks the XSOR estimates. A study that compares expert opinion, STep calculations, and XSOR estimates is reported as Reference D.30.

Comment: Natural circulation is a complex phenomenon. There is no evidence in NUREG-llS0 to suggest that the complexity is appreciated or that it is adequately modeled.

Response

The effect of natural circulation in the reactor coolant system on the potential for early failure and depressurization prior to meltthrough of the vessel was an issue considered by one of the expert panels in the current version of NUREG-llS0. The panel had access to the results of a number of analyses performed with industry and NRC computer codes, as well as experimental data (Ref. D.18). The likelihood of vessel meltthrough with the reactor coolant system at high pressure is low in the current analyses, in part because of this potential for early depressurization. The possibility of containment bypass resulting from temperature-induced failure of steam generator tubes is also represented in the current analyses. However, the likelihood of this bypass mechanism is assessed to be small.

Natural circulation patterns can also affect the progression of a core meltdown and the production of hydrogen in a reactor vessel. This was taken into account in the current NUREG-llS0 analyses; experts interpreted the results of analyses performed with NRC-sponsored codes and also with codes sponsored by the industry.

D.7.2 Supporting Data Base and Modelin~ Assumptions Comment: Evidence suggests that cesium iodide is stable but in NUREG-1150 it is modeled otherwise.

No data or experience suggest that iodine will revolatilize from a basic aqueous solution that would form because of the high percentage of cesium. in fission product releases. Iodine remained in solution in the Three Mile Island plant for several years after the accident.

Response

Cesium iodide is not completely stable either in transport through the reactor coolant system or in solution. The issue is how much of the more volatile form is produced. Recent experimental evidence and analysis indicate that the production of volatile forms in the reactor coolant system is smaller than characterized in the previous draft of NUREG-l1S0. The late release of iodine from the suppression pool is an issue that was addressed by an expert review panel for the current version of NUREG-l1S0. Results of TRENDS code analyses and direct experimental data were considered by the expert panel. The D-25 NUREG-l1S0 OAGI0000611 00634

Appendix D projected pH of the pool was an important consideration. The extent of reevolution obtained in the current study is not as great as in the draft report. For a subcooled suppression pool, the upper bound of the distribution used is 10 percent and the median value is 0.1 percent. For a saturated or boiling suppression pool, larger releases are predicted.

Comment: Key issues that lead to high source terms, such as drywell liner meltthrough, core melt progression, and late iodine release, should be subject to further experimental evaluation.

Response

Significant research results have been obtained in each of these areas subsequent to the release of draft NUREG-1150. At the time this response is being written, the NRC is in the process of reorganizing and reprioritizing its Severe Accident Research Program, in part to account for insights generated in this study.

It is anticipated that the highest priority for research over the next few years will be given to resolving issues associated with potential threats to containment integrity, such as drywell shell meltthrough, rather than to source term phenomenological issues, such as the late release of iodine from water pools.

Comment: Severe fuel damage (SFD) scoping tests on decladded fuel collapse are inappropriate for validating the models of core melt phenomena because the conditions for the experiments and the conditions represented in the codes are different.

Response

The performance of integral fuel damage experiments always involves substantial compromise in achieving prototypic severe accident conditions. A considerable effort has recently been initiated at the Brookhaven National Laboratory to provide a quantification of scale distortion and the effects associated With extrapolations, correlations, or models used beyond their data base to quantify code uncertainties.

Comment: Steam generator tube rupture occurring as a result of a core damage accident was found to be an important contributor to the probability of containment bypass. This assumes that fission products get into the steam generator; detailed analyses indicate that fission products will deposit in the pressurizer and pressurizer surge line, not in the steam generator. Industry studies suggest otherwise.

Response

It is not necessary for fission products to deposit in the steam generator to obtain overheating and failure of the tubes. The Westinghouse experiments on natural circulation indicate that the convective flow path can occur to the steam generators by means of stratified flow in the hot legs. Failure of steam generator tubes prior to hot leg or surge line failure is not considered likely. In part because steam generator tubes may be degraded, some likelihood of tube failure was assessed (by an expert panel) and is included in the analyses.

Comment: Many assumptions are made in the modeling of core degradation phenomena, such as 50 percent of a core becoming molten before slumping occurs and a single well-defined melting point. These assumptions have a large effect on the predicted source terms.

Res'ponse:

There are some simplifications in the core meltdown models in the Source Term Code Package (STCP),

such as the use of a single temperature for fuel melting, which can affect the magnitude of the source term. Of greater significance is the lack of models in the STCP to predict some highly uncertain processes, such as revaporization of fission products from reactor coolant system surfaces after vessel failure. It is important to understand the relationship among the STCP, the XSOR codes, the detailed mechanistic codes, and the use of expert judgment in treating uncertainties in this study. The STCP was only used as a benchmark for the XSOR codes. It played a very small role in the quantification of the accident progression event trees. Probability distributions for the most important uncertain parameters affecting the source terms were determined by expert panels, based in large part on the results of mechanistic code NUREG-1150 D-26 OAGI0000611 00635

Appendix D analyses and experimental results. The source term ranges obtained in this study are dominated by the treatm.ent of these uncertain parameters, not by modeling approximations of core melt progression in the STep.

Comment: Debris cooling is assigned a low likelihood of occurrence in cases where models based on experiments would predict a cool able geometry.

Response

In the present version, debris coolability was considered for conditions involving water and debris interactions both in-vessel and ex-vessel. Based in part on the experience from the accident at Three Mile Island on March 28, 1979, it was assumed that water recovery of a damaged core in-vessel. could result in arresting core degradation. The likelihood of arrest was decreased as a function of the time into the accident. A window of time for recovery was estimated that was determined by the amount of core debris estimated to be on the lower head of the vessel. For minimal core degradation, a high likelihood (0.9) of arrest is assumed if an emergency coolant supply is reestablished. Beyond a level of debris accumulation, the likelihood of arrest is assumed to .be low (0.1). The likelihood of arrest decreases linearly over the time interval.

The likelihood of a coolable debris bed being established ex-vessel was assessed for a variety of different conditions that depended on whether the reactor vessel was at high or low pressure at the time of vessel failure, the size of the failure, the depth of the water in the reactor cavity, and the temperature of the debris. For the different cases, the likelihood of the debris bed being coolable ranges from 20 to 90 percent. Of course, a continuous water supply is a prerequisite to long-term coolability.

Comment: Water in the lower head or water injected into the reactor vessel can have a significant effect on accident progression. The possibility that debris can become critical when flooded is never considered.

Response

In the PWRs, emergency coolant water is borated. The likelihood of recriticality following flooding is considered small and was not represented in this study. In some BWR sequences, a period of time exists when the control blades may have melted and relocated while the fuel pellets are essentially in their normal configuration. Under these circumstances, reflooding could result in a critical condition. In the present study, the likelihood of recriticality under these specific conditions was considered high but the possibility of an energetic excursion with the potential to fail the vessel was assessed to be small (Ref.

D.18).

Comment: In the Sequoyah analysis, it is recognized that water can boil away from debris in a reactor cavity leading to a core-concrete interaction after the ice is depleted and the containment has failed. The scenario does not seem correct because the steam should condense and replenish the debris bed with coolant.

Response

The analyses account for condensation in the containment and the replenishment of water in the reactor cavity. Dryout of the debris bed only occurs ~fter containment failure and an extended period of steam loss from the containment.

Comment: Data from the accident at Three Mile Island do not support the core melt and fission product release models.

Response

To the extent that TMI-2 data can be interpreted to evaluate the magnitude of fission product release and the extent of fuel damage during core uncovery, the TMI-2 data are consistent with the Source Term Code Package (STCP) analyses. Benchmark analysis with the STCP shows good agreement with the D-27 NUREG-l1S0 OAGI0000611 00636

Appendix D pressure history (Ref. D.S2). Examination of TMI-2 core debris indicates that 70 to 80 percent of the iodine and cesium had escaped the core debris. much of which had never been completely melted (Ref.

D.53). These results are consistent with the STCP analyses. Because of the subsequent flooding of the TMI-2 vessel. the examination of the reactor coolant system samples was not able to provide information on the extent of radionuclide deposition during the period of core uncovery and fission product release from the fuel.

Comment: In the risk study. an assumption was made that 5 percent of a population surrounding a nuclear power plant will not evacuate during a severe accident. No basis for this assumption was given.

Actual emergency events, both with and without emergency plans, should be used to develop a well-founded value. The assumption should take into account a failure in offsite emergency response, such as may* be caused by the failure of buildings; roads, and bridges during an earthquake. A realistic assumption must be used because it significantly affects the calculated consequences.

Response

The assumed 5 percent non-evacuation of the population within the 10-mile emergency planning zone (EPZ) of a reactor that was used in the calculations for draft NUREG-1150 is conservative. In the current study. the assumption was changed to 0.5 percent, based on the following rationale. The plants that were studied in NUREG-1150 have detailed and well-maintained emergency plans, which also have provisions for evacuating from special facilities within the EPZ. Because an evacuation is preplanned, it is expected to be nearly complete. The preplanned evacuation should be distinguished from unplanned and impromptu evacuations prompted by transportation accidents involving toxic chemicals, accidents at chemical plants, or natural disasters. The specific value used (0.5 percent) was derived from an actual use of a nuclear emergency plan (for a nearby chemical accident). The current study includes displays of the offsite consequences and risk with assumptions on the alternative modes of emergency response within the EPZ, such as evacuation, early relocation. sheltering. and partial (Le .* 0 to 5 miles) evacuation/partial (i.e., 5 to 10 miles) sheltering. Sensitivity calculations of severe accident consequences during an earthquake, assuming a degraded emergency response, are reported in the supplements of NUREG-l1S0 (Refs. D.12 and D.13).

Comment: It is unreasonable to assume that, once an individual evacuates beyond 15 miles from a damaged reactor, no further dose is received.

Response

In the current consequence analysis, an individual is assumed to avoid further radiation exposures after reaching a radial distance of 20 miles from a reactor. People who evacuated from the 10-mile emergency planning zone (EPZ) of the Grand Gulf and Peach Bottom plants would need about 3 to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> to travel to a distance of 20 miles from these reactors; people who evacuated from the 10-mile EPZ of the Surry, Sequoyah, and Zion plants would need about 7 to 11 hours1.273148e-4 days <br />0.00306 hours <br />1.818783e-5 weeks <br />4.1855e-6 months <br /> to travel to a distance of 20 miles from those reactors. It seems reasonable to assume that by then the location of the radioactive plume and the area contaminated by it would have been known and people would have been advised on how to avoid it.

Comment: The MACCS code should be thoroughly documented and benchmarked. A study should be done of how the MACCS code compares to other codes. The MACCS code should be thoroughly verified and validated to ensure the validity and accuracy of the models. data, and assumptions.

Response

In late 1987 the NRC staff began an inhouse benchmarking activity on the version of the MACCS code (Version 1.4) used for draft NUREG-l1S0. This activity consisted of a comparison of MACCS 1.4 results with the results from various research groups calculating consequences using their own consequence codes. The research groups were members of the Organisation for Economic Co-operation and Development/Nuclear Energy Agency/Committee on Safety of Nuclear Installations (OECD/NEA/CSNI).

The benchmarking activity revealed errors in MACCS 1.4 and these are reported in References D.54 and D.SS.

NUREG-l1S0 D-28 OAGI0000611 00637

Appendix D A comparative review has been performed at the Institute for Energy Technology, Norway, of the chronic exposure pathways modeled in MACCS 1.S with other consequence codes used by the DECD member countries. The findings are reported as Reference D.33.

The Idaho National Engineering Laboratory (INEL) performed the quality assurance and verification of MACCS 1.5. Sandia National Laboratories (SNL). the developers of the code. assisted INEL because the code had not been adequately documented. The quality assurance program was a line-by-Iine check of the Fortran coding and crosschecking with the model equations for consistency.

Corrections of most of the errors identified in the Norwegian and INEL reviews were completed in MACCS 1.S used in this version of NUREG-llS0. The residual errors in the MACCS code appear to cause an error of about a factor of two in the latent cancer fatality and population dose estimates; the errors in the code will be corrected before the code is made available to the public. The documentation (user's manual, model descriptions. and programmer's manual), the Norwegian review, and a report of the final crosschecking by INEL (Ref. D.S6) are expected to be completed in the summer of 1989.

Comment: It seems to be surprising and erroneous that the bulk of the late fatalities associated with large radionuclide releases is derived from the long-term doses committed via food chain pathways of exposure at low levels of individual dose. It contradicts the results of earlier studies (such as the Reactor Safety Study (Ref. D.7), the German Risk study (Ref. D.57), and the Sizewell B calculations (Ref. D.S8>>,

which concluded that the bulk of the late fatalities is associated with relatively high levels of individual dose attributable to relatively short-term exposure following an accident. Substantial work is required to verify this important difference.

Response

Errors'were found in the calculations of the radiological consequences from the food chain pathways of exposure. These errors were partIy from errors in the input to the consequence analysis code, MACCS 1.4, and partly from incorrect modeling of the removal of cesium from the root zone. The incolTect modeling assumed little removal of cesium from the root zone because of irreversible binding of cesium to the soil or cesium percolating through the soil beyond the root zone. This caused the root uptake pathway ingestion doses to be unreasonably large.

D.7.3 Comparisons with Accident at Chernobyl Comment: Offsite doses (versus distances) reported in NUREG-llS0 for some of the source terms are too high and indicate a potential for causing prompt fatalities in the offsite population. In contrast, there were no prompt fatalities outside the plant in the Chernobyl accident.

Response

The potential of a large radioactive release to the atmosphere to result in high doses and prompt fatalities in the public depends on the meteorological conditions during and immediately following the release and the energy content of the release.

A large radioactive release during favorable meteorological conditions may not have the potential for causing prompt fatalities in the public. The opposite is possible if releases occurred during unfavorable meteorological conditions. In a PRA framework, many alternative meteorological conditions are used (based on actual site data), some of which are favorable and some of which are unfavorable so that the effect of virtually all meteorological scenarios can be represented.

A release accompanied by a large quantity of thermal energy may result in the plume lifting off from the building wake and rising in the atmosphere while being transported by the wind, resulting in low offsite doses. This happened during the release from the Chernobyl accident and, therefore, there were no offsite prompt fatalities.

Comment: After the Chernobyl accident, it is difficult to justify a lack of accounting of doses beyond 50 miles in the risk calculations.

D-29 NUREG-1150 OAGI0000611 00638

Appendix D

Response

In draft NUREG-115 0 , the radiological consequence calculations were limited to 500 miles from a damaged reactor. In the analysis for the present version of the report, all radioactive material (except for the noble gases) remaining in the plume at 500 miles from the plant was deposited on the ground between 500 miles and 1,000 miles from the reactor. The contribution of all pathways of exposure between 500 and 1,000 miles are also included in the estimates of the consequences. This ensures nearly 100 percent accounting of the released radionuclides in the consequence calculations. The impact of the small quantities of noble gases leaving the 1.000-mile region is negligible.

Comment: It should be made clear that variations in the relocation/decontamination/interdiction dose criteria are included in the cost uncertainties.

Response

Uncertainties in the offsite consequence models and the values of the input parameters to the consequence code were not treated in the previous analyses. In those analyses. the long-term relocation criterion of the Reactor Safety Study (Ref. D.7) of 25 rerns in 30 years from groundshine was used. In the current analyses, the relocation criterion of 4 rems in 5 years from groundshine is used for base case calculations; this criterion is an approximation of the criterion currently proposed by the U. S.

Environmental Protection Agency (Ref. D.59). The criterion found in the Reactor Safety Study is also used in the current calculations but only to show the sensitivity of the long-term health effects.

Comment: More discussion is needed on the assumptions that have been made about relocation and time scales for the decontamination of property after the 7-day emergency phase when doses could still be high.

Response

In the current consequence calculations. decontamination of both land and buildings was assumed to rednce the levels of radioactive material by a factor of three or 15. A reduction by a factor of three was assumed to require 60 days of decontamination work; a reduction by a factor of 15 was assumed to require 120 days of decontamination work. The decontamination efforts were assumed to commence at the end of the 7-day emergency phase. The affected people were assumed to be relocated during the decontamination period.

D.S Uses of NUREG-1150 As a Resource Document D.S.1 Uses Comment: The way that NUREG-11S0 will be factored into the regulatory process is unclear.

Response

NUREG-1150 is not intended to represent a quantitative and systematic evaluation of regulations.

However. NUREG-1150 does provide a source of information that can support. at least in part. such an objective. The document provides an information base for analyzing plant-specific and generic safety issues. The NUREG-1150 models can be used for assessing the safety significance of operational occurrences and as a basis for evaluating alternative design changes to improve safety. A discussion of the use of NUREG-llS0 in the regulatory process is provided in Chapter 13 of NUREG-llS0 and in Reference D. 8.

Comment: Risk assessment offers a logical framework to review regulations and examine safety issues.

The decision to use risk assessment as a basis for regulatory decisionmaking is a major advancement in the regulation of nuclear power plants. But regulators need to be fully aware of the strengths and the weaknesses of their tools and to be concerned with the degree of preciSion needed to ensure safety.

Response

NUREG-llS0 is not intended to represent a quantitative and systematic evaluation of regulations.

However, NUREG-1150 does provide an information source that can support such an objective. The NUREG-1150 D-30 OAGI0000611 00639

Appendix D results in NUREG-1150 will be used with full recognition of the uncertainties involved and the strengths and the weaknesses of the methods from which the results were derived (as described in Chapters 1 and 13).

Comment: The interpretation of expert judgments about containment response in terms of probabilities has a large effect on risk estimates. The NUREG-llS0 study suggests that the major contributor to risk is early containment failure, but the large uncertainty precludes any regulatory decision on the need for risk reduction using, for example, venting strategies, refractory-lined cavities, and in-plant emergency procedures.

Response

There are necessarily large uncertainties associated with severe accident risks. These large uncertainties are due in part to a lack of understanding associated with many of the complex phenomena in severe accidents. The uncertainty in risk does not preclude its use in decisionmaking. Decisions must be made in spite of the uncertainties, but the uncertainties may change the type of decision being made.

Comment: The application of NUREG-llS0 should be discontinued until the risk estimates are improved.

Response

Draft NUREG-11S0 has not been widely used as a basis for regulatory action during the comment period or while modifications were under way. However, the interim findings of the draft report and the methods developed were not completely ignored. Rather, items identified as being potentially important in the draft report were considered in developing the listing of items for consideration in the guidance provided for the individual plant examination process. Similarly, the information on containment performance provided one input into the NRC's containment performance improvement study. The draft NUREG-llS0 information provided a starting point for the development of a more focused in-depth analysis of various issues. As discussed in Chapter 13, the future uses envisaged for NUREG-llS0 do not rely heavily on the quantitative results obtained for the five plants analyzed.

D.S.2 Cost/Benefit Analysis Comment: The models used in calculating the cost of a severe accident lack many factors that should be taken into account. Many of the assumptions are questionable and unfounded. The models have not been benchmarked. Some interpretations and conclusions that were made in draft NUREG-1150 are questionable. The cost estimates need to be more thoroughly documented to understand and evaluate the calculations.

