MONTHYEARML24012A0492024-01-11011 January 2024 Request for Additional Information Regarding Final Response to Generic Letter 2004-02 ML23219A1662023-08-16016 August 2023 Request for Additional Information Regarding Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping (EPID: L-2023-LLR-0006) - Non-proprietary ML23160A0222023-06-0606 June 2023 NRR E-mail Capture - Calvert Cliffs - Long Term Coupon Surveillance Program RAI ML23156A0102023-06-0404 June 2023 NRR E-mail Capture - Calvert Cliffs - RAI License Amendment Request for Emergency Desiel Generator ML22179A2112022-06-28028 June 2022 Notification of Conduct of a Fire Protection Team Inspection ML22129A0132022-05-0606 May 2022 NRR E-mail Capture - Draft RAIs for Requests for Alternatives I4R-17, I4R-23, ISI-05-018, I6R-10 ML22271A0772022-05-0606 May 2022 NRR E-mail Capture - Final RAIs 9.1.2021 Constellation Relief Request ML22091A0852022-04-0101 April 2022 NRR E-mail Capture - Braidwood and Byron - Final RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22091A2392022-04-0101 April 2022 NRR E-mail Capture - Calvert Cliffs - Formal RAI for Proposed Alternative for Examinations of Certain Pressurizer Welds ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML21287A0322021-10-13013 October 2021 Request for Additional Information Re Proposed Alternative for Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds ML21287A0932021-10-0505 October 2021 Request for Additional Information: Calvert Cliffs 1 & 2 LAR to Revise Spent Fuel Pool Cooling - Shutdown Cooling Systems Licensing Basis (EPID L-2021-LLA-0112) (Email) ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21187A2232021-07-29029 July 2021 Temporary Instruction 2515/194 Inspection Documentation Request ML21180A1562021-06-28028 June 2021 Request for Additional Information Regarding License Amendment Request Concerning Containment Sump ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21130A0382021-05-21021 May 2021 Memo to File - Draft Request for Additional Information Relief Request CISI-03-01 Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements ML21117A0342021-05-0505 May 2021 Request for Additional Information Regarding Proposed Alternative to Use ASME Code Case N-893 ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21053A3142021-02-22022 February 2021 Information Request for a Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000317/2021010 and 05000318/2021010 ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21029A3302021-01-29029 January 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative Request to Use ASME Code Case N-885 ML20275A0032020-09-30030 September 2020 Request for Additional Information Regarding Alternative Request Re Inservice Inspection Impracticality (L-2020-LLR-0089) ML20167A2532020-06-15015 June 2020 Second Request for Additional Information Regarding License Amendment Request Concerning Emergency Diesel Generator Surveillance Requirements for Frequency and Voltage Tolerances ML20157A0782020-06-0505 June 2020 Request for Additional Information Regarding License Amendment Request Concerning Emergency Diesel Generator Surveillance Requirements for Frequency and Voltage Tolerances ML20153A7042020-06-0101 June 2020 NRR E-mail Capture - Preliminary RAI for Fleet Request to Use Alternative OMN-26 ML20135H0132020-05-14014 May 2020 IP 71111.17T (50.59) List of Documents Request ML20083F5892020-03-21021 March 2020 Request for Additional Information Regarding License Amendment Request Concerning Reactor Coolant Pump Flywheel Inspection Program ML19275H1362019-10-0202 October 2019 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Use ASME Code Case N-879 ML19261B2202019-09-18018 September 2019 Request for Additional Information Regarding Final Response to Generic Letter 2004-02 ML19179A0612019-07-19019 July 2019 Three Mile Point 1 - Supplemental Information Needed to Proposed Alternative to Use ASME Code Case N-879 ML19155A1612019-06-11011 June 2019 Changes to Draft Request for Additional Information Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Systems, Structures and Components ML19155A1272019-06-0404 June 2019 Request for Additional Information Regarding Request to Adopt 10 CFR 50.69 Risk Informed Categorization and Treatment of Systems, Structures, and Components ML19070A0192019-03-11011 March 2019 Request for Additional