Official Exhibit - NRC000229-00-BD01 - Indian Point, Unit 3 Technical Specifications 3.1.4
ML15337A263
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 08/10/2015
From:
NRC/OGC
To:
SECY RAS
References
RAS 28148, ASLBP 07-858-03-LR-BD01, 50-247-LR, 50-286-LR
Download: ML15337A263 (8)


Text

NRC000229 UNITED STATES Submitted: August 10, 2015 NUCLEAR REGULATORY COMMISSION 4 0WASHINGTON, D.C. 20555-0001 k0 2 **

ENTERGY NUCLEAR INDIAN POINT 3. LLC AND ENTERGY NUCLEAR OPERATIONS. INC.

DOCKET NO. 50-286 INDIAN POINT NUCLEAR GENERATING UNIT NO. 3 AMENDED FACILITY OPERATING LICENSE Amendment No. 203 License No. DPR-64 The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by the Power Authority of the Amdt. 203 State of New York (PASNY) and Entergy Nuclear Indian Point 3, 11/27/00 United States Nuclear Regulatory Commission Official Hearing Exhibit LLC (ENIP3) and Entergy Nuclear Operations, Inc. (ENO),

submitted under cover letters dated May 11 and May 12, 2000, as supplemented on June 13, June 16, July 14, September 21, In the Matter of: Entergy Nuclear Operations, Inc. October 26, and November 3, 2000, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (Indian Point Nuclear Generating Units 2 and 3) (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I; ASLBP #: 07-858-03-LR-BD01 B. The facility will operate in conformity with the application, the provisions of the Docket #: 05000247 l 05000286 Act, and the rules and regulations of the Commission; Exhibit #: NRC000229-00-BD01 Identified: 11/5/2015 C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the Admitted: 11/5/2015 Withdrawn:

public, and (ii)that such activities will be conducted in compliance with the Commission's regulations; Rejected: Stricken: D. ENIP3 and ENO are financially and technically qualified to Amdt. 203 Other:

engage in the activities authorized by this amendment; 11/27/00 E. ENIP3 and ENO have satisfied the applicable provisions of Amdt. 203 10 CFR Part 140, "Financial Protection Requirements and 11/27/00 Indemnity Agreements" of the Commission's regulations; F. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; Amendment No. 225

G. The receipt, possession and use of source, byproduct and special nuclear material as authorized by this amendment will be in accordance with the Commission's regulations in 10 CFR Parts 30, 40 and 70 including 10 CFR Sections 30.33, 40.32, 70.23, and 70.31; and H. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2. Accordingly, Facility Operating License No. DPR-64 (previously Amdt. 203 issued to Consolidated Edison Company of New York, Inc., and 11/27/00 the Power Authority of the State of New York) is hereby amended in its entirety and transferred to ENIP3 and ENO on November 21, 2000, to read as follows:

A. This amended license applies to the Indian Point Nuclear Amdt. 203 Generating Unit No. 3, a pressurized water nuclear reactor 11/27/00 and associated equipment (the facility), owned by ENIP3 and operated by ENO. The facility is located in Westchester County, New York, on the east bank of the Hudson River in the Village of Buchanan, and is described in the "Final Facility Description and Safety Analysis Report" as supplemented and amended, and the Environmental Report, as amended.

B. Subject to the conditions and requirements incorporated herein, the Commission licenses:

(1) Pursuant to Section 104b of the Act and 10 CFR Part 50, Amdt. 203 "Licensing of Production and Utilization Facilities," 11/27/00 (a) ENIP3 to possess and use, and (b) ENO to possess, use and operate, the facility at the designated location in Westchester County, New York, in accordance with the procedures and limitations set forth in this amended license; (2) ENO pursuant to the Act and 10 CFR Part 70, to receive, Aindt. 203 possess, and use, at any time, special nuclear material as 11/27/00 reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Facility Description and Safety Analysis Report, as supplemented and amended; (3) ENO pursuant to the Act and 10 CFR Parts 30, 40, and 70, Amdt. 203 to receive, possess, and use, at any time, any byproduct 11/27/00 source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; Amendment No. 225

Rod Group Alignment Limits 3.1.4 3.1 REACTIVITY CONTROL SYSTEMS 3.1.4 Rod Group Alignment Limits LCO 3.1.4 All shutdown and control rods shall be OPERABLE, with rod group alignment limits as follows:

a. *WhenTHERMAL POWER is > 85% RTP, the difference between each individual indicated rod position and its group step counter demand position shall be within the limits specified in Table 3.1.4-1 for the group step counter demand position: and
b. When THERMAL POWER is 5 85% RTP, the difference between each individual indicated rod position and its group step counter demand position shall be within 24 steps.