Response

The present version of NUREG-llS0 provides a limited set of risk-reduction calculations, principally related to the potential benefits of accident management strategies in reducing core damage frequency. It does not assess the costs of these or other improvements. Such analyses are more properly considered in the context of specific regulatory actions.

Comment: The averted cost (in terms of risk reduction) does not include secondary costs. The draft risk study recognizes that secondary costs may significantly increase the benefit of some safety options but no attempt was made to quantify this increase. The underestimate can be attributed to the following:

1. The cost of shutdowns of similar reactors on the same site and at other sites.
2. The possibility of a moratorium on nuclear power due to a severe accident.
3. The value of $1 million per averted acute fatality and $100,000 per latent cancer fatality may be too low.

D-31 NUREG-11S0 OAGI0000611 00640

Appendix D

4. The values of the interdiction dose used in the calculations may be too high.
5. No allowance has been made for the decrease in long-term value of land and buildings that have been contaminated.
6. Decontamination costs used in the calculations may be based on decontamination of test sites in deserts instead of agricultural. residential. and commercial property.
7. The radiation releases are calculated out to 50 miles; a radius as much as 500 miles may be more appropriate.

Response

The draft NUREG-llS0 cost/benefit analyses reflected the conventional NRC methods for assessing costs and benefits. Because costlbenefit analyses are more properly considered in the context of specific regulatory activities. they are not provided in this version of NUREG-llS0.

D.8.3 Safety Goal Comparisons Comment: NUREG-llS0 finds that the U.S. safety goals are met; this discourages further improvements in safety.

Response

As discussed in Chapter 13, this version of NUREG-llS0 indicates that the five plants studied in NUREG-llS0 are below the Commission's quantitative health objectives. The NRC staff disagrees that the findings of NUREG-1150 discourage further improvements in nuclear safety. Many improvements have been made at the five plants studied in NUREG-llS0 since the draft report was first published in February 1987; some of the safety improvements arose from this study of various features of the five plants. The NRC staff believes that a comprehensive risk analysis on a plant enhances safety because it presents an overall and comprehensive view of interactions among plant systems and operator actions.

Similarly, the variety of perspectives drawn in NUREG-llS0, particularly in Chapters 8 and 12, provide information that other plants may consider as they perform individual plant examinations.

D.8.4 Extrapolation of Results Comment: It is unclear how NUREG-llS0 will be used in conjunction with individual plant evaluations or plant-specific PRAs as a basis for regulatory decisionmaking.

Response

Perspectives gained from NUREG-1150, previous industry-sponsored PRAs, and analyses done by industry groups, such as IDCOR's analysis of four containment configurations, have been assembled into several NRC reports (Ref. D. 60). These reports provide information to the analysts performing individual plant examinations (I PEs) concerning plant features and operator actions that are important to the evaluation of risk. Chapter 13 discusses how NUREG-llS0 is used in the IPE~ details of the IPE process are presented in Reference D.61.

NUREG-l1S0 D-32 OAGI0000611 00641

Appendix D REFERENCES FOR APPENDIX D 0.1 U. S. Nuclear Regulatory Commission (USNRC), "Draft NUREG-1l50 for Public Comment: Issuance and Availability," Federal Register, Vol. 52, p. 7950, March 13, 1987.

0.2 USNRC, "Seminar on Methodology Used in NUREG-1150, 'Reactor Risk Reference Document',"

Federal Register, Vol. 52, p. 8390, March 17, 1987.

0.3 ACRS, "ACRS Comments on Draft NUREG-ll SO, 'Reactor Risk Reference Document'," letter from W. Kerr, Chairman, Advisory Committee on Reactor Safeguards, to L. W. Zech, Chairman, USNRC, July 1987. ACRS, "Report on NUREG-1150, 'Reactor Risk Reference Document'," letter from W. Kerr, Chairman, Advisory Committee on Reactor Safeguards, to L. W. Zech, Chairman, USNRC, August 16, 1988. ACRS, "NUREG-llS0: Resolution of ACRS Comments," letter from F. Remick, Chairman, Advisory Committee on Reactor Safeguards, to L. W. Zech, Chairman, USNRC, January 23, 1989.

0.4 H. J. C. Kouts et aI., "Methodology for Uncertainty Estimation in NUREG-U50 (Draft): Conclusions of a Review Panel," Brookhaven National Laboratory, NUREG/CR-5000, BNL-NUREG-52119, December 1987.

0.5 W. E. Kastenberg et al., "Findings of the Peer Review Panel on the Draft Reactor Risk Reference Document, NUREG-1150," Lawrence Livermore National Laboratory, NUREG/CR-5113, UCID-21346, May 1988.

0.6 L. LeSage et aI., "Initial Report of the Special Committee on Reactor Risk Reference Document (NUREG-1150)," American Nuclear Society, April 1988.

0.7 . USNRC, "Reactor Safety Study-An Assessment of Accident Risks in U.S. Commercial Nuclear Power Plants," WASH-1400 (NUREG-751014), October 1975.

0.8 USNRC, "Integration Plan for Closure of Severe Accident Issues," SECY-88-147, May 25, 1988.

D.9 J. S. Evans et aI., "On the Propagation of Error in Air Pollution Measurements," Environmental Monitoring and Assessment, Vol. 4, pp. 139-53, 1984.

0.10 H. W. Lewis et at, "Risk Assessment Review Group Report to the U.S. Nuclear Regulatory Commission,"

Ad Hoc Review Group, NUREGICR-0400, September 1978.

0.11 O. I. Chanin, H. Jow, J. A. Rollstin et aI., "MELCOR Accident Consequence Code System (MACeS),"

Sandia National Laboratories, NUREG/CR-4691, Vols. 1-3, SAND86-1562, February 1990.

D.12 R. J. Breeding et aI., "Evaluation of Severe Accident Risks: Surry Unit I," Sandia National Laboratories, NUREG/CR-4551, Vol. 3, Revision I, SAND86-1309, October 1990.

0.13 A. C. Payne, Jr., et aI., "Evaluation of Severe Accident Risks: Peach Bottom Unit 2," Sandia National Laboratories, NUREG/CR-4551, Vol. 4, Revision 1, SAND86-1309, December 1990.

0.14 J. J. Gregory et aI., "Evaluation of Severe Accident Risks: Sequoyah Unit I," Sandia National Laborato-ries, NUREG/CR-4551, Vol. 5, Revision 1, SAND86-1309, December 1990.

D.IS T. D. Brown et aI., "Evaluation of Severe Accident Risks: Grand Gulf Unit I," Sandia National Laborato-ries, NUREG/CR-4551, Vol. 6, Revision 1, SAND86-1309, December 1990 0.16 C. K. Park et aI., "Evaluation of Severe Accident Risks: Zion Unit 1," Brookhaven National Laboratory, NUREG/CR-4551, Vol. 7, Draft Revision 1, BNL-NUREG-52029, to be published.*

0.17 O. B. Clauss, "Round-Robin Analysis of the Behavior of a 1:6-Scale Reinforced Concrete Containment Model Pressurized to Failure: Posttest Evaluations," Sandia National Laboratories, NUREG/CR-5341, SAND89-0349, October 1989.

  • Available in the NRC Public Document Room, 2120 L Street NW., Washington, DC.

D-33 NUREG-1150 OAGI0000611 00642

Appendix D D.IS F. T. Harper et aI., "Evaluation of Severe Accident Risks: Quantification of Major Input Parameters,"

Sandia National Laboratories, NUREG/CR-4551, Vol. 2, Revision 1, SAND86-1309, December 1990.

D.19 R. C. Bertucio and J. A. Julius, "Analysis of Core Damage Frequency: Suny Unit 1," Sandia National Laboratories, NUREG/CR-4550, Vol. 3, Revision 1, SAND86-2084, April 1990.

D.20 A. M. Kolaczkowski et al., "Analysis of Core Damage Frequency: Peach Bottom Unit 2," Sandia National Laboratories, NUREG/CR-4550, Vol. 4, Revision 1, SAND86-2084, August 1989.

D.21 R. C. Bertucio and S. R. Brown, "Analysis of Core Damage Frequency: Sequoyah Unit 1," Sandia National Laboratories, NUREG/CR-4550, Vol. 5, Revision 1, SAND86-2084, April 1990.

D.22 M. T. Drouin et aI., "Analysis of Core Damage Frequency: Grand Gulf Unit 1," Sandia National Laboratories, NUREG/CR-4550, Vol. 6, Revision 1, SAND86-2084, September 1989.

0.23 M. B. Sattison and K. W. Hall, "Analysis of Core Damage Frequency: Zion Unit 1," Idaho National Engineering Laboratory, NUREG/CR-4550, Vol. 7, Revision 1, EGG-2554, May 1990.

D.24 M. Silberberg et aI., "Reassessment of the Technical Bases for Estimating Source Terms," USNRC Report NUREG-0956, July 1986.

D.25 K. D. Bergeron et al., "User's Manual for CONTAIN 1.0, A Computer Code for Severe Reactor Accident Containment Analysis," Sandia National Laboratories, NUREG/CR-4085, SAND84-1204, July 1985.

D.26 R. M. Summers et aI., "MELCOR In-Vessel Modeling," Proceedings of the Fifteenth Water Reactor Safety Information Meeting (Gaithersburg, MD), NUREG/CP-0091, February 1988.

D.27 S. S. Dosanjh (Ed.), "MELPROG-PWR/MOD1: A Two-Dimensional, Mechanistic Code for Analysis of Reactor Core Melt Progression and Vessel Attack Under Severe Accident Conditions," Sandia National Laboratories, NUREG/CR-5193, SAND88-1824, May 1989.

D.28 R. L. Iman and M. J. Shortencarier, "A Fortran 77 Program and User's Guide for the Generation of Latin Hypercube and Random Samples for Use with Computer Models," Sandia National Laboratories, NUREG/CR-3624, SAND83-2365, June 1984.

D .29 M. L. Corradini et aI., "A Review of the Severe Accident Risk Reduction Program (SARRP) Containment Event Trees," University of Wisconsin, NUREG/CR-4569, May 1986.

D.30 P. Cybulskis, "Assessment of the XSOR Codes," Battelle Columbus Division, NUREG/CR-5346, BMI-2171, November 1989.

D.31 R. L. Iman et aI., "PARTITION: A Program for Defining the Source Term/Consequence Analysis Interfaces in the NUREG-llS0 Probabilistic Risk Assessments," Sandia National Laboratories, NUREGI CR-5253, SAND88-2940, May 1990.

D.32 E. D. Gorham-Bergeron et at, "Evaluation of Severe Accident Risks: Methodology for the Accident Progression, Source Term, Consequence, Risk Integration, and Uncertainty Analyses," Sandia National Laboratories, NUREG/CR-4551, Vol. 1, Draft Revision 1, SAND86-1309, to be published.*

D.33 U. Tveten, "Review of the Chronic Exposure Pathway Models in MACCS and Several Other Well-Known Probabilistic Risk Assessment Models," Institutt for Energiteknikk, Norway, NUREG/CR-S377, June 1990.

D.34 Commonwealth Edison Company of Chicago, "Zion Probabilistic Safety Study," September 1981.

D.35 US NRC, "Nuclear Power Plant Severe Accident Research Plan" (G. P. Marino, Ed.), NUREG-0900, Revision 1, April 1986.

D.36 R. Wilson et aI., "Report to the APS of the Study Group on RadionucIide Release from Severe Accidents at Nuclear Power Plants," Reviews of Modem Physics, Vol. 57, No.3, Part II, July 1985.

  • Available in the NRC Public Document Room, 2120 L Street NW., Washington, DC.

NUREG-USO D-34 OAGI0000611 00643

Appendix D D.37 D. L. Berry et aI., "Review and Evaluation of the Zion Probabilistic Safety Study: Plant Analysis," Sandia

.National Laboratories, NUREG/CR-3300, Vol. 1, SAND83-1118, May 1984.

D.38 D. M. Ericson, Jr., (Ed.) et aI., "Analysis of Core Damage Frequency: Internal Events Methodology,"

Sandia National Laboratories, NUREG/CR-4550, Vol. 1, Revision 1, SAND86-2084, January 1990.

D.39 T. A. Wheeler et aI., "Analysis of Core Damage Frequency from Internal Events: Expert Judgment Elicitation," Sandia National Laboratories, NUREG/CR-4550, Vol. 2, SAND86-2084, April 1989.

D.40 R. M. Harrington and L. C. Fuller, "BWR-LTAS: A Boiling Water Reactor Long-Term Accident Simula-tion Code," Oak Ridge National Laboratory, NUREG/CR-3764, ORNLITM-9163, February 1985.

D.41 W. J. Luckas, Jr., "A Human Reliability Analysis for the A1WS Accident Sequence with MSIV Closure at the Peach Bottom Atomic Power Station," Brookhaven National Laboratory, May 1986.

D.42 Fauske and Associates, Inc., "MAAP Modular Accident Analysis Program User's Manual," Vols. I and II, IDCOR Technical Report 16.2-3, February 1987.

D.43 D. J. Hanson et at., "Containment Venting Analysis for the Peach Bottom Atomic Power Station,"

Battelle Columbus Laboratories, NUREG/CR-4696, EGG-2464, February 1987.

D.44 USNRC, "A Review of the Current Understanding for the Potential for Containment Failure from In-Vessel Steam Explosions," NUREG-1116, June 1985.

D.4S D. A. Powers et al., "VANESA: A Mechanistic Model of Radionuclide Release and Aerosol Generation During Core Debris Interactions with Concrete," Sandia National Laboratories, NUREG/CR-4308, SAND85-1370, July 1986.

D.46 F. Muir et al., "CORCON-MODl: An Improved Modelfor Core/Concrete Interactions," Sandia National Laboratories, NUREG/CR-2142, SAND80-2415, September 1981.

D.47 R. K. Cole, Jr., et aI., "CORCON-MOD2: A Computer Program for Analysis of Molten-Core Concrete Interactions," Sandia National Laboratories, NUREG/CR-3920, SAND84-1246, October 1984.

D.48 E. C. Beahm et aI., "Calculations of Iodine Source Terms in Support of NUREG-0956," Oak Ridge National Laboratory, ORNLlNRClLlR-86/17, Technical Letter Report, July 1986.

D.49 G. A. Berna et al., "RELAP5ISCDAP/MODO Code Manual," EGG-RTH-70S1, EG&G, September 1985.

D.50 T. S. Kress, "Review of the Status of Validation of the Computer Codes Used in the Severe Accident Source Term Reassessment Study (BMI-2104)," Oak Ridge National Laboratory, ORNLITM-8842, April 1985.

D.51 M. Khatib-Rahbar et al., "Independent Verification of Radionuclide Release Calculations for Selected Accident Scenarios," Brookhaven National Laboratory, NUREG/CR-4629, BNL-NUREG-51998, July 1986.

D.S2 R. O. Wootori, "MARCH Calculations Performed for the 1MI-2 Analysis Exercise," Nuclear Technology, Vol. 87, August 1989.

0.53 D. W. Akers et aI., "TMI-2 Core Debris Grab Samples-Examination and Analysis, Part 1," Idaho National Engineering Laboratory, GEND-INF-075, p. 110, September 1986.

D.S4 S. Acharya et at, "Benchmarking of the MACCS Code," Transactions ofthe American Nuclear Society (San Diego, California), Vol. 56, pp. 353-4, June 12-16, 1988.

D.S5 S. Acharya et aI., "Benchmarking of the MACCS Code," Proceedings of the Second Part of the Joint CECIOECDINEA Workshop on Recent Advances in Reactor Accident Consequent Assessment (Rome, Italy),

pp. 50-2, January 25-29, 1988.

D-35 NUREG-1150 OAGI0000611 00644

Appendix D D.56 C. A Dobbe et al., "Quality Assurance and Verification of the MACCS Code, Version 1.5," Idaho National Engineering Laboratory, NUREG/CR-5376, EGG-2566, February 1990.

D.57 The Federal Minister of Research and Technology, "The German Risk Study-Summary," Gesellschaft fur Reaktorsicherheit (Germany), August 15, 1979.

D.5S M. R. Hayes et al., "The Technical Basis of 'Spectral Source Terms' for Assessing Uncertainties in Fission Product Release During Accidents in PWRs with Special Reference to Sizewell-B," United Kingdom Atomic Energy Authority, SRD-R-256, November 1982.

D .59 U.S. Environmental Protection Agency, "Manual of Protective Action Guides and Protective Actions for Nuclear Incidents," Office of ~adiation Programs, Draft, 1989.

D.60 Brookhaven National Laboratory, "Assessment of Severe Accident Prevention and Mitgation Features,"

NUREG/CR-4920, Vols. 1-5, BNL-NUREG-52070, July 1988.

D.61 NRC Letter to All Licensees Holding Operating Licenses and Construction Permits for Nuclear Power Reactor Facilities, "Individual Plant Examination for Severe Accident Vulnerabilities-IO CFR §50.54f,"

Generic Letter 88-20, dated November 23, 1988.

NUREG-1150 D-36 OAGI0000611 00645

APPENDIX E RESPONSE TO COMMENTS ON SECOND DRAFT OF NUREG-llS0 OAGI0000611 00646

CONTENTS Page E.1 Introduction ........................................................... . E-1 E.2 Scope ................................................................ . E-3 E.3 Documentation and Display of Results ...................................... . E-7 E.4 Use of Expert Judgment ................................................. . E-10 E.5 Accident Frequency Analysis ............................................. . E-13 E.5.1 Human Reliability Analysis ......................................... . E-13 E.5.2 External-Event Analysis ............................................ . E-15 E.5.3 Other Accident Frequency Comments ................................ . E-16 E.6 Accident Progression Analysis ............................................. . E-20 E.7 Source Terms and Consequences .......................................... . E-24 E. 7.1 Source Terms .................................................... . E-24 E.7.2 Offsite Consequences .............................................. . E-26 E.8 Uses of NUREG-1150 ................................................... . E-27 REFERENCES FOR APPENDIX E ............................................ . E-30 ATTACHMENT TO APPENDIX E ............................................ . EA-l TABLES E.l Membership of Special Committee to Review the Severe Accident Risks Report. E-2 E.2 Membership of American Nuclear Society Special Committee on NUREG-llS0. E-2 E-iii NUREG-1150 OAGI0000611 00647

E.1 Introduction In June 1989, the NRC published NUREG-l1S0, "Severe Accident Risks: An Assessment for Five U.S.

Nuclear Power Plants," as a second draft for peer review (Ref. E.1). At that time, the NRC also formed a peer review committee under the provisions of the Federal Advisory Committee Act to review the second draft report and answer certain questions with respect to its adequacy. This committee was chaired by Dr.

Herbert J.C. Kouts; its entire membership is shown in Table E.!. In parallel, the American Nuclear Society (ANS) continued its review of the report, using a special committee of ANS members. This committee was chaired by Dr. Leo G. LeSage; its entire membership is shown in Table E.2. The com-ments of both committees were provided to the staff in the summer of 1990 (Refs. E.2 and E.3). This appendix summarizes the comments of the NRC-established committee (the "Kouts Committee") and the ANS committee. Summary staff responses are provided for each specific comment.