Information Regarding Exemption Request from 10CFR50.46(A)(1) to Support Resolution of GSI-191 ML19025A1202019-01-24024 January 2019 NRR E-mail Capture - Calvert Cliffs, Fitzpatrick, and Nine Mile Point - Request for Additional Information Regarding License Amendment Request to Revise Emergency Response Organization Staffing ML18347A3972018-12-13013 December 2018 Request for Additional Information Regarding Relocation of Emergency Operation Facility ML18138A1372018-05-22022 May 2018 Plants, Units 1 and 2 - Request for Additional Information Regarding Risk Informed Technical Specification Completion Times (CAC Nos. MF7415 and MF7416; EPID L-2016-LLA-0001) ML18128A3842018-05-0808 May 2018 Plants, Units 1 and 2 - Draft Request for Additional Information Regarding Risk-Informed Technical Specification Completion Times (CAC Nos. MF7415 and MF7416; EPID L-2016-LLA-0001) ML18102A2372018-04-12012 April 2018 NRR E-mail Capture - Calvert Cliffs, Ginna, and Nine Mile Point - Request for Additional Information Regarding License Amendment Request to Revise Emergency Action Level Schemes (EPID-L-2017-LLA-0237) ML18067A1482018-03-0808 March 2018 Enclosurequest for Additional Information (Letter to P. R. Simpson Request for Additional Information Regarding Exelon Generating Company, Llc'S Decommissioning Funding Plan Update for Independent Spent Fuel Storage Installation) ML17345A0912018-01-19019 January 2018 Plants, Units 1 and 2 - Request for Additional Information Regarding Alternative Request SI-RR-01, Rev. 0 (CAC Nos. MG0068 and MG0069; EPID L-2017-LLR-0078) ML17346A9092017-12-21021 December 2017 Request for Additional Information Regarding Risk-Informed Technical Specification Completion Times (CAC Nos. MF7415 and MF7416; EPID L-2016-LLA-0001) ML17331B1342017-12-12012 December 2017 2, and R.E. Ginna Nuclear Power Plant - Request for Additional Information - Regarding ML17304A9412017-11-13013 November 2017 Request for Additional Information Regarding Risk-Informed Technical Specification Completion Times (CAC Nos. MF7415 and MF7416; EPID L-2016-LLA-0001) ML17285B1962017-10-27027 October 2017 Request for Additional Information Regarding Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. ML17075A0152017-03-16016 March 2017 E-mail from R. Guzman to E. Villar - Calvert Cliffs Unit Nos. 1 and 2 - Request for Additional Information License Amendment Request - Control Room Emergency Ventilation System ML17062A4912017-03-0303 March 2017 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative to RPV Threads in Flange Examination (CAC Nos. MF8712-MF8729) ML16222A1252016-08-0909 August 2016 Request for Additional Information - Relief Request No. RR-ISI-04-11, 2016/08/08 E-mail from R.Guzman to T.Loomis ML15299A2792015-11-0303 November 2015 Request for Additional Information Regarding Relief Request for Dissimilar Metal Butt Welds ML15230A0322015-08-13013 August 2015 Request for Additional Information Regarding the National Association Standard 805 License Amendment Request Fire Protection 2024-01-11
[Table view] Category:Letter
MONTHYEARIR 05000317/20230042024-02-0101 February 2024 Integrated Inspection Report 05000317/2023004 and 05000318/2023004 ML24029A0102024-01-29029 January 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000317/2024010 and 05000318/2024010 ML24003A8872024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0033 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 05000318/LER-2023-004, Submittal of LER 2023-004-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Submittal of Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-01-16016 January 2024 Submittal of LER 2023-004-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Submittal of Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer ML24011A0732024-01-11011 January 2024 Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping 05000318/LER-2023-002, Forward LER 2023-002-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-01-0808 January 2024 Forward LER 2023-002-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer 05000318/LER-2023-003, Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip2024-01-0808 January 2024 Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip ML24005A0222024-01-0505 January 2024 Revised Steam Generator Tube Inspection Reports ML23304A0642024-01-0202 January 2024 Issuance of Amendment No. 