APPLICABILITY: MODES 1 and 2.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more rod(s) A.1.1 Verify SDM is within the 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> untrippable. limits specified in the COLR.

DR A.1.2 Initiate boration to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> restore SDM to within limit.

A.2 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> (continued)

INDIAN POINT 3 3.1.4-1 Amendment 205

Rod Group Alignment Limits 3.1.4 ACTIONS (continued)

CONDITION I REQUIRED ACTION COMPLETION TIME B. One rod not within B.1 Restore rod to within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> alignment limits. alignment limits.

DE B.2.1.1 Verify SDM is within the 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> limits specified in the COLR.

B.2.1.2 Initiate boration to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> restore SDM to within limit.

B.2.2 Reduce THERMAL POWER to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />

75% RTP.

B.2.3 Verify SDH is within the Once per limits specified in the 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> COLR.

AMD B.2.4 Perform SR 3.2.1.1. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> ANQ.

B.2.5 Perform SR 3.2.2.1. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> (continued)

INDIAN POINT 3 3.1.4-2 Amendment 205

Rod Group Alignment Limits 3.1.4 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B (continued) B.2.6 Re-evaluate safety 5 days analyses and confirm results remain valid for duration of operation under these conditions.

C. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition B not met.

D. More than one rod not D.1.1 Verify SDM is within the 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> within alignment limit. limits specified in the COLR.

DR D.1.2 Initiate boration to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> restore required SDM to within limit.

D.2 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> INDIAN POINT 3 3.1.4-3 Amendment 205

Rod Group Alignment Limits 3.1.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.4.1 ..-------------- NOTE.-----------------.-----

Not required to be met for individual control rods until 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after completion of control rod movement.

Verify individual rod positions within alignment 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> limit.

SR 3.1.4.2 Verify rod freedom of movement (trippability) by 92 days moving each rod not fully inserted in the core 2 10 steps in one direction.

SR 3.1.4.3 Verify rod drop time of each rod, from the fully Prior to reactor withdrawn position, is g 1.8 seconds from the criticality after loss of stationary gripper coil voltage to each removal of dashpot entry, with: the reactor head

a. Tavg : 5000F; and
b. All reactor coolant pumps operating.

INDIAN POINT 3 3.1.4-4 Amendment 205

Rod Group Alignment Limits 3.1.4 Table 3.1.4-1 Maximum Permissible Rod Misalignment (Indicated Rod Position minus Group Step Counter Demand Position)

When > 85 % RTP Step Counter Demand Maximum Permissible Deviations Position (IRPI Position minus Step Counter Demand Position)

(steps) (steps) s212 -12 and +12 213 to 225 -12 and s +17 226 2 -13 and g +17 227 2 -14 and g +17 228 2 -15 and g +17 229 2 -16 and s +17 2 230 2 -17 and g +17 INDIAN POINT 3 3.1.4-5 Amendment 205

Shutdown Bank Insertion Limits 3.1.5 3.1 REACTIVITY CONTROL SYSTEMS 3.1.5 Shutdown Bank Insertion Limits LCO 3.1.5 Each shutdown bank shall be within insertion limits specified in the COLR.

APPLICABILITY: MODE 1, MODE 2 with any control bank not fully inserted.

NOTE..--------.----------

This LCO is not applicable while performing SR 3.1.4.2.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more shutdown A.1.1 Verify SDM is within the 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> banks not within limits. limits specified in the COLR.

QR A.1.2 Initiate boration to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> restore SDM to within limit.