The second draft of NUREG-llS0 has also been the subject of review by the NRC's Advisory Committee on Reactor Safeguards (ACRS). Its technical review was completed in October 1990; a letter providing its comments was submitted on November 15, 1990. This letter is provided as an attachment to this appen-dix.

Public comment was also requested on the second draft of NUREG-llS0. Four comment letters were received (Refs. E.4 through E. 7). These comments have also been assessed and, where appropriate, changes made in the final version of NUREG':l1S0.

Before discussing the comments provided by the committees on particular topics, it is worth describing the overall conclusions and findings expressed in their reports.

The overall conclusions of the Kouts committee were:

  • "NUREG-USO is a good report, and it represents a great deal of detailed high-quality work. It is commendable that an endeavor was made to consult a wider range of competence apart from that possessed by those directly engaged in producing NUREG-llS0. The benefit of constructive open-ness to criticism is felt in the revised draft."
  • "NUREG-llS0 draws upon a decade and a half of practice of PSA [probabilistic ~afety analysis]

beyond WASH-1400, mainly in the United States but also in other countries. In most respects, it represents the state of the art of this kind of analysis. It is a step forward from WASH-1400."

  • "The data drawn on include many years of experience in plant operation, and a similar period of theoretical and experimental research into severe accident methodology."
  • "The disciplined use of expert opinion elicitation was an important advance over previous methods of using expert opinion. It is noted that the prime motive of this technique was to assess the uncer-tainty in the results of the PSA."
  • "The results were derived in great detail, and they are presented by methods which show well their probabilistic spread."
  • "NUREG-llS0 should be a valuable source of data and methodology to guide future PSAs for indi-vidual plants. Like its predecessor, WASH-1400, it should help to show the path for future PSA developments for some time to come." (Kouts 7.2)

The overall findings of the ANS committee review were:

  • "NUREG-llS0 is a major achievement."
  • "The revised draft reports essentially a new study."
  • "The revised draft provides a balanced presentation of the central tendencies and uncertainties in risk."

E-l NUREG-1150 OAGI0000611 00648

Appendix E Table E.! 'Membership of Special Committee to Review the Severe Accident Risks Report.

Herbert J.C. Kouts Committee Chairman, Defense Nuclear Facility Safety Board George Apostolakis University of California, Los Angeles E.H. Adolf Birkhofer Gesellschaft fur Reaktorsicherheit Forschungsgelande, Federal Republic of Germany Lars G. Hoegberg Swedish Nuclear Power Inspectorate William G. Kastenberg University of California, Los Angeles Leo G. LeSage Argonne National Laboratory Norman C. Rasmussen Massachusetts Institute of Technology Harry J. Teague Safety and Reliability Directorate, United Kingdom Atomic Energy Authority John J. Taylor Electric Power Research Institute Table E.2 Membership of American Nuclear Society Special Committee on NUREG-1150.

Leo G. LeSage Committee Chairman, Argonne National Laboratory Edward A. Warman Committee Vice Chairman, Stone & Webster Engineering Corporation Richard C. Anoba Carolina Power and Light Company*

Ronald K. Bayer Virginia Power Company *

  • R. Allan Brown Ontario Hydro, Canada James C. Carter, III Tenera Risk Management J. Peter Hosemann Paul Scherrer Institute, Switzerland W. Reed Johnson University of Virginia Walter B. Loewenstein Electric Power Research Institute * *
  • Nicholas Tsoulfanidis University of Missouri Willem F. Vinck Associated Consultant, Belgium * * * *

~ Currently with Science Applications International Corporation.

    • Member in 1987 and 1988 .

.... Member until June 1989.

"'*** Corresponding member.

  • "The use of expert opinion in the revised study was greatly improved."
  • "The NRC safety goals are shown to be met for all five plants studied."
  • "The NUREG-1150 documentation is a useful compendium of current severe accident analysis information and data."
  • "The quality of the report is substantially improved."
  • "[The report] is adequate for its stated uses."

The general comments of the ACRS were:

  • "We have reviewed the reports prepared by the ANS Special Committee and by the Special Commit-tee to Review the Severe Accident Risk Report appointed by the Commission [the Kouts Committee]

and found them helpful. We have no serious disagreements with either of these reviews, nor with their findings."

NUREG-1150 E-2 OAGI0000611 00649

Appendix E

  • "The work described in this [second] draft of NUREG-llS0 is an improvement over that described in the first version entitled, 'Reactor Risk Reference Document.' Many previously identified deficien-cies in the expert elicitation process have been corrected. The exposition and organization of the report have been improved. The presentation of results is clearer. There is considerable information that was not in the original version."
  • "The portion that deals with accident initiation and development up to the point at which core heat removal can no longer be assured is unique, compared to other contemporary PRAs. in that a method for estimating the uncertainty in the results has been developed and applied. This method and its application are significant contributions. Although the larger contributions to uncertainty in risk come from the later parts of the accident sequences, this portion is enhanced also by an exten-sive identification of events that can serve as accident initiators as well as an associated set of hy-pothesized event trees. This information should be of considerable assistance to licensees in the performance of an Individual Plant Examination (IPE). It should also be useful to plant operators and to designers."
  • "The formulation of a more detailed representation of accident progression after severe core damage begins. and an improved description of containment performance, contribute some additional infor-mation to this important area. However, understanding of many of the physical phenomena that have an important bearing on this phase of accident progression is still very sparse, and the report may give the impression that more is known about this portion of the accident sequence than is actually the case."
  • "The part of the sequence that begins with the release of radioactive material outside the contain-ment is treated by a relatively new and unevaluated code system. Furthermore, there is no estimate of the uncertainties inherent in the calculations that describe this part of the sequence. Those who use the quantitative values of reported risk must recognize that these uncertainties are not accounted for in the calculated results."

The ACRS letter contained two other comments of particular note. These were:

  • "It is disappointing that the staff asserts that virtually no general conclusions can be drawn from a study that took almost five years and seventeen million dollars to complete. We recommend that the Commission encourage the staff to mine more deeply the wealth of information that has been col-lected in the course of this study in an effort to identify generic conclusions that might be reached."
  • The NUREG-llS0 "results should be used only by those who have a thorough understanding of its limitations. "

These last comments are discussed in Section E.B ("Uses of NUREG-llS0"). Specific limitations noted in the ACRS letter are discussed throughout this appendix.

The remaining sections of this appendix provide itemizations of comments (including more specific find-ings of the ANS committee) received from the review committees and the ACRS on the second draft of NUREG-1150 and staff responses. Comments relating to two general areas. scope and documentation, are itemized first (in Sections E.2 and E.3). followed by comments on specific technical areas: use of expert judgment; accident frequency analysis; accident progression analysis; and source term and offsite consequence analysis (in Sections E.4 tlirough E.7). Finally. Section E.8 itemizes comments on the uses of NUREG-llS0.

It should be noted that all committees concluded that issuance of the final version of NUREG-1150 should not be delayed for the conduct of further research or analysis. As such, the responses to certain comments indicate that issues requiring significant effort may be the subject of future NRC work rather than included in the final version of NUREG-1150.

E.2 Scope Chapter 1 of the second draft of NUREG-llS0 described the scope of the risk analyses and identified certain limitations of these analyses. The review committees also noted these limitations, as well as others.

Some more general comments by the committees with respect to scope included:

E-3 NUREG-llS0 OAGI0000611 00650

Appendix E

  • "The second draft of NUREG-1150 addressed many of the shortcomings identified in the first draft and it provided a more comprehensive and incisive view of risk from the existing light water reactors than did WASH-1400." (Kouts 4.1)
  • "In general, NUREG-llS0 represents state-of-the-art methodology in PSA and associated uncer-tainty analysis. However, comparison of resulting risk figures between individual plants and with quantitative safety goals must be made with caution, taking into account questions as to the complete-ness of the analysis and uncertainties in methods and data." (Kouts 4.12) (Such reservations are itemized in the comments below.)
  • "Many of the limitations and uncertainties mentioned above [in Section 4.12 of the Kouts report]

may be reduced by improved PSA methodology and by improved experimental and empirical data.

Such improvements should be made part of the IPE [Individual Plant Examination] program, but not delay it. We note that many such improvements in methods and data have become available since the closure date for the NUREG-1150 analysis." (Kouts 4.12)

The review committees also provided a number of more specific comments. These are itemized below and staff responses provided.

Comment: The list of initiating events was extensive. and. in most respects. state of the art, but it was not complete. Initiating events not considered included:

  • Human errors of commission;
  • Incidents starting from low power and shutdown conditions;
  • Leaks or breaks of PWR steamlines; and
  • Sabotage (understandable in view of methodological and other difficulties involved) (Kouts 3.2.1.1; ACRS).

The effects of aging were not included in the "analysis (Kouts 4.12. 7.2).

Response

The staff acknowledges that human errors of commission have not been included. The treatment of such errors has been the subject of considerable research for several years, but had not sufficiently evolved to permit its use when the NUREG-llS0 risk analyses were initiated in 1985. The NRC is currently studying ways in which errors of commission can be practically included in future PRAs (Ref. E.8).

The staff acknowledges that accidents initiated during low power and shutdown operations have not been included in the NUREG-1150 analyses. Recent PRA studies and events in the United States and Europe indicate that the core damage frequency from accidents initiated in such plant operational modes may be "significant. The NRC has initiated studies of low power and shutdown accident frequencies and risks for two of the NUREG-1150 plants, Surry and Grand Gulf. Interim, scoping results of these studies are expected in mid-1991. In addition, the NRC has initiated a more general review of non-fuIl-power opera-tional modes to identify the need for additional regulatory requirements. This review is scheduled to be completed in 1991.

Sabotage risks have not been included in the NU:&EG-1150 risk studies. While the effects of sabotage actions may be similar to that of accidents included in the risk studies. the estimation of the frequencies of such actions is highly uncertain and requires a detailed analysis of the spectrum of threats. Because this threat may be highly variable with time. the staff does not consider it meaningful to attempt to include sabotage risks in PRAs.

The potential for PWR steamline breaks to lead to core damage was assessed (using conservative screening analyses) and determined to be of little significance in the NUREG-1150 PWRs. For some break loca-tions, a steamline break can be similar to a loss of power conversion system transient event and thus can be subsumed into that event. For other break locations. steamline breaks can be recovered through any one of several methods (e.g .* feed and bleed cooling. or use of crossties of auxiliary feedwater or emer-gency core cooling injection from a second unit. jf such crossties exist). Using such logic. the core damage NUREG-1150 E-4 OAGI0000611 00651

Appendix E potential resulting from such events was judged to be of sufficiently low frequency that it could be screened out early in the analysis. It should be noted, however, that steamline breaks could be important in other PWRs with different plant layouts and system redundancy.

Aging effects were not explicitly included in the analyses. Some consideration of such effects occurs indirectly, however, in that the data base of component and other failures includes failures resulting from aging. The NRC has an extensive program to investigate the impact of aging on plant equipment and to develop and test methods for more explicitly including aging effects in PRA. This work is described in Reference E. 9.

Chapter 1 of NUREG-llS0 has been updated to better reflect these comments on limitations of the risk analyses.

Comment: The Kouts committee had reservations with respect to the completeness of modeling of inter-dependencies of technical systems, including detailed modeling of auxiliary systems, formally regarded as not safety-related (Kouts 4.12).

Response

A major portion of the analysis was devoted to accurately modeling the important auxiliary/support sys-tems, such as component cooling water, and normal and emergency service water. Dependency matrices were developed to identify the dependence of each frontline system on such systems. Connections be-tween safety and nonsafety systems, such as connections to electric power buses, were explicitly consid-ered. Failures of the support systems were also explicitly considered as initiating events. Although most of these events could be ruled out (in initial screening analyses) as initiating events because of train separa-tion, the use of alternative systems, and operator recovery actions, failures of some support systems did contribute to the estimated core damage frequencies (e.g., the component cooling water system failure at Zion and some electric power bus failures).

Comment: The Kouts committee had reservations with respect to uncertainties associated with probabili-ties mainly based on expert judgment, especially where considerable divergence of opinion existed (Kouts 4.12).

Response

This comment is discussed in Section EA.

Comment: The Kouts committee had reservations with respect to the impact of "safety culture" and the fact that the potential effects of management quality are not included (Kouts 4.12).

Response

This comment is discussed in Section E.S.1.

Comment: Users of the report should be aware of assumptions made in the screening process in which low frequency accident sequences were eliminated from further consideration and that it may not be appropriate to screen out potential sequences in other plants based on the NUREG-11S0 studies (ACRS).

Response

The staff agrees with this comment.

Comment: The frequency of disruptive failure of the reactor pressure vessel was estimated to be between 1E-7 and 1E-6 per reactor year, yet the event was not treated in the analysis. Reviews published in recent years indicate failure probabilities typically in the range of lE-6 to lE-9 per reactor year based mainly on probabilistic fracture mechanics considerations. These considerations show a significant influence of plant-specific parameters such as material properties and aging, positioning of welds, and inspection programs.

Thus, a somewhat more extensive discussion might have been warranted in NUREG-1150 (Kouts 3.2.1. 7).

E-5 NUREG-l1S0 OAGI0000611 00652

Appendix E

Response

A limited screening analysis was performed for NUREG-USO which indicated that the relative contribu-tion of vessel rupture to core damage frequency would be negligible. For this reason, this issue was not pursued further.

One issue that could have a significant effect on the estimated core damage frequencies of PWRs due to pressure vessel rupture is pressurized thermal shock (PTS). In 1985. the NRC issued new regulations (Ref.

E.10). and defined a screening criterion, to limit the potential impact of PTS. Estimates have been made as to when each licensed PWR would reach this screening criterion (Ref. E.ll); none of the three PWRs studied in NUREG-llS0 is close to reaching this criterion.

Comment: The lack of analysis of external events for three of the plants studied is a deficiency (Kouts 7.2).

The fire analysis in NUREG-llS0 was limited to Surry and Peach Bottom. It was generally state of the art but should have been extended to all five plants (Kouts 4.3.3, 7.2).

Response

The original intent of (what was to become) the NUREG-llS0 risk analyses was to provide perspectives on the mid-1980's revisions to source term technology and thus early analyses did not include accidents initiated by external events. In response to comments on the first draft report, the risk analyses of two plants were extended to include external-event analyses. All five plants were not subjected to external-event analyses because qf time and budget constraints. The staff concurs, however, with the basic point made that modern PRAs should include consideration of externally initiated accidents.

Comment: Although the two seismic PRAs in NUREG-1150 have been carried through Level 3, these results have not been reported. We believe that these results might provide valuable insights about seismic vulnerabilities of containment systems (ACRS).

Response

As discussed in Chapter 1, the seismic risk calculations are not described in NUREG-1150 because of certain issues relating to the nonradiological consequences of large earthquakes. While some data are provided in NUREG-1150 with respect to containment performance during seismic events, detailed infor-mation is provided in supporting contractor reports (Refs. E.12 and E.13).

Comment: The methods and data used [in the fire analysis] were probably the best available at the time the work was performed. However, certain issues identified more recently may result in increased fire risk estimates (ACRS).

Response

The staff agrees that the more recently identified issues could be significant. The staff is currently investi-gating these issues further with respect to their importance to plant safety. As the results of these investiga-tions become clear, the staff will reassess the adequacy of current PRA methods and. if appropriate, initiate work to improve the methods.

Comment: It is not clear as to why loss of instrument air was judged not to be important (Kouts 3.2.1.1).

Response!

The loss of instrument air was examined as a potential initiating event. The plants were examined to determine: if the loss of instrument air resulted in a plant trip and the need for decay heat removal; and the effects of loss of instrument air on accident prevention and mitigation systems. For the plants consid-ered, this event was examined and determined to be of minimal importance. Reasons for this conclusion included plant-specific design features such as separation of air supplies, coupled with the availability of backup systems, and/or that loss of instrument air resulted in plant conditions similar to those of other initiating event groups of higher frequencies, such as a transient with the loss of the power conversion system.

NUREG-1150 E-6 OAGI0000611 00653

Appendix E Comment: Recognizing and supporting NRC's desire to publish a final NUREG-1150, we recommend that the report indicate the likely impact of Commonwealth Edison Company's committed modifications on the Zion plant results (Kouts 4.2.2).

Response

The NRC staff has identified the specific modifications that have now been made to the Zion plant (Ref.

E.14). Using this information, sensitivity studies have been performed to assess a revised mean core damage frequency and risk for the Zion plant. Chapters 7, 8, and 12 have been revised to indicate the impact of the modifications made at Zion. More detailed documentation of the sensitivity studies per-formed is provided in Section 15 of Appendix C.

E.3 Documentation and Display of Results As discussed in Appendix D, the display of results in the first draft of NUREG-llS0 was the subject of considerable controversy. Because of the displays used (and other reasons), the first draft was considered inscrutable. In response, the second draft of NUREG-llS0 made significant changes to the displays.

Some general comments made by the two review committees on this subject included:

  • "[With respect to display of results,] the second draft, reviewed by this [Kouts] committee, followed a more conventional course, showing the probability distributions and the major parameters. This choice responds well to the criticisms of both WASH -1400 and the first draft of NUREG-115 0, and the present Committee endorses the decision." (Kouts 4 .11.1)
  • "The current version does a much better job of presenting the results. A particularly helpful form of the results are the matrix-like figures in which mean values of accident progression bins are combined with mean plant damage states and their frequencies. Pie charts are used effectively to display quali-tatively the contributions of various initiating events and accident progression scenarios." (ANS 2.a.12.c)

A related question to the choice of display techniques is the appropriateness of citing and using mean values (vs. median values) to describe uncertain parameters. The NRC-sponsored committee addressed this question and noted the following:

  • "There has been much discussion over the matter of preference between. use of the mean and the median as a point indicator in such cases. Which is the one that most accurately represents the full distribution? We leap forward to the answer: the preference depends on the precise question being asked. In some applications the mean would be preferred; in others it might be the median. There ma y be instances in which neither would suffice." (Kouts 4 .11. 3)

Some other general issues related to documentation were also addressed by the committees. These were:

  • The CANS) committee agrees with the decision not to include the radiological consequences of seismic events (ANS 2.a.9.b).
  • The ANS committee agrees with the deletion of the analyses of accident prevention and mitigation features CANS 2.a.l0).
  • The Kouts committee notes that the staff presentation of the Peach Bottom A TWS sequence demon-strated good traceability of the methods and data used in the analysis, as did the detailed documenta-tion of the Grand Gulf case (Kouts 4.8.4).

The review committees also provided a number of more specific comments. These are itemized below and staff responses provided.

Comment: Experience shows that neglecting sequences with a frequency about two orders of magnitude below the calculated mean core damage frequency does not noticeably change the overall core damage frequency. Thus, for plants that have a mean core damage frequency of lE-5 per year, a cutoff frequency of lE-7 per year seems reasonable (Kouts 4.10.2).

E-7 NUREG-llS0 OAGI0000611 00654

Appendix E It is reasonable to neglect individual risks that are about one order of magnitude or more below the value associated with the U.S. safety goals. A de minimis threshold of 1E-7 per year would appropriately repre-sent this reasoning (Kouts 4.10.3).