349 to Modify the Long-Term Coupon Surveillance Program RS-23-125, Request for Exemption from 10 CFR 2.109(b)2023-12-0707 December 2023 Request for Exemption from 10 CFR 2.109(b) ML23331A2992023-11-27027 November 2023 Submittal of Condition Prohibited by Technical Specifications Due to Failure to Sample Diesel Generator Fuel Oil Storage Tank IR 05000317/20230102023-11-20020 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000317/2023010 and 05000318/2023010 ML23318A4722023-11-14014 November 2023 Supplement to License Amendment Request to Adopt TSTF-59-A ML23317A1032023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums ML23310A0442023-11-0707 November 2023 Project Manager Assignment IR 05000317/20230402023-11-0202 November 2023 95001 Supplemental Inspection Report 05000317/2023040 and Follow-Up Assessment Letter IR 05000317/20230032023-11-0101 November 2023 Integrated Inspection Report 05000317/2023003 and 05000318/2023003 IR 05000317/20230902023-10-26026 October 2023 Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation; Inspection Report 05000317/2023090 ML23289A1202023-10-16016 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23279A1202023-10-0606 October 2023 Response to NRC Inspection Report and Preliminary White Finding IR 05000317/20230502023-09-29029 September 2023 Special Inspection Report 05000317/2023050 and Preliminary White Finding and Apparent Violation ML23272A1032023-09-29029 September 2023 Condition Prohibited by Technical Specifications Due to Inoperable Nuclear Instrumentation at Very Low Power IR 05000317/20234012023-09-18018 September 2023 Cyber Security Inspection Report 05000317/2023401 and 05000318/2023401 ML23254A0012023-09-0505 September 2023 Registration of Use of Casks to Store Spent Fuel IR 05000317/20230052023-08-31031 August 2023 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2023005 and 05000318/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23241A8412023-08-29029 August 2023 Response to Request for Additional Information - Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping ML23240A3872023-08-28028 August 2023 Senior Reactor and Reactor Operator Initial License Examinations ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration ML23219A1662023-08-16016 August 2023 Request for Additional Information Regarding Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping (EPID: L-2023-LLR-0006) - Non-proprietary ML23228A1002023-08-15015 August 2023 Notification of Readiness for NRC 95001 Inspection ML23188A0402023-08-0808 August 2023 Issuance of Amendment Nos. 346 and 324 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML23214A1572023-08-0707 August 2023 Correction to the Renewed Facility Operating License Page 3 in Amendment No 345 IR 05000317/20230022023-08-0303 August 2023 Integrated Inspection Report 05000317/2023002 ML23188A0512023-07-13013 July 2023 Correction to the Renewed Facility Operating License Pages in Amendment Nos. 336 and 314 ML23186A0372023-07-13013 July 2023 Correction to the Renewed Facility Operating License Pages in Amendment Nos. 340 and 318 IR 05000317/20233012023-07-12012 July 2023 Initial Operator Licensing Examination Report 05000317/2023301 and 05000318/2023301 IR 05000317/20230122023-07-10010 July 2023 Commercial Grade Dedication Report 05000317/2023012 and 05000318/2023012 ML23180A2362023-06-29029 June 2023 Correction of Errors on Technical Specification Pages RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators ML23156A6752023-06-20020 June 2023 Request for Withholding Information from Public Disclosure for Proposed Alternative to the Requirements for Repair/Replacement of Saltwater System Buried Piping 2024-02-01
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555"()001 October 17, 2012 Mr. George H. Gellrich, Vice President Calvert Cliffs Nuclear Power Plant, LLC Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702
SUBJECT:
CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NOS. 1 AND 2 REQUEST FOR ADDITIONAL INFORMATION REGARDING THE PHYSICAL SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, AND SAFEGUARDS CONTINGENCY PLAN, REVISION 8
Dear Mr. Gellrich:
By letter dated August 2, 2012, Calvert Cliffs Nuclear Power Plant, LLC (the licensee) submitted the Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 8 for Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2.