A.2 Restore shutdown banks 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to within limits.

B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

INDIAN POINT 3 3.1.5-1 Amendment 205

NRC000229 UNITED STATES Submitted: August 10, 2015 NUCLEAR REGULATORY COMMISSION 4 0WASHINGTON, D.C. 20555-0001 k0 2 **

ENTERGY NUCLEAR INDIAN POINT 3. LLC AND ENTERGY NUCLEAR OPERATIONS. INC.

DOCKET NO. 50-286 INDIAN POINT NUCLEAR GENERATING UNIT NO. 3 AMENDED FACILITY OPERATING LICENSE Amendment No. 203 License No. DPR-64 The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by the Power Authority of the Amdt. 203 State of New York (PASNY) and Entergy Nuclear Indian Point 3, 11/27/00 United States Nuclear Regulatory Commission Official Hearing Exhibit LLC (ENIP3) and Entergy Nuclear Operations, Inc. (ENO),

submitted under cover letters dated May 11 and May 12, 2000, as supplemented on June 13, June 16, July 14, September 21, In the Matter of: Entergy Nuclear Operations, Inc. October 26, and November 3, 2000, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (Indian Point Nuclear Generating Units 2 and 3) (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I; ASLBP #: 07-858-03-LR-BD01 B. The facility will operate in conformity with the application, the provisions of the Docket #: 05000247 l 05000286 Act, and the rules and regulations of the Commission; Exhibit #: NRC000229-00-BD01 Identified: 11/5/2015 C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the Admitted: 11/5/2015 Withdrawn:

public, and (ii)that such activities will be conducted in compliance with the Commission's regulations; Rejected: Stricken: D. ENIP3 and ENO are financially and technically qualified to Amdt. 203 Other:

engage in the activities authorized by this amendment; 11/27/00 E. ENIP3 and ENO have satisfied the applicable provisions of Amdt. 203 10 CFR Part 140, "Financial Protection Requirements and 11/27/00 Indemnity Agreements" of the Commission's regulations; F. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; Amendment No. 225

G. The receipt, possession and use of source, byproduct and special nuclear material as authorized by this amendment will be in accordance with the Commission's regulations in 10 CFR Parts 30, 40 and 70 including 10 CFR Sections 30.33, 40.32, 70.23, and 70.31; and H. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2. Accordingly, Facility Operating License No. DPR-64 (previously Amdt. 203 issued to Consolidated Edison Company of New York, Inc., and 11/27/00 the Power Authority of the State of New York) is hereby amended in its entirety and transferred to ENIP3 and ENO on November 21, 2000, to read as follows:

A. This amended license applies to the Indian Point Nuclear Amdt. 203 Generating Unit No. 3, a pressurized water nuclear reactor 11/27/00 and associated equipment (the facility), owned by ENIP3 and operated by ENO. The facility is located in Westchester County, New York, on the east bank of the Hudson River in the Village of Buchanan, and is described in the "Final Facility Description and Safety Analysis Report" as supplemented and amended, and the Environmental Report, as amended.

B. Subject to the conditions and requirements incorporated herein, the Commission licenses:

(1) Pursuant to Section 104b of the Act and 10 CFR Part 50, Amdt. 203 "Licensing of Production and Utilization Facilities," 11/27/00 (a) ENIP3 to possess and use, and (b) ENO to possess, use and operate, the facility at the designated location in Westchester County, New York, in accordance with the procedures and limitations set forth in this amended license; (2) ENO pursuant to the Act and 10 CFR Part 70, to receive, Aindt. 203 possess, and use, at any time, special nuclear material as 11/27/00 reactor fuel, in accordance with the limitations for storage and amounts required for reactor operation, as described in the Final Facility Description and Safety Analysis Report, as supplemented and amended; (3) ENO pursuant to the Act and 10 CFR Parts 30, 40, and 70, Amdt. 203 to receive, possess, and use, at any time, any byproduct 11/27/00 source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; Amendment No. 225

Rod Group Alignment Limits 3.1.4 3.1 REACTIVITY CONTROL SYSTEMS 3.1.4 Rod Group Alignment Limits LCO 3.1.4 All shutdown and control rods shall be OPERABLE, with rod group alignment limits as follows:

a. *WhenTHERMAL POWER is > 85% RTP, the difference between each individual indicated rod position and its group step counter demand position shall be within the limits specified in Table 3.1.4-1 for the group step counter demand position: and
b. When THERMAL POWER is 5 85% RTP, the difference between each individual indicated rod position and its group step counter demand position shall be within 24 steps.