Taking into account remaining uncertainties in the PRA methodology, e.g., with respect to completeness in the treatment of human factors and external events, estimated core damage frequencies much below lE-S per reactor year should be regarded with some caution (Kouts 4.12).

Response

The staff basically agrees with the frequency cutoff suggested above. In general, accident sequences identi-fied in NUREG-1150 as having frequencies roughly two orders of magnitude or lower below the accident sequence with the highest mean frequency were eliminated.

The staff also basically agrees with the suggestion of neglecting individual risks at levels one order of magnitude or more below the NRC safety goals. In some circumstances, however, values below such levels have been included in NUREG-l1S0 to permit comparisons with such risk measures as the frequency of a "large release" goal (see Section 13.2).

Chapter 1 has been modified to discuss the cautionary statements on interpretation of PRA results.

Throughout the report, figures and tables have also been modified to indicate these cautions.

Comment: The last six chapters of the second draft of NUREG-1150 are the least effective and most difficult to follow portions of the report. Certain of the material is very worthwhile but much of the discussion seems forced, and the observations range from the obvious to those for which the analysis provides no apparent basis (ANS 2.a.12.d).

Response

The~e chapters have been reviewed by the staff and its contractors and updated as appropriate. In addi-tion, Appendix C has been expanded to provide additional discussion of issues important to the results and perspectives provided in Chapters 8 through 13.

Comment: Appendix B provides a valuable example of an accident sequence carried through from accident initiation to offsite consequence estimates. However, the example provided did not include early containment failure; hence many of the more interesting issues that are important to risk are not included in the discussion CANS 5 .e.2).

Response

An example containing early containment failure was originally considered for Appendix B. The early containment failure example was considered interesting but, however, not typical. That is, a more typical sequence was chosen to avoid giving. the wrong impression about the importance of early containment failure to risk at Surry. More detailed discussion of specific risk-important issues is provided separately in Appendix C.

Comment: The purpose of Appendix C was to provide some insight to the resolution of key issues. These discussions are sketchy and the information and reasoning that led to the expert judgments generally not provided. There seems to have been no concerted effort to provide a discussion of those issues that were most important to risk CANS 5.e.1).

Response

Appendix C has been reviewed and expanded to address other important issues. However, the informa*

tion provided is still at a somewhat summary level. The reader seeking more detailed information than that in Appendix C should turn to the extensive issue discussions provided in References E.15 and E.16.

Comment: Recovery actions should be discussed in Chapter 2 and their impact quantified in Chapters 3 to 7 (Kouts 7.3).

NUREG-1150 E-8 OAGI0000611 00655

Appendix E

Response

Appendix A has been modified to clarify how recovery actions were treated in the risk studies. Important operator actions (including recovery actions) are addressed in qualitative terms in Chapters 3 through 7 along with other types of failures. The large number of events involved makes it impractical to provide discussion in the summary report. However, more detailed information, including sensitivity studies and importance calculations, is provided in Appendix C and in the plant-specific accident frequency analysis reports (Refs. E. 17 through E. 21) .

Comment: To facilitate a comparison between estimates of offsite consequences in WASH-1400 and NUREG-1150, it is suggested that the final version of NUREG-1150 include comparisons of estimated probabilities of exceeding whole-body or thyroid doses as a function of distance from the site. These data are available from calculations already completed. so no delay in issuance of the report should be caused by incorporating such comparisons (Kouts 5.5; ANS 2.b.3, 2.b.10).

Response

Although the consequence model used in NUREG-1.150, MACCS 1.5 (Ref. E.22), can calculate center-line whole-body and thyroid doses as a function of distance from the site. neither of these specific results was generated and saved in the NUREG-llS0 analyses. Thus. this information is not now available for generating dose versus distance plots. Because of the time required to develop such information and transform it into a form directly comparable with the Reactor Safety Study (Ref. E.23). it has not been included in the final version of NUREG-1150 but may be appropriate for study and publication in other forums.

Comment: The contributions of the unavailabilities of safety systems to the total core damage frequency should be displayed (Kouts 7.3).

Response

The calculation and display of system unavailabilities is most appropriately performed on an accident sequence basis and should account for the operability states of support systems (e.g .* the unavailability of the auxiliary feedwater system is different if ac power is or is not available). The staff believes that tabulat-ing a single unavailability contribution (e.g., to core damage frequency) could thus be somewhat mislead-ing and has chosen not to include such information in the final version of NUREG-1150. More detailed tabulations of system unavailabilities. accounting for support system availability. etc .* could not be gener-ated in a time period consistent with completion of the final report and thus have also not been included.

Comment: Since the supporting documentation upon which NUREG-U50 depends could be helpful to those performing an individual plant examination (IPE), these reports should be published as soon as feasible CANS 2.b, ACRS).

Response

Roughly 80 percent of the contractor reports supporting NUREG-1150 (including methods descriptions.

computer code descriptions. and documentation of data and reSUlts) have now been published. The pre-sent staff and contractor schedules indicate publication of all reports by the end of March 1991.

Comment: In the plant-specific chapters. the substantial differences in the methods used for the Zion plant analysis are not highlighted (ANS 2.a.12.b).

Response

Chapter 7 has been modified to highlight the differences in methods for the Zion accident frequency analysis.

Comment: The final version of NUREG-1150 should clearly state that it should be viewed as a new study and as a replacement for the first draft CANS 2.b.6).

E-9 NUREG-1150 OAGI0000611 00656

Appendix E

Response

Chapter 1 has been modified to clearly state that the final version of NUREG-llS0 is so different from the first draft that the latter should no longer be used.

Comment: The first draft of NUREG-llS0 was better in one respect. in that it provided a schematic drawing of the containment and reactor coolant system in each plant-specific section (ANS 5 .a).

Response

Plant schematic diagrams have been added to each of the plant-specific chapters (Le., Chapters 3 through 7).

Comment: Some presentations of results are so smail, or so little contrast provided, that the results are unreadable (ANS S.b).

Response

Presentations of results throughout the report have been reviewed and improved where needed.

E.4 Use of Expert Judgment The use of expert judgment is another issue that was the subject of considerable controversy during the review ofthe first draft of NUREG-llS0. Serious criticisms of the methods used in the first draft to obtain these judgments led the staff and its contractors to implement more formal and rigorous methods. The committees reviewing the second draft had a number of general comments on the use of expert judgment.

These included:

  • "The formal methods that NUREG-llS0 employed for such elicitation and the extensive debates that have ensued constitute a significant advance in PSA methodology, since they force visibility on the use of 'engineering judgment,' which is abundant, yet often hidden, in safety studies. The critical element of the whole process, e.g., the selection of the experts, is now widely recognized and appre-ciated." (Kouts 4.7)
  • "Expert opinion elicitation is technically less satisfying than the use of detailed, validated analytical procedures, or experimental data. Considering the lack of understanding of some phenomena, the uncertainties -in the scenarios, and the state of development of many of the analytical procedures, some form of expert opinion was unavoidable, however." (Kouts 4.4) (The committee then contin-ued with a set of more specific comments, some of which are appropriate for staff response. These are discussed below.)
  • "It can be hoped that, in the long term, the accumulation of experience will help to narrow the distributions in many inputs and outputs of risk assessments. This is, however, unlikely for many of the important ones, because the objective of safety is specifically to avoid just those events that would generate the data useful for risk analysis." (Kouts 4.11.2)
  • "There is a general agreement that the techniques used for eliciting expert opinion in preparation of the *second draft were significantly better than those used for the first draft. However, with insuffi-cient information there can be no experts. Thus, use of the term 'expert opinion' in a description of some of the Level 2 work may be misleading. We applaud efforts to improve on the Level 2 treat-ment of previous PRAs. We nevertheless believe that the results from Level 2 presented in this latest

[second] draft must be regarded as having major uncertainties in both calculated mean values ilnd in estimated uncertainties." (ACRS)

More specific comments by the review committees are itemized below and staff responses provided.

Comment: Formal, professionally structured expert opinion is preferable to the current alternative, ac-cording to which the individual PRA analysts make informal judgments that are not always well docu-mented. However, it is not as technically defensible as analysis using detailed, validated codes. The repro-ducibility of expert opinion results is a concern (Kouts 4.4).

NUREG-l1S0 E-l0 OAGI0000611 00657

Appendix E

Response

The staff agrees that a PRA will be improved by having as many robust calculations as possible. However, it should be noted that it will also never be possible to remove expert judgment from a PRA. A PRA is a procedure for assembling information from many sources, including experimental data. theoretical calcu-lations, and mechanistic code calculations, some of which are conflicting and incomplete. The process of obtaining expert opinions such as used in NUREG-l1S0 provides a way to review this information and put it in a form that is suitable for use in a PRA. The outcome of this process will always be improved by better information, including calculations by detailed, validated codes. However. some type of expert judgment is always associated with the use of code calculations for several reasons. First, a code calculation is performed for a very specific accident, but the results of this calculation are used in a PRA for groups of "similar" accidents. This type of aggregation requires judgment since the performance of a calculation for every possible accident is not feasible. Second. it is not possible to fully "validate" the mechanistic codes*

that are used in reactor accident calculations. Thus, there is always a judgment that must be made with respect to the acceptability of a code calculation for a specific application. Third, judgments with respect to model formulation and model parameters must be made to use a code. Thus, the opinion of this "expert" will always enter into the calculations and results.

In the NUREG-l1S0 uses of expert judgments, two factors acted to reduce the potential impact of this concern: the information being obtained from experts was in the form of probability distributions rather than single or best estimates; and, for key issues, a diversity of judgments was sought. Nonetheless, the staff agrees that the reproducibility of expert judgments can be of concern and expects to support research in this area in the future.

Comment: There is always a question as to "who is an expert on a given issue." The membership of expert panels for the second draft of NUREG-l1S0 seemed to be better than for the first draft. Yet it still seemed to be unbalanced in that panels still contained more analysts and fewer persons with practical engineering experience who might have expertise on the phenomena; the panels included more users and fewer generators of data than is preferable (Kouts 4.4, 7.2; ACRS).

Response

The method used to select the members of the expert panels for the NUREG-llS0 risk analyses is dis-cussed in Reference E.24. As described there, one goal was to select experts with a diversity of backgrounds. However, experts familiar with reactor safety were usually selected for practical purposes.

That is, the project schedule did not permit the time. in general. to educate experts in very specialized areas in the more general area of reactor safety. Two experts on specific phenomena with no familiarity with reactor safety analysis were selected: one on the source term panel and one on the containment loadings panel. One of the experts felt uncomfortable extrapolating his knowledge to reactor accident sequences and declined to continue participation. The second expert went through the effort to educate himself on reactor risk and provided valuable input.

Comment: Expert opinion may have been relied upon too heavily in some instances. An important example is the treatment of core cooling after containment failure. In this case, expert opinion was used to argue that equipment would fail 70-80 percent of the time if environmental temperatures exceeded equip-ment qualification limits. No explicit analysis was performed to determine the impact of local environ-mental conditions on eqw,pment heatup and the potential for subsequent failure. It may have been thought that the analysis would have been too time-consuming. It would have been appropriate if possible to have developed these analyses and then to have subjected them to critical review to which expert opinion could have been directed (Kouts 4.4).

Response

The staff and its contractors did obtain additional information and perform extensive analyses to eliminate the need for or support expert judgments and to supplement the information available in the literature.

For the specific issue cited. the experts did receive. for example, information on equipment tolerances and lubricant breakdown temperatures. More generally. many calculations were commissioned specifically fonhe NUREG-llS0 study and presented to the expert panels for review. Some examples of code calcu-lations commissioned include those performed with CONTAIN, CORCON. the Source Term Code E-ll NUREG-llS0 OAGI0000611 00658

Appendix E Package, MELeOR, and MELPROG. Such calculations were performed for specific issues and are de-scribed in Reference E .16.

Comment: There are some subjects for which the expert opinions were either incomplete or were not targeted on the correct issue because definition of the issue evolved subsequent to the elicitation process and resources were lacking to update it. In these cases, the Sandia staff modified the expert opinion in order to treat the redefined issue. Unfortunately, these new calculations were not reviewed with the expert panel and are not reported in the NUREG-1150 main report or other documentation available to the Kouts committee (Kouts 4.4).

Response

There were issues in which the responses of the experts were used in a slightly different context than was originally intended. There were two reasons for this:

  • The experts had different perceptions of the question asked of them; thus, the information was received from the individual experts in different formats. To aggregate these issues, it was necessary to extrapolate and interpolate some of the expert responses.
  • The definition of the issue sometimes evolved subsequent to the elicitation process. In some cases, the issue was much more complex than was anticipated at the time of the elicitation; an example is the treatment of multiple containment failure modes during fast pressure rises. In these cases, the information from the expert panels was reformatted or extrapolated in order to aggregate the re-sponse.

In all cases, the original elicitation notes for the accident progression issues and the source term issues have been documented (after review by the experts) in Reference E.16. Any manipulations that were performed on the expert elicitation are described in a section that preceded the individual expert issue documentation, entitled "Method of Aggregation." In virtually all cases, the manipulations were discussed with the experts prior to its use to ensure that the information was not misused.

Comment: The study assigned equal weight factors to the opinions of all experts. Other methods that can develop unequal weight factors were not used (Kouts 4.4).

Response

The staff and its contractors considered a variety of methods of combining expert judgments, including methods using unequal weighting factors. As noted in Appendix A, the method of equal weighting was chosen because this simple method has been found in many studies (e.g., Ref. E.23) to perform the best.

Comment: The ACRS was told that the budget for the study provided only enough funding to support the participation of about 20 percent of the experts who served on the panels. The remainder were drawn from the NRC staff or from organizations with contractual relationships to the NRC. This biased the selection toward people whose organizations depend upon the NRC for' ~upport (ACRS).

Response

Roughly 30 percent of the experts were funded directly by the NUREG-11S0 study. However, the remain-der ofthe experts were supported by two groups: the NRC and the nuclear industry (e.g., EPRI). Overall, approximately 30 percent of the experts were supported directly by the NUREG-1150 study, 45 percent by other NRC projects, and 25 percent by the nuclear industry.

Comment: The expert opinion procedure is complex, time-consuming, and expensive. Therefore, the full scope of the methodology may have very limited future application. It is unlikely that an expert opinion procedure of this magnitude will be repeated for several years, although expert elicitation on single or narrow issues may be practical. However, it should be remembered that throughout the study analysts had to decide how to use technical information of all kinds; this "expert judgment" is necessary in all PRAs (Kouts 4.4; ACRS).

NUREG-1150 E-12 OAGI0000611 00659

Appendix E

Response

The staff agrees that the expert judgment methods used in NUREG-1150 may have limited utility in future work because of the time and cost involved. The staff intends to pursue research in this area with the intent of making the formal uses of expert judgments and the performance of quantitative uncertainty analyses more practical.

Comment: The discussion of issue quantification could be substantially improved, with much clearer indication of what probability distributions were developed by the staff and which specific issues were quantified by the expert review panels (Kouts 7.3; ANS 2.a.8.a).

Response

The staff agrees with this comment. A table indicating what variables were included in the uncertainty study for the Surry plant (Ref. E.12), and how they were quantified (by expert panels, by NUREG-1150 staff, or by user function), is provided as an example in Section C.l of Appendix C. Similar tables for the other four plants are provided in References E.13 and E.26 through E.28.

E.S Accident Frequency Analysis The review committees and the ACRS had a number of general and specific comments on the accident frequency analysis performed in the NUREG-1150 project. These comments are itemized below"begin-ning with the subject receiving the most comment, human reliability analysis, discussed in Section E.5.1.

Section E.5.2 then provides a discussion of comments on external-event analysis, and Section E.5.3 pro-vides a discussion of other comments on the accident frequency analysis.

E.S,l Human Reliability Analysis The Kouts committee provided considerable comment on the subject of human reliability analysis (HRA).

As a general comment, the committee noted that:

  • "Given the current state of the art in HRA, it would be unreasonable to expect NUREG-1150 to resolve all the outstanding issues including use of a universally accepted model." (Kouts 4,8.2)

The ACRS also provided a general comment on this subject:

  • "As other reviewers have reported, there are recognized deficiencies in the state-of-the-art treat-ments of human performance; and this report is not free of these deficiencies."

In addition, a number of specific comments were provided. These are itemized below along with staff responses.

Comment: NUREG-1150 pioneered the explicit treatment of model uncertainties and the use of expert panels to weigh the relative merits of alternative methods of analysis, but such an approach was not been employed for human actions such as errors of commission and complex situations in control rooms such as in the early phases of an BWR ATWS accident (Kouts 4.8.2).

Response

The staff agrees that the human reliability analysis should have been performed in a manner more consis-tent with the remainder of the risk analyses, Human reliability analysis has been the subject of extensive research in the past few years and has led to the development and initial application of techniques to deal with such issues -as human errors of commis-sion. NRC continues to perform a substantial amount of research in HRA, as described in Reference E.8.

The demonstration and more widespread use of improved HRA methods in PRA is planned to be the subject of future work by NRC.

Comment: It would have been valuable if the theoretical HRAs of the ATWS sequences had been tested against analysis of real events as a basis for an in-depth analysis of uncertainties in HRA. This could be done as part of expert opinion input on the merits of different HRA models. Such an approach to the E-13 NUREG-l1S0 OAGI0000611 00660

Appendix E ATWS HRA appears more appropriate and consistent with the use of expert panels in the remainder of NUREG-1150 (Kouts 4.8.4, 7.2).

Response

The validation of human reliability models (by comparisons with actual events, simulator exercises, etc.) is an integral part of the present NRC program in HRA (Ref. E.B). Future NRC PRA work will make use of such models and thus should provide a better assessment of human performance and its importance to risk.

Comment: For NUREG-1150, the argument was advanced that the conservative screening procedures that have been employed and the wide uncertainty ranges that have been assigned to human error rates have the effect of including the results that other models' would have generated. However, such an ap-proach goes against the presumed goal of a PRA, namely, the realistic estimation of risks. Furthermore, the use of an error factor does not necessarily cover the possibility that the models systematically overesti-mate or underestimate the human error rates (Kouts 4.8.2).

Response

Conservative screening values were used in the initial quantification of human error probabilities. How-ever, for those events that were potentially significant contributors to core damage frequency, more de-tailed analyses were performed (this approach being designed to expend 'significant resources only on those events that are most important). Different types of probability distributions, such as maximum en-tropy or lognormal. were assigned as appropriate. It is possible that the mean values produced in the analyses could be systematically high or low because of various types of systematic errors. However. the uncertainty analysis did account for these errors in the sense that many of the human error uncertainty distributions were correlated. That is, when a value near the high end of the distribution was chosen for one variable, then a value near the high end of the distribution was chosen for all similar human errors.

Thus, the variability did account somewhat for systematic errors. This approach, coupled with the fact that very wide uncertainty distributions were applied to these variables, leads the staff to believe that the treatment of human error uncertainties was adequate for the types of actions included within the scope of the study, recognizing the state of technology of HRA at the time when the work was performed. As noted above, the NRC is currently funding considerable research in the area of HRA (Ref. E.B).