The Nuclear Regulatory Commission staff is reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). On October 3, 2012, NRC staff and the licensee participated in a teleconference to discuss the questions within a draft copy of the RAI.
The NRC staff is requesting a response to the RAI by November 2, 2012.
If you have any questions regarding this issue, please contact me at (301) 415-1016.
Sincerely, Nadiyah S. Morgan, Project Manager Plant licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-317 and 50-318
Enclosure:
RAI cc w/encl: Distribution via Listserv
REQUEST FOR ADDITIONAL INFORMATION REGARDING REGARDING THE PHYSICAL SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, AND SAFEGUARDS CONTINGENCY PLAN, REVISION 8 CALVERT CLIFFS NUCLEAR POWER PLANT, LLC.
CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NO.1 AND 2 DOCKET NOS. 50-317 AND 50-318 In a letter dated August 2, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12219A233), Calvert Cliffs Nuclear Power Plant, LLC (the licensee), submitted the PhYSical Security Plan (PSP), Training and Qualification Plan, and Safeguards Contingency Plan (SCP), Revision 8 for Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2 (Calvert Cliffs). The Nuclear Regulatory Commission (NRC) staff is reviewing the submittal to ensure compliance with Title 10 of the Code of Federal Regulations (10 CFR),
Section 50.54(p)(2).
As a result of the NRC's review, the NRC staff issued the licensee a draft request for additional information (RAI). Upon receipt and review of the RAI, the Calvert Cliffs staff requested a teleconference to clarify the questions within the RAI. On October 3, 2012, NRC staff and the licensee participated in a teleconference to discuss the questions within the RAI, which resulted in a consensus for the NRC to provide clarification of the information required to ensure compliance with 10 CFR 50.54(p).
To complete its review, the NRC staff requests the following additional information:
- 1. Section 11.1 of the PSP includes a description of an Owner Controlled Area (OCA) barrier and an early warning system at the site. Describe how the barrier and associated early warning system intrusion detection and assessment equipment that are identified in Section 11.1 of the PSP meet the requirements of 10 CFR 73.55.
Specifically:
- a. Describe the function of this OCA barrier by identifying how it and the associated intrusion detection and assessment capabilities are integrated within the physical protection program and protective strategy and how these capabilities are used to support the initiation of the protective strategy. Describe how the detection and assessment capability at this OCA barrier facilitates the initiation of operator actions that are credited as target elements within target sets. Describe how the implementation of this OCA barrier and associated intrusion detection and assessment equipment have been included in the drills and exercises of the site's protective strategy that have been conducted to meet the Performance Evaluation Program requirements of 10 CFR Part 73, Appendix B VI, C.3.
Describe the percentage of drills and exercises, conducted since implementation Enclosure
- 2 of this OCA barrier, in which initiation of the protective strategy resulted from adversary detection at this OCA barrier.
Regulatory Basis:
Consistent with 10 CFR 73.55(c)(3), the licensee shall establish, maintain, and implement a PSP which describes how the performance objective and requirements set forth in this section will be implemented.
Consistent with 10 CFR 73.55(e)(1 )(ii), the licensee shall describe in the security plan, physical barriers, barrier systems, and their functions within the physical protection program.
- b. Describe how the openings in this OCA barrier are secured and monitored to prevent exploitation of the openings.
Regulatory Basis:
In accordance with 10 CFR 73.55(e)(4), consistent with the stated function to be performed, openings in any barrier or barrier system established to meet the requirements of this section must be secured and monitored to prevent exploitation of the opening.
- c. Describe how vehicle and material access through this OCA barrier is controlled.
Regulatory Basis:
In accordance with 10 CFR 73.55(g)(1), consistent with the function of each barrier or barrier system, the licensee shall control personnel, vehicle, and material access, as applicable, at each access control point in accordance with the physical protection program design requirements of 10 CFR 73.55, and 10 CFR 73.55(b).
- d. Describe the personnel, vehicle and material access control portals within this OCA barrier, specifically whether they are located outside of, or co-located with, the OCA barrier.
