Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
ML12307A038
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 10/25/2012
From: Heacock D
Dominion, Dominion Energy Kewaunee
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
12-164A, EA-12-051
Download: ML12307A038 (3)


Text

Dominion Energy Kewaunee, Inc. Al 5000 Dominion Boulevard, Glen Allen, VA 23060 i POlmlnlOlf 10 CFR202 2.202 October 25, 2012 1 EA-1 2-051 Attention: Document Control Desk Serial No.: 12-164A U.S. Nuclear Regulatory Commission NL&OS/MAE: RO Washington, D.C. 20555-0001 Docket No.: 50-305 License No.: DPR-43 DOMINION ENERGY KEWAUNEE. INC.

KEWAUNEE POWER STATION INITIAL STATUS REPORT IN RESPONSE TO MARCH 12., 2012 COMMISSION ORDER MODIFYING LICENSES WITH REGARD TO REQUIREMENTS FOR RELIABLE SPENT FUEL POOL INSTRUMENTATION (ORDER NUMBER EA-12-051)

References:

1. NRC Order Number EA-12-051, Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation, dated March 12, 2012 (ML12073A202)
2. NRC Interim Staff Guidance JLD-ISG-2012-03, Compliance with Order EA-12-051, Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation, Revision 0, dated August 29, 2012 (ML12221A339)

On March 12, 2012, the Nuclear Regulatory Commission ("NRC" or "Commission") issued an order (Reference 1) to Dominion Energy Kewaunee, Inc. (DEK). Reference 1 was immediately effective and directs DEK to have a reliable indication of the water level in associated spent fuel storage pools. Specific requirements are outlined in Attachment 2 of Reference 1.

Reference 1 requires submission of an initial status report 60 days following issuance of the final interim staff guidance. The final interim staff guidance (Reference 2) was issued August 29, 2012. The purpose of this letter is to provide the initial status report pursuant to Section IV, Condition C.2, of Reference 1 within 60 days following issuance of Reference 2. This report confirms DEK has received Reference 2 and is in the process of evaluating the guidance for the purpose of providing a reliable indication of the water level in the spent fuel storage pool as described in Attachment 2 of Reference 1.

Major activities completed during this reporting period:

" Resources are being identified and project plans initiated, including development of milestones, to assure compliance with Reference 1.

  • Responses to the RFIs have been reviewed and potential equipment has been identified.
  • Procurement specifications, requesting bids from SFPI suppliers that offer this equipment, are being prepared.

Planned activities for the next six months:

  • Development and submittal of the overall integrated plan.
  • Issuance of site-specific procurement specifications.
  • Selection of equipment and a supplier(s).

Serial No. 12-164A 60-Day Response to Order EA-12-051 Docket No. 50-305 Page 2 of 3

  • Preparation, review, and approval of conforming specifications.
  • Issuance of purchase orders for SFPI.
  • Initiation of the design change process.

Technical difficulties encountered that could affect the ability to provide the licensee's February 28, 2013, submittal:

  • None at this time.

Project milestones schedule through completion of installation and testing:

  • A project milestones schedule will be provided with the overall integrated plan.
  • Implementation of the order will be completed for Kewaunee Unit 1 prior to startup from Refueling Outage (RFO) 34 (Spring 2015).

In view of the recent announcement regarding the planned closing of Kewaunee Power Station, DEK's future responses to the Order may include requests for relief permitted under Section IV of the Order.

If you have any questions, please contact Ms. Margaret Earle at (804) 273-2768.

Sincerely, David A. Heacock President and Chief Nuclear Officer Dominion Energy Kewaunee, Inc.

Commitments made by this letter: No New Regulatory Commitments COMMONWEALTH OF VIRGINIA

)

COUNTY OF HENRICO )

The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by David A. Heacock who is President and Chief Nuclear Officer of Dominion Energy Kewaunee, Inc. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of the Company, and that the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this,-?' day of 2012.

My Commission Expires:

. .VICK!L. HULL Notary Public

[Notary Public (SEAL) Commonwealth of Virginia 140542 F - mvwJ Comsso Wires.....

Ma 31...

v 2014m

--- I,

Serial No. 12-164A 60-Day Response to Order EA-12-051 Docket No. 50-305 Page 3 of 3 cc: Director of Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 13H16M 11555 Rockville Pike Rockville, MD 20852-2738 U. S. Nuclear Regulatory Commission, Region III Regional Administrator 2443 Warrenville Road Suite 210 Lisle, Illinois 60532-4352 Ms. Lisa M. Regner U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 011 F1 11555 Rockville Pike Rockville, MD 20852-2738 Mr. Blake A. Purnell U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 012 D20 11555 Rockville Pike Rockville, MD 20852-2738 Mr. Steven R. Jones U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 010 Al 11555 Rockville Pike Rockville, MD 20852-2738 Mr. Karl D. Feintuch NRC Project Manager Kewaunee U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 H-4A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Kewaunee Power Station