Comment: Considering the different Grand Gulf and Peach Bottom analyses of operator failure to initiate the standby liquid control system during an A TWS event, it is unclear to what extent the differences in estimated probabilities is due to the different methods employed and to the different groups of analysts that have implemented them. It may be questioned if the relatively simple methods used are the most appropriate for very complex,high-stress situations (Kouts 4.8.4).

Response

The HRA methods used for the Grand Gulf and Peach Bottom ATWS analyses included a detailed task analysis, using the THERP method (Ref. E.29) for Grand Gulf and the SLIM-MAUD method (Ref. E.30) for Peach Bottom. The staff acknowledges that use of different methods and analysts can have an impact on the results obtained and that the impact on the two plant ATWS studies of these differences cannot be easily estimated.

While the use of different analysts can influence the results, it should be recognized that plant design differences were found to be important in NUREG-1150. With respect to ATWS accident sequences in Grand *Gulf and Peach Bottom, several such important design differences exist. For example, the standby liquid control system in Grand Gulf is designed to inject boron via the high-pressure core spray sparger, while in Peach Bottom boron is injected into the bottom of the reactor vessel. This difference leads to differences in timing of ATWS events and the procedures established by the plants (operator actions to lower and raise water levels required at Peach Bottom are not needed in Grand Gulf).

Comment: It is beyond the capabilities of present PRA models to account for the influence of manage-ment quality on risk; thus it is understandable that NUREG-llS0 does not address these issues. While management quality may not be quantifiable in PRA in the near future, its impact on safety is currently NUREG-1150 E-14 OAGI0000611 00661

Appendix E being addressed through other NRC and INPO [Institute of Nuclear Power Operations] work. It is impor-tant to bear in mind that management quality is not reflected in the risk information as results and per-spectives are used (Kouts 4.9).

Response

Such influences have not been included in NUREG-llS0 (or in any other PRA). The present NRC human factors research program (Ref. E.B) includes the study of organizational and management influ-ences on plant safety, including consideration of how such influences can be accounted for in risk studies such as NUREG-llS0. Completion of this research should provide some perspective on the degree to which these influences can be incorporated.

Comment: The inclusion of some recovery actions was state of the art. However, the assumptions behind actual recovery curves are not always clear (Kouts 3;2.1.7).

Response

The recovery analysis included an evaluation of both the time available for recovery and the probability of the operator correctly performing the task. For some faults, actual historical data exist. For example, data exist for all electrical-type faults (Le., offsite power and diesel generator faults) and faults associated with the power conversion system. For other type faults, historical data did not exist. This recovery information is documented in Reference E.31. For these situations, an HRA or recovery analysis was performed to

. determine the probability of failure to recover. These recovery curves and "generic" human behavior curves are obtained directly from use of the THERP method (Ref. E.29).

Comment: Innovative recovery actions not covered by operating or emergency procedures should not be included in the baseline analysis, but should be reserved for potential reductions in risk (Kouts 3.2.1. 7).

Response

For some of the accidents analyzed in NUREG-llS0, several hours pass before the onset of core damage.

In severe accidents of such time duration, an emergency response team would be involved to support the operating crew. It would, therefore. be unrealistic not to allow any innovative recovery actions, consider-ing that such options would be under active investigation and consideration. For these reasons. and recog-nizing the goal of performing realistic analyses in PRA, credit for innovative recovery in such accidents was permitted in the NUREG-llS0 analyses.

It should be noted that, while permitted, very few innovative actions were ultimately incorporated into the analyses. Although several innovative recovery actions were proposed, some of these were incorporated into plant procedures (by the licensee), while others were found to be unnecessary for further analysis because of the already low estimated frequency of the associated accident sequences or the low probability of success.

Comment: Special attention should be given to further development of human reliability analysis, and to proper calibration of the procedures used for it, to enable comparisons to be made between plants and 4:

quantitative safety goals (Kouts 12. 7.3).

Response

As discussed in the responses to a number of the previous comments. the NRC has a significant research program under way in the area of human reliability analysis (Ref. E.B).

E.5.2 External-Event Analysis Specific Comments Comment: A simplified approach was taken in NUREG-llS0 in defining seismic initiators, which leads to failure from all resulting transients. small or large (Kouts 4.3.2).

Response

All seismically induced transients were not assumed to result in "failure." It is assumed in the analysis that an earthquake will lead to at least one initiator that will require the plant to shut down (either automatically or as a result of operator action).

E-15 NUREG-1150 OAGI0000611 00662

. Appendix E The occurrence of any of these initiating events, however, does not necessarily imply that core damage will occur. Given that such an initiating event occurs, the same (event tree and fault tree) process is used to assess the conditional probability of core damage as was performed. for the internal-event analyses.

System failure probabilities may be higher because of earthquake-induced damage, but they are not as-sumed to be of unity probability.

Comment: Although plant experience was used to establish fire initiation frequencies, judgmental factors were used to determine whether a fire. once started, would persist and cause damage in spite of fire mitigation systems and actions. It would seem that the same data base that was used for fire initiation could and should have been used to give a more realistic value for fire persistence (ANS 3.f.3.a).

Response

Credit was taken for fire mitigation systems, both manual and automatic, in each fire scenario where applicable. In the case of manual suppression, the same fire data base used to develop the fire initiation frequencies was also used to develop a probability of suppression in any given time frame. For automatic suppression systems, several other studies were used to determine reliability values, as these could not be determined directly from the fire occurrence data base. The data indicated that, for fires in criticalloca-tions, the fire was always eventually suppressed (either automatically or manually) but seldom before damage to critical equipment would be predicted to occur (using the COMPBRN model of fire propaga-tion (Ref. E.32)).

Comment: Research in seismic modeling is warranted with the objective of improving the basic model for prediction of attenuation and ground motion and for developing a consensus of the use of one model or model set based as much as practicable on region-specific spectral shapes. Effort should also be made to improve the basic model to reflect greater source depths and regional variations with the appropriate reflections of substrata waves (Kouts 7.3).

Response

NRC and others continue to sponsor research to improve the general understanding of seismic hazard, including the areas noted above. Such work is described in Reference E.33.

E.S.3 Other Accident Frequency Comments In addition to the comments itemized above on human reliability and external-event analyses, the com-mittees had a number of other comments on the NUREG-llS0 accident frequency analysis. Some general comments provided by the committees included:

  • "[The plant damage state analysis] was more detailed than the corresponding analysis in other recent PSA's. It provided an efficient interface with the detailed and complex accident progression and containment loads analysis, and constitutes an advance in PSA methodology." (Kouts 3.2.1.8)
  • "In respect to including the modes of containment failure, and in the level of detail, the [accident sequence event tree] analysis was advanced other than typically seen in Levell PSA's performed at the time of the NUREG-llS0 analysis." (Kouts 3.2.1.2)
  • "Although NUREG-l1S0 is described as being 'a set of modern PRAs, having the limitations of all such studies,' the level of modeling in the accident frequency analysis is not as detailed in some areas as that found in other current PRAs." (ANS 2.a.8.b)
  • "A rigorous analysis would always combine the generic and plant-specific [failure data] information.

In fact, this is often done using Bayes' theorem. However, we note that in general the numerical differences between the approximate methods of NUREG-llS0 and the rigorous approach are insig-nificant." (Kouts 3.2. 1. 6)

More specific comments made by the committees are itemized below and staff responses provided.

Comment: Since the first draft was issued, considerable effort was devoted to making the accident frequency analysis more robust. However, the NRC staff recognizes that the state of the art with respect to NUREG-l1S0 E-16 OAGI0000611 00663

Appendix E common-cause failures and human reliability analysis is imperfect and that further improvements can be made in these crucial areas. These areas have not been treated as top-level issues in the expert elicitation process (Kouts 6.3).

Response

Common-cause failures and selected human error probabilities were offered to the accident frequency analysis panel as issues. The panel concluded that the approach being taken by the analysis team for common-cause failures was appropriate and that expert judgment would not significantly improve the process. Human errors could not be readily considered as a single issue because each action being consid-ered was unique, requiring a separate analysis. The panel did consider several specific human error issues considered to be particularly important. In addition, sensitivity studies on the importance of human error were performed, as discussed in Appendix C.

Comment: The consideration of operating experience in the so-called subtle interactions, represents a good attempt to ensure completeness of failure modes. The method of treatment of dependent failures was state of the art in most respects. The documentation of common-cause failure analysis is difficult to follow. For example, in some instances references were made to EPRI common-cause methods and data, but it appears that in reality a modified beta-factor method was used, which was itself state of the art. The probability of failure of all station batteries is critical to the final results and therefore necessitates better substantiation. Recovery from common-cause failure was restricted to selected electrical equipment (Kouts 3.2.1.4).

Response

Common-cause failures are discussed in Appendix C and in Reference E.31. The common-cause analysis used in the NUREG-1150 analyses was based primarily on EPRI methods and data. EPRI generic compo-nent beta factors were used in the calculation of the common-cause failure (CCF) rates. The CCF rates were calculated as follows:

CCF = Q * /3n where Q = Total failure rate fJn = Beta factor for n components.

For some components, there was not a generic component beta factor for the number of components modeled. In these cases, the EPRI beta factor was modified. In addition, for some components (e.g.,

batteries, air-operated valves), there were no EPRI generic component beta factors. For these compo-nents, other sources or methods were used to calculate the beta factor.

Common-cause failures of the batteries were analyzed in detail in other studies (Ref. E.34) and were used in the NUREG-1150 analysis. Recovery credit for common-cause failures was included where data ex-isted.

Comment: In the analysis of loss of feedwater initiating events, it was assumed that condensate would also be lost, thereby eliminating a potential source of injection capability. For such an initiating event, the recovery potential may be underestimated because of this assumption (Kouts 3.2.1.1).

Response

The loss of feed water (LOFW) was treated on a plant-specific basis. For Grand Gulf, upon examination of LOFW, it was determined that condensate would not be lost. For Peach Bottom, it was assumed that condensate was lost with LOFW; however, credit was given for the recovery of the power conversion system, which included recovery of condensate. For PWRs, loss of condensate was included as one of the contributors to LOFW. However, because the LOFW initiating event was not an important contributor to the estimated core damage frequency, no credit for recovery of condensate was considered necessary nor given.

E-17 NUREG-1150 OAGI0000611 00664

Appendix E Comment: In general, it appears that very little plant-specific thermal-hydraulic analysis was conducted.

Instead, the analysts relied on the results of generic analyses and made judgments as to the degree of applicability in many scenarios (Kouts 3.2.1.2).

Response

When necessary, plant-specific thermal-hydraulic calculations were performed (e.g., BWR ATWS se-quences, ice condenser containment spray actuation timing, and boiloff calculations). Additional thermal-hydraulic calculations were not deemed necessary because a large library of calculations already existed, including those from NRC research programs, vendor analyses, and other industry programs. In addition, actual plant experience was used. For example, the thermal-hydraulic response to a steam generator tube rupture was based in part upon the data from the North Anna tube rupture incident.

Comment: Some success criteria may be too conservative, e.g., both PORVs are assumed to be required for feed and bleed in PWRs (Kouts 3.2.1.2).

Response

As much as possible, success criteria were developed to be realistic, as opposed to conservative. For example, low-pressure systems were allowed to lead to success in BWR ATWS sequences, including loss of the standby liquid control system, whereas previous studies might not have considered that possibility. In some cases, the success of a particular system was questionable based on information available in the time frame of the study. In these cases, conservative choices were made. Plant procedures (e.g., those that called for both PORVs to be opened in the case of feed and bleed cooling) were also influential in the decisions made in such cases.

Comment: The Grand Gulf A TWS analysis included the two event tree branches of early and late closure of the main steam isolation valves. In the Peach Bottom ATWS analysis, it was, probably conservatively, assumed that the main steam isolation valves (MSIVs) closed for all scenarios. We have found no justifi-cation for this difference based on design data or plant operating experience (Kouts 3.2.1. 3) .

Response

A plant-specific analysis of MSIV response during ATWS was performed for both Grand Gulf and Peach Bottom. It was not assumed in the Peach Bottom ATWS analysis that all scenarios resulted in MSIV closure. Based on a detailed analysis. it was concluded that all ATWS sequences (with MSIVs open) would lead to isolation signals to the MSIVs.

Comment: Electrical control and actuation circuits were not included in the common-cause failure analy-sis (Kouts 3.2.1.4).

Response

Electrical control and actuation circuits faults were included as part of the component random failure rate.

The same applies for the common-cause failures. The faults comprising the common-cause failures for components (Le., valves, pumps, diesels, etc.) were dominated by electrical control and actuation circuit faults.

Comment: Expert judgments assign large uncertainty to the issue of reactor coolant pump seal failure, which is actually susceptible to experimental determination. It is not readily apparent how the bimodal distribution of NUREG-l1S0 would be affected by the revised estimates of leakage rates and times for initiation of leakage (Kouts 4.6.2).

More recent information and the development of some new reactor coolant pump seal designs since the NUREG-1150 risk studies were completed would lead to a prediction of risk less than that reported (ACRS).

NUREG-1150 E-18 OAGI0000611 00665

Appendix E

Response

The expert judgment process was intended to characterize the current understanding of the issue rather than provide resolution. The information base used by the experts included data from experimental pro-grams by Westinghouse, by NRC, and in France. (Appendix C now includes a section of how this issue was addressed; a detailed description is provided in Ref. E .15.)

It should also be noted that the expert judgment process considered the potential importance of the new Westinghouse seal design (not yet in place in the plants analyzed). The experts concluded that seal failure with the new seals would be very unlikely. This would have two effects on the NUREG-1150 analyses.

First. the core damage frequency would be reduced because more recovery time would be available prior to core damage. However, for those accident sequences that continue on to core damage. the core dam-age may occur with the reactor coolant system at high pressure, leading to high containment building loadings at time of reactor vessel breach.

Comment: It is likely that the performance of relief valves, which must function if the feed and bleed operation is to be successful, is not well represented by the data for valve performance used in the NUREG-1150 calculations (ACRS).

Response

The staff agrees that there is now operating experience data that suggest that the PORV failure rates are optimistic. However. since failure of the feed and bleed function is assessed to be dominated by human errors (to actuate the system), it does not appear that increased failure rates for the PORVs would signifi-cantly affect the likelihood of failure to feed and bleed.

Comment: There is now a significant body of evidence to indicate that the failure probability used to describe the operation of certain key motor-operated valves is too low. This may have an important bearing on the outcome of several accident sequences described in the report (ACRS).

Response

The staff agrees that there is now evidence that motor-operated valve failure rates are, under some condi-tions, higher than those used in NUREG-1150. The NUREG-1150 analyses have not been reevaluated in detail to assess the potential impact of the newer failure rates. It is the staff's judgment that, while the impact would be noticeable, it would not be dominating.

Comment: Plant-specific information is becoming increasingly important in PRA; such information should be collected and placed on file for future use (Kouts 7.3).

Response

The NRC has developed a data base for the accident frequency analysis models developed in NUREG-1150 (and for other PRAs as well). This data base can be accessed via two computer codes, SARA and IRRAS (Refs. E.35 and E.36). which permit the manipulation of the data for sensitivity analy-ses. etc. These codes and the data base have been installed and are seeing use in several locations at NRC (and its contractors).

In 1990, the NRC initiated work to assess the feasibility of developing a similar data base and acquisition!

analysis system for the accident progression, source term, and risk analysis models of NUREG-1150. This system would make use of data generated with the detailed NUREG-1150 codes, such as EVNTRE (Ref.

E.37) and PRAMIS (Ref. E.38).

Comment: The NUREG-llS0 documentation does not allow a reviewer to determine how particular events contributed to the frequency of loss of offsite power and subsequent recovery (Kouts 3.2.1. 1) .

Response

As noted in the report, NUREG-1150 provides a summary of the methods and results of the five PRAs performed. More detailed information is contained in the underlying contractor reports (Refs. E.1S through E.21, E.12, E.13, and E.26 through E.28). Even these, however, do not contain some of the raw E-19 NUREG-1150 OAGI0000611 00666

Appendix E data used to develop and quantify the risk models. Such data are retained in the project files. Included in these files are the data on specific losses of offsite power and its recovery. These data included all events at U.S. nuclear power plants through 1987. These included plant-centered, grid, and weather-related faults. Particular events that could not occur at a particular site were eliminated from the data base for that plant. Further, the analysis considered the operating history at each plant. Plant-specific recovery curves were then generated based on an aggregate of all loss of offsite power events, as opposed to sepa-rate recovery curves for each type of failure event.

E.6 Accident Progression Analysis The review committees had a number of specific comments on the NUREG-llS0 accident progression analysis, the most important of which appears to relate to the level of detail in the analysis, compared with the detailed accident phenomenogical computer codes and with the present level of understanding of accident phenomenology. These specific comments are itemized below and staff responses* provided.

Comments dealing with the closely related subject of accident source term methods are discussed in Sec-tion E.7.

Comment: The level of detail in the accident progression analysis appears to have exceeded the under-standing of the phenomena involved. It implied greater insight into the processes assumed to be taking place than was justified (Kouts 3.2.2.1, 7.2; ACRS).

If phenomenological models are not provided and directly used, the dependence of the results of the accident progression analysis on governing physical phenomena is hidden (Kouts 3.2.2.1, 7.2).

The generality of the structure of trees and the flexibility to use different levels of modeling capability and details to answer the questions at branch points make the method very powerful, but concern can arise about the meaningfulness of computed results if little information is available about the issues. The possi-bility of introducing high-level issues makes the method efficient, but this feature should be used with caution if applied to issues with a weak information basis (Kouts 3.2.2.1, 7.2).

We note that in the back end subjective distributions are given for high-level parameters ("issues") that describe the outcomes of complex physical or chemical processes whose basic uncertainties are at lower levels. Mechanistic computational models that would relate these lower-level parameters to the higher-level issues are not employed (for example, the amount of core debris involved in ex-vessel steam explo-sion is an issue, and its dependence on such lower-level parameters as heat generation rates and chemical reaction rates is not modeled explicitly). Developing subjective probability distributions for high-level pa-rameters may not always be the best approach since the physics of the underlying processes does not get the attention that would be desirable (Kouts 4.7).

Response

The comments first question whether the detail exceeds the state of knowledge. The staff does not believe

  • 80. The intended use of a study to some extent defines the appropriate level of detail. The level of detail was chosen to pass the appropriate information on to the source term analysis and to allow the variation of parameters in the integrated uncertainty analysis. In order to meet these two objectives. it was necessary to form the probabilistic models with high-level issues. Uncertain responses to the high-level issues resulted in wide uncertainty distributions. The use of wide uncertainty distributions to characterize processes that are not well understood should not imply greater insight into the process than is justified but should highlight the uncertainty of that process.

The information presented in NUREG-llS0 provides insight into the importance of the high-level pa-rameters and not the governing physical phenomena (e.g., chemical reaction rates). Also, the accident progression event trees used to model the accident progression are based on these high-level parameters.

To evaluate the branch point probabilities. however, the high-level parameters are decomposed to the level of the governing physical phenomena (as documented in Ref. E.16).

Because of the complexity of the accident progression, it would have been computationally impossible to model the accident framework for each accident sequence at the physical process level (heat transfer correlations, oxidation rates, etc.). To obtain the insights necessary on the underlying physical processes, NUREG-1150 E-20 OAGI0000611 00667

Appendix E it is necessary to establish what high-level parameters are important and then refer to the copious docu-mentation provided on parameter distribution development in Reference E.16.