Regulatory Basis:
Consistent with 10 CFR 73.55(g)(1)(i)(A), access control portals must be located outside of, or concurrent with, the physical barrier system through which it controls access.
- e. Describe how the locking devices, intrusion detection equipment, and surveillance equipment implemented at the OCA personnel, vehicle, and material access control portals meet regulatory requirements.
Regulatory Basis:
Consistent with 10 CFR 73.55(g)(1 )(i)(8) , access control portals must be equipped with locking devices, intrusion detection equipment, and surveillance equipment consistent with the intended function.
-3
- f. Describe the search procedures that have been implemented at OCA access control points within this OCA barrier.
Regulatory Basis:
Consistent with 10 CFR 73.55(h)(2)(i), where the licensee has established physical barriers in the owner controlled area, the licensee shall implement search procedures for access control points in the barrier.
- g. Describe how the intrusion detection and assessment equipment at this OCA barrier provides, at all times, the capability to detect and assess unauthorized persons and facilitate the effective implementation of the protective strategy.
Regulatory Basis:
Consistent with 10 CFR 73.55(i)(1), the licensee shall establish and maintain intrusion detection and assessment systems that satisfy the design requirements of 10 CFR 73.55(b) and provide, at all times, the capability to detect and assess unauthorized persons and facilitate the effective implementation of the licensee's protective strategy.
- h. Describe how the intrusion detection and assessment equipment at this OCA barrier is designed to annunciate and display concurrently in two continuously staffed onsite alarm stations.
Regulatory Basis:
Consistent with 10 CFR 73.55(i)(2), intrusion detection equipment must annunciate and assessment equipment shall display concurrently, in at least two continuously staffed onsite alarm stations, at least one of which must be protected in accordance with the requirements of the central alarm station within this section.
- i. Describe how the intrusion detection and assessment systems associated with this OCA barrier are designed to: 1) provide visual and audible annunciation of an alarm; 2) provide a visual display from which assessment of the detected activity can be made; 3) ensure that the annunciation of an alarm indicates the type and location of the alarm; 4) ensure that alarm devices to include transmission lines to annunciators are tamper indicating and self-checking; 5) provide an automatic indication when the alarm system or a component of the alarm system fails, or when the system is operating on the back-up power supply; and 6) support the initiation of a timely response in accordance with the security plans, protective strategy, and associated implementing procedures.
Regulatory Basis:
Consistent with 10 CFR 73.55(i)(3)(i) through (i)(3)(vi), the licensee's intrusion detection and assessment systems must be designed to: (i) provide visual and audible annunciation of the alarm; (ii) provide a visual display from which assessment of the detected activity can be made; (iii) ensure that annunciation of an alarm indicates the type and location of the alarm; (iv) ensure that alarm devices to include transmission lines to annunciators are tamper indicating and
- 4 self-checking; (v) provide an automatic indication when the alarm system or a component of the alarm system fails, or when the system is operating on the back-up power supply; and (vi) support the initiation of a timely response in accordance with the security plans, protective strategy, and associated implementing procedures.
- j. Describe how unattended openings that intersect this OCA barrier have been addressed to detect exploitation by surreptitious bypass.
Regulatory Basis:
Consistent with 10 CFR 73.55(i)(5)(iii), unattended openings that intersect a security boundary such as underground pathways must be protected by a physical barrier and monitored by intrusion detection equipment or observed by security personnel at a frequency sufficient to detect exploitation.
- k. Describe the type of illumination assets that are implemented to ensure the area of this OCA barrier is provided with the illumination necessary to satisfy the design requirements of 10 CFR 73.55(b) and implement the protective strategy.
Regulatory Basis:
Consistent with 10 CFR 73.55(i)(6)(i), the licensee shall ensure that all areas of the facility are provided with illumination necessary to satisfy the design requirements of 10 CFR 73.55(b) and implement the protective strategy.
I. Describe how the implementation of this OCA barrier and associated intrusion detection and assessment equipment is included in security program reviews.
Regulatory Basis:
Consistent with 10 CFR 73.55(m)(1}, as a minimum the licensee shall review each element of the physical protection program at least every 24 months.