APPLICABILITY: MODES 1 and 2.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more rod(s) A.1.1 Verify SDM is within the 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> untrippable. limits specified in the COLR.

DR A.1.2 Initiate boration to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> restore SDM to within limit.

A.2 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> (continued)

INDIAN POINT 3 3.1.4-1 Amendment 205

Rod Group Alignment Limits 3.1.4 ACTIONS (continued)

CONDITION I REQUIRED ACTION COMPLETION TIME B. One rod not within B.1 Restore rod to within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> alignment limits. alignment limits.

DE B.2.1.1 Verify SDM is within the 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> limits specified in the COLR.

B.2.1.2 Initiate boration to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> restore SDM to within limit.

B.2.2 Reduce THERMAL POWER to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />

75% RTP.

B.2.3 Verify SDH is within the Once per limits specified in the 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> COLR.

AMD B.2.4 Perform SR 3.2.1.1. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> ANQ.

B.2.5 Perform SR 3.2.2.1. 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> (continued)

INDIAN POINT 3 3.1.4-2 Amendment 205

Rod Group Alignment Limits 3.1.4 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B (continued) B.2.6 Re-evaluate safety 5 days analyses and confirm results remain valid for duration of operation under these conditions.

C. Required Action and C.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition B not met.

D. More than one rod not D.1.1 Verify SDM is within the 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> within alignment limit. limits specified in the COLR.

DR D.1.2 Initiate boration to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> restore required SDM to within limit.

D.2 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> INDIAN POINT 3 3.1.4-3 Amendment 205

Rod Group Alignment Limits 3.1.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.4.1 ..-------------- NOTE.-----------------.-----

Not required to be met for individual control rods until 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after completion of control rod movement.

Verify individual rod positions within alignment 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> limit.

SR 3.1.4.2 Verify rod freedom of movement (trippability) by 92 days moving each rod not fully inserted in the core 2 10 steps in one direction.

SR 3.1.4.3 Verify rod drop time of each rod, from the fully Prior to reactor withdrawn position, is g 1.8 seconds from the criticality after loss of stationary gripper coil voltage to each removal of dashpot entry, with: the reactor head

a. Tavg : 5000F; and
b. All reactor coolant pumps operating.

INDIAN POINT 3 3.1.4-4 Amendment 205

Rod Group Alignment Limits 3.1.4 Table 3.1.4-1 Maximum Permissible Rod Misalignment (Indicated Rod Position minus Group Step Counter Demand Position)

When > 85 % RTP Step Counter Demand Maximum Permissible Deviations Position (IRPI Position minus Step Counter Demand Position)

(steps) (steps) s212 -12 and +12 213 to 225 -12 and s +17 226 2 -13 and g +17 227 2 -14 and g +17 228 2 -15 and g +17 229 2 -16 and s +17 2 230 2 -17 and g +17 INDIAN POINT 3 3.1.4-5 Amendment 205

Shutdown Bank Insertion Limits 3.1.5 3.1 REACTIVITY CONTROL SYSTEMS 3.1.5 Shutdown Bank Insertion Limits LCO 3.1.5 Each shutdown bank shall be within insertion limits specified in the COLR.

APPLICABILITY: MODE 1, MODE 2 with any control bank not fully inserted.

NOTE..--------.----------

This LCO is not applicable while performing SR 3.1.4.2.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more shutdown A.1.1 Verify SDM is within the 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> banks not within limits. limits specified in the COLR.

QR A.1.2 Initiate boration to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> restore SDM to within limit.

A.2 Restore shutdown banks 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to within limits.

B. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

INDIAN POINT 3 3.1.5-1 Amendment 205