The staff agrees with the comment that the user should interpret the results of the study carefully when there is a weak information base associated with high-level issues. The NUREG-USO approach was to include these issues in our models and apply appropriate uncertainty bounds to the parameter distribu-tions.

Comment: There is inconsistency in the detail of the accident progression analysis. This is in part be-cause the state of knowledge with respect to severe accident phenomenology in BWRs versus PWRs is different, the use of expert elicitation for severe accident issues was not the same for all plants, and there was a large uncertainty in operator behavior with respect to post-core-damage recovery actions (Kouts 6.3).

Response

The general process for performing the accident progression analysis was consistent between PWRs and BWRs. The BWR accident progression event trees (APETs) tended to be larger and more complex be-cause there are more interactions between the containment and the reactor coolant system in BWRs and because the failure location in BWR containments can have a large impact on release fractions. The quality of the information available for input parameter distribution varied for the different issues because of the different amount of experimental and analytical studies performed, but was not clearly superior for either BWRs or PWRs.

There are some issues that have been studied more extensively for PWRs (in-vessel melt progression, direct containment heating). This may have resulted in some inconsistency in the quality of the response on some issues, but the selection criteria for the expert elicitation issues were applied consistently to all plants analyzed.

Comment: The bin "no vessel breach" has a relatively high conditional probability for all plant damage states of PWRs. Yet, the capability to model the issue of core degradation before vessel breach is rather poor. We are unable at present to judge the validity of the conditional probabilities associated with this accident progression bin (Kouts 4.6.1).

Response

The staff agrees that there are considerable uncertainties associated with this issue. However, it is felt that the approaches used in this study adequately represent the knowledge base as it pertains to this issue. The approach used in the NUREG-llS0 analyses is described in Part 6 of Reference E.16.

Comment: Only one of the three experts whose opinions were elicited provided a distribution function for temperature-induced hot leg failure. The other two made the statements" .. .if necessary conditions for high temperature were met, the leg would always fail ... ," and" .. .if high temperatures lasted long enough hot leg would always fail. For shorter time at high temperature hot leg would sometimes fail... "

Since the crucial point in the analysis is the estimation of the hot leg temperature, we cannot see how the two cited statements were incorporated into the aggregated probability distribution presented in NUREG-llS0. Therefore, we are unable to judge the validity of the result (Kouts 4.6.3).

Response

The three experts that considered the temperature-induced hot leg failure all addressed the estimation of the hot leg temperature in their assessments. Two of the experts' decompositions of the issue established continuous distributions for failure probability, the other decomposition provided a point estimate. Each decomposition of the issue was different, yet all addressed hot leg temperatures.

There were many cases in which the distributions (and the associated rationales) provided by experts on the same issue differed significantly. For example, one expert might have felt that the uncertainty in an issue was primarily stochastic in nature while another expert might have felt that the uncertainty was entirely the result of the lack of understanding of the physical process. The method of aggregating E-21 NUREG-llS0 OAGI0000611 00668

Appendix E distributions (described in Ref. E.16) accommodated different perceptions of the results. Further infor-mation on the specific expert analysis of temperature-induced hot leg failure may be found in Part 1 of Reference E.16.

Comment: The treatment of the pressure rise at vessel breach as a single issue by the expert panel obscured a more complete understanding of how the various components contributed to the reduced probability of early containment failure (Kouts 4.6.4).

Response

The containment loads expert panel felt that tightly coupled phenomena were responsible for the loads that accompany vessel failure. Furthermore, the experts felt that there were synergistic relationships among the various phenomena. Thus, because a simple relationship that ties together the various phenom-ena involved did not exist, the expert panel did not believe that these phenomena could be isolated without sacrificing the credibility of the final distribution (Le., the load experienced by the containment).

It was their opinion that artificially breaking apart the loads would not provide a realistic picture of the events that are taking place.

The phenomena that contribute to the loads at vessel breach and the importance of the various phenom-ena for a given distribution are discussed in Reference E.16. From the descriptions of the experts' ration-ales, the importance of various events to the loads at vessel breach can be obtained. Discussion of the reasons for which these loads are less important now than in the first draft of NUREG-115 0 is provided in Section C.S of Appendix C.

Comment: We note that the concrete erosion progresses faster and with greater intensity than is esti-mated in NUREG-1150, with a corresponding influence on hydrogen production. However, we agree with the assessment in NUREG-1150 that the meltthrough per se introduces no important influence on health risk (Kouts 4.6.5).

For reasons explained in the section on basemat meltthrough, we believe that this process (MCCI) [mol-ten core-concrete interactions] is modeled incorrectly, with the consequence that the hydrogen generation rate in the ex-vessel phase of accidents in PWRs would be underestimated (Kouts 4.6.6).

Response

The hydrogen generation rate during core-concrete interactions was based on calculations with the COR-CON computer code, as discussed in Reference E.16. The amount of hydrogen produced in the core-concrete interaction phase is dependent on how much unoxidized metal is available, which in tum is dependent on how much has been oxidized in prior phases. From the CORCON calculations, it appears that most of the unoxidized metals remaining in the debris as core-concrete interactions begin are oxi-dized rapidly. The staff therefore believes that most release rates predicted by current techniques and considering experimental evidence are bounded by the range of release rates in NUREG-1150, when considering in-vessel hydrogen production rate, the at-vessel-breach hydrogen release rate, and the early core-concrete interaction hydrogen production rate.

Because early containment failures and containment bypass accidents tended to dominate the risk. and because there was already so much hydrogen in the containment at the beginning of core-concrete inter-action, the amount of hydrogen produced during core-concrete interaction was not considered to be highly risk significant and thus was not varied in the overall uncertainty analysis. As such, while* an esti-mate of hydrogen production based on CORCON calculations may not agree closely with all estimates from experiments such as those performed in the BETA facility, such differences are not believed to be important to the overall risk estimates.

Comment: A separate accident progression bin should be used for basemat meltthrough because knowl-edge of the consequences of this form of release, though not important from the standpoint of damage to the public, is useful for other purposes (Kouts 3.2.2.3).

Response

The accident progression results that are shown in NUREG-llS0 are summary accident progression bins, grouped together for presentation purposes only. It is possible to separate the basemat meltthrough event NUREG-1150 E-22 OAGI0000611 00669

Appendix E from the long-term containment failure event when presenting results of the detailed accident progression analysis. However, in the source term analysis, the two events were binned together. Thus it is not possible to extract separate source term and consequence results for the basemat meltthrough and late contain-ment failure events without performing new calculations. This was not done in the NUREG-115 0 analyses because of the low estimated risk significance of both of these failure mechanisms.

Comment: The lack of information about many of the physical phenomena that determine the performance of a containment system in a severe accident situation is such that only educated guesses can be made for some sequences that might make significant contributions to risk. Some important phenomenological issues (e.g., direct containment heating, Mark I shell meltthrough) were characterized quite differently in the first and second drafts even though there was not a major change in the information base. Further, no consideration was found on the impact of ex-vessel steam explosions on early containment failure. There is little unambiguous guidance here for a licensee performing an IPE (ACRS).

Response

While the staff believes that significant progress has been made in the understanding of severe accident phenomenology, it also agrees that there is a need for more information on a number of specific issues, such as those highlighted by the ACRS. The staff recognized this in developing the guidance for licensee individual plant examinations (IPEs). Appendix 1 to the IPE generic letter (Ref. E.39) provides guidance on how licensees should deal with this lack of information.

It is correct that a number of phenomenological issues were characterized quite differently in the first and second draft versions of NUREG-1150. This reflects a greater information base on a number of important issues such as direct containment heating. The technical bases used by expert panels to assess such issues are discussed in considerable detail in Reference E.16.

The consideration of ex-vessel steam explosions is discussed in Section C.9 of NUREG-llS0. This phe-nomenon was assessed to be of relatively minor importance in the five plants studied, in part because of the greater impacts of such issues as hydrogen combustion loads, etc. Its most prominent impact was in the Grand Gulf plant; Section 6.3 describes its importance relative to other phenomena.

Comment: The aggregate distribution for the probability of drywell shell meltthrough depends critically on the composition of the expert panel. Since this issue combines severe offsite consequences with very large uncertainties, a better resolution of the issues involved is clearly demanded (Kouts 4.6.7).

Response

The staff agrees with the comment that a better resolution to the drywell shell meltthrough issue is advis-able. This issue has been the subject of continuing research by NRC, as discussed in Reference E.40.

Comment: Large uncertainty contributions associated with some phenomena indicate the need for fur-ther research. These include the thermal-hydraulic phenomena associated with reactor coolant system (RCS) depressurization (as an accident management strategy), the ways in which the ReS may fail during high-pressure accident sequences in PWRs, and the assessment of threats to (and means to ensure the integrity of) the containment structure in case of a core meltdown resulting from pressure vessel failure (Kouts 7.3).

Response

The staff agrees that the wide uncertainty distributions associated with specific phenomena provide one indication of where further research is desirable. Other considerations include the importance of the phenomena in question to risk (some wide uncertainty distributions may be acceptable if the contribution to risk is negligible) and the feasibility that further research will reduce the uncertainty bounds. All of these considerations are included by the staff when identifying and prioritizing future research.

Comment: Containment failure from seismic events was based on broad assumptions rather than struc-tural analyses (Kouts 4,3.2).

E-23 NUREG-l1S0 OAGI0000611 00670

Appendix E

Response

Past work has shown that gross structural failure of a typical reinforced concrete containment due to earthquake motion is highly unlikely (Ref. E.41). Rather, it is the pipe penetrations that are most likely to fail because of the loads put on the penetrations by motion of the pipes passing through the penetrations.

The loads most likely to cause penetration failure would arise from large motion or support failures of steam generators (in PWRs) or the reactor vessel (in BWRs). Hence, in the NUREG-llS0 seismic analy-sis, containment failure was based on failure of the penetrations resulting from the failure of supports of the major reactor coolant system components. Since the vessel failure and the large LOCA initiating events included in the seismic analysis are based on support failures, it was assumed that some failure of the containment would occur, given either of these initiating events.

This assumption is based on a review of typical containment penetration configurations and discussion with structural experts and is based on the assumption that support failure would result in piping displace-ments of 1 to 2 feet, and that this would provide a sufficient load to fail the penetration. There are currently no data on the failure capacity of penetrations, given such loads. Hence, this assumption is based on engineering judgment.

In addition, estimates were needed on the size of the leak, given the failures described above. Again, based on typical penetration configurations, it was judged that the most likely crack size would be approxi-mately 1/2 inch by 18 inches, similar to the small leak definition used in the rest of NUREG-llS0. It was then assumed that a small leak would occur with a conditional probability of 0.9 and that a larger leak would occur with a conditional probability of 0.1. This assumption was based on the fact that piping supports inside containment would absorb a significant portion of the displacement-induced load and thus limit the leak size. Again, however, there are no data or calculations to substantiate this assumption.

E.7 Source Terms and Consequences E. 7.1 Source Terms The Kouts committee had two general comments in the area of source term analysis. These were:

  • "The overall strategy for generating the uncertainty values in Level 2, including the use of the XSOR codes, appears reasonable. since the tests that were made indicated that the uncertainties introduced by the codes are small compared to the overall Level 2 uncertainties." (Kouts 4.5)
  • "Considerable caution is recommended in the use of the results obtained with the approximate XSOR codes without confirmation by more detailed codes." (Kouts 7.3)

The ANS committee had the following general comment:

  • "The source terms reported in NUREG-llS0 and the resultant offsite consequences should be considered as approximations, due to the reliance on the simplified mass balance XSOR models used to produce large numbers of source terms." (ANS 3.d.3)

In addition to these general comments, the review committees had a number of more specific comments.

These are itemized below and staff responses provided.

Comment: The readers of NUREG-llS0 should be aware that, of the thousands of source terms results presented, only a few were obtained using the detailed state-of-the-art calculational methods. The remain-der were calculated using the parametric XSOR codes. This was a tradeoff to meet the need to generate many results in order to evaluate the uncertainties. The XSOR codes should be used with caution without confirmation by more detailed calculations (Kouts 7.3; ANS 2.a.8.d).

Response

The XSOR codes were used for two reasons: (1) to generate source terms for the large number of accident progression bins identified in the accident progression analysis, and (2) to provide a means of incorporating the uncertainty in important analysis parameters into the integrated plant studies. Even if uncertainties were not being incorporated into the plant studies, it would be a very demanding undertaking NUREG-1lS0 E-24 OAGI0000611 00671

Appendix E to perform a mechanistic source term calculation for every accident progression bin. The alternative choices are assigning all accident progression bins to the results of a limited number of mechanistic cal-culations or attempting to modify the results of these calculations to more appropriately match the condi-tions associated with individual accident progression bins. The latter approach was chosen for the NUREG-llS0 analyses.

The XSOR codes actually consist of three parts: a data base developed in the expert elicitation process, a mapping between the accident progression bins and this data base, and an algorithm for constructing source terms on the basis of individual accident progression bins and their associated data. In developing the data base, an attempt was made to use all available sources of information, including mechanistic code calculations, analytic solutions, and experimental data. Thus, the results of mechanistic calculations, as interpreted in the expert review process, are incorporated into the source terms generated by the XSOR codes.

Calculations were performed in which the SOR codes were benchmarked against a Source Term Code Package calculation for a specific scenario. The SOR code was then used to estimate the source terms for a similar scenario. The results compared favorably to a Source Term Code Package calculation made specifically for the second scenario (Ref. E.42).

Chapter 2 and Appendix A to NUREG-llS0 have been modified to clarify the role of the XSOR codes.

Comment: Because of the approximate nature of the XSOR codes. the final version of NUREG-l1S0 should note the need for more exacting analysis of risk-significant accident sequences. The more detailed analysis should be performed and published in a supplement to NUREG-llS0. This analysis should con-centrate on best'estimate modeling and should be compared with the source terms in the final version of the report (Kouts 7.3; ANS 2.a.8.d).

Response

The staff agrees with the comment. The staff intends to investigate the practicality of linking risk analysis calculations more closely to accident analysis codes such as MELCOR (Ref. E.43), potentially reducing the dependence on the XSOR codes. As noted below. the staff intends to initiate more detailed studies of the bypass accident sequences.

Comment: With respect to the containment bypass source term, it would be helpful to cite recent work (by EPRI) to help guide the reader to detailed assessments of some of the most important accidents identified in NUREG-11S0. Citing more recent studies should help guide the users of NUREG-llS0 to existing analyses that provide detailed assessments of some of the most important accident sequences identified in NUREG-llS 0 (Kouts 4.2.1).

The source terms for containment bypass accident sequences. including interfacing-system LOCAs and steam generator tube ruptures, were not the subject of detailed analyses and may be characterized as conservative approximations (ANS 2.a.8.d).

Response

A number of Source Term Code Package computer analyses were performed to estimate the source terms for bypass accidents (Ref. E.44). Model development would be required. however. to more realistically treat certain aspects of such accident sequences as deposition in steam generators in a steam generator tube rupture-initiated core damage accident. The staff intends to perform more detailed studies of bypass sequences in followup work to NUREG-1150 and to compare the results of the new studies with those of NtJREG-1150. More recent work by EPRI and others will be reflected in such followup comparisons.

Comment: A time cutoff of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after the onset of core degradation for the release of radionuclides was used throughout NUREG-llS0. although no mention of this fact is contained in the report (ANS 2.a.8.d).

Response

E-25 NUREG-llS0 OAGI0000611 00672

Appendix E A time cutoff of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after the onset of core degradation was only used when considering the issue of late revolatilization from the reactor coolant system. Some of the members of the source term expert panel were concerned that the majority of the releases were going to occur extremely late in the accident (much later than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after the beginning of core damage). The project staff instructed the panel to consider late releases only up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after core degradation. The reason for this was that some operator action to cool the reactor coolant system would be expected by that time (e.g., using external cooling by the containment sprays). The time cutoff was not an issue for the other source term processes that were considered because the majority of radionuclides were released well before 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Appendix A has been modified to acknowledge this assumption.

Comment: The source terms and consequences of two classes of accidents, containment bypass and early containment failure, should be reported separately as well as the combined data presently displayed (ANS 2.b.9).

Response

The plant-specific risk reports (Refs. E.12, E.13, and E.26 through E.28) present exceedance frequency curves for the source terms associated with different types of accidents, including containment bypass and early containment failure (e.g., see Figs. 3.3-4 and 3.3-9 in Ref. E.12). Equivalent information for con-sequences was not generated. However, the individual plant studies do present detailed information on the contribution of different accident types to risk.

Comment: It is not clear how credit is taken for radionuclide retention in the auxiliary building for PWR containment bypass accidents and the reactor building for BWR containment failures (ANS S.e.4).

Response

Two types of bypass accidents are considered in the PWR analyses: steam generator tube ruptures (SGTRs) and interfacing-system LOCAs (Event V). During an SGTR accident, the radionuclides are released directly to the environment; therefore, no radionuclide retention in the auxiliary building is considered. For the Event V accident, two methods for retention of radionuclides in the auxiliary (or safeguards) building are considered: retention associated with the building itself and retention from either water pools or water sprays. (At Surry, retention in the relatively small safeguards building is limited; however, there is the potential that the release will occur under a pool of water. At Sequoyah, the release could be mitigated by the fire spray system in the auxiliary building.)

Radionuclide retention in the Peach Bottom reactor building was considered, but none was considered for the Grand Gulf analysis. That portion of the reactor building surrounding the Grand Gulf containment is a relatively weak structure (compared with possible severe accident loadings), and it was judged to have little retention value. The decontamination factors applied in all, these plants were provided by the source term expert panel and are documented in Reference E.16.

Comment: At this time, only the MELeOR code is available to the staff for source term calculation.

Although it appears to be an improvement over the Source Term Code Package, it is not yet fully developed, nor is it generally available in its current form. Some method for calculating a source term will be needed by the staff and its contractors for performing or reviewing PRAs as well as other tasks (ACRS).

Response

The MELCOR code is intended to be the staff's principal analytical model for the accident progression portions of its risk analyses. It has been used in the NUREG-1150 work (e.g., Ref. E,4S) and is now being used to support other staff risk analysis work. The staff's planning for further MELCOR development, etc., is described in Reference E.40. As noted above, the staff also plans to investigate the practicality of more closely linking risk analysis calculations to codes such as MELeOR, reducing dependency on parametric models such as the XSOR codes.

E.7.2 Offsite Consequences The review committees had a number of specific comments in the area of offsite consequence analysis.

These are itemized below and staff responses provided.

NUREG-l1S0 E-26 OAGI0000611 00673

Appendix E Comment: The uncertainties in offsite consequences were not included in the NUREG-l1S0 risk uncer-tainty estimates (Kouts 7.2; ACRS)

Response

As indicated in the report. it was not possible because of time constraints to include offsite consequence uncertainties in NUREG-l1S0. The development of needed probability distributions for parameters in-cluded in offsite consequence assessments and the incorporation of these distributions into risk uncer-tainty assessments is planned to be initiated in 1991.