- m. Describe how this OCA barrier and associated intrusion detection and assessment equipment is included in the site maintenance, testing, and calibration program and the intervals that the security equipment (intrusion detection and assessment, access control, and if applicable search equipment) at the security OCA are tested for operability and performance.
Regulatory Basis:
Consistent with 10 CFR 73.55(n)(1)(i), the licensee shall establish, maintain, and implement a maintenance, testing and calibration program to ensure that security systems and equipment, including secondary power supplies and uninterruptible power supplies, are tested for operability and performance at predetermined intervals, maintained in an operable condition, and are capable of performing their intended function.
- n. Describe the compensatory measures that are implemented when the intrusion detection, assessment, access control, and if applicable search equipment at this OCA barrier fails or becomes degraded.
- 5 Regulatory Basis:
Consistent with 10 CFR 73.55(n)(1 )(v), licensees shall implement compensatory measures that ensure the effectiveness of the onsite physical protection program when there is a failure or degraded operation of security-related component or equipment.
Additionally, appropriate changes should be made during the next revision of the site's security plans to ensure the language clearly describes the intended function of this DCA barrier as it pertains to the implementation of certain aspects of the physical protection program (e.g., access control, initiation of the protective strategy, etc.) in accordance with 10 CFR 73.55(e)(1)(ii).
Regulatory Basis:
Consistent with 10 CFR 73.55(c)(3), the licensee shall establish, maintain, and implement a PSP which describes how the performance objective and requirements set forth in this section will be implemented.
Consistent with 10 CFR 73.55(e)(1 )(ii), the licensee shall describe in the security plan, physical barriers, barrier systems, and their functions within the physical protection program.
- 2. Section 5.9 of the SCP includes a description of protective measures for an Independent Spent Fuel Storage Installation (ISFSI). This section refers back to Section 18 of the PSP. These two sections appear to be in contradiction. Describe the protection measures used for the ISFSI. Do the measures described in Section 5.9 come from the measures described in Section 18 of the PSP?
Additionally, the licensee should make appropriate changes during the next revision of Calvert Cliffs' PSP and SCP to ensure the language clearly describes what the protection measures are for the ISFSI in accordance with 10 CFR 73.55(c)(3) and (c)(5).
Describe how the response assets that are designated within Section 18 of the PSP implement the duties and responsibilities for the protection of both locations during simultaneous events.
October 17, 2012 Mr. George H. Gellrich, Vice President Calvert Cliffs Nuclear Power Plant, LLC Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702
SUBJECT:
CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NOS. 1 AND 2 REQUEST FOR ADDITIONAL INFORMATION REGARDING THE PHYSICAL SECURITY PLAN, TRAINING AND QUALIFICATION PLAN, AND SAFEGUARDS CONTINGENCY PLAN, REVISION 8
Dear Mr. Gellrich:
By letter dated August 2, 2012, Calvert Cliffs Nuclear Power Plant, LLC (the licensee) submitted the Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 8 for Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2.
The Nuclear Regulatory Commission staff is reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). On October 3, 2012, NRC staff and the licensee participated in a teleconference to discuss the questions within a draft copy of the RAI.
The NRC staff is requesting a response to the RAI by November 2, 2012.
If you have any questions regarding this issue, please contact me at (301) 415-1016.
Sincerely, Ira!
Nadiyah S. Morgan, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-317 and 50-318
Enclosure:
RAJ cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsN rrDorlLpl1-1 RidsNrrPMCalvertCliffs LPL 1-1 R/F RidsN rrLAKGoldstein RidsAcrsAcnw_MailCTR RidsNrrDorlDpr RidsRgn1 MailCenter RidsNsirDsp RidsOGCMailCenter RCosta, NSIR JCrockett, NSIR ARoundtree, NSIR ADAMS ACCESSION NO: ML12289A081 *Via email LPLI-1/PM LPLI-1/LA NSIR/DSP/RSLB/BC LPLI-1IBC NMor an KGoldstein* RFelts GWilson 10/16/12 10/16/12 10103/2012 10/17/12 OFFICIAL RECORDS COPY