Comment: There are also a number of uncertainties in the modeling of consequences due to decisions that would be made only during or after a severe accident. These decisions. of a sociopolitical nature.

include such things as evacuation. interdiction of land and foodstuff. and the value of real property. These uncertainties have not been included in NUREG-1150. although they have been discussed elsewhere.

Recent experience suggests that much lower interdiction levels than those used in NUREG-llS0 are sometimes used. which would have the effect on NUREG-1150 results of increasing economic impacts and decreasing health impacts (Kouts 3.2.4. 4.12).

Response

The staff agrees that issues such as interdiction levels actually used in the event of a reactor accident may be quite different than those used in NUREG-1150. As discussed in Chapter 2 and Appendix A. the evacuation and interdiction assumptions in NUREG-1150 were based on Environmental Protection Agency and Food and Drug Admini~tration gUidelines. respectively (Refs. E.46 and E.47). The results of sensitivity studies on these assumptions are provided in Chapters 11 and 12 of the summary report.

Comment: The MACCS code used in NUREG-l1S0 for offsite consequence analysis is a relatively new code. still under development. It has been neither benchmarked nor validated. Additional uncertainties are introduced by the use of such a new and relatively untested code (ACRS).

Response

The staff agrees that the use of relatively new computer codes introduces additional uncertainty. Two efforts were undertaken as part of the NUREG-1150 project to improve the reliability of the MACCS code. These were an independent review of the chronic exposure pathway model in the code (Ref. E.48) and an independent line-by-line review of the code (Ref. E.49).

Benchmarking of the MACCS code is now under way under the auspices of an international project sponsored by the Committee on the Safety of Nuclear Installations and the Commission of the European Communities.

Comment: Important information on the offsite consequence calculations is not provided. such as the fact that inhalation doses reflect lifetime dose commitments (ANS 2.a. 8.e).

Response

In its role as a summary document. NUREG-1150 can only give a relatively brief description of the individual models used in the analysis. Detailed descriptions of the individual models are given elsewhere.

For the MACCS program used to calculate offsite consequences, detailed descriptions of both the models and the computer program are given in Reference E.22. Further. the data used in the NUREG-1150 consequence calculations are described in Part 7 of Reference E.16, E.B Uses of NUREG-l1S0 The review committees had a number of specific comments in the area of the uses of NUREG-llS0.

These are itemized below and staff responses provided.

Comment: NUREG-llS0. along with other PRAs and recent work in severe accident analysis. should be used to close out as many open issues as can reasonably be achieved and help prioritize limited research resources on the remaining safety issues. A definitive program for the use of NUREG-1150 and its sup-porting documents should be developed and implemented (Kouts 7.3).

E-27 NUREG-l1S0 OAGI0000611 00674

Appendix E The information presented in NUREO-llS0 must be carefully examined in the context of the plant being studied to determine the priority ranking of safety issues, and we caution against broad generalities (ANS 6).

Use of NUREG-llS0 to assist in prioritization and resolution of safety issues should be considered a priority' application and a principal benefit of the substantial resources expended on this mUltiyear study (ANS 2.a.13.e).

Response

As discussed in Chapter 13. the risk analyses of NUREG-USO are intended to be used as one tool in the prioritization of research and safety issues, as well as in a number of other ways by the staff. Some applications of NUREG-llS0 methods and results have already been made, such as in supporting the development of guidance for individual plant examinations (Refs. E.SO and E.S1). (Chapter 13 has been updated to reflect some of the more recent uses.) As appropriately noted by the ANS comment. the plant-specific nature of the NUREG-llS0 analyses should be and has been kept in mind in such applica-tions.

Following publication of the final version of NUREG-l1S0. the staff intends to provide additional guid-ance to potential users of the report within NRC as to its strengths and weaknesses, etc.

Comment: The results of NUREG-l1S0 should be used only by those who have a thorough understanding of its limitations (ACRS).

Response

The staff agrees with this comment. As noted in Section E.S.3, the staff has developed a data base and computer codes that permit the staff to modify the NUREG-llS0 (and other PRA) accident frequency analyses and plans to develop similar data bases and codes for the remainder of the risk analyses. The staff intends to develop quality assurance procedures as part of this effort to minimize the potential for inappropriate calculations.

Chapter 1 has been modified to note this caution.

Comment: It is disappointing that the staff asserts that virtually no general conclusions can be drawn from a study that took almost 5 years and 17 million dollars to complete. We recommend that the Commission encourage the staff to mine more deeply the wealth of information that has been collected in the course of this study in an effort to identify generic conclusions that might be reached (ACRS).

Response

The staff agrees that NUREG-115 0 provides a substantial body of information, much of which has not yet been "mined" for use in other staff work. It is expected that this body of information will see its principal

).lse by the staff to support the resolution of specific issues, such as study of alternative safety goals, generic issue resolution, PRA reviews, etc. The staff also intends to commit resources to the study of more general issues (e.g., the extrapolation of results for five plants to other plants).

Comment: It is recommended that the NRC issue additional guidance on the treatment of external events in the individual plant examination (~PE) process (Kouts 7.3).

Response

Such guidance was issued in draft form (for public comment) in July 1990 (Ref. E.51).

Comment: The NUREG-1150 methodology is of special value with respect to guiding risk-reduction and risk-management actions because it makes possible a more sophisticated approach to risk management, addressing not only major contributors to risk, taken as point values, but also contributors associated with large uncertainty bands (Kouts 4.13).

Taken together with the individual plant examinations, NUREG-llS0 should help guide evaluation of accident management from a risk-reduction perspective. However, such uses of NUREG-11S0 would seem to be limited due to the parametric nature of the study CANS 6).

NUREG-l1S0 E-28 OAGI0000611 00675

Appendix E

Response

NUREG:""U50 information is being used in the development of general accident management guidance (Ref. E.52). As with the individual plant examination process, the NRC in ensuring that each licensee has developed an adequate accident management program, Such a program will be prepared by the licensee reflecting plant-specific information from a plant's individual plant examination as well as from more generic information such as NUREG-llS0.

Comment: In many European countries, safety goals and objectives are related to a low risk of releases with disruptive effects on society, typically meaning releases with a potential for long-term restrictions on land usage over large areas. The summary presentations of the results in the main report do not facilitate comparisons with such alternative safety goals. An addition of such comparisons or later documentation might enhance the value of the report, especially outside the United States, since many of these may riot be calculable with data in the report (Kouts 4.14).

Response

The staff agrees that a comparison of the spectrum. of national safety goals using the NUREG-l1S0 plant models would be of considerable interest. Such a comparison could not be accomplished in time for inclusion in NUREG-llS0 but is being considered by the staff for future study.

Comment: The limited information presented in NUREG-llS0 with respect to the NRC staff's proposed large-release goal would not be particularly useful in the evaluation of implementation strategies (ANS 2.a.13.d).

Response

The staff agrees that NUREG-1150 provides very limited information on possible large-release goals and implementation strategies. The discussion provided in Chapter 13 of the report was intended as a demonstration of how NUREG-llS0 risk models could be used in assessing alternative goals and applying the then-recommended definition of large release. rather than providing a definitive study of a complex technical issue. Since that time. the Commission has provided the staff with additional guidance on safety goal implementation (Ref. E.53) and possible definitions of large releases. It is expected that the NUREG-llS0 models wiIl be used by the staff as part of the further consideration of large-release defini-tions.

E-29 NUREG-llS0 OAGI0000611 00676

Appendix E REFERENCES FOR APPENDIX E E.l u.s. Nuclear Regulatory Commission (USNRC), "Severe Accident Risks: An Assessment for Five U.S. Nuclear Power Plants," NUREG-llS0, Second Draft for Peer Review, June 1989.

E.2 H. J. C. Kouts et aI., "Special Committee Review of the Nuclear Regulatory Commission's Severe Accident Risks Report (NUREG-1150)," NUREG-1420, August 1990.

E.3 L. LeSage et aI., "Report of the Special Committee on NUREG-1150, The NRC's Study of Severe Accident Risks," American Nuclear Society, June 1990.

E.4 Walston Chubb letter to Denwood F. Ross, Jr., USNRC, August 14, 1989.

E.5 Steven C. Sholly, MHB Technical Associates, letter to Denwood F. Ross, Jr., USNRC, August 7, 1989.

E.6 Roy R. Wight, State of Illinois Department of Nuclear Safety, letter to Chief, Rules and Proce-dures Branch, USNRC, December 15, 1989.

E.7 G. A. Hunger, Jr., Philadelphia Electric Company, letter to Chief, Rules and Procedures Branch, USNRC, January 11, 1990.

E.8 F. Coffman et aI., "Human Factors Regulatory Research Program Plan," NUREG-1384, Vol. 1, October 1989.

E.9 USNRC, "Nuclear Plant Aging Research Program Plan," NUREG-1144, Revision 1, September 1987.

E.l0 USNRC, "Analysis of Potential Pressurized Thermal Shock Events," Federal Register, Vol. 50, p.

29937, July 23, 1985.

E.ll USNRC, "Regulatory Analysis for Proposed Amendment of the PTS Rule, 10 CFR 50.61, 'Frac-ture Toughness Requirements for Protectio~ Against Pressurized Thermal Shock'," cited in "Frac-ture Toughness Requirements For Protection Against Pressurized Thermal Shock Events," Federal Register, Vol. 54, p. 52946, December 26, 1989.

E.12 R. J. Breeding et aI., "Evaluation of Severe Accident Risks: Surry Unit 1," Sandia National Laboratories, NUREG/CR-4551, Vol. 3, Revision 1, SAND86-1309, October 1990.

E.13 A. C. Payne, Jr., et aI., "Evaluation of Severe Accident Risks: Peach Bottom Unit 2," Sandia National Laboratories, NUREG/CR-4551, Vol. 4, Revision 1, SAND86-1309, December 1990.

E.14 R. A. Chrzanowski, "March 13, 1989, letter from Cordell Reed to T. E. Murley," NRC Docket Nos. 50-295 and 50-304, August 24, 1990.

E.15 T. A. Wheeler et aI., "Analysis of Core Damage Frequency from Internal Events: Expert Judg-ment Elicitation," Sandia National Laboratories, NUREG/CR-4550, Vol. 2, SAND86-2084, April 1989.

E.16 F. T. Harper et aI., "Evaluation of Severe Accident Risks: Quantification of Major Input Parame-ters," Sandia National Laboratories, NUREG/CR-4551, Vol. 2, Revision 1, SAND86-1309, De-cember 1990.

E.17 R. C. Bertudo and J. A. Julius, "Analysis of Core Damage Frequency: Surry Unit 1," Sandia National Laboratories. NUREG/CR-4550, Vol. 3, Revision 1, SAND86-2084, April 1990.

E.18 A. M. Kolaczkowski et a1., "Analysis of Core Damage Frequency: Peach Bottom Unit 2," Sandia National Laboratories, NUREG/CR-4550, Vol. 4. Revision 1, SAND86-2084, August 1989.

NUREG-11S0 E-30 OAGI0000611 00677

Appendix E E.19 R. C. Bertudo and S. R. Brown, "Analysis of Core Damage Frequency: Sequoyah Unit 1," Sandia National Laboratories, NUREG/CR-4550, Vol. 5, Revision 1, SAND86-2084, April 1990.

E.20 M. T. Drouin et aI., "Analysis of Core Damage Frequency: Grand Gulf Unit 1," Sandia National Laboratories, NUREG/CR-4550, Vol. 6, Revision 1, SAND86-2084, September 1989.

E.21 M. B. Sattison and K. W. Hall. "Analysis of Core Damage Frequency: Zion Unit 1," Idaho National Engineering Laboratory, NUREG/CR-4550, Vol. 7, Revision 1, EGG-2554, May 1990.

E.22 D. 1. Chanin. H-N Jow, J. A. Rollstin et al.. "MELCOR Accident Consequence Code System (MACCS)," Sandia National Laboratories, NUREG/CR-4691, Vols. 1-3, SAND86-1562, Febru-ary 1990.

E.23 USNRC, "Reactor Safety Study-An Assessment of Accident Risks in U.S. Commercial" Nuclear Power Plants." WASH-1400 (NUREG-75/014), October 1975.

E.24 E. D. Gorham-Bergeron et aI., "Evaluation of Severe Accident Risks: Methodology for the Acci-dent Progression, Source Term, Consequence, Risk Integration, and Uncertainty Analyses," San-dia National Laboratories, NUREG/CR-4551, Vol. 1, Draft Revision 1, SAND86-1309, to be published.

  • E.25 H. F. Martz et a!., "Eliciting and Aggregating Subjective judgments-Some Experimental Issues,"

Proceedings of the 1984 Statistical Symposium on National Energy Issues (Seattle, WA), NUREGI CP-0063, July 1985.

E.26 J. J. Gregory et aI., "Evaluation of Severe Accident Risks: Sequoyah Unit 1," Sandia National Laboratories, NUREG/CR-4551, Vol. 5, Revision 1, SAND86-1309, December 1990.

E.27 T. D. Brown et a!., "Evaluation of Severe Accident Risks: Grand Gulf Unit 1," Sandia National Laboratories, NUREG/CR-4551, Vol. 6, Revision 1, SAND86-1309, December 1990.

E.28 C. K. Park et aI., "Evaluation of Severe Accident Risks: Zion Unit 1," Brookhaven National Laboratory, NUREG/CR-4551, Vol. 7, Draft Revision 1, BNL-NUREG-52029, to be published.

  • E.29 A. D. Swain and H. E. Guttman, "Handbook of Human Reliability Analysis with Emphasis on Nuclear Power Plant Applications," Sandia National Laboratories, NUREG/CR-1278, SAND80-0200, August 1983.

E.30 E. A. Rosa et aI., "Application of SLIM-MAUD: A Test of an Interactive Computer-Based Method of Organizing Expert Assessment of Human Performance and Reliability: Main Report,"

Brookhaven National Laboratory, NUREG/CR-4016, Vol. 1, BNL-NUREG-51828, September 1985.

E.31 D. M. Ericson, Jr., (Ed.) et aI., "Analysis of Core Damage Frequency: Internal Events Method-ology," Sandia National Laboratories, NUREG/CR-4550, Vol. 1, Revision 1, SAND86-2084, January 1990.

E.32 V. Ho et aI., "COMPBRN III-A Computer Code for Modeling Compartment Fires," University of California at Los Angeles, UCLA-ENG-8524, November 1985.

E.33 USNRC, "Seismic Safety Research Program Plan," NUREG-1147, Revision 1, May 1987.

E.34 P. W. Baranowsky et aI., "A Probabilistic Safety Analysis of DC Power Requirements for Nuclear Power Plants," NRC report NUREG-0666, April 1981.

E.35 H. D. Stewart et aI., "System Analysis and Risk Assessment System (SARA). Version 4.0, Volume 1-Reference Manual," Idaho National Engineering Laboratory, NUREG/CR-5022, EGG-2522, to be published.*

E.36 K. D. Russell et aI., "Integrated Reliability and Risk Analysis System (IRRAS) Version 2.0 User's Guide," Idaho National Engineering Laboratory, NUREG/CR-5111. EGG-2535. June 1990.

  • Available in the NRC Public Document Room, 2120 L Street NW., Washington, DC.

E-31 NUREG-1150 OAGI0000611 00678

Appendix E E.37 J. M. Griesmeyer and L. N. Smith. "A Reference Manual for the Event Progression Analysis Code (EVNTRE)," Sandia National Laboratories, NUREG/CR-5174, SAND88-1607, September 1989.

E.38 R. L. Iman et a1., "PRAMIS: Probabilistic Risk Assessment Model Integration System." Sandia National Laboratories, NUREG/CR-5262, SAND88-3093, May 1990.

E.39 USNRC, "Individual Plant Examination for Severe Accident Vulnerabilities-10 CFR § 50.54(f),"

Generic Letter 88-20, November 23, 1988.

E.40 USNRC, "Revised Severe Accident Research Program Plan: FY 1990-1992," NUREG-1365, August 1989.

E.41 M. Amin et aI., "An Analytical Study of Seismic Threat to Containment Integrity," Sandia Na-tional Laboratories. NUREG/CR-5098, SAND88-7018, July 1989.

E.42 P. Cybulskis, "Assessment of the XSOR Codes," Battelle Columbus Division, NUREG/CR-5346, BMI-2171, November 1989.

E.43 R. M. Summers et al., "MELCOR In-Vessel Modeling," Proceedings of the Fifteenth Water Reac-tor Safety Information Meeting (Gaithersburg. MD), NUREG/CP-0091, February 1988.

E.44 R. S. Denning et al.. "Report on Radionuclide Release Calculations for Selected Severe Accident Scenarios: Supplemental Calculations," Battelle Columbus Division, NUREG/CR-4624, Vol. 6, BMI-2139, August 1990.

E.45 S. E. Dingman et al., "MELCOR Analyses for Accident Progression Issues," Sandia National Laboratories, NUREG/CR-5331, SAND89-00n, to be published.

  • E.46 U. S. Environmental Protection Agency, "Manual of Protective Action Guides and Protective Actions for Nuclear Incidents," Office of Radiation Programs, Draft, 1989.

E.47 U.S. Department of Health and Human Services/Food and Drug Administration, "Accidental Radioactive Contamination of Human Food and Animal Feeds; Recommendations for State and Local Agencies," Federal Register, Vol. 47, No. 205. pp. 47073-47083, October 22, 1982.

E.48 U. Tveten, "Review of the Chronic Exposure Pathway Models in MACeS and Several Other Well-Known Probabilistic Risk Assessment Models," Institutt for Energiteknikk, Norway, NUREG/CR-5377. June 1990.

E.49 C. A. Dobbe et aI., "Quality Assurance and Verification of the MACCS Code, Version 1.5,"

Idaho National Engineering Laboratory, NUREG/CR-5376, EGG-2S66, February 1990.

E.50 USNRC, "Individual Plant Examination: Submittal Guidance," NUREG-1335, August 1989.

E.51 USNRC, "Procedural and Submittal Guidance for the Individual Plant Examination of External Events CIPEEE) for Severe Accident Vulnerabilities," NUREG-1407, Draft Report for Comment.

July 1990.

E. 5 2 W. J. Luckas et al., "Assessment of Candidate Accident Management Strategies," Brookhaven National Laboratory, NUREG/CR-5474, BNL-NUREG-52221, March 1990.

E.53 Samuel J. Chilk, "SECY-89-102-Implementation of the Safety Goals," Memorandum to James M. Taylor, dated June 15, 1990.

  • Available in the NRC Public Document Room, 2120 L Street NW., Washington, DC.

NUREG-llS0 E-32 OAGI0000611 00679

ATTACHMENT TO APPENDIX E OAGI0000611 00680

UNITED STATES NUCLEAR REGULATORY COMMISSION ADVISORY COMMITTEE ON REACTOR SAFEGUARDS WASHINGTON. D. C. 20555 November 15, 1990 The Honorable Kenneth M. Carr Chairman U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Chairman Carr:

SUBJECT:

REVIEW OF NUREG-1150, "SEVERE ACCIDENT RISKS: AN ASSESSMENT FOR FIVE U.S. NUCLEAR POWER PLANTS" During the 367th meeting of the Advisory Committee on Reactor Safeguards, November 8-10, 1990, we discussed the second draft of NUREG-1150, "Severe Accident Risks: An Assessment for Five u.S.

Nuclear Power Plants." The Committee had previously discussed this matter with the staff and its consultants and with Dr. Herbert Kouts, Chairman of the Special Committee to Review the Severe Accident Risk Report. Our Subcommittees on Severe Accidents and Probabilistic Risk Assessment discussed this report during a number of joint meetings with members of the staff, Sandia National Laboratories (SNL) and the American Nuclear society (ANS) special Committee (Dr. Leo LeSage, Chairman). We also had the benefit of the documents referenced.

1. INTRODUCTION In this report, we first offer Slome general comments. We then offer recommendations concerning ehe publication of NUREG-1150 and provide comments and cautions concerning interpretation or use of some of the components of this document. And finally, we provide more detailed comm~nts on some key parts.

We have reviewed the reports prepared by the ANS special Committee and by the Special Committee to Review the Severe Accident Risk Report appointed by the Commission and found them helpful. We have no serious disagreements with either of these reviews, nor with their findings.

2.

GENERAL COMMENT

S The work described in this draft of NUREG-1150 is an improvement over that described in the first version entitled, "Reactor Risk Reference Document." Many previously identified deficiencies in the expert elicitation process have been corrected. The exposition and organization of the report have been improved. The presenta-EA-l NUREG-l1S0 OAGI0000611 00681

Appendix E The Honorable Kenneth M. Carr 2 November 15, 1990 tion of results is clearer. There is considerable information that was not in the original version.

The portion that deals with accident initiation and development up to the point at which core heat removal can no longer be assured is unique, compared to other contemporary PRAs, in that a method for estimating the uncertainty in the results has been developed and applied. This method and its application are significant contributions. Although the larger contributions to uncertainty in risk come from the later parts of the accident sequences, this portion is enhanced also by an extensive identification of events that can serve as accident initiators as well as an associated set of hypothesized event trees. This information should be of considerable assistance to licensees in the performance of an Individual Plant Examination (IPE). It should also be useful to plant operators and to designers.

The formulation of a more detailed representation of accident progression after severe core damage begins, and an improved description of containment performance, contribute some additional information to this important area. However, understanding of many of the physical phenomena that have an important bearing on this phase of accident progression is still very sparse, and the report may give the impression that more is known about this portion of the accident sequence than is actually the case.

The part of the sequence that begins with the release of radioac-tive material outside the containment is treated by a relatively new and unevaluated code system. Furthermore, there is no estimate of the uncertainties inherent in the calculations that describe this part of the sequence. Those who use the quantitative values of reported risk must recognize that these uncertainties are not accounted for in the calculated results.

3. RECOMMENDATIONS We recommend that the current version of NUREG-llS0, with the corrections suggested by several of those who have already reviewed it in detail, be published. However, its results should be used only by those who have a thorough understanding of its limitations.

Some o'f these limitations are discussed in subsequent sections of our report.

Since the supporting documents upon which NUREG-llS0 depends could be helpful to those who perform an IPE, we recommend that these also be published as soon as feasible.

Both the commission and the ACRS have raised questions about generic conclusions that might result from a careful examination of the results of this study. It is disappointing that the staff asserts that virtually no general conclusions can be drawn from a NUREG-llS0 EA-2 OAGI0000611 00682

Appendix E The Honorable Kenneth M. Carr 3 November 15, 1990 study that took almost five years and seventeen million dollars to complete. We recommend that the Commission encourage the staff to mine more deeply the wealth of information that has been collected in the course of this study in an effort to identify generic conclusions that might be reached (see section 5.5 of this letter).

4. COMMENTS AND CAUTIONS CONCERNING USES OF THE MATERIAL IN NUREG-1150 We discuss below certain areas in which the methods or results should be used with caution.

4 *. 1 Differences Among Levels of the PRA The phenomena which contribute to sequence progression in Level 1 are generally well understood. Power plant or other related experience with system and component performance has provided sufficient data to permit predictions of sequence progression with considerably greater confidence than for those parts of the sequence described in Levels 2 and 3. NUREG-1150 is unique in the amount of effort that went into estimating uncertainties in the calculated Level 1 results. It is our view that the results of Levell can be used with more confidence than those of Levels 2 and

3. However, as other reviewers have reported, there are recognized deficiencies in the state-of-the-art treatments of human perfor-mance; and this report is not free of those deficiencies. In addition, some possibly important initiators, e.g., those at low power operation or at shutdown, and sequences initiated by fire, are either treated superficially or are neglected altogether.

The Level 2 analyses in NUREG-1150 include more detailed contain-ment event trees than those found in any previous PRA. However, we' have some concern that the amount of detail may lead to a conclusion that much nore is known about the phenomena in this area than is actually the case.

Since there is a dearth of information concerning many of the phenomena that determine severe accident progression, expert elicitation was used most extensively in the Level 2 portion of the PRAs. There is general agreement that the techniques used for eliciting expert opinion in preparation of the second draft were significantly better than those used for the first draft. However, with insufficient information there can be no experts. Thus, use of the term "expert opinion" in a description of some of the Level

2. work may be misleading. (Further comments about the expert elicitation process are given in section 5.3). We applaud efforts to improve on the Level 2 treatment of previous PRAs. We neverthe-less believe that the results from Level 2 presented in this latest draft must be regarded as having major uncertainties in both calculated mean values and in estimated uncertainties.

EA-3 NUREG-1150 OAGI0000611 00683

Appendix E The Honorable Kenneth M. Carr 4 November 15, 1990 The MELCOR Accident 'Consequence Code System (MACCS) was used for the consequence calculations of Level 3. Use of MACCS is a departure from many' existing PRAs that use the Calculation of Reactor Accident Consequences (CRAe) series of codes. MACCS is a relatively new code, still under development. It has been neither benchmarked nor validated. Thus, in addition to the uncertainties inherent in the physical phenomena that enter into consequence modeling, additional uncertainties are introduced by the use of a new and relatively untested code.

No effort was made to estimate the uncertainties in the Level 3 calculations. Thus, the estimates of uncertainties in risk that are given in the report are only those arising from the uncertain-ties calculated for Levels 1 and 2. It is our judgment that the uncertainties in modeling the consequences of a release can be at least as large as those estimated for Level 2. For exalllple, the health effects, especially for low dose exposures, are subject to large uncertainty, and the exposures themselves depend on actions (e.g., evacuation, sheltering, interdiction of land and crops) for which the uncertainty in prediction is largely unknown.

4.2 Assumptions Made in Screening Users of the report should be aware of the assumptions made in the screening process for low-probability, high-consequence events.

For example, the analysts assumed that the probability of total loss of DC power was less than 1 x 10-7 per year and thus could be neglected. The same assumption was made for loss of all service water. Thus I those who use the resul ts in IPE work should recognize that these assumptions may not be valid for all operating plants.

4.3 Credit for Decay Heat Removal by Feed and Bleed The success of the feed and bleed operation is highly dependent on human performance. ,Everyone seems to agree that there are large uncertainties in its treatment in this report. In addition, it is likely that the performance of valves, which must function if this maneuver is to be successful, are not well represented by the data for valve performance used in the calculations.

4.4 performance of Motor-Operated Valves There is now a significant body of evidence which indicates that the failure probability used to describe the operation of certain key motor-operated valves is too low. This may have an important bearing on the outcome of several accident sequences described in the report.

NUREO-llSO EA-4 OAGI0000611 00684

Appendix E The Honorable Kenneth M. Carr 5 November 15, 1990 4.5 Contribution of Pump-Seal Failure to the Risk of Small Break LOCAs We believe that more recent information and some new seal designs developed since the study was made would lead to a prediction of risk less than that reported.

4.6 containment Performance The lack of information about many of the physical phenomena that determine the performance of a containment system in a severe accident situation is such that only educated guesses can be made for some sequences that might make significant contributions to risk. Although the large number of event trees developed in the containment analyses is indicative of what was hypothesized by the analysts, the amount and quality of information concerning a number of key phenomena that determine behavior at branch points are low. The difficulty of arriving at a result with significant confidence is illustrated by two examples. In the analysis of the performance of the Mark I containment used in early BWRs, the experts in the original study predicted a large conditional probability of early failure. In the second study a different group of experts produced a bimodal distribution because part of the panel concluded that the probability of early failure was high, and part considered it low. A second example is the calculation of risk produced by postulated direct containment heating (DCH).

In the first study, the calculated risk due to DCH for PWRs with large dry containments was a major contributor to the total risk.

In the second version, its contribution was significantly less.

In neither case had there been a major change in the information about relevant physical phenomena available at the time of the first study. Further, we find no consideration of the impact of ex-vessel steam explosions on early containment failure. There is little unambiguous guidance here for a licensee performing an IPE.

5. AREAS FOR SPECIAL COMMENT In this section, we provide more detailed comments on some areas that appear to us to deserve special attention.

5.1 Fire Risk The fire contribution to core-damage probability was estimated for two plants using insights gained during previous fire PRAs and studies, the latest methods and data bases developed under NRC sponsorship, and the benefits of extensive plant walkdowns. The methods and data used were probably the best available at the time the reported work was performed. Nevertheless we conclude, on the basis of later information, that the results should be viewed as being incomplete. The models used were not able to take full account of several issues identified by SNL in a scoping study of EA-S NUREG-llS0 OAGI0000611 00685

Appendix E The Honorable Kenneth M. Carr 6 November 15, 1990 fire risks that was completed more recently. These are issues that have not been adequately considered in past fire risk studies and may increase the risk. Of particular concern are seismic-fire interactions, adequacy of fire barriers, equipment survival in the environment generated by the fire, and control systems interac-tions. The PRA for the LaSalle nuclear plant, which is nearing completion, may provide insights concerning the risk importance of these issues.

5.2 Seismic Risk The seismic PRAs for the Surry and Peach Bottom nuclear plants were performed using two quite different representations of the seismic hazards. The results however, at least for sequences leading to core damage, were similar in terms of which accident initiators and sequences were important. This tends to support the acceptability of using the seismic margin approach rather than a PRA in the search for plant-specific seismic vulnerabilities in the IPE-External Events (IPEEE) program. However, the success of either approach in finding vulnerabilities depends strongly on walkdowns to identify those systems and components to be evaluated.

Knowledge of what to look for is derived chiefly from PRAs done on other plants, and these have tended to focus primarily on core damage rather than releases of radioactive material to the environ-ment. Although containments are usually quite rugged seismically, this is not necessarily true for containment cooling systems, containment isolation systems, etc.

Although the two seismic PRAs in NUREG-1150 have been carried

'through Level 3, these results have not been reported. We believe that these results might provide valuable insights about seismic vulnerabilities of containment systems.

5.3 The Expert Elicitation Process There is general agreement that the use of expert elicitation in the preparation of the resul ts in this draft of the report is improved compared to that used for the first version. However, we have reservations about some parts of the application of the process. For example, during our discussions of the choice of the

,participating experts we got the impression that an effort was made to choose participants in such a way that a wide spectrum of viewpoints would be represented. This was defended as proper, based on the assumption that unless this wide spectrum of opinion was represented, the uncertainty in expert opinion would not be appropriately accounted for. We found this argument unconvincing, and would have preferred to see individuals chosen primarily on the basis of their knowledge and understanding of the phenomena being considered. Furthermore, we were told that the budget for the study provided only enough funding to support the participation of about 20 percent of the experts who served on the panels. The NUREG-l1S0 EA-6 OAGI0000611 00686

Appendix E The Honorable Kenneth M. Carr 7 November 15, 1990 remainder were drawn from the NRC staff or from organizations with contractual relationships to the NRC. This biased the selection toward people whose organizations depend upon the NRC for support.

We also observe that the membership of the panels seems to have been dominated by analysts in contrast to those who have done significant research on phenomena of importance to the accident sequences being described.

5.4 Source Term Description The staff, or at least that part of it closely associated with this study, has discarded for future use the Source Term Code Package (STCP) that was one of the resources used by the expert panels in the preparation of NUREG-1150. The expert elicitation method is too resource intensive to be used generally. At this time, only the MELCOR code is available to the staff for source term cal-cUlation. Although it appears to be an improvement over the STep, it is not yet fully developed, nor is it generally available in its current form. Some method for calculating a source term will be needed by the staff and its contractors for performing or reviewing PRAs, as well as for other tasKs, such as a revision of the siting rule.

5.5 Lack of General Conclusions We have asked the staff whether the results reported in NUREG-1150 shed any light on the risk expected due to operation of the population of plants now licensed. With few exceptions, it is the staf~'s view that one can tell little or nothing about the expected risk of plants not studied from the results of the study of these five plants in NUREG-1150. In spite of these statements, however, those who prepared the report propose that applications will include evaluation and resolution of generic issues and prioritiza-tion of future research and prioritization of inspection ac-tivities. If, as we were told, the results from the analyses of these plants have ~ittle or no generic significance, application of these results must be made with considerable caution.

We believe that the large amount of information collected as input to the calculations made during this study, and the results of the large number of analyses undertaken, must surely permit some more general conclusions to be drawn than we find in this report. For example, the risk calculated for each of the five plants analyzed (although calculated only for internal initiators) falls within the Quantitative Health Objectives (QHOs) set forth in the Safety Goal Policy statement. Each was designed and constructed and, is operating wi thin the rules and regulations promulgated by the Commission. There must be some significance in the fact that plants supplied by a number of different vendors, constructed at different locations, under supervision of different organizations, over a period of more than a decade, with rather different balance EA-7 NUREG-1150 OAGI0000611 00687

Appendix E The Honorable Kenneth M. Carr 8 November 15, 1990 of plant configurations, and different containments, nevertheless fall within the QHOs. Is application of the NRC I S regulations achieving the objectives of the NRC Safety Goal Policy?

Another area of interest is the risk reduction achieved by some recently promulgated rules. The report indicates that station blackout is a significant risk contributor for three of the plants studied. Answers to questions we asked during our meetings with the staff indicated that some of the plants analyzed had imple-mented most of the requirements of the station Blackout Rule, while others had only just begun the process. Could one draw any conclusions from the plants studied as to the risk reduction to be expected from implementation of the station Blackout Rule? Or could one estimate the risk reduction for some "average" plant?

This would be interesting, since in the typical cost benefit analysis associated with backfit it is assumed that some such conclusion can be drawn about plants generally. It would be useful to see what an examination of these five plants would indicate.

The five nuclear power plants chosen for the study were selected partly on the basis of the different types of containment rep-resented. We find little or no discussion of relative containment performance or identification of containment designs that might be expected to have superior mitigation capabilities. For example, in light of the containment being proposed for the Advanced Boiling water Reactor (ABWR), it would be helpful to have any information or conclusions that were developed during the course of the study as to relative efficacy of the containment being proposed for that design as compared to the Mark I or the Mark III containments. Or, for large dry containments, does the subatmospheric operation of the Surry system provide a sUbstantial decrease in risk (because, for example, of its continuous indication of leak tightness) as compared to a large dry containment operated at atmospheric pressure?

Although it may not be feasible to make major changes in contain-ments of reactors now in operation, it is possible to choose containments with superior mitigation characteristics for nuclear plants not yet constructed. It might even be feasible, as a result of the study, to recommend a containment design that combines the best features of several of the existing systems. If in the course of this study information has been developed that could be used to reduce the conditional failure probability of containment, given severe core damage, the risk uncertainty in new designs might be NUREG-llSO EA-8 OAGI0000611 00688

Appendix E The Honorable Kenneth M. Carr 9 November 15, 1990 reduced without requiring any additional studies of core damage progression.

Sincerely, Carlyle Michelson Chairman

References:

1. U.S. Nuclear Regulatory Commission, NUREG-1150, "Severe Accident Risks: An Assessment for Five u.s. Nuclear Power Plants, If Volumes 1 and 2 (Second Draft for Peer Review) I dated June 1989.
2. Amer ican Nuclear Society, IlReport of the Special Committee on NUREG-1150, The NRC'S Study of Severe Accident Risks, It L.

LeSage (Chairman), dated August 1990.

3. U. s. Nuclear RegulatD~Y commission, NUREG-142 0 , "special committee Review of the Nuclear Regulatory Commission's Severe Accident Risks Report (NUREG-1150), It H. Kouts (Chairman),

dated August 1990.

4. U.S. Nuclear Regulatory Commission, NUREG-1150, II,Reactor Risk Reference Document, II Volumes 1, 2, and 3, Draft issued for comment, dated February 1987.

EA-9 NUREG-l1S0 OAGI0000611 00689

NRC FORM 335 U.S. NUCLEAR REGULATORY COMMISSION 1. REPORT NUMBER (2-89) (Assigned by NRC, Add Vol.,

NRCM 1102, Supp., Rev., and Addendum Num-3201,3202 BIBLIOGRAPHIC DATA SHEET bers, If any.)

(See Instructions on the reverse) NUREG-1150

2. TITLE AND SUBTITLE Vol. 3
3. DATE REPORT PUBLISHED Severe Accident Risks: An Assessment for Five U.S. Nuclear Power Plants MONTH I YEAR Appendices D and E January 1991 Final Report 4. FIN OR 'GRANT NUMBER
5. AUTHOR(S) 6. TYPE OF REPORT Final Technical
7. PERIOD COVERED (Inclusive Dates)
8. PERFORMING ORGANIZATION - NAME AND ADDRESS (If NRC, provide Division, Office or Region, U.S. Nuclear Regulatory Commission, and mailing address; If contractor, provide name and mailing address.)

Division of Systems Research Office of Nuclear RegulatOlY Research U.S. Nuclear Regulatory Commission Washington, DC 20555

9. SPONSORING ORGANIZATION - NAME AND ADDRESS (If NRC, type "Same as above"; If contractor, provide NRC Division, Office or Region, U.S. Nuclear Regulatory Commission, and mailing address.)

Same as 8. above.

10. SUPPLEMENTARY NOTES
11. ABSTRACT (200 words or less)

This report summarizes an assessment of the risks from severe accidents in five commercial nuclear power plants in the United States. These risks are measured in a number of ways, including: the estimated frequencies of core damage accidents from internally initiated accidents, and externally initiated accidents for two of the plants; the performance of containment structures under severe accident loadings; the potential magnitude of radionuclide releases and offsite con-sequences of such accidents; and the overall risk (the product of accident frequencies and consequences). Supporting this summary report are a large number of reports written under contract to NRC which provide the detailed discussion of the methods used and results obtained in these risk studies.

Volume 3 of this report contains two appendices. Appendix D summarizes comments received and staff responses on the first (February 1987) draft of NVREG-1150. Appendix E provides a similar summary of comments and responses, but for the second (June 1989) version of the report.

12. KEY WORDS/DESCRIPTORS (LIst words or phrases that will assIst researchers In locatIng the report.) 13. AVAILABILITY STATEMENT Unlimited
14. SECURITY CLASSIFICATION severe accidents (This Page) risk analysis probabilistic risk analysis Unclassified (This Report)

Unclassified

15. NUMBER OF PAGES
16. PRICE NRC FORM 335 (2-89)

OAGI0000611 00690

THIS DOCUMENT WAS PRINTED USING RECYCLED PAPER.

OAGI0000611 006